CN109656769A - A kind of Android communicating terminal test method for hardware, test technology and system test process - Google Patents

A kind of Android communicating terminal test method for hardware, test technology and system test process Download PDF

Info

Publication number
CN109656769A
CN109656769A CN201811606482.XA CN201811606482A CN109656769A CN 109656769 A CN109656769 A CN 109656769A CN 201811606482 A CN201811606482 A CN 201811606482A CN 109656769 A CN109656769 A CN 109656769A
Authority
CN
China
Prior art keywords
test
complete machine
hardware
mode
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811606482.XA
Other languages
Chinese (zh)
Inventor
叶林凤
林昱
陈少伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RINGSLINK (XIAMEN) NETWORK COMMUNICATION TECHNOLOGY Co Ltd
Original Assignee
RINGSLINK (XIAMEN) NETWORK COMMUNICATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RINGSLINK (XIAMEN) NETWORK COMMUNICATION TECHNOLOGY Co Ltd filed Critical RINGSLINK (XIAMEN) NETWORK COMMUNICATION TECHNOLOGY Co Ltd
Priority to CN201811606482.XA priority Critical patent/CN109656769A/en
Priority to CN202310408998.8A priority patent/CN116414640A/en
Publication of CN109656769A publication Critical patent/CN109656769A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/2284Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing by power-on test, e.g. power-on self test [POST]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/2273Test methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing

Abstract

A kind of Android communicating terminal test method for hardware, test technology and system test process, it is characterized in that testing process is refined, the test method is divided into mainboard mode and complete machine mode two stages, mainboard mode are as follows: first run detection check first is carried out to hardware after the welding of the PCB main board of communicating terminal, can find to do over again at this time if problematic;Complete machine mode are as follows: be assembled into complete machine by mainboard mode and the detection check PCB main board that there is no problem, carry out complete machine detection verifying.The present invention refines testing process, and hardware detection range is digested to sub-module, refines process, and the mainboard stage increases process, can be to avoid the additional rework cost that goes wrong, and is easier the hardware module that positioning is broken down, and work time cost is returned in reduction;Verifying all linked with one another after working flow control, the mode of man-computer cooperation reduce artificial omission phenomenon;Increase strike-machine pressure test, guarantees the stability of product.

Description

A kind of Android communicating terminal test method for hardware, test technology and system test Process
Technical field
The present invention relates to communication technique field, a kind of Android communicating terminal test method for hardware, test work are referred in particular to Skill and system test process.
Background technique
Nowadays Android communicating terminal has become media of communication indispensable in people's daily life.With The rapid development of Android communication terminal equipment, corresponding type type are increasingly frequent.Consequent is a large amount of hardware Testing requirement.
Currently, mostly using and being verified in complete machine equipment, passed through in Android communicating terminal field of hardware To needing communicating terminal to be tested to carry out environment configurations, test, test result analysis etc. in complete machine equipment, to check firmly Part function is can to operate normally, if there are BUG.
This test mode there are the problem of following problems:
1, hardware detection process is single, is only verified when complete machine, if some problems are the hardware on mainboard Equipment, such as bluetooth module, wifi module, these problems cannot but be verified after welding, need first to be assembled into whole It is just able to verify that when machine.If at this time discovery bluetooth be unable to normal use, investigation goes wrong, do over again and need to dismantle complete machine, mold changing block it After the processing such as welded again, then re-start mounter again, then tested.It just will appear dress secondary twice at this time Machine process increases the expense done over again.If quantity is big, rework cost will become very high;
2, traditional strike-machine test is exactly generally to power on to put, without otherwise test operation, such as without carrying out strike-machine Pressure test, such strike-machine test is too simple not rigorous enough, does not measure the stability of machine in high load situations, because This cannot be guaranteed the stability of product.
Summary of the invention
The purpose of the present invention is to provide a kind of refinement process, reduce the Android communicating terminal hardware testing side done over again Method, test technology and system test process.
In order to achieve the above objectives, solution of the invention are as follows: a kind of Android communicating terminal test method for hardware, It is characterized in that testing process is refined, which is divided into mainboard mode and complete machine mode two stages, mainboard mode are as follows: First run detection check first is carried out to hardware after the welding of the PCB main board of communicating terminal, can find to return at this time if problematic Work;Complete machine mode are as follows: be assembled into complete machine, carried out whole by mainboard mode and the detection check PCB main board that there is no problem Machine testing verifying.
A kind of test technology of Android communicating terminal test method for hardware, specific as follows:
Step 1: starting mainboard mode: after PCB main board has been welded first, MAC information interim to its programming and sequence number, According to the requirement of various types, according to illustrating that document carries out building external environment accordingly;Then the hardware of PCB main board is carried out Test, according to test result, carries out relevant processing for mainboard, if PCB main board test is out of question, can carry out follow-up work; If PCB main board test is problematic, the PCB main board for removing the test is reprocessed;
Step 2: starting complete machine mode: the step 1 PCB main board that there is no problem after the test of mainboard mode hardware is assembled into It is tested in complete machine, progress strike-machine test first then carries out relevant return to this complete machine if report strike-machine test is abnormal Repair processing;
Step 3: strike-machine is tested into the permanent MAC information of normal complete machine programming and factory sequence number, after programming is complete, according to each Then the requirement of kind of type carries out system test according to illustrating that document carries out building external environment accordingly;If complete machine is surveyed A certain test crash, system test terminate during examination, while all test datas all being recorded, the verification after being used for Process;If system test passes through, auxiliary examination is carried out to the programmings such as MAC information information and hardware test information, is protected in this way The equipment MAC information of factory and the uniqueness of factory sequence number are demonstrate,proved;
Step 4: after system test is by test and auxiliary examination, deleting relevant test information, restores factory and sets It sets.
Further, the verification for restore to the whole set equipment for having carried out factory reset factory, only works as equipment Successfully carrying out recovering could pass through after factory-run school is tested, it is ensured that the equipment into user hand is the state of initial start-up, will not There is the phenomenon that without flowing out after engineering test.
Further, in the step 2, increase strike-machine pressure test in strike-machine test process.
A kind of system test process of Android communicating terminal hardware, it is characterised in that complete machine mode passes through following steps It realizes:
Step S1, in strike-machine test, an ancillary service thread is opened on backstage simultaneously, is gone using an auxiliary examination program, the auxiliary Checking routine verifies strike-machine result;
Step S2, auxiliary examination program to strike-machine result verification after if by verification, then the auxiliary examination program to complete machine into The permanent MAC information of row programming and factory sequence number;
Step S3, according to the requirement of preset various types, external environment is built, system test is carried out to complete machine, and will survey Test result is stored in the memory block of surveyed complete machine in a manner of key assignments;
Step S4, MAC information checking is carried out, the test result of complete machine is tested using a MAC and complete machine result checking routine Card, later further verifies MAC information and is sent to background server.
Further, in the system test of the step S3, all test items can all be recorded to depositing for surveyed complete machine In storage area, for assisting MAC and complete machine result checking routine.
The present invention refines testing process, is divided into various modules, can carry out to hardware after PCB editions welding first Wheel verification.Hardware detection range is digested to sub-module, refines process, the mainboard stage increases process, hardware detection is all distributed The stage earliest to it, in this way can be to avoid the additional rework cost that goes wrong, and it is easier the hardware module that positioning is broken down, Work time cost is returned in reduction;Verifying all linked with one another after working flow control, the mode of man-computer cooperation reduce artificial omission phenomenon; Increase strike-machine pressure test, guarantees the stability of product.
Detailed description of the invention
Fig. 1 is flow diagram of the invention;
Fig. 2 is the schematic illustration of the embodiment of the present invention.
Specific embodiment
Below in conjunction with drawings and the specific embodiments, the present invention will be described in detail.
Embodiment:
As shown in Figure 1, a kind of test technology of Android communicating terminal test method for hardware, detailed process are as follows:
Step 1: starting mainboard mode: after PCB main board has been welded first, MAC information interim to its programming and sequence number, According to the requirement of various types, according to illustrating that document carries out building external environment accordingly;Then the hardware of PCB main board is carried out Test, according to test result, carries out relevant processing for mainboard, if PCB main board is successfully tested, can carry out follow-up work;If PCB main board test is problematic, then the PCB main board for removing the test is reprocessed;
Step 2: starting complete machine mode: the step 1 PCB main board that there is no problem after the test of mainboard mode hardware is assembled into It is tested in complete machine, progress strike-machine test first then carries out relevant return to this complete machine if report strike-machine test is abnormal Repair processing;
Step 3: strike-machine is tested into the permanent MAC information of normal complete machine programming and factory sequence number, after programming is complete, according to each Then the requirement of kind of type carries out system test according to illustrating that document carries out building external environment accordingly;If complete machine is surveyed A certain test crash, system test terminate during examination, while all test datas all being recorded, the verification after being used for Process;If system test passes through, auxiliary examination is carried out to the programmings such as MAC information information and hardware test information, is protected in this way The equipment MAC information of factory and the uniqueness of factory sequence number are demonstrate,proved;
Step 4: after system test is by test and auxiliary examination, deleting relevant test information, restores factory and sets It sets.
To the whole set equipment for having carried out factory reset carry out restore factory verification, only when equipment successfully carry out it is extensive Factory-run school of appearing again could pass through after testing, it is ensured that the equipment into user hand is the state of initial start-up, is not in by work The phenomenon that being flowed out after journey test.
In the step 2, increase strike-machine pressure test in strike-machine test process.
A kind of system test process of Android communicating terminal hardware, it is characterised in that complete machine mode passes through following steps It realizes:
Step S1, in strike-machine test, an ancillary service thread is opened on backstage simultaneously, is gone using an auxiliary examination program, the auxiliary Checking routine verifies strike-machine result;
Step S2, auxiliary examination program to strike-machine result verification after if by verification, then the auxiliary examination program to complete machine into The permanent MAC information of row programming and factory sequence number;
Step S3, according to the requirement of preset various types, external environment is built;System test is carried out to complete machine, and will be surveyed Test result is stored in the memory block of surveyed complete machine in a manner of key assignments;
Step S4, MAC information checking is carried out, the test result of complete machine is tested using a MAC and complete machine result checking routine Card, later further verifies MAC information and is sent to background server.
In the system test of step S3, all test items can be all recorded in the memory block of surveyed complete machine, be used for MAC With complete machine result checking routine.If the complete machine of a certain test crash is accidentally flowed into next process and carries out school by tester It tests, the result of test item auxiliary examination tool of throwing to can also identify.
Such as shown in Fig. 2, in embodiment, mainboard mode is carried out for hardware, such as bluetooth, key, camera, various The hardware such as LED light carry out PCB main board test to them respectively, by all hardware installations by after test to host, form one Complete machine, and then start complete machine mode, the test of complete machine mode includes hardware above, while increasing such as display screen, touch screen, E10S The total system of power supply etc. is tested.
The basis referred in text illustrates that temperature carries out building external environment accordingly, refers generally to wifi, bluetooth, network Etc. external environments build.
The above description is only an embodiment of the present invention, not to the limitation of this case design, all design key institutes according to this case The equivalent variations done each falls within the protection scope of this case.

Claims (6)

1. a kind of Android communicating terminal test method for hardware, it is characterised in that refine testing process, by the test method point For main plate mode and complete machine mode two stages, mainboard mode are as follows: communicating terminal PCB main board welding after first to hardware into Row first run detection check can find to do over again if problematic at this time;Complete machine mode are as follows: by mainboard mode and detection check does not have The PCB main board of problem is assembled into complete machine, carries out complete machine detection verifying.
2. a kind of test technology of Android communicating terminal test method for hardware, specific as follows:
Step 1: starting mainboard mode: after PCB main board has been welded first, MAC information interim to its programming and sequence number, According to the requirement of various types, according to illustrating that document carries out building external environment accordingly;Then the hardware of PCB main board is carried out Test, according to test result, carries out relevant processing for mainboard, if PCB main board test is out of question, can carry out follow-up work; If PCB main board test is problematic, the PCB main board for removing the test is reprocessed;
Step 2: starting complete machine mode: the step 1 PCB main board that there is no problem after the test of mainboard mode hardware is assembled into It is tested in complete machine, progress strike-machine test first then carries out relevant return to this complete machine if report strike-machine test is abnormal Repair processing;
Step 3: strike-machine is tested into the permanent MAC information of normal complete machine programming and factory sequence number, after programming is complete, according to each Then the requirement of kind of type carries out system test according to illustrating that document carries out building external environment accordingly;If complete machine is surveyed A certain test crash, system test terminate during examination, while all test datas all being recorded, the verification after being used for Process;If system test passes through, auxiliary examination is carried out to the programmings such as MAC information information and hardware test information, is protected in this way The equipment MAC information of factory and the uniqueness of factory sequence number are demonstrate,proved;
Step 4: after system test is by test and auxiliary examination, deleting relevant test information, restores factory and sets It sets.
3. a kind of test technology of Android communicating terminal test method for hardware as claimed in claim 2, it is characterised in that: The verification for restore to the whole set equipment for having carried out factory reset factory, only when equipment successfully carries out recovering factory-run school It could pass through after testing, it is ensured that the equipment into user hand is the state of initial start-up, is not in without engineering test After the phenomenon that flowing out.
4. a kind of test technology of Android communicating terminal test method for hardware as claimed in claim 2, it is characterised in that: In the step 2, increase strike-machine pressure test in strike-machine test process.
5. a kind of system test process of Android communicating terminal hardware, it is characterised in that complete machine mode passes through following steps reality It is existing:
Step S1, in strike-machine test, an ancillary service thread is opened on backstage simultaneously, is gone using an auxiliary examination program, the auxiliary Checking routine verifies strike-machine result;
Step S2, auxiliary examination program to strike-machine result verification after if by verification, then the auxiliary examination program to complete machine into The permanent MAC information of row programming and factory sequence number;
Step S3, according to the requirement of preset various types, external environment is built, system test is carried out to complete machine, and will survey Test result is stored in the memory block of surveyed complete machine in a manner of key assignments;
Step S4, MAC information checking is carried out, the test result of complete machine is tested using a MAC and complete machine result checking routine Card, later further verifies MAC information and is sent to background server.
6. the system test process of Android communicating terminal hardware as claimed in claim 5, it is characterised in that: step S3's In system test, all test items can be all recorded in the memory block of surveyed complete machine, for assisting MAC and complete machine result school Test program.
CN201811606482.XA 2018-12-27 2018-12-27 A kind of Android communicating terminal test method for hardware, test technology and system test process Pending CN109656769A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811606482.XA CN109656769A (en) 2018-12-27 2018-12-27 A kind of Android communicating terminal test method for hardware, test technology and system test process
CN202310408998.8A CN116414640A (en) 2018-12-27 2018-12-27 Communication terminal hardware testing method and complete machine testing flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811606482.XA CN109656769A (en) 2018-12-27 2018-12-27 A kind of Android communicating terminal test method for hardware, test technology and system test process

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202310408998.8A Division CN116414640A (en) 2018-12-27 2018-12-27 Communication terminal hardware testing method and complete machine testing flow

Publications (1)

Publication Number Publication Date
CN109656769A true CN109656769A (en) 2019-04-19

Family

ID=66116838

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202310408998.8A Pending CN116414640A (en) 2018-12-27 2018-12-27 Communication terminal hardware testing method and complete machine testing flow
CN201811606482.XA Pending CN109656769A (en) 2018-12-27 2018-12-27 A kind of Android communicating terminal test method for hardware, test technology and system test process

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202310408998.8A Pending CN116414640A (en) 2018-12-27 2018-12-27 Communication terminal hardware testing method and complete machine testing flow

Country Status (1)

Country Link
CN (2) CN116414640A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110650136A (en) * 2019-09-23 2020-01-03 睿云联(厦门)网络通讯技术有限公司 SIP PBX implementation method and system deployed at android platform end
CN111585847A (en) * 2020-05-21 2020-08-25 四川虹美智能科技有限公司 Detection system and method
CN113419162A (en) * 2021-07-09 2021-09-21 广州朗国电子科技股份有限公司 PCB testing method and device based on android system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102455961A (en) * 2010-10-29 2012-05-16 鸿富锦精密工业(深圳)有限公司 System and method for managing and controlling mainboard testing process
CN104601771A (en) * 2014-12-26 2015-05-06 沈阳晨讯希姆通科技有限公司 Method and system for testing main board of mobile phone
CN106954063A (en) * 2017-03-17 2017-07-14 山东浪潮商用系统有限公司 A kind of set-top box test method, apparatus and system
US20180018247A1 (en) * 2014-09-30 2018-01-18 International Business Machines Corporation Device, method and program for performing system testing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102455961A (en) * 2010-10-29 2012-05-16 鸿富锦精密工业(深圳)有限公司 System and method for managing and controlling mainboard testing process
US20180018247A1 (en) * 2014-09-30 2018-01-18 International Business Machines Corporation Device, method and program for performing system testing
CN104601771A (en) * 2014-12-26 2015-05-06 沈阳晨讯希姆通科技有限公司 Method and system for testing main board of mobile phone
CN106954063A (en) * 2017-03-17 2017-07-14 山东浪潮商用系统有限公司 A kind of set-top box test method, apparatus and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110650136A (en) * 2019-09-23 2020-01-03 睿云联(厦门)网络通讯技术有限公司 SIP PBX implementation method and system deployed at android platform end
CN110650136B (en) * 2019-09-23 2021-09-07 睿云联(厦门)网络通讯技术有限公司 SIP PBX implementation method and system deployed at android platform end
CN111585847A (en) * 2020-05-21 2020-08-25 四川虹美智能科技有限公司 Detection system and method
CN113419162A (en) * 2021-07-09 2021-09-21 广州朗国电子科技股份有限公司 PCB testing method and device based on android system

Also Published As

Publication number Publication date
CN116414640A (en) 2023-07-11

Similar Documents

Publication Publication Date Title
US20190205233A1 (en) Fault injection testing apparatus and method
CN104123219A (en) Method and device for testing software
CN109656769A (en) A kind of Android communicating terminal test method for hardware, test technology and system test process
CN103458086B (en) A kind of smart mobile phone and fault detection method thereof
CN103744824B (en) One is dispatched from the factory method of testing and test system
CN103454575B (en) For realizing system, PCBA board and method that PCBA board is tested
CN104317713A (en) Automatic testing tool and method on basis of templates
CN102968371B (en) The method of test JAVA API unit component and device
CN111339731B (en) FPGA (field programmable Gate array) verification platform and method for SoC (System on chip)
CN104572031A (en) Method and device for generating test case
CN105677344A (en) Updating system of firmware of complex programmable logic device and updating method of updating system
CN110321292A (en) Chip detecting method, device, electronic equipment and computer readable storage medium
CN109582524A (en) A kind of test method, system and electronic equipment and storage medium
CN106528429A (en) UI testing method and device
CN101594627A (en) A kind of apparatus and method of simulating mobile terminal fault
CN104021251A (en) PCB check method and device
CN101131663B (en) Method for detecting installation correctness of computer PCI/PCI Express devices
CN107679423A (en) Partition integrity inspection method and device
CN106547667B (en) Fault prompting method and system for mobile terminal
CN102289399A (en) System and method for testing main board of computer
CN102455965A (en) Electronic device test system and method
CN109656804A (en) Automated testing method, equipment, storage medium and device
CN105701072A (en) Method and device for filtering test contents of multiple projects based on excel form
CN106326043A (en) USB based diagnosis device and method
CN115757099A (en) Automatic test method and device for platform firmware protection recovery function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419