CN109638948A - A kind of method and device promoting power-efficient - Google Patents

A kind of method and device promoting power-efficient Download PDF

Info

Publication number
CN109638948A
CN109638948A CN201811506518.7A CN201811506518A CN109638948A CN 109638948 A CN109638948 A CN 109638948A CN 201811506518 A CN201811506518 A CN 201811506518A CN 109638948 A CN109638948 A CN 109638948A
Authority
CN
China
Prior art keywords
circuit
load
power
efficient
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811506518.7A
Other languages
Chinese (zh)
Inventor
余鹏飞
杜钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Ruiqin Technology Co Ltd
Original Assignee
Wuxi Ruiqin Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Ruiqin Technology Co Ltd filed Critical Wuxi Ruiqin Technology Co Ltd
Priority to CN201811506518.7A priority Critical patent/CN109638948A/en
Publication of CN109638948A publication Critical patent/CN109638948A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/005Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting using a power saving mode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/005Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting using a power saving mode
    • H02J9/007Detection of the absence of a load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0067Converter structures employing plural converter units, other than for parallel operation of the units on a single load

Abstract

The application provides a kind of method and device for promoting power-efficient.This method comprises: obtaining the load of system after the power good of system, and according to the load of system, control system works in the first circuit or second circuit, wherein the first circuit and second circuit are the different circuit of power-efficient.In the program, according to the payload size of system, carry out control system work in different circuits, and the power-efficient of different circuits is different, according to the payload size of system, the operating circuit of system is set as the higher circuit of power-efficient under the load of current system, helps to ensure that system power-efficient all with higher under the loading condition of various systems.

Description

A kind of method and device promoting power-efficient
Technical field
This application involves technical field of circuit control more particularly to a kind of method and devices for promoting power-efficient.
Background technique
Existing smart machine possesses higher power-efficient when the load of system is lower, and when the load of system compared with The power-efficient of Gao Shi, smart machine will decline.Alternatively, existing smart machine only designs the loading range in certain system Interior power-efficient with higher, and except preset range, power-efficient will decline, and the loading range is unable to satisfy The use demand of user.
How to make smart machine power-efficient all with higher under the loading condition of various systems, is to need at present The technical issues of solution.
Summary of the invention
The application provides a kind of method and device for promoting power-efficient, to realize smart machine in the negative of various systems Power-efficient all with higher in the case of load.
In a first aspect, the application provides a kind of method for promoting power-efficient, comprising: after the power good of system, obtain The load of system is taken, and according to the load of system, control system works in the first circuit or second circuit, wherein the first circuit It is the different circuit of power-efficient from second circuit.In the program, according to the payload size of system, carry out control system work not Same circuit, and the power-efficient of different circuits is different, and according to the payload size of system, the operating circuit of system is set For the higher circuit of power-efficient under the load of current system, help to ensure that system all has under the loading condition of various systems There is higher power-efficient.
In one possible implementation, the above-mentioned load according to system, control system work in the first circuit or Two circuits, comprising: judge whether the load of system is greater than load threshold, be if the load of system greater than load threshold, controls System works in the first circuit, alternatively, control system works in second circuit if the load of system is not more than load threshold.Its In, when the load of system is greater than load threshold, the power-efficient of the first circuit is higher than the power-efficient of second circuit, in system Load when being not more than load threshold, the power-efficient of the first circuit is not higher than the power-efficient of second circuit.In the program, root According to the size of the load of system, to determine the operating circuit of system, and the operating circuit determined is the tool under present load size There is the circuit of relatively high power-efficient, helps to ensure that system electricity all with higher under the loading condition of various systems Source efficiency.
In one possible implementation, above-mentioned control system works in the first circuit, comprising: if system work at present In second circuit, then control system conversion work is in the first circuit.The above-mentioned control system works in second circuit, comprising: If system work at present is in the first circuit, control system conversion work is in second circuit.In the program, however, it is determined that current system Work is in the lower circuit of power-efficient, then control system conversion work circuit, if system worked it is higher in power-efficient Circuit reduce resource consumption then without being changed to the operating circuit of system.
In one possible implementation, the above method can also include: in system before the power good of system When electrification, control system works in the first circuit.When system just electrifies, the power supply of system is also unstable, can not be according to system Loading condition select the operating circuit of system, since the first circuit has higher power supply effect when the load of system is higher The load for the system that rate, i.e. the first circuit can be born is higher relative to second circuit, in system electrification, selects the work of system Circuit is the first circuit, helps avoid the possibility that overload damage occurs in circuit system.
In one possible implementation, the load of above-mentioned acquisition system, can specifically include: periodically obtain system The load of system.Since the load of system can constantly change according to behaviour in service, the load of system is periodically obtained, to week The higher circuit of determination power-efficient of phase property, helps to ensure that system is all relatively high in the power-efficient at each moment.
Second aspect, the application provide a kind of device for promoting power-efficient, comprising: load determining unit, for being After the power good of system, the load of system is obtained.Circuit selecting unit, for according to load, control system to work in the first electricity Road or second circuit, the first circuit and second circuit are the different circuit of power-efficient.It is big according to the load of system in the device It is small, carry out control system work in different circuits, and the power-efficient of different circuits is different, it is big according to the load of system It is small, the operating circuit of system is set as the higher circuit of power-efficient under the load of current system, helps to ensure that system exists Power-efficient all with higher under the loading condition of various systems.
In one possible implementation, foregoing circuit selecting unit specifically can be used for: judging the load of system is No to be greater than load threshold, if the load of system is greater than load threshold, control system works in the first circuit, alternatively, if system Load be not more than load threshold, then control system works in second circuit.Wherein, it is greater than load threshold in the load of system When, the power-efficient of the first circuit is higher than the power-efficient of second circuit, when the load of system is not more than load threshold, first The power-efficient of circuit is not higher than the power-efficient of second circuit.In the device, according to the size of the load of system, it is to determine The operating circuit of system, and the operating circuit determined is the circuit under present load size, with relatively high power-efficient, Help to ensure that system power-efficient all with higher under the loading condition of various systems.
In one possible implementation, foregoing circuit selecting unit specifically can be used for control system and work in first Circuit, comprising: if system work at present is in second circuit, control system conversion work is in the first circuit.Foregoing circuit selection Unit specifically can be used for control system and work in second circuit, comprising: be if system work at present in the first circuit, controls Conversion work of uniting is in second circuit.In the device, however, it is determined that current system works in the lower circuit of power-efficient, then controls and be Conversion work circuit of uniting carries out if system has worked in the higher circuit of power-efficient without the operating circuit to system Change, reduces resource consumption.
In one possible implementation, foregoing circuit selecting unit can be also used for: in system electrification, control system System works in the first circuit.When system just electrifies, the power supply of system is also unstable, can not be selected according to the loading condition of system The operating circuit for selecting system, since the first circuit has higher power-efficient, i.e. the first circuit when the load of system is higher The load for the system that can be born is higher relative to second circuit, in system electrification, selects the operating circuit of system for the first electricity Road helps avoid the possibility that overload damage occurs in circuit system.
In one possible implementation, above-mentioned load determining unit specifically can be used for: in the power good of system Afterwards, the load of the system is periodically obtained.Since the load of system can constantly change according to behaviour in service, periodically The load of acquisition system helps to ensure that system in the electricity at each moment periodically to determine the higher circuit of power-efficient Source efficiency is all relatively high.
The third aspect, the application provide a kind of network equipment, comprising:
Memory, for storing program instruction;
Processor executes aforementioned first according to the program of acquisition for calling the program instruction stored in the memory Method described in any embodiment in aspect or first aspect.
Fourth aspect, the application provide a kind of computer readable storage medium, the computer-readable recording medium storage There are computer executable instructions, the computer executable instructions are for making computer execute aforementioned first aspect or first aspect Method described in middle any embodiment.
Detailed description of the invention
Fig. 1 is a kind of method schematic diagram for promoting power-efficient provided by the present application;
Fig. 2 is a kind of flow diagram for promoting power-efficient provided by the present application;
Fig. 3 is a kind of schematic device for promoting power-efficient provided by the present application;
Fig. 4 is a kind of structural schematic diagram of the network equipment provided by the present application.
Specific embodiment
In order to keep the purposes, technical schemes and advantages of the application clearer, below in conjunction with attached drawing to the application make into One step it is described in detail.
Fig. 1 is a kind of method schematic diagram for promoting power-efficient provided by the present application, as shown in Figure 1, this method comprises:
Step 101, after the power good of system, the load of system is obtained.
Step 102, according to the load of system, control system works in the first circuit or second circuit.
Wherein, the first circuit and second circuit are the different circuit of power-efficient.
For above-mentioned steps 101, in one possible implementation, (DC Res can be sensed by D.C. resistance Istance Sense) obtain the load of system.The load of system may include one of following information or a variety of: system Voltage, electric current, the power of system of system etc..According to the load information of system, the load of system is greater than load threshold Load state is known as system and is in heavy duty, and the load of system is known as system no more than the load state of load threshold and is in light It carries.The current power of system is such as obtained, if the power is greater than preset threshold value, claims to be currently at heavy duty when system, if the power No more than preset threshold value, then system is claimed to be currently at underloading.
Wherein, load threshold can be the value of artificial settings, such as can be set as 50%, at this point, the load in system is big When 50%, system is claimed to be in heavy duty, when the load of system is not more than 50%, system is claimed to be in underloading.
In one possible implementation, above-mentioned steps 101 can specifically include: periodically obtain the negative of system It carries.Above-mentioned steps 102 can specifically include: periodically according to the load of system, control system works in the first circuit or Two circuits.Wherein, in a step 101, can by the period 1 obtain system load in a step 102 can be by second week Phase works in the first circuit or second circuit according to the load control system of system.Period 1 is not more than second round, i.e., The frequency of the load of acquisition system is not less than the load according to system to change the frequency of circuit system.For example, if in step 101 In, the primary load for obtaining system in one minute, then in a step 102, the load control that can be once come with one minute according to system System processed works in the first circuit or second circuit, can also once be worked according to the load control system of system with five minutes First circuit or second circuit.When the period 1 being less than second round, the one or more of the system got can be used Load value determines that circuit works in the first circuit or second circuit.For example, in a step 101, primary obtain is within one minute The load of system once worked in the first circuit or second with five minutes in a step 102 come the load control system according to system Circuit, then, in a step 102, it will the average value of the load value of the system obtained in a step 101 according to five carries out The selection of circuit.
In one possible implementation, above-mentioned steps 102 can specifically include: judge whether the load of system is greater than Load threshold judges that above system is currently at heavy duty or is lightly loaded.If the present load of system is greater than load threshold, that is, it is System is currently at heavy duty, then control system works in the first circuit.Alternatively, if the present load of system is not more than load threshold, I.e. system is currently at underloading, then control system works in second circuit.Wherein, the first circuit is being relative to second circuit System has higher power-efficient in the first circuit when overloaded, and being in second circuit at light load in system has higher electricity Source efficiency.
Further, above-mentioned control system works in the first circuit, can specifically include: if in a step 101, getting The load of system be greater than load threshold, and current system works in second circuit, then control system conversion work is in the first electricity Road.If the load of the system in a step 101, got is greater than load threshold, and current system works in the first circuit, then without The operating circuit of system need to be converted.
Similarly, above-mentioned control system works in second circuit, can specifically include: if in a step 101, what is got is The load of system is not more than load threshold, and current system works in the first circuit, then control system conversion work is in second circuit. If the load of the system in a step 101, got is greater than load threshold, and current system works in second circuit, then is not necessarily to The operating circuit of system is converted.
In one possible implementation, the power-efficient of above-mentioned first circuit and second circuit system load not Difference simultaneously can design difference by the circuit hardware of the first circuit and second circuit to realize, such as the first circuit and second Resistance sizes used in circuit are different.Conversion between above-mentioned first circuit and second circuit can be realized by switching.Than Such as, control works in the system conversion work of second circuit in the first circuit, can be by disconnecting between system and second circuit Switch, and the switch between closed system and the first circuit.For another example, control works in the system conversion work of the first circuit Make in second circuit, it can be by disconnecting the switch between system and the first circuit, and between closed system and second circuit Switch.
Step 102 is realized by above scheme, according to the size of the load of system, to determine the operating circuit of system, and really Fixed operating circuit is the circuit under present load size, with relatively high power-efficient, helps to ensure that system exists Power-efficient all with higher under the loading condition of various systems.And, however, it is determined that current system work power-efficient compared with Low circuit, then control system conversion work circuit, if system has worked in the higher circuit of power-efficient, without to being The operating circuit of system is changed, and reduces resource consumption.
In one possible implementation, before above-mentioned steps 101, namely may be used also before the power good of system To include: in system electrification, control system works in the first circuit.In the program, when system just electrifies, the power supply of system It is also unstable, the operating circuit of system can not be selected according to the loading condition of system, since the first circuit is in the load of system There is higher power-efficient, i.e. the load for the system that the first circuit can be born is higher relative to second circuit, is being when higher It when system electrification, selects the operating circuit of system for the first circuit, helps avoid the possibility that overload damage occurs in circuit system.
The method provided by the present application for promoting power-efficient is explained with flow chart shown in Fig. 2 below, such as Fig. 2 institute Show, when system just starts, step 201 be first carried out, control system works in the first circuit, wherein the first circuit compared to Second circuit has higher power-efficient when overloaded.Then step 202 is executed, the state of system is judged, if system is at this time In underloading, 203 are thened follow the steps, control system works in second circuit, wherein second circuit is compared to the first circuit light There is higher power-efficient when load, it is no to then follow the steps 201.Then, step 202 is repeated by predetermined period, according to step Rapid 202 judging result executes step 201 or step 203.
The specific embodiment and beneficial effect shown in Fig. 2 for promoting power-efficient process and above-mentioned method shown in FIG. 1 It is identical, it can refer to foregoing description, details are not described herein.
Based on the same inventive concept, Fig. 3 illustratively shows a kind of device for promoting power-efficient provided by the present application, The device can execute the process for promoting the method for power-efficient.The device includes:
Load determining unit 301, for after the power good of system, obtaining the load of system.
Circuit selecting unit 302, for according to load, control system to work in the first circuit or second circuit.Wherein, One circuit and second circuit are the different circuit of power-efficient.
In the program, according to the payload size of system, carrys out control system and work in different circuits, and different circuits Power-efficient it is different, according to the payload size of system, the operating circuit of system is set as power supply under the load of current system More efficient circuit helps to ensure that system power-efficient all with higher under the loading condition of various systems.
In one possible implementation, foregoing circuit selecting unit 302 specifically can be used for: judge the load of system Whether load threshold is greater than, if the load of system is greater than load threshold, control system works in the first circuit, alternatively, if being The load of system is not more than load threshold, then control system works in second circuit.Wherein, it is greater than load threshold in the load of system When, the power-efficient of the first circuit is higher than the power-efficient of second circuit, when the load of system is not more than load threshold, first The power-efficient of circuit is not higher than the power-efficient of second circuit.In the program, according to the size of the load of system, it is to determine The operating circuit of system, and the operating circuit determined is the circuit under present load size, with relatively high power-efficient, Help to ensure that system power-efficient all with higher under the loading condition of various systems.
In one possible implementation, foregoing circuit selecting unit 302 specifically can be used for control system and work in First circuit, comprising: if system work at present is in second circuit, control system conversion work is in the first circuit.Foregoing circuit Selecting unit 302 specifically can be used for control system and work in second circuit, comprising: if system work at present in the first circuit, Then control system conversion work is in second circuit.In the program, however, it is determined that current system works in the lower circuit of power-efficient, Then control system conversion work circuit, if system has worked in the higher circuit of power-efficient, without the work to system Circuit is changed, and reduces resource consumption.
In one possible implementation, foregoing circuit selecting unit 302 can be also used for: in system electrification, control System processed works in the first circuit.When system just electrifies, the power supply of system is also unstable, can not be according to the loading condition of system The operating circuit of system is selected, since the first circuit has higher power-efficient when the load of system is higher, i.e., first The load for the system that circuit can be born is higher relative to second circuit, and in system electrification, selecting the operating circuit of system is the One circuit helps avoid the possibility that overload damage occurs in circuit system.
In one possible implementation, above-mentioned load determining unit 301 specifically can be used for: steady in the power supply of system After fixed, the load of the system is periodically obtained.Since the load of system can constantly change according to behaviour in service, periodically Ground obtains the load of system, periodically to determine the higher circuit of power-efficient, helps to ensure that system at each moment Power-efficient is all relatively high.
Concept relevant to technical solution provided by the present application involved in above-mentioned apparatus is explained and is described in detail and is other Step refers to the description as described in these contents in the aforementioned method or other embodiments for promoting power-efficient, does not do herein superfluous It states.
Based on design same as the previously described embodiments, the application also provides a kind of network equipment.
Fig. 4 is a kind of structural schematic diagram of the network equipment provided by the present application.As shown in figure 4, the network equipment 400 wraps It includes:
Memory 401, for storing program instruction;
Processor 402 executes aforementioned according to the program of acquisition for calling the program instruction stored in the memory One method as described in the examples for promoting power-efficient.
Based on design same as the previously described embodiments, the application also provides a kind of computer storage medium, the computer Readable storage medium storing program for executing is stored with computer executable instructions, and the computer executable instructions are for making computer execute aforementioned One method as described in the examples for promoting power-efficient.
It should be noted that be schematical, only a kind of logical function partition to the division of unit in the application, it is real There may be another division manner when border is realized.Each functional unit in this application can integrate in one processing unit, It is also possible to each unit to physically exist alone, can also be integrated in two or more units in a module.Above-mentioned collection At unit both can take the form of hardware realization, can also realize in the form of software functional units.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.Computer program product Including one or more computer instructions.When loading on computers and executing computer program instructions, all or part of real estate Raw process or function according to the application.Computer can be general purpose computer, special purpose computer, computer network or its His programmable device.Computer instruction may be stored in a computer readable storage medium, or computer-readable deposit from one Storage media is transmitted to another computer readable storage medium, for example, computer instruction can be from a web-site, calculating Machine, server or data center are (such as red by wired (such as coaxial cable, optical fiber, Digital Subscriber Line (DSL)) or wireless Outside, wirelessly, microwave etc.) mode transmitted to another web-site, computer, server or data center.Computer can Reading storage medium can be any usable medium or include that one or more usable mediums are integrated that computer can access The data storage devices such as server, data center.Usable medium can be magnetic medium, (for example, floppy disk, hard disk, tape), Optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid State Disk (SSD)) etc..
It should be understood by those skilled in the art that, the application can provide as method, system or computer program product.Cause This, the shape of complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Formula.Moreover, the application, which can be used, can use storage in the computer that one or more wherein includes computer usable program code The form for the computer program product implemented on medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.).
The application be referring to according to the present processes, equipment (system) and computer program product flow chart and/or Block diagram describes.It should be understood that each process that can be realized by computer program instructions in flowchart and/or the block diagram and/or The combination of process and/or box in box and flowchart and/or the block diagram.It can provide these computer program instructions to arrive General purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices processor to generate one Machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for realizing flowing The device for the function of being specified in journey figure one process or multiple processes and/or block diagrams one box or multiple boxes.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies Within, then the application is also intended to include these modifications and variations.

Claims (10)

1. a kind of method for promoting power-efficient characterized by comprising
After the power good of system, the load of the system is obtained;
According to the load, controls the system and work in the first circuit or second circuit, first circuit and described second Circuit is the different circuit of power-efficient.
2. the method as described in claim 1, which is characterized in that it is described according to the load, it controls the system and works in One circuit or second circuit, comprising:
Judge whether the load of the system is greater than load threshold;
If the load of the system is greater than the load threshold, controls the system and work in the first circuit;Alternatively,
If the load of the system is not more than the load threshold, controls the system and work in second circuit;
Wherein, when the load of the system is greater than the load threshold, the power-efficient of first circuit is higher than described second The power-efficient of circuit;When the load of the system is not more than the load threshold, the power-efficient of first circuit is not high In the power-efficient of the second circuit.
3. method according to claim 2, which is characterized in that the control system works in the first circuit, comprising:
If the system work at present controls the system conversion work in first circuit in the second circuit;
The control system works in second circuit, comprising:
If the system work at present controls the system conversion work in the second circuit in first circuit.
4. the method as described in claim 1, which is characterized in that before the power good of the system, comprising:
In system electrification, controls the system and work in first circuit.
5. method according to any of claims 1-4, which is characterized in that the load for obtaining the system, comprising:
Periodically obtain the load of the system.
6. a kind of device for promoting power-efficient characterized by comprising
Load determining unit, for after the power good of system, obtaining the load of the system;
Circuit selecting unit works in the first circuit or second circuit for according to the load, controlling the system, and described the One circuit and the second circuit are the different circuit of power-efficient.
7. device as claimed in claim 6, which is characterized in that the circuit selecting unit is specifically used for:
Judge whether the load of the system is greater than load threshold;
If the load of the system is greater than the load threshold, controls the system and work in the first circuit;Alternatively,
If the load of the system is not more than the load threshold, controls the system and work in second circuit;
Wherein, when the load of the system is greater than the load threshold, the power-efficient of first circuit is higher than described second The power-efficient of circuit;When the load of the system is not more than the load threshold, the power-efficient of first circuit is not high In the power-efficient of the second circuit.
8. device as claimed in claim 7, which is characterized in that the circuit selecting unit is specifically used for controlling the system work Make in the first circuit, comprising:
If the system work at present controls the system conversion work in first circuit in the second circuit;
The circuit selecting unit is specifically used for the control system and works in second circuit, comprising:
If the system work at present controls the system conversion work in the second circuit in first circuit.
9. device as claimed in claim 6, which is characterized in that the circuit selecting unit is also used to the power supply in the system Before stabilization, controls the system and work in first circuit.
10. device as claim in any one of claims 6-9, which is characterized in that the load determining unit is specifically used for:
After the power good of system, the load of the system is periodically obtained.
CN201811506518.7A 2018-12-10 2018-12-10 A kind of method and device promoting power-efficient Pending CN109638948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811506518.7A CN109638948A (en) 2018-12-10 2018-12-10 A kind of method and device promoting power-efficient

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811506518.7A CN109638948A (en) 2018-12-10 2018-12-10 A kind of method and device promoting power-efficient

Publications (1)

Publication Number Publication Date
CN109638948A true CN109638948A (en) 2019-04-16

Family

ID=66072818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811506518.7A Pending CN109638948A (en) 2018-12-10 2018-12-10 A kind of method and device promoting power-efficient

Country Status (1)

Country Link
CN (1) CN109638948A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110707735A (en) * 2019-11-21 2020-01-17 广州供电局有限公司 Super capacitor power module and feeder terminal
CN117118191A (en) * 2023-02-10 2023-11-24 荣耀终端有限公司 Method for improving power efficiency, electronic device and computer readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101562395A (en) * 2008-03-14 2009-10-21 康舒科技股份有限公司 Voltage modulation circuit capable of increasing light load efficiency
CN101604904A (en) * 2008-06-11 2009-12-16 康舒科技股份有限公司 Can promote the switched power supplier of light-load efficiency
CN102347633A (en) * 2010-08-03 2012-02-08 联想(北京)有限公司 Power supply module and power supply system
CN102723867A (en) * 2011-03-29 2012-10-10 联想(北京)有限公司 Power conversion device and electronic device comprising same
CN104635899A (en) * 2013-11-11 2015-05-20 纬创资通股份有限公司 power supply circuit, power supply system and power supply method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101562395A (en) * 2008-03-14 2009-10-21 康舒科技股份有限公司 Voltage modulation circuit capable of increasing light load efficiency
CN101604904A (en) * 2008-06-11 2009-12-16 康舒科技股份有限公司 Can promote the switched power supplier of light-load efficiency
CN102347633A (en) * 2010-08-03 2012-02-08 联想(北京)有限公司 Power supply module and power supply system
CN102723867A (en) * 2011-03-29 2012-10-10 联想(北京)有限公司 Power conversion device and electronic device comprising same
CN104635899A (en) * 2013-11-11 2015-05-20 纬创资通股份有限公司 power supply circuit, power supply system and power supply method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110707735A (en) * 2019-11-21 2020-01-17 广州供电局有限公司 Super capacitor power module and feeder terminal
CN117118191A (en) * 2023-02-10 2023-11-24 荣耀终端有限公司 Method for improving power efficiency, electronic device and computer readable storage medium

Similar Documents

Publication Publication Date Title
JP6667502B2 (en) Load scheduling in multiple battery devices
JP5304764B2 (en) Facility power management system
CN201150005Y (en) Information processing system supplied power by battery or AC-DC convertor
CN111061560B (en) Cloud rendering resource scheduling method and device, electronic equipment and storage medium
CN107710540B (en) Method and apparatus for controlling power supply
US20180351416A1 (en) Power transmitting apparatus, control method of the same and storage medium
CN111522652A (en) Power balancing for increased load density and improved energy efficiency
US9787123B2 (en) Charge/discharge control device and charge/discharge control method
CN106937534A (en) Mechanism for extending the cycle life of battery
CN104102523A (en) Method for migrating virtual machine and resource scheduling platform
US20190137956A1 (en) Battery lifetime maximization in behind-the-meter energy management systems
US10680455B2 (en) Demand charge minimization in behind-the-meter energy management systems
EP2962427A1 (en) Method and system to represent the impact of load variation on service outage over multiple links
CN109638948A (en) A kind of method and device promoting power-efficient
CN110621047A (en) Operator network switching method and device and computer readable storage medium
JP6125090B2 (en) Method for allocating energy resources in a network signaling node
US20080101260A1 (en) Parent terminal selection method and terminal having parent terminal selection function for use in star-type connection AD HOC wireless network
KR101777186B1 (en) Method for Managing Access Points in Wifi Network
CN103812199A (en) Charging control method and charging control equipment
KR20200037379A (en) System for battery charging using wireless charging signal
CN108075967B (en) Link selection method and device
KR20150069496A (en) Method and Apparatus for Selecting Energy-Efficient in Multi Radio Environment
CN112910061B (en) Control method, device and medium for charging system load balancing
JP2011221724A (en) Information processing system and information processing method
CN114520528A (en) Charging control method and device, terminal equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416