CN109649346A - Building site vehicle purges platform - Google Patents

Building site vehicle purges platform Download PDF

Info

Publication number
CN109649346A
CN109649346A CN201910063674.9A CN201910063674A CN109649346A CN 109649346 A CN109649346 A CN 109649346A CN 201910063674 A CN201910063674 A CN 201910063674A CN 109649346 A CN109649346 A CN 109649346A
Authority
CN
China
Prior art keywords
building site
platform
vehicle
purging
site vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910063674.9A
Other languages
Chinese (zh)
Inventor
刘文斌
高维
吕洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sp Longyuan Power Technology & Engineering Co Ltd
Original Assignee
Sp Longyuan Power Technology & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sp Longyuan Power Technology & Engineering Co Ltd filed Critical Sp Longyuan Power Technology & Engineering Co Ltd
Priority to CN201910063674.9A priority Critical patent/CN109649346A/en
Publication of CN109649346A publication Critical patent/CN109649346A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60SSERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
    • B60S3/00Vehicle cleaning apparatus not integral with vehicles
    • B60S3/04Vehicle cleaning apparatus not integral with vehicles for exteriors of land vehicles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/10009Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation sensing by radiation using wavelengths larger than 0.1 mm, e.g. radio-waves or microwaves
    • G06K7/10366Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation sensing by radiation using wavelengths larger than 0.1 mm, e.g. radio-waves or microwaves the interrogation device being adapted for miscellaneous applications
    • G06K7/10415Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation sensing by radiation using wavelengths larger than 0.1 mm, e.g. radio-waves or microwaves the interrogation device being adapted for miscellaneous applications the interrogation device being fixed in its position, such as an access control device for reading wireless access cards, or a wireless ATM
    • G06K7/10425Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation sensing by radiation using wavelengths larger than 0.1 mm, e.g. radio-waves or microwaves the interrogation device being adapted for miscellaneous applications the interrogation device being fixed in its position, such as an access control device for reading wireless access cards, or a wireless ATM the interrogation device being arranged for interrogation of record carriers passing by the interrogation device

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • General Health & Medical Sciences (AREA)
  • Electromagnetism (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention belongs to vehicle purging techniques fields, disclose a kind of building site vehicle purging platform, comprising: purge platform body, include silt pond and double-edged fine-toothed comb, the silt pond is formed with sinking space, the top in the silt pond has opening, and the double-edged fine-toothed comb is covered in the opening, and for carrying building site vehicle to be purged;And air bubble, the inner side and outer side for the wheel to the building site vehicle to be purged export compressed air.The present invention is through the above technical solution, so that this purging platform purges vehicle using the compressed air of air bubble output, to instead of traditional water backwashing manner, water resource is saved, platform is rinsed compared to traditional clear water simultaneously, eliminates sewage circulating treating system, the purging platform structure is simple, low cost, it is more convenient.

Description

Building site vehicle purges platform
Technical field
The invention belongs to vehicle purging techniques field, in particular to a kind of convenient and efficient, water conservation construction site vehicle Purging platform.
Background technique
Effectively to administer the Construction traffic band road Ni Shang, construction is eliminated to the maximum extent to urban environment and resident living Influence, each city issue one after another " about further strengthen building site vehicle rinse facilities management notice ", be distinctly claimed and build Vehicle wash facility should all be arranged by building building site, establish vehicle rinsing platform, and vehicle rinsing platform must not exceed 3 apart from building site gate Rice.Newly-started engineering will carry out vehicle wash facility system of check and acceptance, organize to check and accept by construction unit, examination will be unqualified to be ordered It stops work to rectify and improve.
Building site vehicle in the prior art rinses platform and generally includes the sink for containing water, and some is using allowing vehicle The method directly opened from sink realizes the cleaning of tire.When cleaning, sink opening is always maintained at unlimited setting, water quality It can be deteriorated.The cleaning that tire is realized using giant or the method for artificial flushing also.It is dry in order to rinse when cleaning Only, a large amount of pressure (hydraulic) waters are needed.Which kind of backwashing manner is either used, a large amount of wastes of water resource, the pollution at water source are all caused.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of building site vehicles to purge platform comprising: purging platform Ontology includes silt pond and double-edged fine-toothed comb, and the silt pond is formed with sinking space, and the top in the silt pond has opening, described Double-edged fine-toothed comb is covered in the opening, and for carrying building site vehicle to be purged;And air bubble, for being built to described wait purge The inner side and outer side of the wheel of building site vehicle exports compressed air.
In building site vehicle as described above purging platform, it is preferable that the air bubble specifically includes: air tank, For accommodating the compressed air, it is set to the outside of the double-edged fine-toothed comb;Interior blowpipe, is provided with the first valve, and one end with it is described The gas outlet of air tank is connected to, the inside of the wheel of other end building site vehicle to be purged described in;Outer blowpipe, is provided with Second valve, and one end is connected to the gas outlet of the air tank, vehicle of the other end towards the building site vehicle to be purged The outside of wheel;Inner nozzle is set to the other end of the interior blowpipe;And outer nozzle, it is set to the other end of the outer blowpipe.
In building site vehicle as described above purging platform, it is preferable that the rotation angle of the inner nozzle is 360 °.
In building site vehicle as described above purging platform, it is preferable that the air bubble further include: compressor is used Air after generating pressurization to air pressurized, the gas outlet of the compressor is connected to the air inlet of the air tank.
In building site vehicle as described above purging platform, it is preferable that the building site vehicle purging platform is also It include: detector, for detecting whether the building site vehicle to be purged drives to predeterminated position;And controller, the control The input terminal of device processed is connect with the sensor, and the output end of the controller is connect with first valve and the second valve, Control first valve and the second valve opening or closing.
In building site vehicle as described above purging platform, it is preferable that the detector includes: the first buried vehicle Sensor and the second underground vehicle sensor;The first underground vehicle sensor and the second underground vehicle sensor Along the two sides for being driven out to direction and being separately positioned on the purging platform body of the building site vehicle to be purged;First ground Buried vehicle sensors are connect with the controller so that the controller controls first valve and the second valve opening;Institute The second underground vehicle sensor is stated to be connect with the controller so that the controller controls first valve and the second valve Door is closed.
In building site vehicle as described above purging platform, it is preferable that the detector further include: the first card reading Device is mounted at the entrance in construction site, and the radiation direction of the antenna of first card reader is towards outside the construction site; Second card reader is mounted at the entrance in the construction site, and the radiation direction of the antenna of second card reader is towards institute It states in construction site;And electronic tag, it is mounted on the building site vehicle to be cleaned, is loaded with the construction site to be cleaned The information of vehicle is communicated to connect with first card reader and second card reader by radio RF recognition technology;It is corresponding Ground, the controller are also connect with first card reader and the second card reader, control first valve and the second valve is opened It opens and closes;Wherein, the purging platform body is located on the inside of the entrance in the construction site.
In building site vehicle as described above purging platform, it is preferable that the building site vehicle purging platform is also Include: display unit, connect with the controller, shows that the building site vehicle to be purged is in purging state.
In building site vehicle as described above purging platform, it is preferable that the building site vehicle purging platform is also Include: dedusting pond, is set to the side of the purging platform body;Exhaust fan is set to the side wall of the purging platform body On;And deduster, it is connected to, is set on ground through cleaning shaft with the gas outlet of the exhaust fan, the cleaning shaft setting In in the dedusting pond.
Technical solution provided in an embodiment of the present invention has the benefit that
By setting air bubble and purging platform body, so that this purging platform uses the compressed air pair of air bubble output Vehicle is purged, to save water resource, while rinsing compared to traditional clear water instead of traditional water backwashing manner Platform eliminates sewage circulating treating system, and the purging platform structure is simple, and low cost is more convenient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that a kind of building site vehicle provided in an embodiment of the present invention purges platform.
Wherein, symbol description is as follows in figure:
1 purging platform body, 11 double-edged fine-toothed combs, 3 air tanks, blowpipe in 4,5 outer blowpipes, blow gun in 6,7 outer blow guns, 8 compressors, 9 first induction zones, 10 second induction zones, 12 first valves, 13 second valves.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.The explanation of each example through the invention Mode, which provides, to be not intended to limit the present invention.In fact, those skilled in the art will be clear that, the scope of the present invention or essence are not being departed from In the case where mind, it can modify in the present invention and modification.For example, being illustrated or described as the spy of a part of one embodiment Sign can be used for another embodiment, to generate another embodiment.Thus, it may be desirable to which the present invention includes to be included into appended power Such modifications and variations in the range of benefit requirement and its equivalent.
In the description of the present invention, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the present invention rather than require the present invention that must be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.Term used in the present invention " connected ", " connection ", " setting " shall be understood in a broad sense, for example, it may be solid Fixed connection, may be a detachable connection;It can be directly connected, can also be indirectly connected by intermediate member;It can be Line electrical connection, radio connection are also possible to wireless communication signals connection, for the ordinary skill in the art, can To understand the concrete meaning of above-mentioned term as the case may be.
Referring to Fig. 1, the embodiment of the invention provides a kind of building site vehicles to purge platform comprising: purging platform sheet Body 1 and air bubble.
Specifically, purging platform body 1 (or silt pond) is for providing operating space comprising: silt pond and comb Son 11.For the ease of the traveling of vehicle, silt pond is case structure, is generally disposed at below ground, so that it is empty to be formed with sinking Between.Opening is provided at the top of silt pond, so that sinking space is connected with the atmospheric environment of outside.Double-edged fine-toothed comb 11 is grid knot Structure, is covered in the opening in silt pond, and lower section is sinking space.In purging, building site vehicle to be purged is travelled to comb On son 11.Wheel of the air (or compressed air) that air bubble is used to have certain pressure to building site vehicle to be purged Inner side and outer side output, i.e., the inner side and outer side of wheel is purged, falls the clod on wheel, silt.The air Pressure value can be 0.4MPa~0.6MPa, can also for other pressure values in practical applications can be according to the actual situation It is selected, the present embodiment is to this without limiting.
The present embodiment is by setting air bubble and purging platform body 1, so that this purging platform is using air bubble output Compressed air purges vehicle, to save water resource, while compared to tradition instead of traditional water backwashing manner Clear water rinse platform, eliminate sewage circulating treating system, the purging platform structure is simple, and low cost is more convenient.
Air bubble specifically includes: air tank 3, interior blowpipe 4, outer blowpipe 5, interior blow gun 6 and outer blow gun 7.Air tank 3 is for holding It receives compressed air, is set to the outside of double-edged fine-toothed comb 11, the left side of double-edged fine-toothed comb 11 is provided with air tank 3, the right side of double-edged fine-toothed comb 11 as shown in figure 1 It is provided with air tank 3.For purging on the inside of wheel, the gas outlet of one end and air tank 3 connects the compressed air that interior blowpipe 4 exports It is logical, the inside of the wheel of other end direction building site vehicle to be purged, in the position of gas outlet of the interior blowpipe 4 close to air tank 3 It installs and is equipped with the first valve 12.The compressed air that outer blowpipe 5 exports is used to purge the outside of wheel, one end and air tank 3 Gas outlet connection, the outside of the wheel of other end direction building site vehicle to be purged, in outer blowpipe 5 going out close to air tank 3 The position of port is provided with the second valve 13.Inner nozzle 6 is set to the other end of interior blowpipe 4.Outer nozzle 7 is set to outer blowpipe 5 The other end.When purging, the first valve 12 and the second valve 13 are opened, compressed air respectively through interior blowpipe 4 and interior blow gun 6 with And outer blowpipe 5 and outer blow gun 7 are conveyed to the inner side and outer side of wheel.After purging, the first valve 12 and the second valve are closed 13.Building site vehicle breaks inside and outside blowpipe in order to prevent, and two blowpipes are hose, such as stainless steel software, and each along double-edged fine-toothed comb 11 are laid with.There are four wheels for usual building site vehicle dress, and in order to efficiently purge wheel, the quantity of air bubble is 4, a vehicle The position of wheel configures an air bubble.The rotation angle of inner nozzle 6 is 360 °, so that a nozzle is taken into account purging and be located at The wheel of its two sides further improves purging efficiency.It can also be 0 ° that the rotation angle of outer nozzle 7, which can be less than 180 °, Outer nozzle 7 is oriented fixed angle at this time, and the rotation angle of the present embodiment not external nozzle 7 is defined.
In order to guarantee the continual operation of air bubble, air bubble further include: compressor 8 is used for air pressurized to produce Air after raw pressurization, i.e. generation compressed air, gas outlet is connected to the air inlet of air tank 3.When the pressure of air tank 3 is low When the first setting pressure, compressor 8 starts, and is inflated by compressor 8 to air tank 3.When the pressure of air tank 3 is higher than When the second setting pressure, compressor 8 is closed.
In order to reduce artificial running cost, building site vehicle purges platform further include: detector and controller.Detector For detecting whether building site vehicle to be purged drives to predeterminated position.Controller and sensor and the first valve 12 and the The connection of two valves 13, the data for being sent according to sensor control the first valve 12 and the second valve 13 opens or closes.
Preferably, detector includes: the first underground vehicle sensor and the second underground vehicle sensor.First is buried Formula vehicle sensors and the second underground vehicle sensor are separately positioned on and blow along the direction that is driven out to of building site vehicle to be purged The two sides of platform body 1 are washed, the rear that purging platform body 1 is arranged in such as the first underground vehicle sensor, second is buried The front of purging platform body 1 is arranged in vehicle sensors, is usually respectively divided out at the rear of purging platform body 1 and front First induction zone 9 and the second induction zone 10, the first underground vehicle sensor and the second underground vehicle sensor are set respectively It sets in the first induction zone 9 and the second induction zone 10.When the first underground vehicle sensor detects building site vehicle, Controller controls the first valve 12 and the second valve 13 is opened, and realizes the purging of vehicle;When the second underground vehicle sensor is examined When measuring building site vehicle, show that vehicle purging finishes, sail out of purging platform body, controller controls the first valve 12 and the Two valves 13 are closed, and realize the purging of vehicle.
In order to efficiently use air bubble resource, before vehicle is driven out to construction site, vehicle is purged, detector also wraps It includes: the first card reader, the second card reader and electronic tag.First card reader is mounted at the entrance in construction site, and first reads The radiation direction of the antenna of card device is towards outside construction site.Second card reader is mounted at the entrance in construction site, and second reads The radiation direction of the antenna of card device is towards in construction site.Electronic tag is mounted on building site vehicle to be cleaned, be loaded with to The information for cleaning building site vehicle, is connected with the first card reader and the second card reader by wireless radio frequency discrimination RFID technical communication It connects.Controller is also connect with the first card reader and the second card reader, controls the first valve 12 and the second valve 13 opens and closes. Specifically, controller judgement receives the sequencing for the data that the first card reader and the second card reader are sent, if first receiving first Card reader send data, after receive the second card reader transmission data, show that vehicle drives into construction site, control first at this time Valve 12 and the second valve 13 are closed, even if receiving the data of the first underground vehicle sensor transmission again, also control the first valve Door 12 and the second valve 13 are closed.If first receive the second card reader transmission data, after receive the first underground vehicle sensor The data of transmission, then control the first valve 12 and the second valve 13 is opened, if sending receiving the second underground vehicle sensor Data, then control the first valve 12 and the second valve 13 and close.Purging platform body 1 is located in the entrance in construction site Side.
Building site vehicle purges platform further include: display unit is connect with controller, shows construction site vehicle to be purged Be in purging state.Display unit can be display screen, purge state on a display screen with text importing;It can also be multiple The lamp of different colours, such as red light and green light, when vehicle drives towards purging platform, green light is lighted, when traveling to the first buried vehicle When induction zone where sensor, green light goes out, and red light is lighted, when traveling to the induction where the second underground vehicle sensor Qu Shi, green light are lighted, and red light goes out, and are in different positions by vehicle and are lighted the lamp of different colours, to remind driver It is finished with whether this purging working platform personnel vehicle be in purging state or purge.
In order to be had an impact when further preventing purging to ambient enviroment life, this platform further include: dedusting pond, exhaust fan And deduster.Dedusting pond is set to the side of purging platform body 1, is also formed with sinking space.It is flat that exhaust fan is set to purging On the side wall of playscript with stage directions body 1, for aspirating the dust generated when air bubble is opened.Cleaning shaft is set in dedusting pond, one end It is connected to the gas outlet of exhaust fan, the other end is connected to the air inlet of deduster.Deduster is set on ground, can be cloth bag Formula deduster.When purging, exhaust fan and deduster are opened, and exhaust fan is by dust suction to deduster, by deduster to powder Dirt is recycled.
For the ease of clearing up silt, the clod of silt bottom of pond portion, this purging platform further include: sediment pump is set to mud The bottom of sand basin, for extracting silt, clod out.
In order to rationally control flushing times, building site vehicle purges platform further include: the time relay is connected to control Between device processed and the first valve 12 and between controller and the second valve 13, for automatically powering off after purging the set time, To close the first valve 12 and the second valve 13.
To sum up, the embodiment of the present invention is by setting air bubble and purging platform body, so that this purging platform uses air The compressed air of big gun output purges vehicle, to save water resource, same phase instead of traditional water backwashing manner Than rinsing platform in traditional clear water, sewage circulating treating system is eliminated, the purging platform structure is simple, low cost, more It is convenient and efficient.
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Therefore, embodiment disclosed above, in all respects are merely illustrative, not the only.Institute Have within the scope of the present invention or is included in the invention in the change being equal in the scope of the present invention.

Claims (9)

1. a kind of building site vehicle purges platform, which is characterized in that the building site vehicle purges platform and includes:
Platform body is purged, includes silt pond and double-edged fine-toothed comb, the silt pond is formed with sinking space, the top tool in the silt pond There is opening, the double-edged fine-toothed comb is covered in the opening, and for carrying building site vehicle to be purged;With
Air bubble, the inner side and outer side for the wheel to the building site vehicle to be purged export compressed air.
2. building site vehicle according to claim 1 purges platform, which is characterized in that the air bubble specifically includes:
Air tank is set to the outside of the double-edged fine-toothed comb for accommodating the compressed air;
Interior blowpipe is provided with the first valve, and one end is connected to the gas outlet of the air tank, and the other end is towards described wait purge The inside of the wheel of building site vehicle;
Outer blowpipe is provided with the second valve, and one end is connected to the gas outlet of the air tank, and the other end is towards described wait purge The outside of the wheel of building site vehicle;
Inner nozzle is set to the other end of the interior blowpipe;With
Outer nozzle is set to the other end of the outer blowpipe.
3. building site vehicle according to claim 2 purges platform, which is characterized in that
The rotation angle of the inner nozzle is 360 °.
4. building site vehicle according to claim 2 purges platform, which is characterized in that the air bubble further include:
Compressor, for generating the air after pressurization to air pressurized, the gas outlet of the compressor and the air tank into Port connection.
5. building site vehicle according to claim 1 purges platform, which is characterized in that the building site vehicle purging Platform further include:
Detector, for detecting whether the building site vehicle to be purged drives to predeterminated position;With
Controller, the input terminal of the controller are connect with the sensor, the output end of the controller and first valve Door is connected with the second valve, controls first valve and the second valve opening or closing.
6. building site vehicle according to claim 5 purges platform, which is characterized in that the detector includes: first Underground vehicle sensor and the second underground vehicle sensor;
The first underground vehicle sensor and the second underground vehicle sensor are along the building site vehicle to be purged It is driven out to the two sides that direction is separately positioned on the purging platform body;
The first underground vehicle sensor connect with the controller so that the controller control first valve and Second valve opening;
The second underground vehicle sensor connect with the controller so that the controller control first valve and Second valve is closed.
7. building site vehicle according to claim 6 purges platform, which is characterized in that the detector further include:
First card reader, is mounted at the entrance in construction site, and the radiation direction of the antenna of first card reader is towards institute It states outside construction site;
Second card reader is mounted at the entrance in the construction site, the radiation direction court of the antenna of second card reader Into the construction site;With
Electronic tag is mounted on the building site vehicle to be cleaned, is loaded with the information of the building site vehicle to be cleaned, It is communicated to connect with first card reader and second card reader by radio RF recognition technology;
Accordingly, the controller is also connect with first card reader and the second card reader, controls first valve and the Two valve openings and closing;
Wherein, the purging platform body is located on the inside of the entrance in the construction site.
8. building site vehicle according to claim 5 purges platform, which is characterized in that the building site vehicle purging Platform further include:
Display unit is connect with the controller, shows that the building site vehicle to be purged is in purging state.
9. building site vehicle according to claim 1 purges platform, which is characterized in that the building site vehicle purging Platform further include:
Dedusting pond is set to the side of the purging platform body;
Exhaust fan is set on the side wall of the purging platform body;With
Deduster is connected to through cleaning shaft with the gas outlet of the exhaust fan, is set on ground, and the cleaning shaft is set to In the dedusting pond.
CN201910063674.9A 2019-01-23 2019-01-23 Building site vehicle purges platform Pending CN109649346A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910063674.9A CN109649346A (en) 2019-01-23 2019-01-23 Building site vehicle purges platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910063674.9A CN109649346A (en) 2019-01-23 2019-01-23 Building site vehicle purges platform

Publications (1)

Publication Number Publication Date
CN109649346A true CN109649346A (en) 2019-04-19

Family

ID=66120569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910063674.9A Pending CN109649346A (en) 2019-01-23 2019-01-23 Building site vehicle purges platform

Country Status (1)

Country Link
CN (1) CN109649346A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110304025A (en) * 2019-06-28 2019-10-08 宣化钢铁集团有限责任公司 Coal yard wheel clean method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218118Y (en) * 1994-11-25 1996-01-24 朱其胜 On-board washing apparatus
US20060011220A1 (en) * 2004-07-14 2006-01-19 Mueller Barbara A Shopping cart wash tunnel
KR20110084701A (en) * 2010-01-18 2011-07-26 우영메카(주) Parking and entrance and exit security managing system and apparatus
CN203713832U (en) * 2014-02-26 2014-07-16 滨州职业学院 Compressed air automobile washing device
CN203974768U (en) * 2014-06-27 2014-12-03 宝山钢铁股份有限公司 A kind of stock ground service rack is responded to and washing equipment automatically with vehicle
CN104217466A (en) * 2014-09-05 2014-12-17 大连工业大学 RFID-based traffic direction identification system and method
CN206501831U (en) * 2016-11-30 2017-09-19 显为智能科技(苏州)有限公司 Intelligent vehicle washing system
CN207712022U (en) * 2018-01-17 2018-08-10 山东鲁王建工有限责任公司 Vehicle rinsing stage apparatus
CN209700618U (en) * 2019-01-23 2019-11-29 国电龙源电力技术工程有限责任公司 Building site vehicle purges platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218118Y (en) * 1994-11-25 1996-01-24 朱其胜 On-board washing apparatus
US20060011220A1 (en) * 2004-07-14 2006-01-19 Mueller Barbara A Shopping cart wash tunnel
KR20110084701A (en) * 2010-01-18 2011-07-26 우영메카(주) Parking and entrance and exit security managing system and apparatus
CN203713832U (en) * 2014-02-26 2014-07-16 滨州职业学院 Compressed air automobile washing device
CN203974768U (en) * 2014-06-27 2014-12-03 宝山钢铁股份有限公司 A kind of stock ground service rack is responded to and washing equipment automatically with vehicle
CN104217466A (en) * 2014-09-05 2014-12-17 大连工业大学 RFID-based traffic direction identification system and method
CN206501831U (en) * 2016-11-30 2017-09-19 显为智能科技(苏州)有限公司 Intelligent vehicle washing system
CN207712022U (en) * 2018-01-17 2018-08-10 山东鲁王建工有限责任公司 Vehicle rinsing stage apparatus
CN209700618U (en) * 2019-01-23 2019-11-29 国电龙源电力技术工程有限责任公司 Building site vehicle purges platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110304025A (en) * 2019-06-28 2019-10-08 宣化钢铁集团有限责任公司 Coal yard wheel clean method

Similar Documents

Publication Publication Date Title
CN209700618U (en) Building site vehicle purges platform
CN109649346A (en) Building site vehicle purges platform
CN206456344U (en) A kind of mining running auto spraying dust falling system
CN105674793B (en) A kind of heat exchanger energy-saving cleaning apparatus
CN104975626B (en) A kind of lightweight high-pressure water jet ground heading equipment
CN106498997A (en) A kind of collection excavates the Accrete clearing device and dredging method that collects and carry one
CN109720306A (en) A kind of intelligent vehicle self-stripping system for Dust Improvement
CN105022323B (en) A kind of radio-frequency intelligent matching dregs dumping system based on totally-enclosed slag-soil truck
CN107524183A (en) A kind of hydraulic engineering row's silt device
US20230003330A1 (en) Pipeline inspection system
CN110322641A (en) A kind of automobile-used inflation cleaning control system of intelligence
CN109131246A (en) Self-service car washing device of intelligence
CN109436851A (en) A kind of fettling installation and method of closed mixing sand tank
CN107059973A (en) Pond cleaning method
CN102582587A (en) Compact water saver for automobile washing
CN210816457U (en) Cleaning equipment for large quartz blocks
CN209957548U (en) Integrated equipment for resource utilization of town sewage
CN209156521U (en) A kind of building 3D printing equipment cleaning device
CN105667458A (en) Intelligent self-service vehicle washer capable of being used by multiple people simultaneously
CN118223945B (en) Construction and ventilation method for dangerous waste landfill rock tunnel
CN208934414U (en) A kind of portable mixer truck unloading bucket device for plugging
CN109750586A (en) A kind of measuring device and measuring method of road surface pit slot
CN110180817A (en) The multiphase flow cleaning device and cleaning method of solid state electrode in a kind of chemical instruments
CN205836782U (en) One utilizes the self-service vehicle washing system of circular treatment waste water, sewage
CN109093522A (en) 3D printing object after-treatment device, system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination