CN109623099A - Helical blade wearing layer alloy welding deposit technique - Google Patents

Helical blade wearing layer alloy welding deposit technique Download PDF

Info

Publication number
CN109623099A
CN109623099A CN201811603396.3A CN201811603396A CN109623099A CN 109623099 A CN109623099 A CN 109623099A CN 201811603396 A CN201811603396 A CN 201811603396A CN 109623099 A CN109623099 A CN 109623099A
Authority
CN
China
Prior art keywords
welding
helical blade
wearing layer
road
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811603396.3A
Other languages
Chinese (zh)
Other versions
CN109623099B (en
Inventor
陈爱民
王秋生
戴日全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Hongda Group Co Ltd
Original Assignee
Jiangsu New Hongda Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Hongda Group Co Ltd filed Critical Jiangsu New Hongda Group Co Ltd
Priority to CN201811603396.3A priority Critical patent/CN109623099B/en
Publication of CN109623099A publication Critical patent/CN109623099A/en
Application granted granted Critical
Publication of CN109623099B publication Critical patent/CN109623099B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/04Welding for other purposes than joining, e.g. built-up welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K35/00Rods, electrodes, materials, or media, for use in soldering, welding, or cutting
    • B23K35/22Rods, electrodes, materials, or media, for use in soldering, welding, or cutting characterised by the composition or nature of the material
    • B23K35/24Selection of soldering or welding materials proper
    • B23K35/30Selection of soldering or welding materials proper with the principal constituent melting at less than 1550 degrees C
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K35/00Rods, electrodes, materials, or media, for use in soldering, welding, or cutting
    • B23K35/22Rods, electrodes, materials, or media, for use in soldering, welding, or cutting characterised by the composition or nature of the material
    • B23K35/24Selection of soldering or welding materials proper
    • B23K35/30Selection of soldering or welding materials proper with the principal constituent melting at less than 1550 degrees C
    • B23K35/3033Ni as the principal constituent
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/04Welding for other purposes than joining, e.g. built-up welding
    • B23K9/044Built-up welding on three-dimensional surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Arc Welding In General (AREA)

Abstract

The present invention provides a kind of helical blade wearing layer alloy welding deposit technique.Remove the rust dirt impurity of helical blade end face and neighbouring welding section;With ERNiCrMo-3 Ni-Cr-Mo welding wire along the helical blade end face argon arc-welding built-up welding transition zone, arrow path is used when welding, short arc, is not swung, welding current is 80 to 85 peaces, temperature is not higher than 130 degrees Celsius between road, the built-up welding number of plies is one layer of twice, using sequential welding, the welding direction of twice is on the contrary, and trace overlap amount reaches the half of preceding road weld seam afterwards;Weldment natural cooling;The helical blade is preheated to 200 to 250 degrees Celsius;Built-up welding Si Taili cobalt-base alloys cladding, welding current is 75 to 80 peaces when built-up welding, and temperature is not less than 200 degrees Celsius between road, the welding direction between welding bead be back and forth it is round-trip, welded by road, be staggered at the welding point between per pass weld seam road.The service life of blade can greatly be extended through the invention.

Description

Helical blade wearing layer alloy welding deposit technique
Technical field
The present invention relates to helical blade welding technology field, in particular to a kind of helical blade wearing layer alloy welding deposit work Skill.
Background technique
Remoter from transmission shaft on blade, stress is bigger, and the edge abrasion amount of blade is also bigger.It is used in machinery part surface The method heap of welding applies the process of one or more layers same material or different metals, referred to as built-up welding.
In the prior art, the method that helical blade material uses pure carbon steel or stainless steel to make additional Cr30 moving vane, Its wear-resisting property is general, and service life is short and processing is many and diverse.
Summary of the invention
In view of the above technical problems, relatively simple the purpose of the present invention is to provide a kind of technique and blade can be extended use the longevity The helical blade wearing layer alloy welding deposit technique of life.
Helical blade wearing layer alloy welding deposit technique of the invention includes: step 1, remove helical blade end face and near The rust dirt impurity of welding section;Step 2, with ERNiCrMo-3 Ni-Cr-Mo welding wire along the helical blade end face argon arc-welding built-up welding mistake Cross layer, when welding using arrow path, short arc, do not swing, welding current is 80 to 85 peaces, and weldingvoltage is 12 to 16 volts, welding speed Degree is 8 to 12 centimetres per minute, and temperature is not higher than 130 degrees Celsius between road, and the built-up welding number of plies is one layer of twice, using sequential welding, after The welding direction in the road Dao Yuqian on the contrary, and lap reach the half of preceding road weld seam;Step 3, weldment natural cooling;Step 4, The helical blade is preheated to 200 to 250 degrees Celsius;Step 5, built-up welding Si Taili cobalt-base alloys cladding, welding current when built-up welding For 75 to 80 peaces, weldingvoltage is 16 to 18 volts, and speed of welding is 10 to 12 centimetres per minute, and temperature is taken the photograph not less than 200 between road Family name's degree, the welding direction between welding bead be back and forth it is round-trip, welded by road, be staggered at the welding point between per pass weld seam road.
Preferably, the ERNiCrMo-3 Ni-Cr-Mo gage of wire used is 2 millimeters, and protective gas is argon in step 2 Gas, 10 millimeters of gas nozzle, gas flow is 10 to 12 liters per minute.
Preferably, carrying out argon arc-welding built-up welding, gage of wire 3.2 using No. 12 welding wires of Si Taili cobalt-based in step 5 Millimeter, protective gas are argon gas, and 10 millimeters of gas nozzle, gas flow is 10 to 12 liters per minute.
Preferably, further including in step 3, butt-welding fitting carries out dyeing inspection, gives repair welding when defect occurs in flaw detection and repairs Mill.
Preferably, wrapping up the helical blade in step 4 using heating tape and being preheated.
Preferably, arc crater fills up when receiving arc in step 5, reflow arc inciting process is used at welding point.
Preferably, further including checking fillet in parallel shear after step 5, there is interior recess to use argon arc repair welding.
Preferably, further including, if face of weld is rough smooth, removing defect at defective place, and make after step 5 It polishes flat after being filled up with argon arc welding.
Preferably, further including using the entire helical blade of rock wool tight immediately after welding after step 5, delay Slow cool down is to room temperature.
Further, after step 5 further include: make 100% infiltration to welded component weld surface and monitor;And/or with Surfacing hardness is detected on the vertical plane of deposited metal surface.
Compared with prior art, helical blade wearing layer alloy welding deposit technique of the invention is in helical blade (such as two-phase 2205 material of steel) on built-up welding cobalt-based antifriction alloy (as taken charge of too vertical 12), helical blade can be made with higher wear-resisting and corrosion-resistant Comprehensive performance, higher deposited metal hardness is (as up to 42 to 47 HRC).For extend blade service life, in helical blade As required with axis assembling, spot welding, welding after, bead-welding technology of the invention can be used in blade edge;Using above-mentioned Alloy welding deposit technique reduces the production and processing of Cr30 moving vane, while can greatly extend the service life of blade.
Detailed description of the invention
Fig. 1 is the flow chart of the helical blade wearing layer alloy welding deposit technique of one embodiment of the invention.
Fig. 2 is the built-up welding section structural schematic diagram of one embodiment of the invention.
Specific embodiment
To make to have further understanding to the purpose of the present invention, construction, feature and its function, hereby cooperate embodiment detailed It is described as follows.
Incorporated by reference to referring to Fig. 1 and Fig. 2, Fig. 1 is the helical blade wearing layer alloy welding deposit technique of one embodiment of the invention Flow chart, Fig. 2 are the built-up welding section structural schematic diagram of one embodiment of the invention.Helical blade wearing layer alloy welding deposit of the invention Technique includes the following steps.
S1 removes the rust dirt impurity of 10 end face of helical blade and neighbouring welding section, such as oil, rust, moisture content impurity.Helical-blade 2205 material of dual phase steel can be used in piece main body.
S2, with ERNiCrMo-3 Ni-Cr-Mo welding wire along the helical blade end face argon arc-welding built-up welding transition zone 12, when welding It using arrow path, short arc, does not swing, welding current is 80 to 85 peaces, and weldingvoltage is 12 to 16 volts, and speed of welding is per minute 8 To 12 centimetres, temperature is not higher than 130 DEG C between road, and the built-up welding number of plies is one layer of twice, using sequential welding, twice the (the in such as Fig. 2 the 1st The welding direction 2) of road, the on the contrary, and rear road (the in such as Fig. 2 the 2nd) lap reach preceding road (the in such as Fig. 2 the 1st) The half of weld seam.Preferably, in step s 2, the ERNiCrMo-3 Ni-Cr-Mo gage of wire used is 2 millimeters, and protective gas is Argon gas, 10 millimeters of gas nozzle, gas flow is 10 to 12 liters per minute.
Using said welding method parameter, the scaling loss of alloying element can be reduced, dilution rate is reduced, avoids austenite column The segregation of coarse grains and impurity.Using sequential welding, the tendency that crackle is increased because of local heating, cooling is reduced.
S3, weldment natural cooling.The step forbids water cooling, in order to avoid generate cold crack.
Preferably, in step s3 further include that butt-welding fitting carries out dyeing inspection, give repair welding when defect occurs in flaw detection and repair Mill.In principle, it should ensure that the built-up welding for carrying out subsequent Si Taili (such as Stellite 12) welding wire after zero defect again.
The helical blade is preheated to 200 to 250 degrees Celsius by S4.Preferably, using heating tape wrap up the helical blade into Row preheating.
S5, built-up welding Si Taili cobalt-base alloys cladding 14, welding current is 75 to 80 peaces when built-up welding, and weldingvoltage is 16 to 18 Volt, speed of welding are 10 to 12 centimetres per minute, and temperature is not less than 200 DEG C between road, the welding direction between welding bead be back and forth it is round-trip, It welds by road, is staggered at the welding point between per pass (the in such as Fig. 2 the 3rd, the 4th and the 5th) weld seam road.In an embodiment In, step S5 carries out argon arc-welding built-up welding using No. 12 welding wires of Si Taili cobalt-based, and gage of wire is 3.2 millimeters, and protective gas is argon Gas, 10 millimeters of gas nozzle, gas flow is 10 to 12 liters per minute.Preferably, strict control welding current must not when built-up welding It is excessive, dilution rate is reduced to greatest extent;Welding direction between welding bead should be welded by road back and forth back and forth, with reduce welding stress and Deformation.
Preferably, in step s 5, arc crater fills up when receiving arc, to prevent crater crack;It is used back at welding point Arc inciting process is welded, to guarantee the welding quality at welding point.
In one embodiment, further include checking fillet in parallel shear after step 5, thering is interior recess to use argon arc repair welding.
It preferably, further include, if face of weld is rough smooth, removing defect at defective place, and make after step S5 It polishes flat after being filled up with argon arc welding.Face of weld is answered smooth, and no slag inclusion, splashing, knot carbon, undercut the defects of rosin joint, have Fault location is removed defect and polished flat after being filled up by previous process using argon arc welding.
Preferably, further include using the entire helical blade of rock wool tight immediately after welding after step S5, delay Slow cool down is to room temperature.
Preferably, after step S5 further include: make 100% infiltration to welded component weld surface and monitor.Such as whether see it Meet the professional standards such as NB47013.
Preferably, after step S5 further include: with detect surfacing hardness on the vertical plane of deposited metal surface.Such as it sees Its HRC hardness meets 43~48 related request.
Helical blade wearing layer alloy welding deposit technique of the invention is the heap in helical blade (such as 2205 material of dual phase steel) Welding cobalt-based antifriction alloy, (such as too vertical 12) of department, can make the with higher wear-resisting and corrosion-resistant comprehensive performance of helical blade, higher Deposited metal hardness is (as up to 42 to 47 HRC).
For extend blade service life, helical blade as required with axis assembling, spot welding, welding after, can be in leaf Piece edge uses bead-welding technology of the invention;Reduce the production of Cr30 moving vane using above-mentioned alloy welding deposit technique to add Work, while can greatly extend the service life of blade.
The present invention is described by above-mentioned related embodiment, however above-described embodiment is only to implement example of the invention. It must be noted that the embodiment disclosed is not limiting as the scope of the present invention.On the contrary, do not depart from spirit of the invention and It is changed and retouched made by range, belongs to scope of patent protection of the invention.

Claims (10)

1. a kind of helical blade wearing layer alloy welding deposit technique, characterized by comprising:
Step 1 removes the rust dirt impurity of helical blade end face and neighbouring welding section;
Step 2, with ERNiCrMo-3 Ni-Cr-Mo welding wire along the helical blade end face argon arc-welding built-up welding transition zone, when welding, is adopted With arrow path, short arc, do not swing, welding current be 80 to 85 peace, weldingvoltage be 12 to 16 volts, speed of welding be per minute 8 to 12 centimetres, temperature is not higher than 130 degrees Celsius between road, and the built-up welding number of plies is one layer of twice, using sequential welding, the welding of Hou Dao and preceding road It is contrary, and lap reaches the half of preceding road weld seam;
Step 3, weldment natural cooling;
The helical blade is preheated to 200 to 250 degrees Celsius by step 4;
Step 5, built-up welding Si Taili cobalt-base alloys cladding, welding current is 75 to 80 peaces when built-up welding, and weldingvoltage is 16 to 18 Volt, speed of welding are 10 to 12 centimetres per minute, and temperature is not less than 200 degrees Celsius between road, and the welding direction between welding bead is back and forth Back and forth, it welds by road, is staggered at the welding point between per pass weld seam road.
2. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that in step 2, use ERNiCrMo-3 Ni-Cr-Mo gage of wire be 2 millimeters, protective gas is argon gas, and 10 millimeters of gas nozzle, gas flow is every 10 to 12 liters of minute.
3. helical blade wearing layer alloy welding deposit technique as claimed in claim 1 or 2, which is characterized in that in step 5, adopt Argon arc-welding built-up welding is carried out with No. 12 welding wires of Si Taili cobalt-based, gage of wire is 3.2 millimeters, and protective gas is argon gas, gas nozzle 10 millimeters, gas flow is 10 to 12 liters per minute.
4. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that also wrapped in step 3 It includes, butt-welding fitting carries out dyeing inspection, gives repair welding reconditioning when defect occurs in flaw detection.
5. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that in step 4, utilize It wraps up the helical blade and is preheated in heating tape.
6. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that in step 5, receive arc When arc crater fill up, at welding point use reflow arc inciting process.
7. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that also wrapped after step 5 It includes, checks fillet in parallel shear, thering is interior recess to use argon arc repair welding.
8. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that also wrapped after step 5 It includes, if face of weld is rough smooth, removes defect at defective place, and polish flat after filling up using argon arc welding.
9. helical blade wearing layer alloy welding deposit technique as described in claim 1, which is characterized in that also wrapped after step 5 It includes, uses the entire helical blade of rock wool tight immediately after welding, be slowly cooled to room temperature.
10. helical blade wearing layer alloy welding deposit technique as claimed in claim 9, which is characterized in that also wrapped after step 5 It includes: 100% infiltration being made to welded component weld surface and is monitored;And/or with detect overlay cladding on the vertical plane of deposited metal surface Hardness.
CN201811603396.3A 2018-12-26 2018-12-26 Gold surfacing process for abrasion-resistant layer of helical blade Active CN109623099B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811603396.3A CN109623099B (en) 2018-12-26 2018-12-26 Gold surfacing process for abrasion-resistant layer of helical blade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811603396.3A CN109623099B (en) 2018-12-26 2018-12-26 Gold surfacing process for abrasion-resistant layer of helical blade

Publications (2)

Publication Number Publication Date
CN109623099A true CN109623099A (en) 2019-04-16
CN109623099B CN109623099B (en) 2020-12-25

Family

ID=66077906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811603396.3A Active CN109623099B (en) 2018-12-26 2018-12-26 Gold surfacing process for abrasion-resistant layer of helical blade

Country Status (1)

Country Link
CN (1) CN109623099B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110773839A (en) * 2019-11-13 2020-02-11 安徽应流集团霍山铸造有限公司 Welding process method for preventing repair welding cracks of nickel-based alloy bent pipe
CN111261399A (en) * 2020-03-30 2020-06-09 南京安盛电子有限公司 Method for stacking and welding silicon steel sheets of transformer
CN111318864A (en) * 2020-03-04 2020-06-23 南宁弗纳姆智能科技有限公司 Sugarcane cutter processing technology
CN112276307A (en) * 2020-10-20 2021-01-29 江苏利柏特股份有限公司 Stellite alloy welding and heat treatment process for modular production
CN113523719A (en) * 2021-07-10 2021-10-22 上海泽超实业有限公司 Machining process of helical blade
CN113909656A (en) * 2021-12-10 2022-01-11 东方法马通核泵有限责任公司 Surfacing process and surfacing method for main pump shaft seal matching part
CN114226908A (en) * 2021-12-14 2022-03-25 东方电气集团东方汽轮机有限公司 Welding method for dissimilar stellite trace alloy elements

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101433990A (en) * 2008-11-19 2009-05-20 南京宝色股份公司 Overlaying welding method of large area carbide alloy of workpiece wear layer
CN105710499A (en) * 2014-12-03 2016-06-29 重庆远煌机械制造有限公司 Build-up welding technique
CN105710500A (en) * 2014-12-04 2016-06-29 重庆聆益机械有限公司 Process for overlaying flange sealing surface with stainless steel flux-cored wire
CN105750693A (en) * 2016-04-29 2016-07-13 山西阳煤化工机械(集团)有限公司 Wear-resistant material surfacing method achieving preheating temperature lowering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101433990A (en) * 2008-11-19 2009-05-20 南京宝色股份公司 Overlaying welding method of large area carbide alloy of workpiece wear layer
CN105710499A (en) * 2014-12-03 2016-06-29 重庆远煌机械制造有限公司 Build-up welding technique
CN105710500A (en) * 2014-12-04 2016-06-29 重庆聆益机械有限公司 Process for overlaying flange sealing surface with stainless steel flux-cored wire
CN105750693A (en) * 2016-04-29 2016-07-13 山西阳煤化工机械(集团)有限公司 Wear-resistant material surfacing method achieving preheating temperature lowering

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张亚滨: "不锈钢钴基耐磨堆焊焊接工艺", 《科技信息》 *
王纯祥等: "大型螺旋送料转轴的整体焊接工艺", 《焊接》 *
马鸣等: "钴基耐磨硬质合金焊条电弧焊堆焊国产化试验研究", 《电焊机》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110773839A (en) * 2019-11-13 2020-02-11 安徽应流集团霍山铸造有限公司 Welding process method for preventing repair welding cracks of nickel-based alloy bent pipe
CN111318864A (en) * 2020-03-04 2020-06-23 南宁弗纳姆智能科技有限公司 Sugarcane cutter processing technology
CN111261399A (en) * 2020-03-30 2020-06-09 南京安盛电子有限公司 Method for stacking and welding silicon steel sheets of transformer
WO2021196676A1 (en) * 2020-03-30 2021-10-07 南京安盛电子有限公司 Transformer silicon steel sheet stacking and welding method
CN112276307A (en) * 2020-10-20 2021-01-29 江苏利柏特股份有限公司 Stellite alloy welding and heat treatment process for modular production
CN112276307B (en) * 2020-10-20 2021-11-05 江苏利柏特股份有限公司 Stellite alloy welding and heat treatment process for modular production
CN113523719A (en) * 2021-07-10 2021-10-22 上海泽超实业有限公司 Machining process of helical blade
CN113909656A (en) * 2021-12-10 2022-01-11 东方法马通核泵有限责任公司 Surfacing process and surfacing method for main pump shaft seal matching part
CN114226908A (en) * 2021-12-14 2022-03-25 东方电气集团东方汽轮机有限公司 Welding method for dissimilar stellite trace alloy elements

Also Published As

Publication number Publication date
CN109623099B (en) 2020-12-25

Similar Documents

Publication Publication Date Title
CN109623099A (en) Helical blade wearing layer alloy welding deposit technique
EP3452247B1 (en) Field girth welding technology for high manganese steel slurry pipelines
US10086462B2 (en) Hardfacing with low carbon steel electrode
CN102107314B (en) Method for overlaying wear-resistant layer of blade shroud of turbine working blade
CN113579426B (en) Welding method for stainless steel pipeline lined in butt joint section
CN101927390A (en) Method for welding circumferential weld between metal thin-wall clad layer and base layer of clad pipe
CN110560844A (en) Welding method of nickel-based material pipeline
CN106695079A (en) Welding method of double-metal composite pipe
US20090065556A1 (en) Method to reduce shrinkage driven distortion when welding on pressure piping and vessel materials
CN112171016A (en) Austenitic stainless steel NBG welding process
CN102848057A (en) Method for reworking welding seam of aluminum and aluminum alloy
CA2987748A1 (en) Work string tubing connection restoration
CN108817843A (en) A kind of monodentate crusher renovation technique
CN103212936B (en) A kind of restorative procedure of single roll crusher
US6730876B2 (en) Highly ductile reduced imperfection weld for ductile iron and method for producing same
CN112589241A (en) Vertical grinding roller core inclined plane welding repair method
CN110666305A (en) Narrow gap welding process of G115 steel
CN114535751B (en) Mining scrapping plate CMT gradient surfacing layer and preparation method thereof
CN112439981B (en) Butt joint method of corrosion-resistant alloy prefabricated inner joint coating steel pipe
CN114985880A (en) Method for welding austenitic stainless steel part and carbon steel part
KR102214407B1 (en) Manufacturing Method for High-Manganese SAW Steel Pipes for Cryogenic Usage for the Shipbuilding and Marine Plant and the High-Manganese SAW Steel Pipes Thereof
CN112439982A (en) X-shaped groove welding process of corrosion-resistant alloy composite pipe
CN107398688B (en) A kind of multiple tube instrument mouth aperture and welding method
RU2775448C1 (en) Method for manufacturing a longitudinally welded clad pipe
JPH0647192B2 (en) Submerged arc welding wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant