CN109667225A - A kind of interim steel pipe support base steel plate installation leveling structure and method - Google Patents

A kind of interim steel pipe support base steel plate installation leveling structure and method Download PDF

Info

Publication number
CN109667225A
CN109667225A CN201710953034.6A CN201710953034A CN109667225A CN 109667225 A CN109667225 A CN 109667225A CN 201710953034 A CN201710953034 A CN 201710953034A CN 109667225 A CN109667225 A CN 109667225A
Authority
CN
China
Prior art keywords
steel
steel plate
steel pipe
pipe support
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710953034.6A
Other languages
Chinese (zh)
Other versions
CN109667225B (en
Inventor
刘家铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710953034.6A priority Critical patent/CN109667225B/en
Priority claimed from CN201710953034.6A external-priority patent/CN109667225B/en
Publication of CN109667225A publication Critical patent/CN109667225A/en
Application granted granted Critical
Publication of CN109667225B publication Critical patent/CN109667225B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of interim steel pipe support base steel plate installation leveling structure, including supporting steel pipe, built-in fitting, it is characterised in that: the supporting steel pipe (1) is equipped with steel tube base steel plate (2);Supporting steel pipe material diameter 609*10mm;The built-in fitting is armored concrete pre-embedded steel slab (4), and pre-embedded steel slab, which does not reach, is horizontally mounted requirement, and there are certain tilt angle, pre-embedded steel slab bottom is equipped with anchor bar (6);Wherein: being plugged with iron chock (3) between steel tube base steel plate free end top and pre-embedded steel slab (4) surface, and be also plugged with iron chock (3) in steel tube base steel plate free end two sides.The present invention has interim steel pipe support base steel plate installation leveling structure simple, easy for construction, using the time suitable for interim steel pipe support is 5-6 months, only pre-embedded steel slab when Equipment Foundations are constructed, pre-embedded bolt is not needed, installation accuracy is not high, quick for installation, dismounting conveniently, is saved engineering cost and is improved the advantages of using cost performance.

Description

A kind of interim steel pipe support base steel plate installation leveling structure and method
Technical field
The present invention relates to installation technology of steel structure field, specifically, being a kind of interim steel pipe support base steel plate installation Leveling method.
Background technique
In Steel Structure Installation engineering, many interim steel pipe support mounting structures are used in reinforced concrete foundation Pre-embedded steel slab and bolt pattern.The pedestal prepared screw-bolt hole of steel pipe support will be matched with pre-embedded bolt, and tighten ability with nut It firmly installs.But this steel pipe support installation specification pre-embedded bolt is pre-buried more accurate, and while installing takes a lot of work expense When, especially interim steel pipe support is not grown again using the time, generally only 5-6 months, relatively low using sexual valence.
Therefore known interim steel pipe support base steel plate installation leveling structure there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of safe and reliable interim steel pipe support base steel plate installation leveling structure.
It is another object of the present invention to propose that a kind of safe and reliable interim steel pipe support base steel plate installs levelling side Method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of interim steel pipe support base steel plate installation leveling structure, including supporting steel pipe, built-in fitting, it is characterised in that:
The supporting steel pipe is equipped with steel tube base steel plate;Supporting steel pipe material diameter 609*10mm;
The built-in fitting is armored concrete pre-embedded steel slab, and pre-embedded steel slab, which does not reach, is horizontally mounted requirement, and there are certain to incline Rake angle, pre-embedded steel slab bottom are equipped with anchor bar;
Wherein: steel tube base steel plate is in a horizontal state, and one end is contacted with pre-embedded steel slab surface, and the other end is vacantly arranged, steel pipe It is plugged with iron chock between pedestal steel plate free end top and pre-embedded steel slab surface, and is also filled in steel tube base steel plate free end two sides There is iron chock, reaches the interim leveling structure between steel tube base steel plate and pre-embedded steel slab.
Interim steel pipe support base steel plate installation leveling structure of the invention can also using technical measures below come into One step is realized.
Interim steel pipe support base steel plate above-mentioned installs leveling structure, wherein the steel tube base steel plate is circular steel Plate, diameter 659*10mm.
Interim steel pipe support base steel plate above-mentioned installs leveling structure, wherein the steel tube base steel plate hanging part is filled out Enter medium coarse sand.
Interim steel pipe support base steel plate above-mentioned installs leveling structure, wherein the medium coarse sand is clean, without organic Object.
Interim steel pipe support base steel plate above-mentioned installs leveling structure, wherein the iron chock and pre-embedded steel slab surface point Solid welding is fixed.
Interim steel pipe support base steel plate above-mentioned installs leveling structure, wherein the pre-embedded steel slab specification is 709*709* 20mm。
A kind of interim steel pipe support base steel plate installation leveling method, it is characterised in that the following steps are included:
A, steel pipe support pedestal steel plate is made
It is vertically welded in supporting steel pipe material pedestal steel plate center admittedly with diameter 609*10mm steel pipe, steel tube base steel plate is circular steel Plate, diameter 659*10mm;
B, pre-embedded steel slab is made
Pre-embedded steel slab specification is 709*709*20mm, and several anchor bars are equipped with below pre-embedded steel slab, and anchor bar is φ 20mm Round steel;Pre-embedded steel slab is cast in reinforced concrete foundation;
C, prefabricated several iron chocks (3)
It carries out being cut into several iron chocks with 50mm thick steel plate spare;
D, interim steel pipe support base steel plate installation is levelling
After reinforced concrete foundation reaches some strength, prefabricated steel pipe support base steel plate is hung into pre-embedded steel slab with crane On, contact steel pipe support pedestal steel plate one end with pre-embedded steel slab (4) surface, the other end vacantly forms certain inclination angle, is carved with iron It is levelling that son fills in inclination angle, to be adjusted according to reinforced concrete foundation and pre-embedded steel slab flatness, when with medium coarse sand choker block, From filling among the circumferential pedestal of steel pipe support pedestal four, and clog closely knit, to prevent iron chock to be displaced, after correction plug is flat, iron is carved Son is fixed with pre-embedded steel slab spot welding, and it is levelling to complete interim steel pipe support base steel plate installation.
Interim steel pipe support base steel plate installation leveling method of the invention can also using technical measures below come into One step is realized.
Method above-mentioned, wherein the reinforced concrete foundation intensity reach 75% can be by prefabricated steel pipe support base steel Plate is hung on pre-embedded steel slab, and it is levelling to carry out interim steel pipe support base steel plate installation.
After adopting the above technical scheme, interim steel pipe support base steel plate installation leveling structure of the invention and method have Following advantages:
1, interim steel pipe support base steel plate installation leveling structure is simple, easy for construction;
2, construction quality is safe and reliable, and being suitable for interim steel pipe support using the time is 5-6 months, and Equipment Foundations are only pre- when constructing Steel plate is buried, pre-embedded bolt is not needed, installation accuracy is not high, and quick for installation, dismounting is conveniently;
3, engineering cost is saved, to improve using cost performance.
Detailed description of the invention
Fig. 1 is that the interim steel pipe support base steel plate of the embodiment of the present invention installs leveling structure schematic diagram;
Fig. 2 is the cross-sectional view of A-A in Fig. 1.
In figure: 1 steel pipe, 2 steel tube base steel plates, 3 iron chocks, 4 pre-embedded steel slabs, 5 concrete, 6 pre-embedded steel slab anchor bars, 7 medium coarse sands.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Interim steel pipe support base steel plate of the invention installs leveling structure, including supporting steel pipe, built-in fitting.
Referring now to Fig. 1, Fig. 1 is the structural schematic diagram of XX of the invention, and Fig. 2 is the cross-sectional view of A-A in Fig. 1.As schemed Show, the supporting steel pipe 1 is equipped with steel tube base steel plate 2;Supporting steel pipe material diameter 609*10mm.
The built-in fitting is armored concrete pre-embedded steel slab 4, and pre-embedded steel slab, which does not reach, is horizontally mounted requirement, is existed certain Tilt angle, pre-embedded steel slab bottom be equipped with anchor bar 6, anchor bar be φ 20mm round steel.The steel tube base steel plate is Circular steel plate, diameter 659*10mm.The pre-embedded steel slab specification is 709*709*20mm.
Wherein: steel tube base steel plate 2 is in a horizontal state, and one end is contacted with 4 surface of pre-embedded steel slab, and the other end is vacantly set It sets, steel tube base steel plate free end top and pre-embedded steel slab are plugged with iron chock 3 between 4 surface, and hanging in steel tube base steel plate End two sides are also plugged with iron chock 3, reach the interim leveling structure between steel tube base steel plate 2 and pre-embedded steel slab 4.The steel pipe bottom Seat steel plate hanging part inserts medium coarse sand, and medium coarse sand is clean, is free of organic matter.The iron chock 3 and 4 surface point of pre-embedded steel slab Solid welding is fixed.
Embodiment 2
Interim steel pipe support base steel plate of the invention installs leveling method, construction process: reinforced concrete foundation and pre-buried steel Plate is constructed → measured, and calculating sand bedding course screed-coat thickness is (unsuitable for built-in fitting flatness and actual elevation → using iron chock pre- levelling → Greater than 50mm) → it is levelling with medium coarse sand and reach required screed-coat thickness → compacting medium coarse sand → steel pipe support lifting → adjustment hang down Straight degree → adjustment flatness → plug reality medium coarse sand → by iron chock and pre-embedded steel slab spot welding → reinforcing.
Interim steel pipe support base steel plate installation leveling method of the invention the following steps are included:
A, steel pipe support pedestal steel plate is made
It is vertically welded in supporting steel pipe material pedestal steel plate center admittedly with diameter 609*10mm steel pipe, steel tube base steel plate is circular steel Plate, diameter 659*10mm.
B, pre-embedded steel slab is made
Pre-embedded steel slab specification is 709*709*20mm, and several anchor bars are equipped with below pre-embedded steel slab, and anchor bar is φ 20mm Round steel;Pre-embedded steel slab is cast in reinforced concrete foundation.
C, prefabricated several iron chocks 3
It carries out being cut into several iron chocks with 50mm thick steel plate spare.
D, interim steel pipe support base steel plate installation is levelling
After reinforced concrete foundation reaches some strength, prefabricated steel pipe support base steel plate is hung into pre-embedded steel slab with crane On, contact steel pipe support pedestal steel plate one end with 4 surface of pre-embedded steel slab, the other end vacantly forms certain inclination angle, carves son with iron It is levelling to fill in inclination angle.It to be adjusted according to reinforced concrete foundation and pre-embedded steel slab flatness, it, be from when with medium coarse sand choker block Filling among the circumferential pedestal of steel pipe support pedestal four, and clog it is closely knit, to prevent iron chock to be displaced, after correction plug is flat, Tie Qiezi It is fixed with pre-embedded steel slab spot welding, it is levelling to complete interim steel pipe support base steel plate installation.The reinforced concrete foundation intensity reaches Prefabricated steel pipe support base steel plate can be hung on pre-embedded steel slab to 75%, carry out interim steel pipe support base steel plate installation It is levelling.
The present invention has substantive distinguishing features and significant technological progress, interim steel pipe support base steel plate installation of the invention Leveling structure and method, only pre-embedded steel slab when Equipment Foundations are constructed, do not need pre-embedded bolt, and installation accuracy is not high, quick for installation, It is convenient to remove, and efficiently solves the Fast Installation of interim steel pipe support, and after the completion of construction, can be convenient dismounting, thus Achieve the purpose that rapid construction.
Interim steel pipe support base steel plate installation leveling structure of the invention and method are scientific and educational park PPP, Henan Ruzhou It is used in mesh spring breeze Lu Yiqiao, spring breeze Lu Erqiao box girder construction temporary support engineering.One bridge span arrangement of spring breeze road are as follows: 4 × 25m is prestressed concrete continuous box girder, full-bridge totally one, overall length 113.16m, 25 meters wide (5.5 meters of+14 meters of the pavement rows of bridge + 5.5 meters of lane pavement), single width bridge arrangement.
Two bridge span arrangement of spring breeze road are as follows: (4 × 25+3 × 25) m is prestressed concrete continuous box girder, full-bridge two Connection, overall length 187.24m, bridge is 25 meters wide (5.5 meters of+14 meters of pavements+5.5 meters of pavements of runway), single width bridge arrangement.
Using interim steel pipe support base steel plate installation leveling structure of the invention and method, significant effect, in construction Cost of labor has been saved to install, removing interim steel pipe support, has obtained the favorable comment of Construction Party and management.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (8)

1. a kind of interim steel pipe support base steel plate installs leveling structure, including supporting steel pipe, built-in fitting, it is characterised in that:
The supporting steel pipe (1) is equipped with steel tube base steel plate (2);Supporting steel pipe material diameter 609*10mm;
The built-in fitting is armored concrete pre-embedded steel slab (4), and pre-embedded steel slab, which does not reach, is horizontally mounted requirement, and there are certain Tilt angle, pre-embedded steel slab bottom are equipped with anchor bar (6);
Wherein: steel tube base steel plate (2) is in a horizontal state, and one end is contacted with pre-embedded steel slab (4) surface, and the other end is vacantly set It sets, is plugged with iron chock (3) between steel tube base steel plate free end top and pre-embedded steel slab (4) surface, and in steel tube base steel plate Free end two sides are also plugged with iron chock (3), reach the interim leveling structure between steel tube base steel plate (2) and pre-embedded steel slab (4).
2. interim steel pipe support base steel plate as described in claim 1 installs leveling structure, which is characterized in that the steel pipe bottom Seat steel plate is circular steel plate, diameter 659*10mm.
3. interim steel pipe support base steel plate as described in claim 1 installs leveling structure, which is characterized in that the steel pipe bottom Seat steel plate hanging part inserts medium coarse sand.
4. interim steel pipe support base steel plate as claimed in claim 3 installs leveling structure, which is characterized in that the medium coarse sand It is clean, be free of organic matter.
5. interim steel pipe support base steel plate as described in claim 1 installs leveling structure, which is characterized in that the iron chock (3) fixed with pre-embedded steel slab (4) surface point solid welding.
6. interim steel pipe support base steel plate as described in claim 1 installs leveling structure, which is characterized in that the pre-buried steel Plate gauge lattice are 709*709*20mm.
7. a kind of steel pipe support base steel plate as described in claim 1 interim installs leveling method, it is characterised in that including with Lower step:
A, steel pipe support pedestal steel plate is made
It is vertically welded in supporting steel pipe material pedestal steel plate center admittedly with diameter 609*10mm steel pipe, steel tube base steel plate is circular steel Plate, diameter 659*10mm;
B, pre-embedded steel slab is made
Pre-embedded steel slab specification is 709*709*20mm, and several anchor bars are equipped with below pre-embedded steel slab, and anchor bar is φ 20mm Round steel;Pre-embedded steel slab is cast in reinforced concrete foundation;
C, prefabricated several iron chocks (3)
It carries out being cut into several iron chocks with 50mm thick steel plate spare;
D, interim steel pipe support base steel plate installation is levelling
After reinforced concrete foundation reaches some strength, prefabricated steel pipe support base steel plate is hung into pre-embedded steel slab with crane On, contact steel pipe support pedestal steel plate one end with pre-embedded steel slab (4) surface, the other end vacantly forms certain inclination angle, is carved with iron It is levelling that son fills in inclination angle, to be adjusted according to reinforced concrete foundation and pre-embedded steel slab flatness, when with medium coarse sand choker block, From filling among the circumferential pedestal of steel pipe support pedestal four, and clog closely knit, to prevent iron chock to be displaced, after correction plug is flat, iron is carved Son is fixed with pre-embedded steel slab spot welding, and it is levelling to complete interim steel pipe support base steel plate installation.
8. interim steel pipe support base steel plate as claimed in claim 7 installs leveling method, which is characterized in that the reinforcing bar is mixed Solidifying earth foundation intensity, which reaches 75%, to hang onto prefabricated steel pipe support base steel plate on pre-embedded steel slab, carry out interim steel pipe branch It is levelling to support the installation of pedestal steel plate.
CN201710953034.6A 2017-10-13 Temporary steel pipe support base steel plate installation leveling structure and method Active CN109667225B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710953034.6A CN109667225B (en) 2017-10-13 Temporary steel pipe support base steel plate installation leveling structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710953034.6A CN109667225B (en) 2017-10-13 Temporary steel pipe support base steel plate installation leveling structure and method

Publications (2)

Publication Number Publication Date
CN109667225A true CN109667225A (en) 2019-04-23
CN109667225B CN109667225B (en) 2024-07-09

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012057430A (en) * 2010-09-13 2012-03-22 Sumitomo Mitsui Construction Co Ltd Structure and method for connecting pile and steel column
CN204662909U (en) * 2015-04-04 2015-09-23 余姚市东华电器塑料厂 A kind of novel laying ceramic tile screeder
CN105904203A (en) * 2016-07-06 2016-08-31 莱芜钢铁集团有限公司 Levelling device for mounting equipment
CN206308984U (en) * 2016-12-26 2017-07-07 张福杰 A kind of floor tile balance element
CN207295497U (en) * 2017-10-13 2018-05-01 五冶集团上海有限公司 A kind of interim steel pipe support base steel plate installation leveling structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012057430A (en) * 2010-09-13 2012-03-22 Sumitomo Mitsui Construction Co Ltd Structure and method for connecting pile and steel column
CN204662909U (en) * 2015-04-04 2015-09-23 余姚市东华电器塑料厂 A kind of novel laying ceramic tile screeder
CN105904203A (en) * 2016-07-06 2016-08-31 莱芜钢铁集团有限公司 Levelling device for mounting equipment
CN206308984U (en) * 2016-12-26 2017-07-07 张福杰 A kind of floor tile balance element
CN207295497U (en) * 2017-10-13 2018-05-01 五冶集团上海有限公司 A kind of interim steel pipe support base steel plate installation leveling structure

Similar Documents

Publication Publication Date Title
US8875471B2 (en) Method and apparatus for lifting and leveling a concrete panel
CN107542017A (en) A kind of assembled road construction method
US11976431B2 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
CN103498425A (en) Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof
CN110863498A (en) Deep foundation pit combined supporting construction method next to subway station
CN104831639A (en) Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam
CN106930315B (en) A kind of moving tower crane foundation structure and construction method
CN113863166B (en) Reverse order construction method for swivel-first and mounting support
CN112879026A (en) Temporary backrest support structure for rectangular pipe jacking construction and construction method thereof
CN210712590U (en) Variable-gradient jacking transformation construction system for curved continuous beam bridge
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN111851569A (en) Gantry crane track foundation beam and construction method thereof
CN117166510A (en) Deep large-diameter open caisson construction method
CN207295497U (en) A kind of interim steel pipe support base steel plate installation leveling structure
CN116608323A (en) Quick construction equipment and construction method for fully assembled concrete drainage pipeline
CN109667225A (en) A kind of interim steel pipe support base steel plate installation leveling structure and method
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN113152978B (en) Hydraulic self-lifting construction method based on inverted cone water tank
CN112227369B (en) Cover-excavation top-down construction permanent steel pipe stand column installation construction method
CN201915420U (en) Foundation of temporary gate building
CN114277672A (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN208792366U (en) A kind of prefabrication elevator shaft foundation pit
JP3599902B2 (en) Structure and method of constructing structure using the same
CN103184763B (en) Method for installing kiln tail steel structure framework on large-sized cement clinker production line
CN112482316A (en) Gate dam gate machine beam construction method and gate dam gate machine beam structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant