CN109635884A - Fibre cement board assembly line information big data system based on two dimensional code identification technology - Google Patents
Fibre cement board assembly line information big data system based on two dimensional code identification technology Download PDFInfo
- Publication number
- CN109635884A CN109635884A CN201811203144.1A CN201811203144A CN109635884A CN 109635884 A CN109635884 A CN 109635884A CN 201811203144 A CN201811203144 A CN 201811203144A CN 109635884 A CN109635884 A CN 109635884A
- Authority
- CN
- China
- Prior art keywords
- information
- cement board
- big data
- dimensional code
- assembly line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
The invention belongs to fiber cement board technical field of producing, specifically provide the fibre cement board assembly line information big data system based on two dimensional code identification technology, by by two dimensional code acquisition device reasonable layout in each crucial workshop section of fibre cement board assembly line, highly effective gathering effective information is simultaneously effectively combined 2 D code system with big data platform technology, fibre cement board assembly line composition of raw materials-technological parameter-fiber cement board Properties Correlation data information is obtained, provides true, accurate data supporting for fiber cement board qualitative control and the optimization of fiber cement board performance;It is scanned the two-dimensional code by user terminal or network account logs in, obtain fiber cement board full spectrum information, while access authority is set, avoids key technology information leakage.
Description
Technical field
The invention belongs to fiber cement board technical field of producing, and in particular to the fiber based on two dimensional code identification technology
Cement panel production lines information big data system.
Background technique
Fiber cement board be it is a kind of with cement for main cementing material, the fibers such as inorganic mineral fiber or cellulose fibre are
Reinforcing material is formed, is pressurizeed (non-pressurised), steam pressure (or non-steam pressure) conserves manufactured environmentally protective inorganic building material.Fiber water
Mud plate has superior fire prevention, waterproof performance, excellent heat preservation and insulation, the use longevity of good soundproof effect and overlength
Life;It is widely used in construction wall, furred ceiling, floor, road sound insulation absorbent lined barrier, the panel for pouring wall, combined wall board
Field.
Fiber cement board preparation process flow is complicated, final fiber cement board quality and composition of raw materials and production technology system
It spends closely related.Currently, the determination of fibre cement board assembly line formula and process system is mainly reference with knowhow, lack
Really, accurate data supporting, and laboratory preparation simulation industrial production line carries out the preparation of fiber cement board, due to cannot be real
Existing process system is completely the same, and the experimental data provided is only for reference and is not directly applicable actual production.
To meet market development demand, fibre cement product need to develop to high-grade, special performance direction, mature fiber
Cement panel production lines equipment is more and huge, under the premise of shortage is true, accurate data supports, directly adjusts in the production line excellent
Change formula, the normal production of enterprise, trial and error higher cost can be seriously affected.
Summary of the invention
The purpose of the present invention is overcome the problems, such as that fibre cement product production technology precision is low in the prior art.
For this purpose, the present invention provides the fibre cement board assembly line information big data system based on two dimensional code identification technology,
It include: two-dimensional code generation module, information acquisition module, big data platform and user terminal;
The two-dimensional code generation module is for being marked fiber cement board in Jie Pi workshop section and generating corresponding two dimension
Code;
The information acquisition module is used for each workshop section after Jie Pi workshop section and sweeps to the two dimensional code on fiber cement board
It retouches to obtain the two-dimensional barcode information on the fiber cement board, and for acquiring the workshop section to the machining information of the fiber cement board,
And the two-dimensional barcode information and the machining information are passed into the big data platform together;
The big data platform is used to receive the two-dimensional barcode information and machining information at different workshop sections, and will be at each workshop section
Two-dimensional barcode information and machining information carry out classification storage;
The user terminal obtains the two-dimensional barcode information at each workshop section of the big data platform according to default registration selectivity
And machining information.
Preferably, the information acquisition module includes the first collector, and first collector acquires the stacking workshop section
Locate the position of fiber cement board and stacking time on piler and generates stacking machining information.
Preferably, the information acquisition module includes the second collector, and second collector acquires the demoulding workshop section
Place's ingot stripper is to the briquetting pressure size of fiber cement board, dwell time, precuring temperature and precuring time and generates demoulding processing
Information.
Preferably, the information acquisition module includes third collector, and the third collector acquires the sanding workshop section
Place's sander is to the steam press maintenance pressure of fiber cement board, steam pressure time, pressure rising time and dip time and generates sanding processing
Information.
Preferably, the information acquisition module includes the 4th collector, and the 4th collector acquires the finished product detection
The performance detection value of laboratory at workshop section to fiber cement board.
Preferably, the big data platform receives the integrated information at different workshop sections, by the information in the integrated information
It carries out classification storage and access authority is set by rank.
Preferably, the user terminal stores information according to the classification that preset access authority obtains the big data platform.
Preferably, the integrated information includes the technique at fibre cement board type, grade, specification information and each workshop section
Parameter and fiber cement board performance detection data.
Preferably, the big data platform includes two dimensional code sub-module stored, user account submodule, public information submodule
Block and confidential information submodule.
Beneficial effects of the present invention: this fibre cement board assembly line based on two dimensional code identification technology provided by the invention
Information big data system, by by two dimensional code acquisition device reasonable layout in each crucial workshop section of fibre cement board assembly line, efficiently
Acquisition effective information is simultaneously effectively combined 2 D code system with big data platform technology, is obtained fibre cement board assembly line raw material and is matched
Side-technological parameter-fiber cement board Properties Correlation data information is that fiber cement board qualitative control and fiber cement board performance are excellent
Change and true, accurate data supporting is provided;It is scanned the two-dimensional code by user terminal or network account logs in, obtain fiber cement board
Full spectrum information, while access authority is set, avoid key technology information leakage.
This information big data system can in real time, accurately feed back production line information, administrative staff can by system with
When understand the production line condition of production everywhere, guarantee that production is stablized and carry out and improve for fiber cement board technique and formula to provide reliably
Data are supported.
The present invention is described in further details below with reference to attached drawing.
Detailed description of the invention
Fig. 1 is the frame of the fibre cement board assembly line information big data system the present invention is based on two dimensional code identification technology
Figure.
Description of symbols: two-dimensional code generation module 1, information acquisition module 2, big data platform 3, user terminal 4, first
Collector 21, the second collector 22, third collector 23, the 4th collector 24, two dimensional code sub-module stored 31, user account
Module 32, public information submodule 33, confidential information submodule 34.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " center ", "upper", "lower", "front", "rear", " left side ",
The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on the figure
Orientation or positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device of indication or suggestion meaning or
Element must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Term " first ", " second " be used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or
Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply
Ground includes one or more of the features;In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or
It is more than two.
The present invention provides the fibre cement board assembly line information big data systems based on two dimensional code identification technology, comprising:
Two-dimensional code generation module 1, information acquisition module 2, big data platform 3 and user terminal 4;
The two-dimensional code generation module 1 is for being marked fiber cement board in Jie Pi workshop section and generating corresponding two dimension
Code;
The information acquisition module 2 is used for each workshop section after Jie Pi workshop section and sweeps to the two dimensional code on fiber cement board
It retouches to obtain the two-dimensional barcode information on the fiber cement board, and for acquiring the workshop section to the machining information of the fiber cement board,
And the two-dimensional barcode information and the machining information are passed into the big data platform 3 together;
The big data platform 3 is used to receive the two-dimensional barcode information and machining information at different workshop sections, and will be at each workshop section
Two-dimensional barcode information and machining information carry out classification storage;
The user terminal 4, which obtains the two dimensional code at each workshop section of the big data platform 3 according to default registration selectivity, to be believed
Breath and machining information.
It follows that as shown in Figure 1, fibre cement board assembly line successively includes stock, vertical mixer, platemaking machine, connects
The equipment such as base machine, piler, press, precuring kiln, ingot stripper, still kettle, sander and finished product detection, each equipment are corresponding not
Same operation workshop section.It is the fiber water positioned at the two-dimensional code generation module 1 connect at base machine when fiber cement board, which enters, connects base machine
Mud plate coding simultaneously forms first without two two dimensional code, which includes product type, grade, specification information and production
The leading portions critical technical parameters such as formula, forming tube breast roll pressure.Fiber cement board with two dimensional code enters next workshop section
Stacking workshop section is equipped with first information collector 21 on the piler at stacking workshop section, when fiber cement board enters stacking workshop section
When, while first information collector 21 reads two dimensional code, and acquire at the stacking workshop section fiber cement board on piler
Position and stacking time simultaneously generate stacking machining information, and by the workshop section two-dimensional barcode information and stacking machining information be packaged hair
Give big data platform 3.Next workshop section is entered back into after by connecing base machining, is followed successively by press, precuring kiln and demoulding
Machine, the second collector 22 acquire at the demoulding workshop section ingot stripper to the briquetting pressure size of the fiber cement board, dwell time, pre-
It supports temperature and precuring time and generates demoulding machining information.
Specifically, it is connected between information acquisition module 2 and big data platform 3 by wireless network, fibre cement board assembly line
Including early-stage preparations process, pulpboard paper → pulping → defibrination → metering, water → metering, cement → metering, quartz sand → defibrination →
Metering, aforementioned four composition raw material pour into vertical mixer after having measured and be stirred → laminator → connect base machine → piler →
Press → precuring kiln → ingot stripper → still kettle → sander → finished product → finished product monitoring.Two dimensional code is installed in Jie Pi machine workshop section
Generation module 1 carries out spray two dimensional code especially by two dimensional code code spraying device on fiber cement board, the fibre for starting processing each in this way
Dimension cement plate has a unique corresponding two dimensional code.Specifically, two-dimensional code generation module generates a packet in Jie Pi workshop section
Two dimensional code containing the front ends critical technical parameter information such as product type, grade, specification information and formula, forming tube breast roll pressure,
And it is transmitted to big data platform 3.Fiber cement board with two dimensional code enters next workshop section, in fibre cement board assembly line
On crucial workshop section on setting information acquisition module 2, when fiber cement board pass through the workshop section when, adopted by information acquisition module 2
Collect the two dimensional code of the fiber cement board, while obtaining the section to the machining information of fiber cement board, by the two dimensional code and processing
Information package is sent to big data platform 3 at integrated information and is handled, and information is carried out classification storage, user terminal 4
Can know the different workshop sections of the corresponding fiber cement board of the two dimensional code by corresponding two dimensional code in scanning big data platform 3
Machining information, can also pass through network remote obtain fiber cement board integrated information.
Preferably scheme, the big data platform 3 receive the integrated information at different workshop sections, will be in the integrated information
Information carries out classification storage and access authority is arranged by rank.While obtaining integrated information, since big data platform 3 is to each
The integrated information of fiber cement board at workshop section has carried out classification storage and access authority is arranged by rank, i.e., user terminal 4 can only
Obtain a part of the integrated information of the fiber cement board of appropriate level.
Preferably scheme, the user terminal 4 are stored according to the classification that preset access authority obtains the big data platform 3
Information.It follows that can also be by the way that administration authority be arranged in user terminal 4, so that user terminal 4 is obtaining big data platform 3
Information when can only obtain information in extent of competence, be convenient for the confidentiality of data in this way, key message avoided to reveal.
Preferably scheme, the information acquisition module 2 include the first collector 21, the second collector 22, third collector
23 and the 4th collector 24, first collector 21, the second collector 22, third collector 23 and the 4th collector 24 difference
Positioned at stacking workshop section, demoulding workshop section, sanding workshop section and finished product detection workshop section.
It follows that the first collector 21 is located at stacking workshop section, and while reading two dimensional code on plate, Xiang Suoshu big data
Platform 3 transmits plate respective panels pile location dependent information;First collector 21 acquires at the stacking workshop section fiber on piler
The position of cement plate and stacking time simultaneously generate stacking machining information.
Second collector 22 is located at demoulding workshop section, transmits while reading two dimensional code on plate to the big data platform 3
The corresponding related datas such as straight sheet pile briquetting pressure and precuring temperature, time;Second collector 22 acquires to be taken off at the demoulding workshop section
Mould machine is to the briquetting pressure size of fiber cement board, dwell time, precuring temperature and precuring time and generates demoulding machining information.
Third collector 23 is located at sanding workshop section, transmits while reading two dimensional code on plate to the big data platform 3
Corresponding plate steam press maintenance and thickness data;Third collector 23 acquires at the sanding workshop section sander to fiber cement board
Steam press maintenance pressure, steam pressure time, pressure rising time and dip time simultaneously generate sanding machining information.
4th collector 24 is located at while two dimensional code on finished product detection workshop section (laboratory), reading plate to described big
Data platform 3 transmits corresponding plate detection data.4th collector 24 acquires the laboratory at the finished product detection workshop section to fibre
Tie up the performance detection value of cement plate.
Preferably scheme, the big data platform 3 include two dimensional code sub-module stored 31, user account submodule 32, public affairs
Open message sub-module 33 and confidential information submodule 34.It follows that two dimensional code sub-module stored 31 is for storing each two dimension
Code information, two-dimensional barcode information include each related ginseng of formula, molding parameter, maintenance parameter and performance test results etc. of the plate
Number;
User account submodule 32 for storing user account information, and for compare user terminal login account information with
Store account information;
Public information submodule 33, for feeding back specified permission information to particular account according to plate testing result;
Confidential information submodule 34, for receiving all formulas, technological parameter and testing result information, and it is close according to maintaining secrecy
Code is to 4 pushed information of user terminal.
Beneficial effects of the present invention: this fibre cement board assembly line based on two dimensional code identification technology provided by the invention
Information big data system, by two dimensional code acquisition device reasonable layout in each crucial workshop section of fibre cement board assembly line, highly effective gathering
Effective information is simultaneously effectively combined 2 D code system with big data platform technology, obtains fibre cement board assembly line composition of raw materials-
Technological parameter-fiber cement board Properties Correlation data information is that fiber cement board qualitative control and fiber cement board performance optimize
True, accurate data supporting is provided;It is scanned the two-dimensional code by user terminal or network account logs in, it is complete to obtain fiber cement board
Azimuth information, while access authority is set, avoid key technology information leakage.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all
It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.
Claims (9)
1. the fibre cement board assembly line information big data system based on two dimensional code identification technology characterized by comprising two dimension
Code generation module (1), information acquisition module (2), big data platform (3) and user terminal (4);
The two-dimensional code generation module (1) is for being marked fiber cement board in Jie Pi workshop section and generating corresponding two dimension
Code;
The information acquisition module (2) is used for each workshop section after Jie Pi workshop section and is scanned to the two dimensional code on fiber cement board
To obtain the two-dimensional barcode information on the fiber cement board, and for acquiring the workshop section to the machining information of the fiber cement board, and
The two-dimensional barcode information and the machining information are passed into the big data platform (3) together;
The big data platform (3) is used to receive the two-dimensional barcode information and machining information at different workshop sections, and will be at each workshop section
Two-dimensional barcode information and machining information carry out classification storage;
The user terminal (4) obtains the two dimensional code letter at each workshop section of the big data platform (3) according to default registration selectivity
Breath and machining information.
2. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the information acquisition module (2) includes the first collector (21), first collector (21) acquires the heap
The position of fiber cement board and stacking time and stacking machining information is generated on piler at pile workshop section.
3. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the information acquisition module (2) includes the second collector (22), the second collector (22) acquisition is described de-
Ingot stripper to the briquetting pressure size of fiber cement board, dwell time, precuring temperature and precuring time and generates de- at die worker's section
Mould machining information.
4. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the information acquisition module (2) includes third collector (23), the third collector (23) acquires the sand
Sander to the steam press maintenance pressure of fiber cement board, steam pressure time, pressure rising time and dip time and generates sand at light workshop section
Light machining information.
5. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the information acquisition module (2) includes the 4th collector (24), the 4th collector (24) acquisition it is described at
Product examine surveys the laboratory at workshop section to the performance detection value of fiber cement board.
6. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the big data platform (3) receives the integrated information at different workshop sections, by the information in the integrated information into
Row classification stores and access authority is arranged by rank.
7. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the user terminal (4) stores letter according to the classification that preset access authority obtains the big data platform (3)
Breath.
8. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the integrated information includes the technological parameter at fibre cement board type, grade, specification information and each workshop section
And fiber cement board performance detection data.
9. the fibre cement board assembly line information big data system according to claim 1 based on two dimensional code identification technology,
It is characterized by: the big data platform (3) includes two dimensional code sub-module stored (31), user account submodule (32), openly
Message sub-module (33) and confidential information submodule (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811203144.1A CN109635884B (en) | 2018-10-16 | 2018-10-16 | Fiber cement board production line information big data system based on two-dimensional code recognition technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811203144.1A CN109635884B (en) | 2018-10-16 | 2018-10-16 | Fiber cement board production line information big data system based on two-dimensional code recognition technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109635884A true CN109635884A (en) | 2019-04-16 |
CN109635884B CN109635884B (en) | 2022-04-15 |
Family
ID=66066362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811203144.1A Active CN109635884B (en) | 2018-10-16 | 2018-10-16 | Fiber cement board production line information big data system based on two-dimensional code recognition technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109635884B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110852402A (en) * | 2019-10-17 | 2020-02-28 | 广州裕申电子科技有限公司 | Industrial production data processing method, system and storage medium |
CN111353559A (en) * | 2020-02-28 | 2020-06-30 | 无锡沃尔德信息科技有限公司 | Data acquisition and tracing system for PVC decorative film whole production process |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103370180A (en) * | 2010-10-22 | 2013-10-23 | 林儿庆 | Mobile production system for cement panel |
CN103745311A (en) * | 2013-12-25 | 2014-04-23 | 天通精电新科技有限公司 | Production data management information system |
CN105507493A (en) * | 2016-01-21 | 2016-04-20 | 李涛 | Plate with identity recognition function and manufacture process thereof |
CN105652829A (en) * | 2015-12-21 | 2016-06-08 | 洛阳兰迪玻璃机器股份有限公司 | Toughened glass production method and production line |
CN106096977A (en) * | 2016-06-03 | 2016-11-09 | 武汉铁锚焊接材料股份有限公司 | A kind of flux-cored wire manufacturing parameter retroactive method based on Quick Response Code and system |
CN107272629A (en) * | 2017-07-28 | 2017-10-20 | 赣州科睿特软件股份有限公司 | A kind of intelligent plant system based on technology of Internet of things with industrial big data |
EP3236258A2 (en) * | 2016-03-30 | 2017-10-25 | Pouria Ghods | Embedded wireless monitoring sensors |
CN107628754A (en) * | 2017-08-22 | 2018-01-26 | 洛阳兰迪玻璃机器股份有限公司 | A kind of glass plate and its production method |
CN108629602A (en) * | 2018-05-04 | 2018-10-09 | 武汉大学 | A kind of food safety management System and method for based on block chain technology |
-
2018
- 2018-10-16 CN CN201811203144.1A patent/CN109635884B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103370180A (en) * | 2010-10-22 | 2013-10-23 | 林儿庆 | Mobile production system for cement panel |
CN103745311A (en) * | 2013-12-25 | 2014-04-23 | 天通精电新科技有限公司 | Production data management information system |
CN105652829A (en) * | 2015-12-21 | 2016-06-08 | 洛阳兰迪玻璃机器股份有限公司 | Toughened glass production method and production line |
CN105507493A (en) * | 2016-01-21 | 2016-04-20 | 李涛 | Plate with identity recognition function and manufacture process thereof |
EP3236258A2 (en) * | 2016-03-30 | 2017-10-25 | Pouria Ghods | Embedded wireless monitoring sensors |
CN106096977A (en) * | 2016-06-03 | 2016-11-09 | 武汉铁锚焊接材料股份有限公司 | A kind of flux-cored wire manufacturing parameter retroactive method based on Quick Response Code and system |
CN107272629A (en) * | 2017-07-28 | 2017-10-20 | 赣州科睿特软件股份有限公司 | A kind of intelligent plant system based on technology of Internet of things with industrial big data |
CN107628754A (en) * | 2017-08-22 | 2018-01-26 | 洛阳兰迪玻璃机器股份有限公司 | A kind of glass plate and its production method |
CN108629602A (en) * | 2018-05-04 | 2018-10-09 | 武汉大学 | A kind of food safety management System and method for based on block chain technology |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110852402A (en) * | 2019-10-17 | 2020-02-28 | 广州裕申电子科技有限公司 | Industrial production data processing method, system and storage medium |
CN110852402B (en) * | 2019-10-17 | 2023-10-27 | 广州裕申电子科技有限公司 | Industrial production data processing method, system and storage medium |
CN111353559A (en) * | 2020-02-28 | 2020-06-30 | 无锡沃尔德信息科技有限公司 | Data acquisition and tracing system for PVC decorative film whole production process |
Also Published As
Publication number | Publication date |
---|---|
CN109635884B (en) | 2022-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109635884A (en) | Fibre cement board assembly line information big data system based on two dimensional code identification technology | |
CN103927616B (en) | Collector associates the method with electric energy meter rotation | |
CN101540069A (en) | Method for examining and managing thermodynamic system | |
CN106767991B (en) | A kind of based on WLAN Thermal Meter verification management system and method | |
CN106157166A (en) | Intelligent power supply gathers service system | |
CN105427036B (en) | Shield segment pouring process quality management method | |
CN101515378A (en) | Informationization management method for vessel entering and leaving port | |
CN206131999U (en) | System for real -time supervision hull base -line on throne inflection | |
CN109784674B (en) | Quality tracking system and method based on BIM model | |
CN101620267B (en) | Indoor wireless locating method | |
CN203012738U (en) | Material error proofing information contrast system | |
CN109754036A (en) | Information-based quality control system and quality control method for Plastic Drain Slab Construction | |
CN206347999U (en) | A kind of tower crane system for detecting verticality device based on BIM | |
CN102346019A (en) | Laser measuring system employing GPS positioning and method thereof | |
CN106500786A (en) | The gas meter, flow meter of application Internet of Things propagated sensation module | |
CN106338595A (en) | Asphalt foaming parameter measurement method and system | |
CN207742327U (en) | A kind of detection device of ammeter electric wire | |
CN207851308U (en) | Object space variation monitoring system based on satellite positioning | |
CN112819129A (en) | Prefabricated part and identification method thereof | |
CN107784445A (en) | A kind of statistical method of man-hour loss | |
CN212721717U (en) | Intelligent electronic scale | |
CN107703894A (en) | A kind of drainage pipeline networks remotely monitors SCADA system | |
CN107655451A (en) | Laser linear array displacement measuring device and its application method | |
CN209356021U (en) | A kind of laser mud level gauging system | |
CN210163874U (en) | Informationized automatic monitoring device for ultra-deep foundation pit in karst region |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |