CN109660421A - Method, apparatus, server and the storage medium of flexible scheduling resource - Google Patents

Method, apparatus, server and the storage medium of flexible scheduling resource Download PDF

Info

Publication number
CN109660421A
CN109660421A CN201811261924.1A CN201811261924A CN109660421A CN 109660421 A CN109660421 A CN 109660421A CN 201811261924 A CN201811261924 A CN 201811261924A CN 109660421 A CN109660421 A CN 109660421A
Authority
CN
China
Prior art keywords
performance data
server
test
resource
pressure test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811261924.1A
Other languages
Chinese (zh)
Inventor
李泽阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201811261924.1A priority Critical patent/CN109660421A/en
Publication of CN109660421A publication Critical patent/CN109660421A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/16Threshold monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3409Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment for performance assessment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0893Assignment of logical groups to network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters

Abstract

A kind of method of flexible scheduling resource, comprising: generate pressure test file, wherein the pressure test file includes project to be measured and test case information;Pressure test is executed according to the pressure test file;According to the project to be measured and test case information, the performance data of the test case during the test is acquired;And the performance data is monitored and analyzes, and judge whether that the scalable appearance of elasticity is needed to adjust according to the performance data.The present invention also provides device, server and the storage mediums of a kind of flexible scheduling resource.It is able to carry out quick response storage resilient expansion demand through the invention, carries out scalable resource, safeguards system stable operation in time.

Description

Method, apparatus, server and the storage medium of flexible scheduling resource
Technical field
The present invention relates to the field of test technology, and in particular to a kind of method, apparatus of flexible scheduling resource, server and deposits Storage media.
Background technique
At present for financial testing field, or even industry is entirely tested, in the case where high concurrent quotes scene, imperfect bullet Property scheduling resource solution.Pressure test is usually to test the oncurrent processing ability of system, passes through client The monitoring situation of response time and server end judges whether system reaches system performance index.Existing pressure test scheme In, when user, which largely accesses, causes peak flow situation, in order to guarantee the normal operation of business, the content of server can be obtained With the service conditions such as CPU, server is scheduled or is disposed manually to distribute resource.But in most cases, due to manual There is the possibility for not having real-time and flexible scheduling in scheduling, can bring the operating condition of unpredictable business and need to resource The defect for the quick response asked.
Summary of the invention
In view of the foregoing, it is necessary to propose method, apparatus, server and the storage medium of a kind of flexible scheduling resource, It is able to carry out quick response, timely scalable resource, safeguards system stable operation.
The first aspect of the present invention provides a kind of method of flexible scheduling resource, which comprises
Generate pressure test file, wherein the pressure test file includes project to be measured and test case information;
Pressure test is executed according to the pressure test file;
According to the project to be measured and test case information, the performance number of the test case during the test is acquired According to;And
The performance data is monitored and analyzed, and is judged whether that the scalable appearance of elasticity is needed to adjust according to the performance data.
Preferably, before executing pressure test according to the pressure test file, the method for the flexible scheduling resource Further include the steps that configuring production environment and pressure surveys request data.
Preferably, described to judge whether that the method for needing the scalable appearance adjustment of elasticity includes: according to the performance data
Obtain the performance data obtained according to service operation situation and empirical value in actual production upper limit threshold and Lower threshold;
When the performance data in test process is greater than upper limit threshold, elastic dilatation adjustment is carried out;
When the performance data in test process is less than lower threshold, elastic capacity reducing adjustment is carried out;
When the performance data in test process is more than or equal to the lower threshold and is less than or equal to the upper limit threshold, protect Hold business normal operation.
Preferably, when the performance data when in test process is greater than the upper limit threshold, elastic dilatation adjustment is carried out The step of include: the one group of server resource for increasing and being made of primary server and at least one dependent server.
Preferably, described to monitor and include: the step of analyzing the performance data
Using the dependent server as from node, the corresponding primary server of the dependent server is as host node;
The performance data and idling-resource letter for periodically sending the dependent server to the host node from node Breath.
Preferably, the step of needing elastic scalable appearance adjustment, is judged whether according to the performance data further include: according to institute The idling-resource for stating performance data and the slave node obtained is screened from node.
Preferably, when the performance data in test process is greater than the upper limit threshold, retain idle central processor CPU Number be greater than or equal to actual production in business execute needed for central processor CPU number and the memory of free time money Source is greater than or equal to the slave node that business in actual production executes required memory source;
When the performance data in test process is less than the lower threshold, the central processor CPU of free time is deleted It is small that number is less than the number of central processor CPU needed for business execution and/or the memory source of the free time in actual production The slave node of memory source needed for business executes in actual production.
The second aspect of the present invention provides a kind of device of flexible scheduling resource, and described device includes:
Press module, for generating pressure test file, wherein the pressure test file includes project to be measured and test Example information;
Execution module, for executing pressure test according to the pressure test file;
Data acquisition module, for acquiring the test case and surveying according to the project to be measured and test case information Performance data during examination;And
Monitoring module judges whether to need bullet for monitoring and analyzing the performance data, and according to the performance data Property the adjustment of scalable appearance.
The third aspect of the present invention provides a kind of server, and the server includes processor and memory, the processing The method that device is used to realize the flexible scheduling resource when executing the computer program stored in the memory.
The fourth aspect of the present invention provides a kind of computer readable storage medium, deposits on the computer readable storage medium Contain computer program, the computer program realizes flexible scheduling resource method when being executed by processor.
Method, apparatus, server and the storage medium of flexible scheduling resource of the present invention, the method includes generating Pressure test file, wherein the pressure test file includes project to be measured and test case information;According to the pressure test File executes pressure test;According to the project to be measured and test case information, the test case is acquired during the test Performance data;And the performance data is monitored and analyzes, and judge whether to need the scalable appearance of elasticity according to the performance data Adjustment.Realization carries out scalable appearance automatically, has very strong practicability and scalability.For burst service peak and burst flow energy It is enough to be coped with well, ensure that business operates normally, that is to say, that can for peak flow and it is how concurrent situations such as occur When, carry out quick response, timely scalable resource, safeguards system stable operation.Reduction system is because of high concurrent, high flow capacity or burst flow Service disconnection caused by amount.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the application environment architecture diagram for the method for flexible scheduling resource that the embodiment of the present invention one provides.
Fig. 2 is the flow chart of the method for flexible scheduling resource provided by Embodiment 2 of the present invention.
Fig. 3 is the function mould in the device preferred embodiment for the flexible scheduling resource of the present invention that the embodiment of the present invention three provides Block figure.
Fig. 4 is the schematic diagram for the server that the embodiment of the present invention four provides.
The present invention that the following detailed description will be further explained with reference to the above drawings.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real Applying example, the present invention will be described in detail.It should be noted that in the absence of conflict, the embodiment of the present invention and embodiment In feature can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, described embodiment is only It is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Description and claims of this specification and term " first " in above-mentioned attached drawing, " second " and " third " etc. are For distinguishing different objects, not for description particular order.In addition, term " includes " and their any deformations, it is intended that Non-exclusive include in covering.Such as the process, method, system, product or equipment for containing a series of steps or units do not have It is defined in listed step or unit, but optionally further comprising the step of not listing or unit, or optionally further comprising For the intrinsic other step or units of these process, methods, product or equipment.
The method of the flexible scheduling resource of the embodiment of the present invention is applied by N group server and by network and the N group In the hardware environment that the client that server is attached is constituted.One group in the N group server includes a main service Device (master) and at least one dependent server (slave) for being subordinated to the primary server.The network includes but unlimited In: wide area network, Metropolitan Area Network (MAN) or local area network.The method of the flexible scheduling resource of the embodiment of the present invention can be executed by server, It can also be executed by client;It can also be and executed jointly by server and client side.
The server for needing to carry out the method for flexible scheduling resource can directly collect cost hair on the server The function of flexible scheduling resource provided by bright method, or installation is for realizing the client of method of the invention.For another example, Method provided by the present invention can also be in the form of Software Development Kit (Software Development Kit, SDK) It operates in the equipment such as server, the interface of flexible scheduling resource function is provided in the form of SDK, server or other equipment are logical Crossing the interface provided can be realized flexible scheduling resource function.
Embodiment one
As shown in fig.1, the application environment frame of the method for flexible scheduling resource provided for the embodiment of the present invention one Composition.
The method of flexible scheduling resource of the invention is applied in the environment of client 1 and the composition of server 2.The service It is communicated to connect between device 2 and client 1 by wired or wireless network.The cable network can appointing for traditional wire communication What type, such as internet, local area network.Any type that the wireless network can communicate for conventional wireless, such as radio, Wireless Fidelity (Wireless Fidelity, WIFI), honeycomb, satellite, broadcast etc..Wireless communication technique may include, but unlimited In global system for mobile communications (Global System for Mobile Communications, GSM), general grouped wireless Business (General Packet Radio Service, GPRS), CDMA (Code Division Multiple Access, CDMA), wideband code division multiple access (W-CDMA), CDMA2000, IMT single carrier (IMT Single Carrier), enhancing Type data rate GSM evolution (Enhanced Data Rates for GSM Evolution, EDGE), Long Term Evolution (Long-Term Evolution, LTE), senior long term evolution technology, time-division Long Term Evolution (Time-Division LTE, TD-LTE), the 5th third-generation mobile communication technology (5G), high performance radio local area network (High Performance Radio Local Area Network, HiperLAN), high performance radio wide area network (High Performance Radio Wide Area Network, HiperWAN), local multiple spot distribute business (Local Multipoint Distribution Service, LMDS), full micro-wave access global inter communication (Worldwide Interoperability for Microwave Access, WiMAX), ZigBee protocol (ZigBee), bluetooth, orthogonal frequency division multiplexi (Flash Orthogonal Frequency-Division Multiplexing, Flash-OFDM), large capacity space-division multiple access (High Capacity Spatial Division Multiple Access, HC-SDMA), Universal Mobile Telecommunications System (Universal Mobile Telecommunications System, UMTS), Universal Mobile Telecommunications System time division duplex (UMTS Time-Division Duplexing, UMTS-TDD), evolved high-speed packet access (Evolved High Speed Packet Access, HSPA +), TD SDMA (Time Division Synchronous Code Division Multiple Access, TD-SCDMA), evolution data optimization (Evolution-Data Optimized, EV-DO), Digital Enhanced Cordless Communications (Digital Enhanced Cordless Telecommunications, DECT) and other.
The client 1 may include personal computer (Personal Computer, PC), personal digital assistant (Personal Digital Assistant, PDA), radio hand-held equipment, tablet computer (Tablet Computer), intelligence Mobile phone etc..Above-mentioned client 1 is only citing, and non exhaustive, including but not limited to above-mentioned client.The client 1 can be with User carries out human-computer interaction by modes such as keyboard, mouse, remote controler, touch tablet or voice-operated devices.
In the present embodiment, application program is installed in the client 1, when user needs access application, needs Access request is sent to server 2, the server 2 returns to the application program page to visitor after responding the access request Family end 1.It is understood that the client 1 may include it is multiple, multiple client 1 can by network to server 2 send out Magnanimity access request is sent, for example, a large amount of clients 1 can when electric business platform (such as Jingdone district and day cat) carries out 618 and double 11 big rush To send magnanimity access request to server 2 by network.
The application program can be mounted to any third-party application in the operating system of client 1, such as wechat, micro- Rich, iqiyi.com, youku.com, health 160, Jingdone district, Baidu's glutinous rice, Baidu map, KuGoo music, Netease's cloud music, mobile phone Taobao etc. Using.This programme is not construed as limiting this.Wherein, the operating system includes android system, Saipan system, Windows system System, ios (Mobile operating system of Apple Inc.'s exploitation) system etc..
The client 1 further includes display screen, and the display screen can have touch function, such as liquid crystal (Liquid Crystal Display, LCD) display screen or Organic Light Emitting Diode (Organic Light-Emitting Diode, OLED) Display screen.The display screen is for showing the contents such as the Application Program Interface.
The server 2 is that one kind can be automatic to carry out numerical value calculating and/or letter according to the instruction for being previously set or storing The equipment of processing is ceased, hardware includes but is not limited to microprocessor, specific integrated circuit (application program lication Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), digital processing unit (Digital Signal Processor, DSP), embedded device etc..In this embodiment party In formula, the server 2 includes multiple groups, and each group of server 2 is by a primary server (master) 20 and is subordinated to the master At least one dependent server 21 (slave) of server 20 forms.
In the present embodiment, the primary server 20 and dependent server 21 belong to Master-Slave framework, usually One primary server 20 can connect more a 21 examples of dependent server of N, and each slave is an individual server 2, institute The server 2 for having slave to dispose above is completely equivalent each other, but mutually indepedent.The primary server 20 with it is described extremely Distributed communication, all instructions (message that the primary server 20 receives can be carried out between a few dependent server 21 Production, confirmation etc.) it can all synchronize and be sent to dependent server 21.For example, a primary server 20 can be with ten affiliated services Device 21 communicates to connect, and the primary server 20, which synchronizes all instructions received, is sent to described ten dependent servers 21.
In the present embodiment, the server 2 further includes a proxy server (not shown in figure 1), agency's clothes Device be engaged at least one dependent server 21 described in bulk management.For example, the proxy server can control it is described at least The starting of one dependent server 21 is closed and is restarted.It is understood that the proxy server and the primary server 20 can be only fitted in a server 2.
In another embodiment, the primary server 20 can directly control at least one described dependent server 21. Specifically, establishing the trusting relationship between the primary server 20 and each dependent server 21, the primary server The dependent server 21 that 20 selections need to control, the primary server 20 receive operational order, and remote according to the operational order The dependent server 21 that process control is selected executes relevant operation.
Embodiment two
Fig. 2 is the flow chart of the method for flexible scheduling resource provided by Embodiment 2 of the present invention.Institute according to different requirements, The execution sequence stated in flow chart can change, and certain steps can be omitted.
Step S21, pressure test file is generated, wherein the pressure test file includes project to be measured and test case Information.
In one embodiment, the pressure test file can be generated by one interface UI of user's operation.The UI Interface display has project to be measured and test case information, and user generates pressure survey by selecting project to be measured and test case Try file.The project to be measured includes interface message to be measured etc., and the test case information includes the IP information of dependent server.
In another embodiment, the pressure test file can also be called by one order line of input.
Step S22, pressure test is executed according to the pressure test file.
Preferably, before executing pressure test according to the pressure test file, the method for the flexible scheduling resource Further include the steps that configuring production environment and pressure surveys request data.
Specifically, the method for the flexible scheduling resource according to pressure test file and pressure in a production environment, surveying Request data executes pressure test.
In the present embodiment, it is pressed and is surveyed to carry out pressure test using full link, the full link pressure, which is surveyed, directly to be produced On carry out pressure survey, pass through and carry out pressure directly in production and survey to be capable of the reduction true production circumstances of top.
In the present embodiment, the pressure surveys request data using the truthful data of production.For example, direct recording 3-5 days Production access request flow, then data cleansing is carried out to the request of recording.For example, the request of some user is substituted for one Pressure surveys the request of Virtual User, and the commodity of request are also substituted for pressure and survey virtual goods etc..The truthful data of the production can lead to The mode that inflow-rate of water turbine playback, log play back acquires.In one embodiment, the pressure, which surveys request data, can also be manual construction Data.
In addition, in order to not interfere with production environment during pressing and surveying, the method for the flexible scheduling resource is being initiated to ask Shown by the pressure mark in request message head to distinguish pressure and survey request data and actual production data, so that pressure be surveyed when asking Flow be all diverted in specified application server and specified memory and carry out data preservation and processing.
In the present embodiment, the primary server is responsible for for the access request that client is sent being distributed to being subordinated to The dependent server of the primary server, then the dependent server executes pressure test according to the pressure test file, Then test result is back to the primary server by the dependent server.
Step S23, according to the project to be measured and test case information, the test case is acquired during the test Performance data.
In the present embodiment, it is tested during collecting test in such a way that python script is in conjunction with linux order The performance data of example (dependent server).Number is determined according to the current tcp number of links of dependent server in test process Whether terminate according to acquisition.If current tcp connection quantity is less than initialization connection quantity (such as 1000 connections), continue to adopt Collection;If current tcp connection quantity is more than or equal to initialization connection quantity, terminate collection process.
The operation that the python script is mainly realized includes performance data initial acquisition.Specifically, by calling linux Sar and iostat order, write data into original document.After the completion of acquisition, execution performance index extraction script, from original Index file extracts effective data and is written in final file, and carries out packaging operation.For example, by being taken in pressure test sequence Business device performance indicator is once acquired according to 10s and is written in file.
In the present embodiment, the performance data includes TPS/QPS, error rate, engaged line journey, cpu, memory, disk io, Load capacity, throughput, responding ability and reliability.The load capacity refers to the patient maximum number of user of application program institute Amount, that is, in the normal response time, the quantity for most clients that application program can be supported.The throughput refers to The trading volume that application program is completed within the unit time, that is, within the unit time, application program is directed to different load pressures Power, the number of transaction that can be done.The responding ability of the application program refers in various load pressures, the response of system Time, that is, from client request initiate, to server end response return required for the time, including network latency and The server process time.The reliability of the application program refers under stream time state, what system can operate normally Time, i.e., without error message in stream time section.
The application program can be shopping application program (such as Jingdone district and Taobao) or financial applications (such as safety pocket Bank).
Step S24, monitoring and the analysis performance data, and judged whether to need elasticity scalable according to the performance data Hold adjustment.
Specifically, the performance data is monitored using " active " mode reported from node to host node.In this implementation In mode, using each dependent server as from node, the corresponding primary server of the dependent server as host node, it is described from Node periodically sends the performance data and idling-resource information of the dependent server, such as performance number to the host node According to including CPU accounting and free memory etc., the idling-resource information includes CPU idle number and idle memory source Deng.
In the present embodiment, the host node be resource consolidation distribution node, it is described from node be container host Machine.Container cloud platform allocates resources to frame, and the resource requirement information that the host node is responded according to frame carries out resource Scheduling.The resource requirement information is obtained according to the performance data.The host node, which is scheduled resource, to be specifically included: from Node active reports resource idle condition to host node, and host node is according to the idling-resource situation of the slave node of acquisition to frame Resource is issued to invite, if resource invite in scheduler of resource when meeting the job requirements on frame, in frame (Scheduler) unit is to host node resource response demand, and host node is according to central processing unit (CPU) and memory source to from section Point is filtered, and in the residue for meeting resource requirement from node, carries out the selection from node further according to polling dispatching algorithm.
In the present embodiment, judge whether that needing the scalable appearance of elasticity to adjust includes: according to the performance data
Obtain the performance data obtained according to service operation situation and empirical value in actual production upper limit threshold and Lower threshold;When the performance data in test process is greater than the upper limit threshold, carry out elastic dilatation adjustment, for example, increase by One group of server resource of primary server and at least one dependent server composition;When the performance data in test process is less than institute Lower threshold is stated, then carries out elastic capacity reducing adjustment.When the performance data in test process is in critical range, then program or business It operates normally.
It is understood that judging whether the step of needing elastic scalable appearance adjustment according to the performance data further include: It is screened according to the idling-resource of the performance data and the slave node obtained from node.Specifically, when the performance in test process Data are greater than the upper limit threshold, and the number for retaining idle central processor CPU is greater than or equal to business in actual production and holds The number and the memory source of the free time of the required central processor CPU of row are greater than or equal to business in actual production and execute institute The slave node of the memory source needed;When the performance data in test process is less than the lower threshold, in the deletion free time The number of central processor CPU is less than the number of central processor CPU needed for business execution and/or the free time in actual production Memory source be less than actual production in business execute needed for memory source slave node.
It is understood that when the performance data in test process is less than or equal to the upper limit threshold and is more than or equal to described It when lower threshold, does not deal with, keeps existing and carry out business processing from node number.
In one embodiment, the upper limit threshold and lower threshold can also be specified by user.
In conclusion the method for flexible scheduling resource provided by the invention, including generate pressure test file, wherein institute Stating pressure test file includes project to be measured and test case information;Pressure test is executed according to the pressure test file;Root According to the project to be measured and test case information, the performance data of the test case during the test is acquired;And monitoring and The performance data is analyzed, and is judged whether that the scalable appearance of elasticity is needed to adjust according to the performance data.Realization is expanded automatically Capacity reducing has very strong practicability and scalability.It can be good at being coped with for burst service peak and burst flow, protect Barrier business operates normally, that is to say, that can for peak flow and it is more concurrent situations such as occur when, carry out quick response, and When scalable resource, safeguards system stable operation.Reduction system is because of caused by high concurrent, high flow capacity or burst flow in business It is disconnected.
The above is only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, for For those skilled in the art, without departing from the concept of the premise of the invention, improvement, but these can also be made It all belongs to the scope of protection of the present invention.
Below with reference to the 3rd to 4 figure, respectively the functional module to the server for the method for realizing above-mentioned flexible scheduling resource and Hardware configuration is introduced.
Embodiment three
Fig. 3 is the functional block diagram in the device preferred embodiment of flexible scheduling resource of the present invention.
In some embodiments, the device 30 of the flexible scheduling resource is run in server.The flexible scheduling money The device 30 in source may include multiple functional modules as composed by program code segments.In the device 30 of the flexible scheduling resource The program code of each program segment can store in memory, and as performed by least one processor, (be detailed in execution Fig. 3 and its associated description) flexible scheduling resource function.
In the present embodiment, function of the device 30 of the flexible scheduling resource according to performed by it can be divided into more A functional module.The functional module may include: pressure module 301, execution module 302, data acquisition module 303 and monitoring Module 304.The so-called module of the present invention refers to that one kind performed by least one processor and can complete fixed function The series of computation machine program segment of energy, storage is in memory.It in some embodiments, will be rear about the function of each module It is described in detail in continuous embodiment.
Pressure module 301 executes pressure test for generating pressure test file, and according to the pressure test file.
In one embodiment, the pressure test file can be generated by one interface UI of user's operation.The UI Interface display has project to be measured and test case information, and user generates pressure survey by selecting project to be measured and test case Try file.The project to be measured includes interface message to be measured etc., and the test case information includes the IP information of dependent server.
In another embodiment, the pressure test file can also be called by one order line of input.
Execution module 302 is used to execute pressure test according to the pressure test file.
Preferably, before executing pressure test according to the pressure test file, the device of the flexible scheduling resource It further include that configuration production environment and pressure survey request data.
Specifically, the device 30 of the flexible scheduling resource is used in a production environment, according to pressure test file and pressure It surveys request data and executes pressure test.
In the present embodiment, it is pressed and is surveyed to carry out pressure test using full link, the full link pressure, which is surveyed, directly to be produced On carry out pressure survey, pass through and carry out pressure directly in production and survey to be capable of the reduction true production circumstances of top.
In the present embodiment, the pressure surveys request data using the truthful data of production.For example, direct recording 3-5 days Production access request flow, then data cleansing is carried out to the request of recording.For example, the request of some user is substituted for one Pressure surveys the request of Virtual User, and the commodity of request are also substituted for pressure and survey virtual goods etc..The truthful data of the production can lead to The mode that inflow-rate of water turbine playback, log play back acquires.In one embodiment, the pressure, which surveys request data, can also be manual construction Data.
In addition, in order to not interfere with production environment during pressing and surveying, the device of the flexible scheduling resource is initiating to ask Shown by the pressure mark in request message head to distinguish pressure and survey request data and actual production data, so that pressure be surveyed when asking Flow be all diverted in specified application server and specified memory and carry out data preservation and processing.
In the present embodiment, the primary server is responsible for for the access request that client is sent being distributed to being subordinated to The dependent server of the primary server, then the dependent server executes pressure test according to the pressure test file, Then test result is back to the primary server by the dependent server.
Data acquisition module 303 is used to acquire the test case according to the project to be measured and test case information and exist Performance data in test process.
In the present embodiment, it is tested during collecting test in such a way that python script is in conjunction with linux order The performance data of example (dependent server).Number is determined according to the current tcp number of links of dependent server in test process Whether terminate according to acquisition.If current tcp connection quantity is less than initialization connection quantity (such as 1000 connections), continue to adopt Collection;If current tcp connection quantity is more than or equal to initialization connection quantity, terminate collection process.
The operation that the python script is mainly realized includes performance data initial acquisition.Specifically, by calling linux Sar and iostat order, write data into original document.After the completion of acquisition, execution performance index extraction script, from original Index file extracts effective data and is written in final file, and carries out packaging operation.For example, by being taken in pressure test sequence Business device performance indicator is once acquired according to 10s and is written in file.
In the present embodiment, the performance data includes TPS/QPS, error rate, engaged line journey, cpu, memory, disk io, Load capacity, throughput, responding ability and reliability.The load capacity refers to the patient maximum number of user of application program institute Amount, that is, in the normal response time, the quantity for most clients that application program can be supported.The throughput refers to The trading volume that application program is completed within the unit time, that is, within the unit time, application program is directed to different load pressures Power, the number of transaction that can be done.The responding ability of the application program refers in various load pressures, the response of system Time, that is, from client request initiate, to server end response return required for the time, including network latency and The server process time.The reliability of the application program refers under stream time state, what system can operate normally Time, i.e., without error message in stream time section.
The application program can be shopping application program (such as Jingdone district and Taobao) or financial applications (such as safety pocket Bank).
Monitoring module 304 judges whether needs according to the performance data for monitoring and analyzing the performance data The scalable appearance adjustment of elasticity.
Specifically, the performance data is monitored using " active " mode reported from node to host node.In this implementation In mode, using each dependent server as from node, the corresponding primary server of the dependent server as host node, it is described from Node periodically sends the performance data and idling-resource information of the dependent server, such as performance number to the host node According to including CPU accounting and free memory etc., the idling-resource information includes CPU idle number and idle memory source Deng.
In the present embodiment, the host node be resource consolidation distribution node, it is described from node be container host Machine.Container cloud platform allocates resources to frame, and the resource requirement information that the host node is responded according to frame carries out resource Scheduling.The resource requirement information is obtained according to the performance data.The host node, which is scheduled resource, to be specifically included: from Node active reports resource idle condition to host node, and host node is according to the idling-resource situation of the slave node of acquisition to frame Resource is issued to invite, if resource invite in scheduler of resource when meeting the job requirements on frame, in frame (Scheduler) unit is to host node resource response demand, and host node is according to central processing unit (CPU) and memory source to from section Point is filtered, and in the residue for meeting resource requirement from node, carries out the selection from node further according to polling dispatching algorithm.
In the present embodiment, judge whether that needing the scalable appearance of elasticity to adjust includes: according to the performance data
Obtain the performance data obtained according to service operation situation and empirical value in actual production upper limit threshold and Lower threshold;When the performance data in test process is greater than the upper limit threshold, carry out elastic dilatation adjustment, for example, increase by One group of server resource of primary server and at least one dependent server composition;When the performance data in test process is less than institute Lower threshold is stated, then carries out elastic capacity reducing adjustment.When the performance data in test process is in critical range, then program or business It operates normally.
It is understood that judging whether the step of needing elastic scalable appearance adjustment according to the performance data further include: It is screened according to the idling-resource of the performance data and the slave node obtained from node.Specifically, when the performance in test process Data are greater than the upper limit threshold, and the number for retaining idle central processor CPU is greater than or equal to business in actual production and holds The number and the memory source of the free time of the required central processor CPU of row are greater than or equal to business in actual production and execute institute The slave node of the memory source needed;When the performance data in test process is less than the lower threshold, in the deletion free time The number of central processor CPU is less than the number of central processor CPU needed for business execution and/or the free time in actual production Memory source be less than actual production in business execute needed for memory source slave node.
It is understood that when the performance data in test process is less than or equal to the upper limit threshold and is more than or equal to described It when lower threshold, does not deal with, keeps existing and carry out business processing from node number.
In one embodiment, the upper limit threshold and lower threshold can also be specified by user.
In conclusion the device of flexible scheduling resource provided by the invention, including pressure module 301, execution module 302, Data acquisition module 303 and monitoring module 304.The pressure module 301 is for generating pressure test file, wherein the pressure Power test file includes project to be measured and test case information;The execution module 302 is used for according to the pressure test file Execute pressure test;The data acquisition module 303 is used to acquire the survey according to the project to be measured and test case information Try the performance data of example during the test;And the monitoring module 304 is for monitoring and analyzing the performance data, and root Judge whether to need the scalable appearance adjustment of elasticity according to the performance data.Realization carries out scalable appearance automatically, has very strong practicability And scalability.It can be good at being coped with for burst service peak and burst flow, ensure that business operates normally, that is, Say, can for peak flow and it is more concurrent situations such as occur when, carry out quick response, timely scalable resource, safeguards system is steady Fixed operation.Reduction system service disconnection because of caused by high concurrent, high flow capacity or burst flow.
The above-mentioned integrated unit realized in the form of software function module, can store and computer-readable deposit at one In storage media.Above-mentioned software function module is stored in a storage medium, including some instructions are used so that a computer It is each that equipment (can be personal computer, double screen equipment or the network equipment etc.) or processor (processor) execute the present invention The part of a embodiment the method.
Example IV
Fig. 4 is the schematic diagram for the server that the embodiment of the present invention four provides.
The server 4 includes: database 41, memory 42, at least one processor 43, is stored in the memory 42 In and the computer program 44 and at least one communication bus 45 that can be run at least one described processor 43.
The method that at least one described processor 43 realizes above-mentioned flexible scheduling resource when executing the computer program 44 Step in embodiment.
Illustratively, the computer program 44 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 42, and are executed by least one described processor 43, to complete this hair It is bright.One or more of module/units can be the series of computation machine program instruction section that can complete specific function, described Instruction segment is for describing implementation procedure of the computer program 44 in the server 4.
The server 4 is that one kind can be automatic to carry out numerical value calculating and/or letter according to the instruction for being previously set or storing The equipment of processing is ceased, hardware includes but is not limited to microprocessor, specific integrated circuit (application program lication Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), digital processing unit (Digital Signal Processor, DSP), embedded device etc..Art technology Personnel are appreciated that the schematic diagram 4 is only the example of server 4, do not constitute the restriction to server 4, may include Than illustrating more or fewer components, certain components or different components are perhaps combined, such as the server 4 can be with Including input-output equipment, network access equipment, bus etc..
The database (Database) 41 is to carry out the foundation of tissue, storage and management data according to data structure described Warehouse on server 4.Database is generally divided into hierarchical database, network database and three kinds of relational database.? In present embodiment, the database 41 is for storing the performance data.
At least one described processor 43 can be central processing unit (Central Processing Unit, CPU), It can also be other general processors, digital signal processor (Digital Signal Processor, DSP), dedicated integrated Circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..The processor 43 can be microprocessor or the processor 43 is also possible to any conventional place Device etc. is managed, the processor 43 is the control centre of the server 4, utilizes various interfaces and the entire server 4 of connection Various pieces.
The memory 42 can be used for storing the computer program 44 and/or module/unit, and the processor 43 passes through Operation executes the computer program and/or module/unit being stored in the memory 42, and calls and be stored in memory Data in 42 realize the various functions of the server 4.The memory 42 can mainly include storing program area and storage number According to area, wherein storing program area can application program needed for storage program area, at least one function (for example sound plays function Energy, image player function etc.) etc.;Storage data area, which can be stored, uses created data (such as audio number according to server 4 According to, phone directory etc.) etc..In addition, memory 42 may include high-speed random access memory, it can also include non-volatile memories Device, such as hard disk, memory, plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card), at least one disk memory, flush memory device or other volatibility are solid State memory device.
Program code is stored in the memory 42, and at least one described processor 43 can call the memory 42 The program code of middle storage is to execute relevant function.For example, (pressure module 301 executes mould to modules described in Fig. 3 Block 302, data acquisition module 303 and monitoring module 304) it is stored in the program code in the memory 42, and by described Performed by least one processor 43, to realize the function of the modules to achieve the purpose that scheduling of resource.
The pressure module 301 is for generating pressure test file, wherein the pressure test file includes project to be measured With test case information;
The execution module 302 is used to execute pressure test according to the pressure test file;
The data acquisition module 303 is used to that it is real to acquire the test according to the project to be measured and test case information The performance data of example during the test;
The monitoring module 304 judges whether for monitoring and analyzing the performance data according to the performance data Need the scalable appearance adjustment of elasticity.
Preferably, before executing pressure test according to the pressure test file, the device of the flexible scheduling resource Production environment can also be configured and pressure surveys request data.
Preferably, described to judge whether that the method for needing the scalable appearance adjustment of elasticity includes: according to the performance data
Obtain the performance data obtained according to service operation situation and empirical value in actual production upper limit threshold and Lower threshold;
When the performance data in test process is greater than upper limit threshold, elastic dilatation adjustment is carried out;
When the performance data in test process is less than lower threshold, elastic capacity reducing adjustment is carried out;
When the performance data in test process is more than or equal to the lower threshold and is less than or equal to the upper limit threshold, protect Hold business normal operation.
Preferably, when the performance data when in test process is greater than the upper limit threshold, elastic dilatation adjustment is carried out The step of include: the one group of server resource for increasing and being made of primary server and at least one dependent server.
Preferably, described to monitor and include: the step of analyzing the performance data
Using the dependent server as from node, the corresponding primary server of the dependent server is as host node;
The performance data and idling-resource letter for periodically sending the dependent server to the host node from node Breath.
Preferably, the step of needing elastic scalable appearance adjustment, is judged whether according to the performance data further include: according to institute The idling-resource for stating performance data and the slave node obtained is screened from node.
Preferably, when the performance data in test process is greater than the upper limit threshold, retain idle central processor CPU Number be greater than or equal to actual production in business execute needed for central processor CPU number and the memory of free time money Source is greater than or equal to the slave node that business in actual production executes required memory source;
When the performance data in test process is less than the lower threshold, the central processor CPU of free time is deleted It is small that number is less than the number of central processor CPU needed for business execution and/or the memory source of the free time in actual production The slave node of memory source needed for business executes in actual production.
If the integrated module/unit of the server 4 is realized in the form of SFU software functional unit and as independent production Product when selling or using, can store in a computer readable storage medium.Based on this understanding, the present invention realizes All or part of the process in above-described embodiment method can also instruct relevant hardware to complete by computer program, The computer program can be stored in a computer readable storage medium, and the computer program is being executed by processor When, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, described Computer program code can be source code form, object identification code form, executable file or certain intermediate forms etc..The meter Calculation machine readable medium may include: can carry the computer program code any entity or device, recording medium, USB flash disk, Mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory Device (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It needs to illustrate It is that the content that the computer-readable medium includes can be fitted according to the requirement made laws in jurisdiction with patent practice When increase and decrease, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium does not include electric carrier wave letter Number and telecommunication signal.
Although being not shown, the server 4 can also include the power supply (such as battery) powered to all parts, preferably , power supply can be logically contiguous by power-supply management system and at least one described processor 43, to pass through power management system System realizes the functions such as management charging, electric discharge and power managed.Power supply can also include one or more direct current or friendship Galvanic electricity source, recharging system, power failure detection circuit, power adapter or inverter, power supply status indicator etc. are any Component.The server 4 can also include bluetooth module, Wi-Fi module etc., and details are not described herein.
It should be understood that the embodiment is only purposes of discussion, do not limited by this structure in patent claim.
In several embodiments provided by the present invention, it should be understood that arriving, disclosed electronic equipment and method can be with It realizes by another way.For example, electronic equipment embodiment described above is only schematical, for example, the list The division of member, only a kind of logical function partition, there may be another division manner in actual implementation.
It, can also be in addition, each functional unit in each embodiment of the present invention can integrate in same treatment unit It is that each unit physically exists alone, can also be integrated in same unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included in the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.This Outside, it is clear that one word of " comprising " is not excluded for other units or, odd number is not excluded for plural number.The multiple units stated in system claims Or device can also be implemented through software or hardware by a unit or device.The first, the second equal words are used to indicate name Claim, and does not indicate any particular order.
Finally it should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although reference Preferred embodiment describes the invention in detail, those skilled in the art should understand that, it can be to of the invention Technical solution is modified or equivalent replacement, without departing from the spirit of the technical scheme of the invention range.

Claims (10)

1. a kind of method of flexible scheduling resource, which is characterized in that the described method includes:
Generate pressure test file, wherein the pressure test file includes project to be measured and test case information;
Pressure test is executed according to the pressure test file;
According to the project to be measured and test case information, the performance data of the test case during the test is acquired;And
The performance data is monitored and analyzed, and is judged whether that the scalable appearance of elasticity is needed to adjust according to the performance data.
2. the method for flexible scheduling resource as described in claim 1, which is characterized in that held according to the pressure test file Before row pressure test, the method also includes configuration production environment and press the step of surveying request data.
3. the method for flexible scheduling resource as claimed in claim 2, which is characterized in that described to be judged according to the performance data Whether need elasticity it is scalable hold adjustment method include:
Obtain the upper limit threshold and lower limit of the performance data obtained according to service operation situation and empirical value in actual production Threshold value;
When the performance data in test process is greater than upper limit threshold, elastic dilatation adjustment is carried out;
When the performance data in test process is less than lower threshold, elastic capacity reducing adjustment is carried out;
When the performance data in test process is more than or equal to the lower threshold and is less than or equal to the upper limit threshold, industry is kept Business operates normally.
4. the method for flexible scheduling resource as claimed in claim 3, which is characterized in that the performance number when in test process When according to being greater than the upper limit threshold, carrying out the step of elastic dilatation adjusts includes: to increase by primary server and at least one subordinate At least one set of server resource of server composition.
5. the method for flexible scheduling resource as claimed in claim 4, which is characterized in that described to monitor and analyze the performance number According to the step of include:
Using the dependent server as from node, the corresponding primary server of the dependent server is as host node;
The performance data and idling-resource information for periodically sending the dependent server to the host node from node.
6. the method for flexible scheduling resource as claimed in claim 5, which is characterized in that judged whether according to the performance data The step of needing elastic scalable appearances adjustment further include: according to the idling-resource of the performance data and the slave node obtained screen from Node.
7. the method for flexible scheduling resource as claimed in claim 6, it is characterised in that:
When the performance data in test process is greater than the upper limit threshold, the number for retaining idle central processor CPU is greater than Or the number and the memory source of the free time of the central processor CPU needed for executing equal to business in actual production are greater than or wait The slave node of memory source needed for business executes in actual production;
When the performance data in test process is less than the lower threshold, the number of the central processor CPU of the deletion free time The number and/or the memory source of the free time of central processor CPU needed for executing less than business in actual production are less than real The slave node of memory source needed for business executes in the production of border.
8. a kind of device of flexible scheduling resource, which is characterized in that described device includes:
Press module, for generating pressure test file, wherein the pressure test file includes project to be measured and test case Information;
Execution module, for executing pressure test according to the pressure test file;
Data acquisition module, for acquiring the test case and testing according to the project to be measured and test case information Performance data in journey;And
Monitoring module for monitoring and analyzing the performance data, and judges whether to need elastic expansion according to the performance data Capacity reducing adjustment.
9. a kind of server, which is characterized in that the server includes processor and memory, and the processor is for executing institute Flexible scheduling resource as claimed in any of claims 1 to 7 in one of claims is realized when stating the computer program stored in memory Method.
10. a kind of computer readable storage medium, computer program, feature are stored on the computer readable storage medium It is, the computer program realizes flexible scheduling money as claimed in any of claims 1 to 7 in one of claims when being executed by processor The method in source.
CN201811261924.1A 2018-10-26 2018-10-26 Method, apparatus, server and the storage medium of flexible scheduling resource Pending CN109660421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811261924.1A CN109660421A (en) 2018-10-26 2018-10-26 Method, apparatus, server and the storage medium of flexible scheduling resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811261924.1A CN109660421A (en) 2018-10-26 2018-10-26 Method, apparatus, server and the storage medium of flexible scheduling resource

Publications (1)

Publication Number Publication Date
CN109660421A true CN109660421A (en) 2019-04-19

Family

ID=66110410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811261924.1A Pending CN109660421A (en) 2018-10-26 2018-10-26 Method, apparatus, server and the storage medium of flexible scheduling resource

Country Status (1)

Country Link
CN (1) CN109660421A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083510A (en) * 2019-05-06 2019-08-02 深圳市网心科技有限公司 Fringe node test method, electronic equipment, system and medium
CN110188027A (en) * 2019-05-31 2019-08-30 深圳前海微众银行股份有限公司 Performance estimating method, device, equipment and the storage medium of production environment
CN110782211A (en) * 2019-10-25 2020-02-11 上海燕汐软件信息科技有限公司 Data processing method and device, electronic equipment and storage medium
CN111722917A (en) * 2020-06-30 2020-09-29 北京来也网络科技有限公司 Resource scheduling method, device and equipment for performance test task
CN113742219A (en) * 2021-08-05 2021-12-03 中移(杭州)信息技术有限公司 Pressure regulation and performance test method, system and storage medium
EP3920469A1 (en) * 2020-06-05 2021-12-08 Beijing Baidu Netcom Science And Technology Co. Ltd. Method and apparatus for stress testing, electronic device and computer readable medium
CN117041653A (en) * 2023-08-08 2023-11-10 心动网络股份有限公司 Method, device, equipment and medium for recording playing picture based on resource allocation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103051500A (en) * 2013-01-04 2013-04-17 北京邮电大学 Test method and system of service network system
CN106470219A (en) * 2015-08-17 2017-03-01 阿里巴巴集团控股有限公司 The dilatation of computer cluster and capacity reduction method and equipment
CN107688526A (en) * 2017-08-25 2018-02-13 上海壹账通金融科技有限公司 Performance test methods, device, computer equipment and the storage medium of application program
CN107704387A (en) * 2017-09-26 2018-02-16 恒生电子股份有限公司 For the method, apparatus of system early warning, electronic equipment and computer-readable medium
CN107733676A (en) * 2016-08-12 2018-02-23 中国移动通信集团浙江有限公司 A kind of method and system of flexible scheduling resource
CN108536521A (en) * 2018-03-30 2018-09-14 口碑(上海)信息技术有限公司 Based on emulation platform offline environment checking method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103051500A (en) * 2013-01-04 2013-04-17 北京邮电大学 Test method and system of service network system
CN106470219A (en) * 2015-08-17 2017-03-01 阿里巴巴集团控股有限公司 The dilatation of computer cluster and capacity reduction method and equipment
CN107733676A (en) * 2016-08-12 2018-02-23 中国移动通信集团浙江有限公司 A kind of method and system of flexible scheduling resource
CN107688526A (en) * 2017-08-25 2018-02-13 上海壹账通金融科技有限公司 Performance test methods, device, computer equipment and the storage medium of application program
CN107704387A (en) * 2017-09-26 2018-02-16 恒生电子股份有限公司 For the method, apparatus of system early warning, electronic equipment and computer-readable medium
CN108536521A (en) * 2018-03-30 2018-09-14 口碑(上海)信息技术有限公司 Based on emulation platform offline environment checking method and device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083510A (en) * 2019-05-06 2019-08-02 深圳市网心科技有限公司 Fringe node test method, electronic equipment, system and medium
CN110188027A (en) * 2019-05-31 2019-08-30 深圳前海微众银行股份有限公司 Performance estimating method, device, equipment and the storage medium of production environment
WO2020238965A1 (en) * 2019-05-31 2020-12-03 深圳前海微众银行股份有限公司 Production environment performance evaluation method and apparatus, and storage medium
CN110782211A (en) * 2019-10-25 2020-02-11 上海燕汐软件信息科技有限公司 Data processing method and device, electronic equipment and storage medium
EP3920469A1 (en) * 2020-06-05 2021-12-08 Beijing Baidu Netcom Science And Technology Co. Ltd. Method and apparatus for stress testing, electronic device and computer readable medium
CN111722917A (en) * 2020-06-30 2020-09-29 北京来也网络科技有限公司 Resource scheduling method, device and equipment for performance test task
CN113742219A (en) * 2021-08-05 2021-12-03 中移(杭州)信息技术有限公司 Pressure regulation and performance test method, system and storage medium
CN117041653A (en) * 2023-08-08 2023-11-10 心动网络股份有限公司 Method, device, equipment and medium for recording playing picture based on resource allocation

Similar Documents

Publication Publication Date Title
CN109660421A (en) Method, apparatus, server and the storage medium of flexible scheduling resource
WO2021017301A1 (en) Management method and apparatus based on kubernetes cluster, and computer-readable storage medium
WO2021238045A1 (en) Rpa-based customer requirement obtaining and querying method under large-scale customization
CN110245078A (en) A kind of method for testing pressure of software, device, storage medium and server
CN103346912B (en) Method, device and system for conducting warning correlation analysis
CN108595316B (en) Lifecycle management method, manager, device, and medium for distributed application
CN110689223B (en) Robot batch management system based on RPA control
CN101707399A (en) Method and system for acquiring electric energy information
CN105183299A (en) Human-computer interface service processing system and method
CN110781180B (en) Data screening method and data screening device
CN113301102A (en) Resource scheduling method, device, edge cloud network, program product and storage medium
CN110717132A (en) Data collection method and pushing method for full-link monitoring system and related equipment
CA3169413A1 (en) Report generating method, device, electronic equipment, and computer-readable medium
CN108156225A (en) It is micro- using monitoring system and method based on container cloud platform
US10331484B2 (en) Distributed data platform resource allocator
CN113570468A (en) Enterprise payment wind control service platform
CN111724046A (en) Electricity purchase management system
CN110534136A (en) The method and apparatus of recording
CN102541563A (en) Method and system for generating monitoring interfaces
CN103297477A (en) Data collecting and reporting system, data processing method and proxy server
CN114756301B (en) Log processing method, device and system
CN103164776B (en) A kind of medicine traceability system and medicine retroactive method thereof and flow monitoring method
CN106355084A (en) Android group authority management method and system based on callback mechanism
CN109525422A (en) A kind of daily record data method for managing and monitoring
CN103023740A (en) Information interaction bus system and electric power data transmission method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419