CN109636178A - Screening technique, device, computer equipment and the storage medium of Power Project - Google Patents

Screening technique, device, computer equipment and the storage medium of Power Project Download PDF

Info

Publication number
CN109636178A
CN109636178A CN201811505877.0A CN201811505877A CN109636178A CN 109636178 A CN109636178 A CN 109636178A CN 201811505877 A CN201811505877 A CN 201811505877A CN 109636178 A CN109636178 A CN 109636178A
Authority
CN
China
Prior art keywords
value
project
power project
risk
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811505877.0A
Other languages
Chinese (zh)
Other versions
CN109636178B (en
Inventor
林秀浩
文上勇
吴良峥
张继钢
乔慧婷
童达芸
梁燕妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy Development Research Institute of China Southern Power Grid Co Ltd
Original Assignee
Energy Development Research Institute of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy Development Research Institute of China Southern Power Grid Co Ltd filed Critical Energy Development Research Institute of China Southern Power Grid Co Ltd
Priority to CN201811505877.0A priority Critical patent/CN109636178B/en
Publication of CN109636178A publication Critical patent/CN109636178A/en
Application granted granted Critical
Publication of CN109636178B publication Critical patent/CN109636178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application involves a kind of screening technique of Power Project, device, computer equipment and storage medium, computer equipment assesses Power Project information according to preset risk screening index, obtains the value-at-risk of Power Project;Then according to the size comparison result of value-at-risk and default risk threshold value, it is determined whether Power Project information is assessed according to enterprise development screening index, and/or, it is determined whether Power Project information is assessed according to financial screening index, to obtain calculated result;Finally, screening Power Project according to calculated result.Since computer equipment assesses Power Project information according to risk screening index, enterprise development screening index and/or financial screening index, above-mentioned Power Project can be screened from three project risk, Characteristics of Development and income feature dimensions, be assessed so as to the implementary value more fully to Power Project overseas.

Description

Screening technique, device, computer equipment and the storage medium of Power Project
Technical field
The present invention relates to field of computer technology, more particularly to the screening technique, device, computer of a kind of Power Project Equipment and storage medium.
Background technique
In recent years, the project of electric power enterprise obtains great-leap-forward development overseas, so that electric power enterprise sufficiently participates in the world During the division of labor works with international partners.It therefore, is that electric power enterprise is overseas implementing the important rank of respective items purpose for the screening of Project Abroad Section, different electric power enterprises have respective screening system.
Currently, overseas the screening technique of Power Project is commented two dimensions of risk and income of Power Project overseas Estimate, meet electric power enterprise risk it is controllable under conditions of, select suitable Project Abroad to be implemented.
It is not comprehensive enough for the assessment of the implementary value of Power Project overseas but using above-mentioned screening technique.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide the screening technique, device, computer of a kind of Power Project Equipment and storage medium.
A kind of screening technique of Power Project, which comprises
Power Project information is assessed according to preset risk screening index, obtains the value-at-risk of the Power Project;Wherein, The risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project;
According to the size comparison result of the value-at-risk and default risk threshold value, it is determined whether referred to according to enterprise development screening Mark assesses the Power Project information, and/or, it is determined whether the Power Project information is assessed according to financial screening index, with Obtain calculated result;Wherein, the enterprise development screening index includes at least one development for being used to determine the Power Project The index of feature, the finance screening index include the index that at least one is used to determine the income feature of the Power Project;
Power Project is screened according to the calculated result.
The size comparison result according to the value-at-risk and default risk threshold value in one of the embodiments, really Whether determine according to the enterprise development screening index assessment Power Project information, and/or, it is determined whether according to financial screening index The Power Project information is assessed, to obtain calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, the electricity is assessed according to the enterprise development screening index Power project information, obtain the Power Project develops value;And the electric power item is assessed according to the financial screening index Mesh information obtains the income reliable value of the Power Project.
The calculated result includes the value-at-risk, described develops value and the income in one of the embodiments, Reliable value;The Power Project is screened according to the calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, it is determined that the risk of the Power Project meets controllable item Part;
If the value that develops is greater than preset development threshold value, it is determined that the Characteristics of Development of the Power Project meets default Project implementation condition;
If the income reliable value is greater than preset revenue threshold, it is determined that the Characteristics of Development of the Power Project meets institute State project implementation condition.
The size comparison result according to the value-at-risk and default risk threshold value in one of the embodiments, really Whether determine according to the enterprise development screening index assessment Power Project information, and/or, it is determined whether according to financial screening index The Power Project information is assessed, to obtain calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, the electricity is assessed according to the enterprise development screening index Power project information, obtain the Power Project develops value;
Develop value and the default size comparison result for developing threshold value according to described, it is determined whether screen according to the finance Power Project information described in index evaluation obtains the income reliable value of the Power Project.
In one of the embodiments, it is characterized in that, described assess Power Project according to preset risk screening index Information obtains the value-at-risk of the Power Project, comprising:
The target keywords in the Power Project information are extracted, judge the Power Project according to the target keywords Can not implement project list described in whether belonging to, obtain the first value-at-risk;
The balance data stream logic in the Power Project information is extracted, judges that the balance data stream logic whether there is Logic is false situation, obtains the second value-at-risk;
Signature analysis is carried out to environment locating for the project, determines at least one third value-at-risk based on the analysis results;
By first value-at-risk, second value-at-risk and at least one third value-at-risk and value be determined as institute State value-at-risk.
In one of the embodiments, it is characterized in that, described assess the electric power item according to enterprise development screening index Mesh information, obtain the Power Project develops value, comprising:
The project location information in the Power Project information is obtained, and the electricity is determined according to the project location information Whether power project belongs to preset target development projects, and obtaining at least one first can develop value;
The project label in the Power Project information is obtained, and according to the project location information and/or the project Mark determines whether the Power Project belongs to the project of interconnecting, and value can be developed by obtaining second;
The advertisement information in the Power Project information is obtained, and determines that the Power Project is according to the advertisement information It is no to belong to preliminary item, obtain at least one third development value;
By it is described at least one first can develop value, second can develop value and at least one third can develop value and value, Value can be developed described in being determined as.
In one of the embodiments, it is characterized in that, described assess the electric power item according to the financial screening index Mesh information obtains the income reliable value of the Power Project, comprising:
The cooperation information in the Power Project information is obtained, and determines that the Power Project is according to the cooperation information No includes preset target cooperation information, obtains at least one first income reliable value;
The resource information in the Power Project information is obtained, and determines that the Power Project is according to the resource information No is preset target resource project, obtains the second income reliable value;
The expected revenue information in the Power Project information is obtained, and the electricity is determined according to the expected revenue information Whether power project meets preset expected revenue threshold value, obtains third income reliable value;
The cost information in the Power Project information is obtained, and determines that the Power Project is according to the cost information It is no to meet preset inexpensive condition, obtain the 4th income reliable value;
By at least one described first income reliable value, the second income reliable value, third income reliable value sum the 4th receive Beneficial reliable value and value are determined as the income reliable value.
A kind of screening plant of Power Project, which is characterized in that the system comprises: risk screening module, strategy screening Module, financial screening module and project screening module;
Module is obtained, for assessing Power Project information according to preset risk screening index, obtains the Power Project Value-at-risk;Wherein, the risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, ring locating for project Border;
Determining module, for the size comparison result according to the value-at-risk and default risk threshold value, it is determined whether according to Enterprise development screening index assesses the Power Project information, and/or, it is determined whether the electricity is assessed according to financial screening index Power project information, to obtain calculated result;Wherein, the enterprise development index includes at least one for determining the electric power item The index of purpose Characteristics of Development, the finance screening index include the income feature that at least one is used to determine the Power Project Index;
Screening module, for screening Power Project according to the calculated result.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing Device realizes the step of screening technique of above-mentioned Power Project when executing the computer program.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor The step of realizing the screening technique of above-mentioned Power Project.
Screening technique, device, computer equipment and the storage medium of above-mentioned Power Project, computer equipment is according to preset Risk screening index assesses Power Project information, obtains the value-at-risk of Power Project;Then according to value-at-risk and default risk threshold The size comparison result of value, it is determined whether Power Project information is assessed according to enterprise development screening index, and/or, it is determined whether Power Project information is assessed according to financial screening index, to obtain calculated result;Finally, screening electric power item according to calculated result Mesh.Due to computer equipment according to risk screening index, enterprise development screening index and/or financial screening index to Power Project Information is assessed, and can be sieved from three project risk, Characteristics of Development and income feature dimensions to above-mentioned Power Project Choosing, is assessed so as to the implementary value more fully to Power Project overseas.
Detailed description of the invention
Fig. 1 is the applied environment figure of the screening technique of Power Project in one embodiment;
Fig. 2 is the flow diagram of the screening technique of Power Project in one embodiment;
Fig. 3 is the flow diagram of the screening technique of Power Project in another embodiment;
Fig. 4 is the flow diagram of the screening technique of Power Project in another embodiment;
Fig. 5 is the flow diagram of the screening technique of Power Project in another embodiment;
Fig. 6 is the flow diagram of the screening technique of Power Project in another embodiment;
Fig. 7 is the structural block diagram of the screening plant of Power Project in one embodiment;
Fig. 8 is the structural block diagram of the screening plant of Power Project in one embodiment;
Fig. 9 is the structural block diagram of the screening plant of Power Project in one embodiment;
Figure 10 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
The screening technique of Power Project provided by the embodiments of the present application can be applied in application environment as shown in Figure 1. Wherein, computer equipment 120 assesses Power Project information 110, and computer equipment 120 can be, but not limited to be various People's computer, laptop, smart phone and tablet computer.
In one embodiment, as shown in Fig. 2, providing a kind of screening technique of Power Project, it is applied in this way It is illustrated for computer equipment in Fig. 1, comprising the following steps:
S101, Power Project information is assessed according to preset risk screening index, obtains the value-at-risk of Power Project;Its In, risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project.
When screening to Power Project, computer equipment can assess above-mentioned electric power item according to risk screening index Purpose project information obtains the value-at-risk of Power Project, and whether risk is controllable for determining above-mentioned Power Project for above-mentioned value-at-risk.
Wherein, project list can not be implemented in above-mentioned risk screening index, can refers to being used for for electric power enterprise formulation Determine that Power Project has the project list of high risk, for the above-mentioned Power Project that can not implement in project list, computer Equipment thinks that the Power Project risk is uncontrollable.
Above-mentioned revenue and expenditure risk conditions, refer to project income, in terms of whether there is unreasonable factor, computer The unreasonable link that equipment can be identified project by revenue and expenditure risk conditions with the presence or absence of income, expenditure etc., so that it is determined that item Whether risk is controllable for mesh.
Environment locating for above-mentioned project refers to that the environment of the position where above-mentioned Power Project, above-mentioned environment can be electric power Social environment of project position, such as economic environment, social relationships environment etc., for determining that above-mentioned Power Project is being implemented Whether can smoothly execute in the process, computer equipment can be according to the judgement of the environmental information to Power Project, to identify project Whether risk is controllable.
Specifically, the value-at-risk that computer equipment obtains can be the scoring scored above-mentioned risk screening index Value, such as value-at-risk are 6, are also possible to the risk class of the Power Project determined according to above-mentioned risk screening index, such as wind Danger value is prime risk etc., for above-mentioned value-at-risk form it is not limited here.
S102, according to the size comparison result of value-at-risk and default risk threshold value, it is determined whether screened according to enterprise development Index evaluation Power Project information, and/or, it is determined whether Power Project information is assessed according to financial screening index, in terms of obtaining Calculate result;Wherein, enterprise development index includes at least one index for being used to determine the Characteristics of Development of Power Project, finance screening Index includes the index that at least one is used to determine the income feature of Power Project.
Computer equipment, can be according to the big of value-at-risk and default risk threshold value on the basis of obtaining above-mentioned value-at-risk Small comparison result, to determine above-mentioned Power Project, whether risk is controllable.Further, computer equipment is determining above-mentioned electric power item After mesh risk is controllable, Power Project information can be assessed according to enterprise development screening index, and/or, according to financial screening index Power Project information is assessed, to obtain calculated result.Wherein, above-mentioned calculated result may include above-mentioned value-at-risk, also can wrap It includes computer equipment and the assessment result that Power Project information obtains is assessed according to enterprise development screening index, can also include calculating Machine equipment assesses the assessment result that Power Project information obtains according to financial screening index.
Above-mentioned enterprise development index includes the index that at least one is used to determine the Characteristics of Development of Power Project, be can be used for Determine whether Power Project meets the strategic development direction of Utilities Electric Co., it is consistent with the developing goal of Utilities Electric Co..Above-mentioned finance Screening index include at least one be used for determine Power Project income feature index, such as about project expected revenue, The index of the features such as cost, computer equipment can extract the income feature of Power Project according to Power Project information, and next pair Power Project carries out the assessment in terms of income.
S103, Power Project is screened according to calculated result.
Computer equipment can screen electric power item according to above-mentioned calculated result on the basis of obtaining above-mentioned calculated result Mesh, to determine whether above-mentioned Power Project has implementary value.Computer equipment can be according to risk screening index, enterprise development The assessment result of screening index and financial screening index screens above-mentioned electric power after carrying out comprehensive assessment to Power Project information Project;In the result that can also be compared to value-at-risk with default risk threshold value, further according to enterprise development screening index and Financial screening index is assessed respectively, then to above-mentioned assessment result in conjunction with value-at-risk, to screen to Power Project. For above-mentioned Power Project screening mode it is not limited here.
The screening technique of above-mentioned Power Project, computer equipment are assessed Power Project according to preset risk screening index and are believed Breath, obtains the value-at-risk of Power Project;Then according to the size comparison result of value-at-risk and default risk threshold value, it is determined whether root Power Project information is assessed according to enterprise development screening index, and/or, it is determined whether Power Project is assessed according to financial screening index Information, to obtain calculated result;Finally, screening Power Project according to calculated result.Since computer equipment is screened according to risk Index, enterprise development screening index and/or financial screening index assess Power Project information, can from project risk, Three dimensions of strategic development feature and income feature screen above-mentioned Power Project, so as to more fully to overseas The implementary value of Power Project is assessed.
In one embodiment, it is related to a kind of acquisition process of calculated result, it is on the basis of the above embodiments, above-mentioned S102 includes:
If value-at-risk is equal to default risk threshold value, Power Project information is assessed according to enterprise development screening index, is obtained Power Project develops value;And Power Project information is assessed according to financial screening index, the income for obtaining Power Project can By value.
Specifically, computer equipment is when determining that above-mentioned value-at-risk is equal to default risk threshold value, it is believed that the electric power item Mesh risk is controllable;The Power Project controllable for risk, computer equipment can be according to enterprise development screening index to electric power item Mesh information is assessed, to obtain the development value of Power Project;Wherein, above-mentioned development value is bigger, indicates above-mentioned Power Project Strategy implementation value is bigger.
Further, computer equipment can also assess above-mentioned Power Project information according to financial screening index, To obtain the income reliable value of Power Project;Wherein, above-mentioned income reliable value is bigger, indicates the income implementary value of above-mentioned project It is bigger.
The screening technique of above-mentioned Power Project, computer equipment by obtain Power Project develop value and income is reliable Value, Power Project to be quantitatively evaluated, so that computer equipment is to Power Project in terms of strategic development and income side The assessment in face is more acurrate.
In one embodiment, it is related to the mode that computer equipment screens Power Project according to calculated result, On the basis of above-described embodiment, above-mentioned S103 includes:
If value-at-risk is equal to default risk threshold value, computer equipment determines that the risk of Power Project meets controlled condition; If value can be developed greater than preset development threshold value, it is determined that the Characteristics of Development of Power Project meets preset project implementation condition; If income reliable value is greater than preset revenue threshold, it is determined that the Characteristics of Development of Power Project meets project implementation condition.
Specifically, if the value-at-risk of Power Project is equal to preset risk threshold value, computer equipment thinks above-mentioned electric power item Mesh meets the requirement in above-mentioned risk screening index, such as the Power Project can not implemented on project list, and there is no receive Branch risk, and environment locating for project can satisfy the condition that project is smoothly implemented, then computer equipment thinks the electric power item Mesh risk is controllable;If the value-at-risk of the Power Project is less than preset risk threshold value, computer equipment thinks the Power Project Risk is uncontrollable.
If can develop value greater than preset development threshold value, computer equipment thinks the Characteristics of Development and electric power of the Power Project The developing goal of company is consistent, meets project implementation condition;Further, the first development threshold value can be set in computer equipment Develop threshold value with second, develops threshold value if value can be developed and be greater than preset first and be less than or equal to the second development threshold value, calculate Machine equipment thinks that the Power Project has certain development implementary value;Develop threshold value if value can be developed and be greater than above-mentioned second, Computer equipment thinks Power Project development implementary value with higher.
If income reliable value is greater than preset revenue threshold, computer equipment thinks that above-mentioned Power Project has in terms of income There is implementary value, meets project implementation condition;Further, computer equipment can be set the first revenue threshold and second and receive Beneficial threshold value, if income reliable value is greater than preset first income reliable value threshold value and is less than or equal to the second income reliable value threshold value, Then computer equipment thinks that the Power Project has certain income implementary value;If income reliable value is greater than above-mentioned second income Can threshold value, then computer equipment thinks Power Project income implementary value with higher.
The screening technique of above-mentioned Power Project, computer equipment by by calculated result value-at-risk, can develop value and Income reliable value is compared with corresponding threshold value, and to determine Power Project, whether risk is controllable, and whether meets project reality Apply condition.In above-mentioned comparison basis, computer equipment can be special in project risk, Characteristics of Development and income to Power Project It levies three aspects reasonably to be screened, to keep the selection result more accurate.
Fig. 3 is the flow diagram of the screening technique of Power Project in another embodiment, and the present embodiment is related to another kind The acquisition process of calculated result, on the basis of the above embodiments, as shown in figure 3, above-mentioned S102 includes:
If S201, value-at-risk are equal to default risk threshold value, Power Project information is assessed according to enterprise development screening index, Obtain Power Project develops value.
S202, basis can develop value and the default size comparison result for developing threshold value, it is determined whether be referred to according to finance screening Mark assessment Power Project information, obtains the income reliable value of Power Project.
Specifically, computer equipment is when value-at-risk is equal to default risk threshold value, it is believed that the Power Project risk can Control;The Power Project controllable for risk, computer equipment can believe Power Project first according to enterprise development screening index Breath is assessed, and obtain above-mentioned Power Project develops value;Further, computer equipment can develop value according to above-mentioned With it is default develop threshold value size comparison result, then determine whether obtain Power Project income reliable value.
If computer equipment confirms that the Power Project meets project implementation condition according to above-mentioned comparison result, then can be with Think that the Power Project has implementary value, the income reliable value for obtaining above-mentioned Power Project can not had to;If according to above-mentioned ratio Compared with as a result, computer equipment confirms that the Power Project does not meet project implementation condition, then, computer equipment can continue to electricity Power project information is assessed, to obtain the income reliable value of above-mentioned Power Project.For example, if the above-mentioned value that develops is greater than default Develop threshold value, computer equipment can consider that the Power Project meets project implementation condition, without obtaining the Power Project Income reliable value.
The screening technique of above-mentioned Power Project, computer equipment can preferentially obtain electric power according to the demand of electric power enterprise Project develops value, further determines whether the income reliable value for obtaining Power Project, can make the screening of Power Project As a result more meet the demand of electric power enterprise;Further, the Power Project of project implementation condition, Ke Yiti are met for development value Rise screening efficiency.
Above-described embodiment, which mainly describes computer equipment, to be referred to and wealth according to risk screening index, enterprise development screening Business screening index assesses Power Project information, to obtain calculated result, following primarily by Fig. 4-implementation shown in fig. 6 Example, come the specific acquisition modes introduced calculated result risk value, value and income reliable value can be developed.
Fig. 4 is the flow diagram of the screening technique of Power Project in another embodiment, and the present embodiment is related to electric power item The specific acquisition modes of purpose value-at-risk, on the basis of the above embodiments, as described in Figure 4, above-mentioned S101 includes:
Target keywords in S301, extraction Power Project information, judge whether Power Project belongs to according to target keywords In project list can not be implemented, the first value-at-risk is obtained.
The above-mentioned project list that can not implement may include the project for being in " the especially supervision enterprise " of Risk Supervision, " provide not The total investment of project, the project of payment of a debt " enterprise puts into ratio mistake to the project lower than the project of relevant regulations, project place enterprise Lower than project of target etc., computer equipment can extract above-mentioned Power Project letter for big project, project expected yield Target keywords in breath, such as debt ratio, " especially supervision enterprise " etc., then extract Power Project according to above-mentioned keyword Relevant information, determine whether the Power Project can not implemented on project list.For example, appearance of enterprise is negative where Power Project Debt rate is greater than 100%, then it is assumed that enterprise where the Power Project pays one's debts with all his assets, then the Power Project can not when to apply project clear Dan Shang.
For can not when apply Power Project on project list, computer equipment thinks that the Power Project risk can not Control can determine that the first value-at-risk is 0;If according to the keyword extracted determine the Power Project not can not when apply item On mesh inventory, then computer equipment thinks that the Power Project risk is controllable, it can determine that the first value-at-risk is 1.
Balance data stream logic in S302, extraction Power Project information judges that balance data stream logic whether there is and patrols Collecting is false situation, obtains the second value-at-risk.
Specifically, computer equipment can judge the balance data stream logic in Power Project information, to judge The income of the Power Project, expenditure etc. whether there is unreasonable factor, if sentenced after carrying out logic judgment to above-mentioned data Disconnected conclusion is vacation, then computer equipment thinks the Power Project balance data, there are unreasonable factors.Computer equipment can be with Judge whether the revenue source of the Power Project is reasonable, computer equipment can be judged according to standard revenue source, example Such as, computer equipment is when the revenue source data to the project carry out logic judgment, if judgement conclusion occur is false; Furthermore it is also possible to which the revenue source to the Power Project judges etc. with whether the ability to pay of relevant enterprise matches.
If computer equipment has that logic is vacation for above-mentioned balance data stream logic judgment, it is considered that the electricity Power project risk in terms of revenue and expenditure is uncontrollable, and the second value-at-risk is 0;If it is not, then the second value-at-risk is 1.
S303, signature analysis is carried out to environment locating for project, determines at least one third value-at-risk based on the analysis results.
Computer equipment can carry out feature point with the information of environmental correclation locating for the project in Power Project information Analysis, for example, by big data obtain the Power Project location whether closely occur in two years economic crisis, debt crisis with And exchange rate big ups and downs etc., it can also obtain whether the Power Project location occurs extensive movable possibility etc., such as For fruit there are above situation, computer equipment thinks that environment locating for the project cannot make the Power Project smoothly implement.
Computer equipment can be according to different environmental informations, to obtain different third value-at-risks, for example, if this area There are economic crisis, debt crisis and exchange rate big ups and downs etc., then the first third value-at-risk is 0, if it is not, being then 1;If the ground Area occurs extensive movable possibility, then the second third value-at-risk is 0, if being otherwise 1 etc..
S304, by the first value-at-risk, the second value-at-risk and at least one third value-at-risk and value be determined as value-at-risk.
Computer equipment is determining the basis of above-mentioned first value-at-risk, the second value-at-risk and at least one third value-at-risk On, complete the comprehensive assessment to the Power Project risk, can by above-mentioned first value-at-risk, the second value-at-risk and at least one Third value-at-risk is summed, and the value-at-risk of the Power Project is obtained.Above-mentioned value-at-risk is smaller, indicates the risk of the Power Project It is smaller.
The screening technique of above-mentioned Power Project, computer equipment can not implement project, revenue and expenditure risk and item by obtaining Power Project is assessed in terms of environment locating for mesh, computer equipment can be allow more accurately to determine to the electric power item Whether risk is controllable for mesh.
Fig. 5 is the flow diagram of the screening technique of Power Project in another embodiment, and the present embodiment is related to electric power item Purpose can develop the specific acquisition modes of value, and on the basis of the above embodiments, as described in Figure 5, above-mentioned S102 includes:
Project location information in S401, acquisition Power Project information, and Power Project is determined according to project location information Whether preset target development projects is belonged to, and obtaining at least one first can develop value.
Wherein, above-mentioned target development projects can be preset key project of country etc..Specifically, computer equipment can be with Whether the area where acquisition project is the regional inventory of emphasis development, then according to the project location information of acquisition, to determine Whether the Power Project, which is located at, is given priority to regional project, if the Power Project place, which is located at, gives priority to area, computer Equipment thinks that the project is target development projects, determines that Lesson One development value is 1;If not, being 0.
Project label in S402, acquisition Power Project information, and determined according to project location information and/or project label Whether Power Project belongs to the project of interconnecting, and value can be developed by obtaining second.
Specifically, then the available project list that interconnects of computer equipment is obtained from above-mentioned Power Project information Project label is taken, such as mark can be " Power System Interconnection intercommunication " etc., then believe according to the mark of acquisition and/or project place Breath, to determine whether the project is interconnecting on project list, for example, whether above-mentioned Power Project gives priority to area Interconnect collaborative project etc..If so, computer equipment thinks that the project meets electric power enterprise developing goal, determine that second can Development value is 1;If it is not, being then 0.
Advertisement information in S403, acquisition Power Project information, and determine whether Power Project belongs to according to advertisement information Preliminary item obtains at least one third development value.
Specifically, computer equipment can also extract the advertisement information of project, above-mentioned circular letter from Power Project information Breath can carry whether above-mentioned Power Project belongs to preliminary item, such as whether the project has pioneering meaning in its location Whether the publicity or the project of justice have the publicity etc. of pioneering meaning in the power industry or energy industry.
If the advertisement information of above-mentioned Power Project, there are the advertisement information of pioneering meaning, computer equipment thinks the electric power Project can obtain good implementation result, can determine that above-mentioned third development value is 1;If it is not, being then 0.
In addition, computer equipment can also obtain whether above-mentioned Power Project has " demonstration ", " mark from advertisement information The advertisement information of bar " etc., and if it exists, then computer thinks that the Power Project can obtain good implementation result, can be with Determine that above-mentioned third development value is 1;If it is not, being then 0.
S404, at least one first can be developed into value, second can develop value and at least one third can develop value and value, It is determined as that value can be developed.
Computer equipment above-mentioned first can develop value, second can develop value and at least one third and can develop value having determined On the basis of, the comprehensive assessment that can develop aspect to the Power Project is completed, can develop value for first, second can develop Value and at least one third can develop value and sum, and obtain the Power Project develops value.The above-mentioned value that develops is bigger, table Show that the implementary value of the Power Project is bigger.
The screening technique of above-mentioned Power Project, computer equipment from Power Project whether be target development projects, whether mutually Connection intercommunication project and whether pioneering project etc. assesses the developability of the Power Project, determines that the project is The no developing goal for meeting electric power enterprise, so as to more accurately determine the implementary value of the Power Project.
Fig. 6 is the flow diagram of the screening technique of Power Project in another embodiment, and the present embodiment is related to electric power item The specific acquisition modes of purpose income reliable value, on the basis of the above embodiments, as described in Figure 6, above-mentioned S102 includes:
S501, obtain Power Project information in cooperation information, and according to cooperation information determine Power Project whether include Preset target cooperation information obtains at least one first income reliable value.
Specifically, the cooperation information of the available Power Project of computer equipment and preset target cooperation information Inventory, to determine whether Power Project includes target cooperation information, that is to say, that enterprise where can determining the Power Project Whether cooperation object includes target cooperation object, such as comprising the higher enterprise of ranking precedence, enterprise, the conjunction of enterprise where project It opposes as if information etc. is supported in no offer.
If computer equipment is judged according to cooperation information comprising target cooperation information in the cooperation information of the project, then Computer thinks that the project has certain income implementary value, can determine that the first income reliable value is 1, if it is not, being then 0.
Resource information in S502, acquisition Power Project information, and determine whether Power Project is pre- according to resource information If target resource project, obtain the second income reliable value.
Specifically, the information and mesh in the available Power Project information of computer equipment in terms of project resource Resource item Rule of judgment is marked, to determine whether the Power Project has high-quality resource.For example, computer equipment can determine Whether state in the resource of Power Project includes that fuel source and the Power Project location have high-grade energy resource etc..
If computer equipment determines that the project belongs to target resource project, then computer equipment thinks that the project has one Fixed income implementary value can determine that the second income reliable value is 1, if it is not, being then 0.
Expected revenue information in S503, acquisition Power Project information, and Power Project is determined according to expected revenue information Whether meet preset expected revenue threshold value, obtains third income reliable value.
Further, the expected revenue information in the available Power Project information of computer equipment, and remaining is preset Expected revenue threshold value compare, if above-mentioned expected revenue information is greater than above-mentioned expected revenue threshold value, computer equipment thinks The Power Project has income implementary value, can determine that third income reliable value is 1;If above-mentioned expected revenue information is less than upper Expected revenue threshold value is stated, then computer equipment thinks that the Power Project income implementary value is lower, can determine third income Reliable value is 0.
Cost information in S504, acquisition Power Project information, and determine whether Power Project meets according to cost information Preset low cost condition, obtains the 4th income reliable value.
Specifically, the cost information in the available above-mentioned Power Project information of computer equipment and it is preset it is low at This condition, if cost information meets above-mentioned inexpensive condition, it is certain that computer equipment thinks that the Power Project has Income implementary value can then determine that the 4th income reliable value is 1;If it is not, being then 0.
S505, by least one first income reliable value, the second income reliable value, third income reliable value sum the 4th receive Beneficial reliable value and value are determined as income reliable value.
Computer equipment is determining at least one above-mentioned first income reliable value, the second income reliable value, third income On the basis of 4th income reliable value of reliable value sum, complete to the comprehensive assessment in terms of the Power Project income, it can be down to A few first income reliable value, the second income reliable value, third income reliable value sum the 4th income reliable value sum, Obtain the income reliable value of the Power Project.Above-mentioned income reliable value is bigger, indicates that the implementary value of the Power Project is bigger.
The screening technique of above-mentioned Power Project, cooperation information, income, cost and money of the computer equipment from Power Project Source etc. fully assesses the income implementary value of the Power Project, determines whether the project meets implementation condition, from And it can more accurately determine the implementary value of the Power Project.
It should be understood that although each step in the flow chart of Fig. 2-6 is successively shown according to the instruction of arrow, These steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-6 Part steps may include that perhaps these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively It carries out, but can be at least part of the sub-step or stage of other steps or other steps in turn or alternately It executes.
In one embodiment, as shown in fig. 7, providing a kind of screening plant of Power Project, comprising: obtain module 10, determining module 20 and screening module 30, in which:
Module 10 is obtained, for assessing Power Project information according to preset risk screening index, obtains Power Project Value-at-risk;Wherein, risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project.
Determining module 20, for the size comparison result according to value-at-risk and default risk threshold value, it is determined whether according to enterprise Industry develops screening index and assesses Power Project information, and/or, it is determined whether Power Project letter is assessed according to financial screening index Breath, to obtain calculated result;Wherein, enterprise development index includes at least one finger for being used to determine the Characteristics of Development of Power Project Mark, financial screening index include the index that at least one is used to determine the income feature of Power Project.
Screening module 30, for screening Power Project according to calculated result.
The screening plant of the Power Project of above-mentioned offer can execute above method embodiment, realization principle and technology Effect is similar, and details are not described herein.
In one embodiment, on the basis of the above embodiments, determining module 20 is specifically used for: being equal in value-at-risk pre- If when risk threshold value, assessing Power Project information according to enterprise development screening index, obtain Power Project develops value;With And Power Project information is assessed according to financial screening index, obtain the income reliable value of Power Project.
In one embodiment, above-mentioned calculated result includes value-at-risk, can develop value and income reliable value, screening module 30 It is specifically used for:
When value-at-risk is equal to default risk threshold value, determine that the risk of Power Project meets controlled condition;Value can developed When greater than preset development threshold value, determine that the Characteristics of Development of Power Project meets preset project implementation condition;It is reliable in income When value is greater than preset revenue threshold, determine that the Characteristics of Development of Power Project meets project implementation condition.
In one embodiment, as shown in figure 8, on the basis of the above embodiments, determining module 20 includes acquiring unit 201 and first determination unit 202, in which:
Acquiring unit 201, for assessing electricity according to enterprise development screening index when value-at-risk is equal to default risk threshold value Power project information, obtain Power Project develops value.
First determination unit 202, for according to the size comparison result that can develop value and default development threshold value, it is determined whether Power Project information is assessed according to financial screening index, obtains the income reliable value of Power Project.
In one embodiment, as shown in figure 9, on the basis of the above embodiments, obtaining module 10 includes:
Judging unit 101 judges electric power according to target keywords for extracting the target keywords in Power Project information Whether project, which belongs to, can not implement project list, obtain the first value-at-risk;
Judging unit 101 is also used to extract the balance data stream logic in Power Project information, judges that balance data stream is patrolled Collecting with the presence or absence of logic is false situation, obtains the second value-at-risk;
Analytical unit 102 determines at least one for carrying out signature analysis to environment locating for project based on the analysis results Third value-at-risk;
Second determination unit 103, for by the first value-at-risk, the second value-at-risk and at least one third value-at-risk and value It is determined as value-at-risk.
In one embodiment, on the basis of the above embodiments:
Acquiring unit 201 is also used to obtain the project location information in Power Project information, and according to project location information Determine whether Power Project belongs to preset target development projects, obtaining at least one first can develop value;
Acquiring unit 201, is also used to obtain the project label in Power Project information, and according to project location information and/ Or project label determines whether Power Project belongs to the project of interconnecting, value can be developed by obtaining second;
Acquiring unit 201 is also used to obtain the advertisement information in Power Project information, and determines electric power according to advertisement information Whether project belongs to preliminary item, obtains at least one third development value;
First determination unit 202, be also used to by least one first can develop value, second can develop value and at least one Three can develop value and values, are determined as that value can be developed.
In one embodiment, on the basis of the above embodiments:
Acquiring unit 201 is also used to obtain the cooperation information in Power Project information, and determines electric power according to cooperation information Whether project includes preset target cooperation information, obtains at least one first income reliable value;
Acquiring unit 201 is also used to obtain the resource information in Power Project information, and determines electric power according to resource information Whether project is preset target resource project, obtains the second income reliable value;
Acquiring unit 201 is also used to obtain the expected revenue information in Power Project information, and according to expected revenue information It determines whether Power Project meets preset expected revenue threshold value, obtains third income reliable value;
Acquiring unit 201 is also used to obtain the cost information in Power Project information, and determines electric power according to cost information Whether project meets preset inexpensive condition, obtains the 4th income reliable value;
First determination unit 202 is also used to receive at least one the first income reliable value, the second income reliable value, third The 4th income reliable value and value of beneficial reliable value sum, are determined as income reliable value.
The screening plant of Power Project provided by the embodiments of the present application can execute above method embodiment, realize former Reason is similar with technical effect, and details are not described herein.
The specific of screening plant about Power Project limits the screening technique that may refer to above for Power Project Restriction, details are not described herein.Modules in the screening plant of above-mentioned Power Project can be fully or partially through software, hard Part and combinations thereof is realized.Above-mentioned each module can be embedded in the form of hardware or independently of in the processor in computer equipment, It can also be stored in a software form in the memory in computer equipment, execute the above modules in order to which processor calls Corresponding operation.
In one embodiment, a kind of computer equipment is provided, which can be terminal, internal structure Figure can be as shown in Figure 10.The computer equipment includes the processor connected by system bus, memory, network interface, shows Display screen and input unit.Wherein, the processor of the computer equipment is for providing calculating and control ability.The computer equipment Memory includes non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system and computer Program.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The meter The network interface for calculating machine equipment is used to communicate with external terminal by network connection.When the computer program is executed by processor To realize a kind of screening technique of Power Project.The display screen of the computer equipment can be liquid crystal display or electric ink Display screen, the input unit of the computer equipment can be the touch layer covered on display screen, be also possible to outside computer equipment Key, trace ball or the Trackpad being arranged on shell can also be external keyboard, Trackpad or mouse etc..
It will be understood by those skilled in the art that structure shown in Figure 10, only part relevant to application scheme The block diagram of structure, does not constitute the restriction for the computer equipment being applied thereon to application scheme, and specific computer is set Standby may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, is stored in memory Computer program, the processor perform the steps of when executing computer program
Power Project information is assessed according to preset risk screening index, obtains the value-at-risk of Power Project;Wherein, risk Screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project;
According to the size comparison result of value-at-risk and default risk threshold value, it is determined whether commented according to enterprise development screening index Estimate Power Project information, and/or, it is determined whether Power Project information is assessed according to financial screening index, to obtain calculated result; Wherein, enterprise development index includes at least one index for being used to determine the Characteristics of Development of Power Project, financial screening index packet Include the index for the income feature that at least one is used to determine Power Project;
Power Project is screened according to calculated result.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor
Power Project information is assessed according to preset risk screening index, obtains the value-at-risk of Power Project;Wherein, risk Screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project;
According to the size comparison result of value-at-risk and default risk threshold value, it is determined whether commented according to enterprise development screening index Estimate Power Project information, and/or, it is determined whether Power Project information is assessed according to financial screening index, to obtain calculated result; Wherein, enterprise development index includes at least one index for being used to determine the Characteristics of Development of Power Project, financial screening index packet Include the index for the income feature that at least one is used to determine Power Project;
Power Project is screened according to calculated result.
Computer readable storage medium provided in this embodiment, implementing principle and technical effect and above method embodiment Similar, details are not described herein.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.

Claims (10)

1. a kind of screening technique of Power Project, which is characterized in that the described method includes:
Power Project information is assessed according to preset risk screening index, obtains the value-at-risk of the Power Project;Wherein, described Risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project;
According to the size comparison result of the value-at-risk and default risk threshold value, it is determined whether commented according to enterprise development screening index Estimate the Power Project information, and/or, it is determined whether the Power Project information is assessed according to financial screening index, to obtain Calculated result;Wherein, the enterprise development index includes at least one finger for being used to determine the Characteristics of Development of the Power Project Mark, the finance screening index include the index that at least one is used to determine the income feature of the Power Project;
Power Project is screened according to the calculated result.
2. the method according to claim 1, wherein described according to the big of the value-at-risk and default risk threshold value Small comparison result, it is determined whether the Power Project information is assessed according to enterprise development screening index, and/or, it is determined whether root The Power Project information is assessed according to financial screening index, to obtain calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, the electric power item is assessed according to the enterprise development screening index Mesh information, obtain the Power Project develops value;And the Power Project is assessed according to the financial screening index and is believed Breath, obtains the income reliable value of the Power Project.
3. according to the method described in claim 2, it is characterized in that, the calculated result includes the value-at-risk, described sends out Exhibition value and the income reliable value;The Power Project is screened according to the calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, it is determined that the risk of the Power Project meets controlled condition;
If the value that develops is greater than preset development threshold value, it is determined that the Characteristics of Development of the Power Project meets preset item Mesh implementation condition;
If the income reliable value is greater than preset revenue threshold, it is determined that the Characteristics of Development of the Power Project meets the item Mesh implementation condition.
4. the method according to claim 1, wherein described according to the big of the value-at-risk and default risk threshold value Small comparison result, it is determined whether the Power Project information is assessed according to enterprise development screening index, and/or, it is determined whether root The Power Project information is assessed according to financial screening index, to obtain calculated result, comprising:
If the value-at-risk is equal to the default risk threshold value, the electric power item is assessed according to the enterprise development screening index Mesh information, obtain the Power Project develops value;
Develop value and the default size comparison result for developing threshold value according to described, it is determined whether according to the financial screening index The Power Project information is assessed, the income reliable value of the Power Project is obtained.
5. method according to claim 1-4, which is characterized in that described to be commented according to preset risk screening index Estimate Power Project information, obtain the value-at-risk of the Power Project, comprising:
The target keywords in the Power Project information are extracted, whether judge the Power Project according to the target keywords It can not implement project list described in belonging to, obtain the first value-at-risk;
The balance data stream logic in the Power Project information is extracted, judges the balance data stream logic with the presence or absence of logic It is false situation, obtains the second value-at-risk;
Signature analysis is carried out to environment locating for the project, determines at least one third value-at-risk based on the analysis results;
By first value-at-risk, second value-at-risk and at least one third value-at-risk and value be determined as the wind Danger value.
6. according to claim 1, method described in any one of 2,4, which is characterized in that described according to enterprise development screening index The Power Project information is assessed, obtain the Power Project develops value, comprising:
The project location information in the Power Project information is obtained, and the electric power item is determined according to the project location information Whether mesh belongs to preset target development projects, and obtaining at least one first can develop value;
The project label in the Power Project information is obtained, and according to the project location information and/or the project label Determine whether the Power Project belongs to the project of interconnecting, value can be developed by obtaining second;
The advertisement information in the Power Project information is obtained, and determines whether the Power Project belongs to according to the advertisement information In preliminary item, at least one third development value is obtained;
By it is described at least one first can develop value, second can develop value and at least one third can develop value and value, determine Develop value to be described.
7. according to claim 1, method described in any one of 2,4, which is characterized in that described according to the financial screening index The Power Project information is assessed, the income reliable value of the Power Project is obtained, comprising:
The cooperation information in the Power Project information is obtained, and determines whether the Power Project wraps according to the cooperation information Containing preset target cooperation information, at least one first income reliable value is obtained;
Obtain the resource information in the Power Project information, and according to the resource information determine the Power Project whether be Preset target resource project obtains the second income reliable value;
The expected revenue information in the Power Project information is obtained, and the electric power item is determined according to the expected revenue information Whether mesh meets preset expected revenue threshold value, obtains third income reliable value;
The cost information in the Power Project information is obtained, and determines whether the Power Project is full according to the cost information The default cost conditions of foot, obtain the 4th income reliable value;
By at least one described first income reliable value, the second income reliable value, third income reliable value sum the 4th income can By being worth and being worth, it is determined as the income reliable value.
8. a kind of screening plant of Power Project, which is characterized in that the system comprises: risk screening module, strategy screening mould Block, financial screening module and project screening module;
Module is obtained, for assessing Power Project information according to preset risk screening index, obtains the wind of the Power Project Danger value;Wherein, the risk screening index includes: that can not implement project list, revenue and expenditure risk conditions, environment locating for project;
Determining module, for the size comparison result according to the value-at-risk and default risk threshold value, it is determined whether according to enterprise Develop screening index and assesses the Power Project information, and/or, it is determined whether the electric power item is assessed according to financial screening index Mesh information, to obtain calculated result;Wherein, the enterprise development index includes at least one for determining the Power Project The index of Characteristics of Development, the finance screening index include the finger that at least one is used to determine the income feature of the Power Project Mark;
Screening module, for screening Power Project according to the calculated result.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 8 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any item of the claim 1 to 8 is realized when being executed by processor.
CN201811505877.0A 2018-12-10 2018-12-10 Electric power item screening method and device, computer equipment and storage medium Active CN109636178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811505877.0A CN109636178B (en) 2018-12-10 2018-12-10 Electric power item screening method and device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811505877.0A CN109636178B (en) 2018-12-10 2018-12-10 Electric power item screening method and device, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN109636178A true CN109636178A (en) 2019-04-16
CN109636178B CN109636178B (en) 2021-08-31

Family

ID=66072492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811505877.0A Active CN109636178B (en) 2018-12-10 2018-12-10 Electric power item screening method and device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109636178B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110399302A (en) * 2019-07-26 2019-11-01 中国工商银行股份有限公司 Risk Identification Method, device, electronic equipment and the medium of Software Testing Project
CN110400118A (en) * 2019-06-11 2019-11-01 湖南标普信息科技有限公司 Project evaluation method and system based on property tax big data
CN111598705A (en) * 2020-05-18 2020-08-28 山东管理学院 Technical risk assessment method and system for investment risk project

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120323635A1 (en) * 2008-02-29 2012-12-20 Solarcity Corporation Methods of Processing Information in Solar Energy System
CN104732440A (en) * 2015-04-03 2015-06-24 合肥高新创业园管理有限公司 Investment and financing project screening system for facing high-tech business incubator
CN105303368A (en) * 2015-10-27 2016-02-03 中国石油天然气股份有限公司 Screening method of energy saving and emission reduction projects
CN106557870A (en) * 2016-11-03 2017-04-05 国网河南节能服务有限公司 A kind of energy potential evaluation method for electrical network energy contract mangement project
CN207764835U (en) * 2017-11-15 2018-08-24 南方电网科学研究院有限责任公司 Electricity Investment Warning System
CN108876153A (en) * 2018-06-22 2018-11-23 中国南方电网有限责任公司 A kind of Electricity Investment environmental assessment method, apparatus, equipment and storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120323635A1 (en) * 2008-02-29 2012-12-20 Solarcity Corporation Methods of Processing Information in Solar Energy System
CN104732440A (en) * 2015-04-03 2015-06-24 合肥高新创业园管理有限公司 Investment and financing project screening system for facing high-tech business incubator
CN105303368A (en) * 2015-10-27 2016-02-03 中国石油天然气股份有限公司 Screening method of energy saving and emission reduction projects
CN106557870A (en) * 2016-11-03 2017-04-05 国网河南节能服务有限公司 A kind of energy potential evaluation method for electrical network energy contract mangement project
CN207764835U (en) * 2017-11-15 2018-08-24 南方电网科学研究院有限责任公司 Electricity Investment Warning System
CN108876153A (en) * 2018-06-22 2018-11-23 中国南方电网有限责任公司 A kind of Electricity Investment environmental assessment method, apparatus, equipment and storage medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110400118A (en) * 2019-06-11 2019-11-01 湖南标普信息科技有限公司 Project evaluation method and system based on property tax big data
CN110399302A (en) * 2019-07-26 2019-11-01 中国工商银行股份有限公司 Risk Identification Method, device, electronic equipment and the medium of Software Testing Project
CN111598705A (en) * 2020-05-18 2020-08-28 山东管理学院 Technical risk assessment method and system for investment risk project

Also Published As

Publication number Publication date
CN109636178B (en) 2021-08-31

Similar Documents

Publication Publication Date Title
Wu et al. The effects of digital finance and financial constraint on financial performance: Firm-level evidence from China's new energy enterprises
Kulatilaka et al. Strategic growth options
Moran et al. Global supply chains of coltan: a hybrid life cycle assessment study using a social indicator
Moghaddam et al. The smirk of emerging market firms: a modification of the Dunning's typology of internationalization motivations
CN109636178A (en) Screening technique, device, computer equipment and the storage medium of Power Project
CN109615280A (en) Employee's data processing method, device, computer equipment and storage medium
Dietsche et al. What are the prospects for Mozambique to diversify its economy on the back of" local content"?
Chaffai et al. How far away is the MENA banking system? Efficiency comparisons with international banks
Shapiro et al. Strategic heterogeneity in the global mining industry
Bondar et al. Construction Project Management Based on the Circular Economy
Ha et al. Real option approach on infrastructure investment in Vietnam: focused on smart city project
Ung et al. SMEs access to finance in Cambodia
Kruse et al. Smart specialisation policy strategy for interregional cooperation: pushing less-developed regions.
Pouresmaieli et al. Corporate social responsibility in complex systems based on sustainable development
Ayodele et al. African Continental Free Trade Agreement: the Pros and Cons on the Oil and Gas Industry in Nigeria
Mahmud et al. Navigating Challenges: Technology Adoption Issues in Business and Management in Emerging Nations—A Case Study of Bangladesh
CN112348403B (en) Wind control model construction method and device and electronic equipment
Kathuria Outward FDI from India—are there any lessons for other developing countries
Zhang Why Does Local Variation Matter? Explaining China’s Regional Development Models
Zhang Explaining Local Variation and Economic Growth: China in an Evolutionary Approach
Che The life cycle of government ownership
Kakabadse et al. Information Technology for Public Sector in Developing Countries: Designing Relevant Infra-Structural Capability or New Colonialism?
Distler et al. Emerging multinational corporations and their cross-border M&A activity
Bigerna et al. Environmental variables and power firms' productivity: micro panel estimation with time-Invariant variables
Dissel et al. Multiple perspectives on appraisal techniques for new technologies: Examples from the aerospace industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant