CN109617736A - A kind of data transmission method and relevant apparatus - Google Patents

A kind of data transmission method and relevant apparatus Download PDF

Info

Publication number
CN109617736A
CN109617736A CN201811602984.5A CN201811602984A CN109617736A CN 109617736 A CN109617736 A CN 109617736A CN 201811602984 A CN201811602984 A CN 201811602984A CN 109617736 A CN109617736 A CN 109617736A
Authority
CN
China
Prior art keywords
data
aperiodicity
primary gateway
gateway
master controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811602984.5A
Other languages
Chinese (zh)
Inventor
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hollysys Automation Co Ltd
Original Assignee
Hangzhou Hollysys Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hollysys Automation Co Ltd filed Critical Hangzhou Hollysys Automation Co Ltd
Priority to CN201811602984.5A priority Critical patent/CN109617736A/en
Publication of CN109617736A publication Critical patent/CN109617736A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

This application discloses a kind of data transmission methods, comprising: standby gateway receives the first aperiodicity data of primary gateway transmission, and the first aperiodicity data are stored in storage equipment;Judge whether primary gateway breaks down;When primary gateway breaks down, the first aperiodicity data are transferred to master controller in preset time.The application is backuped in standby gateway by increasing aperiodicity data, aperiodicity data can be transferred in master controller by standby gateway when primary gateway failures, it avoids and is not uploaded to the aperiodicity data of master controller also after primary gateway failures in the related technology and can not upload, the generation of the phenomenon that omission for causing data to transmit improves the reliability of aperiodicity data transmission.The application additionally provides a kind of data transmission device, data transmission system, electronic equipment and computer readable storage medium simultaneously, all has above-mentioned beneficial effect.

Description

A kind of data transmission method and relevant apparatus
Technical field
This application involves technical field of data transmission, in particular to a kind of data transmission method, data transmission device, data Transmission system, electronic equipment and computer readable storage medium.
Background technique
In the controls, communication gate plays the role of forming a connecting link.To upper layer, communication gate and master controller are logical Letter, to lower layer, communication gate is communicated with input-output equipment.Mainly there is following responsibility: receiving the period output number of master controller According to, and period output data is periodically transferred to output equipment;The periodical input data of input equipment are received, and periodically by the period Input data is transferred to master controller;The aperiodicity data for receiving input equipment and output equipment are stored in storage equipment, When to the master controller free time, aperiodicity data are transferred to master controller.
In the related technology using under dual redundant gateway mode, having a primary gateway and a standby gateway.If Primary gateway breaks down, and can not work on, then standby gateway can be upgraded to primary gateway and continue transmission cycle data and non- Periodic data guarantees the reliability of data transmission to a certain extent.But it has been saved on former primary gateway, not yet The aperiodicity data for being uploaded to master controller can not be uploaded to master controller, will necessarily be missed, and not can guarantee non- The reliable transmission of periodic data.
Therefore, how to provide a kind of scheme of solution above-mentioned technical problem is that those skilled in the art need to solve at present Problem.
Summary of the invention
The purpose of the application is to provide a kind of data transmission method, data transmission device, data transmission system, electronic equipment And computer readable storage medium, it can be improved the reliability of aperiodicity data transmission.Its concrete scheme is as follows:
This application provides a kind of data transmission methods, comprising:
Standby gateway receives the first aperiodicity data of primary gateway transmission, and the first aperiodicity data are deposited Storage is in storage equipment;
Judge whether the primary gateway breaks down;
When the primary gateway breaks down, the first aperiodicity data are transferred to main control in preset time Device.
Preferably, when the primary gateway breaks down, the first aperiodicity data are transferred in preset time After master controller, further includes:
The fault message of the primary gateway is sent to display equipment.
Preferably, when the primary gateway breaks down, the first aperiodicity data are transferred in preset time After master controller, further includes:
The standby gateway receives the second aperiodicity data that input equipment is sent, and by the second aperiodicity number In the storage device according to storage;
Judge whether the primary gateway restores normal;
When the primary gateway restores normal, the second aperiodicity data are transferred to the primary gateway, to work as Carried out data transmission when the standby gateway failure using the primary gateway.
Preferably, when the primary gateway breaks down, the first aperiodicity data are transferred in preset time Master controller, comprising:
When the primary gateway breaks down, when determining described default according to the size of the first aperiodicity data Between;
The first aperiodicity data are transferred to the master controller in the preset time.
The application provides a kind of data transmission device, comprising:
First reception and memory module receive the first aperiodicity data of primary gateway transmission for standby gateway, and The first aperiodicity data are stored in storage equipment;
First judgment module, for judging whether the primary gateway breaks down;
First transmission module, for when the primary gateway breaks down, in preset time by first aperiodicity Data are transferred to master controller.
Preferably, further includes:
Sending module, for the fault message of the primary gateway to be sent to display equipment.
Preferably, further includes:
Second reception and memory module receive the second aperiodicity number that input equipment is sent for the standby gateway According to, and in the storage device by the second aperiodicity data storage;
Second judgment module, for judging whether the primary gateway restores normal;
Second module, for the second aperiodicity data being transferred to described when the primary gateway restores normal Primary gateway, to be carried out data transmission using the primary gateway when the standby gateway failure.
Preferably, first transmission module includes:
Determination unit, for when the primary gateway breaks down, the size according to the first aperiodicity data to be true The fixed preset time;
Transmission unit, for the first aperiodicity data to be transferred to the master controller in the preset time.
The application provides a kind of data transmission system, comprising:
Master controller;
Primary gateway, the first aperiodicity data standby gateway for transmission;
The standby gateway, the first aperiodicity data sent for receiving the primary gateway, and by described first Aperiodicity data are stored in storage equipment;Judge whether the primary gateway breaks down;When the primary gateway breaks down When, the first aperiodicity data are transferred to the master controller in preset time.
The application provides a kind of electronic equipment, comprising:
Memory, for storing computer program;
Processor is realized when for executing the computer program such as the step of above-mentioned data transmission method.
The application provides a kind of computer readable storage medium, is stored with computer on the computer readable storage medium Program is realized when the computer program is executed by processor such as the step of above-mentioned data transmission method.
This application provides a kind of data transmission methods, comprising: standby gateway receives the first non-week of primary gateway transmission Phase property data, and the first aperiodicity data are stored in storage equipment;Judge whether primary gateway breaks down;Work as primary gateway When failure, the first aperiodicity data are transferred to master controller in preset time.
As it can be seen that the application is backuped in standby gateway by increasing aperiodicity data, can lead to when primary gateway failures It crosses standby gateway aperiodicity data are transferred in master controller, avoid on not having also after primary gateway failures in the related technology The generation for the phenomenon that aperiodicity data for reaching master controller can not upload, the omission for causing data to transmit improves aperiodic Property data transmission reliability.The application additionally provide simultaneously a kind of data transmission device, data transmission system, electronic equipment and Computer readable storage medium all has above-mentioned beneficial effect, and details are not described herein.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of application for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow chart of data transmission method provided by the embodiment of the present application;
Fig. 2 is the flow chart of another kind data transmission method provided by the embodiment of the present application;
Fig. 3 is the flow chart of another kind data transmission method provided by the embodiment of the present application;
Fig. 4 is a kind of structural schematic diagram of data transmission device provided by the embodiment of the present application.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
In the related technology if primary gateway breaks down, can not work on, then standby gateway can be upgraded to primary net Pass continues to transmit data, but have been saved on former primary gateway, there are no the aperiodicity data for being uploaded to master controller It can not be uploaded to master controller, will necessarily be missed, not can guarantee the reliable transmission of aperiodicity data.Based on above-mentioned Technical problem, the present embodiment provides a kind of data transmission methods, are backuped in standby gateway by increasing aperiodicity data, when Aperiodicity data can be transferred in master controller by standby gateway when primary gateway failures, avoid in the related technology when The phenomenon that aperiodicity data for not being uploaded to master controller after primary gateway failures can not also upload, the omission for causing data to transmit Generation, improve the reliability of aperiodicity data transmission, it is specific referring to FIG. 1, Fig. 1 is one provided by the embodiment of the present application The flow chart of kind data transmission method, specifically includes:
S101, standby gateway receive the first aperiodicity data of primary gateway transmission, and by the first aperiodicity data It is stored in storage equipment.
Based on the mode of dual redundant gateway, embodiment adds the back mechanism of aperiodicity data, backup gateway is connect The first aperiodicity data of primary gateway transmission are received, and the first aperiodicity data are stored in storage equipment.This step Purpose be in advance storage aperiodicity data to backup gateway, when primary gateway failures, backup gateway can continue non-week Phase property data carry out being transmitted to reliability of the master controller to guarantee data transmission.The work of gateway, that is, standby gateway or primary gateway With being: receiving the period output data of master controller, and period output data is periodically transferred to output equipment;Input is received to set Standby periodical input data, and periodical input data are periodically transferred to master controller;Receive input equipment and output equipment Aperiodicity data are stored in storage equipment, when to the master controller free time, aperiodicity data are transferred to main control Device.The present embodiment is not defined storage equipment, and user can store according to the actual situation, can be deposited according to preset condition The store path for determining the first aperiodicity data in storage equipment is stored up, preset condition is time or size of data or data class Type.First aperiodicity data refer to the data transmitted again when the master controller free time.It is corresponding to have periodic data, Periodic data refers to the data that can be passed to master controller in real time.The present embodiment does not limit primary gateway and standby gateway It is fixed, as long as guaranteeing to be able to carry out data transmission, real time monitoring between the two.
S102, judge whether primary gateway breaks down.
Primary gateway and standby gateway carry out real-time monitoring between the two, obtain corresponding use state, so as to as master When gateway fails, standby gateway executes the operation of primary gateway, to realize the transmission of data, guarantees the integrality of data transmission.This Embodiment is not defined fault condition, as long as can not realize that the complete transmission of data is classified as fault condition.
S103, the first aperiodicity data are transferred to master controller in preset time.
When primary gateway breaks down, S103 step is executed, the first aperiodicity data are transferred to master in preset time Controller.
When primary gateway does not break down, continue to be monitored the state of primary gateway execution S102 step.
The purpose of this step is when primary gateway failures, and standby gateway transmits the first aperiodicity data in preset time To master controller, the transmission of data is realized.The present embodiment is not defined preset time, can be evening hours, can be The time that master controller does not use, as long as can satisfy the purpose of the present embodiment.It is completed at this time by the first aperiodicity Data are transmitted to the operation of master controller.The present embodiment is not defined the switching mode between primary gateway and standby gateway, User can set according to the actual situation.
Further, the fault message of primary gateway is sent to display equipment,
Specifically, fault message refers to the time of primary gateway failures, the data of failure, identity of operator etc..This reality It applies example not to be defined display equipment, as long as information can be shown.
As it can be seen that by the way that the fault message of primary gateway is sent to display equipment, so that user can understand failure feelings in time Condition carries out the maintenance of equipment convenient for operator.
Based on the above-mentioned technical proposal, the present embodiment is backuped in standby gateway by increasing aperiodicity data, works as major network Aperiodicity data can be transferred in master controller by standby gateway when closing failure, avoid and work as major network in the related technology The hair for the phenomenon that aperiodicity data for not being uploaded to master controller after the failure of pass can not also upload, the omission for causing data to transmit It is raw, improve the reliability of aperiodicity data transmission.
Based on the above embodiment, the present embodiment provides a kind of data transmission methods, work as primary gateway failures reparation by taking Afterwards, the second aperiodicity data are transferred in primary gateway by standby gateway, so that primary gateway after standby gateway failure can be into The transmission of row data ensures the reliability of data transmission, specific referring to FIG. 2, Fig. 2 is another kind provided by the embodiment of the present application The flow chart of data transmission method, comprising:
S201, standby gateway receive the first aperiodicity data of primary gateway transmission, and by the first aperiodicity data It is stored in storage equipment.
S202, judge whether primary gateway breaks down.
S203, the first aperiodicity data are transferred to master controller in preset time.
When primary gateway breaks down, S203 step is executed, the first aperiodicity data are transferred to master in preset time Controller.
When primary gateway does not break down, continue to be monitored the state of primary gateway execution S202 step.
Above-described embodiment specifically is please referred to, the present embodiment is no longer repeated.
S204, standby gateway receive the second aperiodicity data that input equipment is sent, and by the second aperiodicity data It is stored in storage equipment.
At this point, standby gateway replaces primary gateway to execute operation.Standby gateway receives the aperiodicity data of output equipment, will Aperiodicity data save in storage equipment, then aperiodicity data are sent to master controller in preset time;Standby gateway The periodical number input data of input equipment is received, and periodic data is transferred to master controller;Standby gateway receives input The aperiodicity data of equipment save aperiodicity data in storage equipment, then send out aperiodicity data in preset time It send to master controller;Standby gateway receives the periodical output data of master controller, and periodical output data is sent to Output equipment, wherein standby gateway carries out real-time monitoring to primary gateway.
S205, judge whether primary gateway restores normal.
The purpose of this step is to confirm whether primary gateway restores normal.
S206, the second aperiodicity data are transferred to primary gateway, to be put into using major network when standby gateway failure The transmission of row data.
When primary gateway does not restore normal, continue to be monitored primary gateway execution S205 step.
When primary gateway restores normal, S206 step is executed, the second aperiodicity data are transferred to primary gateway, to realize The backup of data is carried out data transmission using primary gateway when standby gateway failure, realizes standby gateway and primary gateway at this time Between switching.
Based on the above-mentioned technical proposal, for the present embodiment by taking after primary gateway failures are repaired, standby gateway is non-by second Periodic data is transferred in primary gateway, so that primary gateway is able to carry out data transmission after standby gateway failure, ensures data The reliability of transmission.
Based on the above embodiment, the present embodiment provides a kind of data transmission methods, work as primary gateway failure by taking When, preset time is determined according to the size of the first aperiodicity data, is transferred to the first aperiodicity data in preset time Master controller, realizes the adjustability of the time of data transmission, and then realizes efficient data transfer, specifically referring to FIG. 3, Fig. 3 For the flow chart of another kind data transmission method provided by the embodiment of the present application, comprising:
S301, standby gateway receive the first aperiodicity data of primary gateway transmission, and by the first aperiodicity data It is stored in storage equipment.
S302, judge whether primary gateway breaks down.
Above-described embodiment specifically is please referred to, the present embodiment is no longer repeated.
S303, preset time is determined according to the size of the first aperiodicity data.
When primary gateway does not break down, continue to be monitored the state of primary gateway execution S302 step.
When primary gateway breaks down, S303 step is executed, when determining default according to the size of the first aperiodicity data Between.
The purpose of this step is that the time of transmission is determined according to the size of the first aperiodicity data, guarantees the conjunction of time Reason arranges.For example, being carried out in the idle situation of night master controller when the first aperiodicity data are greater than preset threshold Transmission;When the first aperiodicity data are less than preset threshold, can at work in the idle situation of interior master controller into Row transmission, that is, guarantee that data are transmitted, also guarantee not influence to work normally.
S304, the first aperiodicity data are transferred to master controller in preset time.
The purpose of this step, which is realized, is transferred to master controller for the first aperiodicity data, to complete the transmission of data.
Based on the above-mentioned technical proposal, the present embodiment is by taking when primary gateway breaks down, according to the first aperiodicity The size of data determines preset time, and the first aperiodicity data are transferred to master controller in preset time, realize data The adjustability of the time of transmission, and then realize efficient data transfer.
It to a kind of data transmission device provided by the embodiments of the present application, system, electronic equipment and computer-readable deposits below Storage media is introduced, a kind of data transmission device, system, electronic equipment and computer readable storage medium described below with Above-described data transmission method can correspond to each other reference.
With reference to Fig. 4, Fig. 4 is a kind of structural schematic diagram of data transmission device provided by the embodiment of the present application, relevant mode Block is all set in standby gateway, and data transmission device includes:
First reception and memory module 401, the first aperiodicity data of primary gateway transmission are received for standby gateway, And the first aperiodicity data are stored in storage equipment;
First judgment module 402, for judging whether primary gateway breaks down;
First transmission module 403, for passing the first aperiodicity data in preset time when primary gateway breaks down It is defeated to arrive master controller.
In some specific embodiments, further includes:
Sending module, for the fault message of primary gateway to be sent to display equipment.
In some specific embodiments, further includes:
Second reception and memory module receive the second aperiodicity data that input equipment is sent for standby gateway, and Second aperiodicity data are stored in storage equipment;
Second judgment module, for judging whether primary gateway restores normal;
Second module, for the second aperiodicity data being transferred to primary gateway, to work as when primary gateway restores normal Carried out data transmission when standby gateway failure using primary gateway.
In some specific embodiments, the first transmission module 401 includes:
Determination unit, when being preset for being determined according to the size of the first aperiodicity data when primary gateway breaks down Between;
Transmission unit, for the first aperiodicity data to be transferred to master controller in preset time.
The present embodiment provides a kind of data transmission systems, comprising:
Master controller;
Primary gateway, the first aperiodicity data standby gateway for transmission;
Standby gateway, for receiving the first aperiodicity data of primary gateway transmission, and by the first aperiodicity data It is stored in storage equipment;Judge whether primary gateway breaks down;It is non-by first in preset time when primary gateway breaks down Periodic data is transferred to master controller.
The present embodiment provides a kind of electronic equipment, comprising:
Memory, for storing computer program;
Processor is realized when for executing computer program such as the step of above-mentioned data transmission method.
The present embodiment provides a kind of computer readable storage medium, computer journey is stored on computer readable storage medium Sequence is realized when computer program is executed by processor such as the step of above-mentioned data transmission method.
Due to data transmission device, the implementation of data transmission system, electronic equipment and computer readable storage medium part Example corresponded to each other with the embodiment of data transmission method part, therefore data transmission device, data transmission system, electronic equipment and The embodiment of computer readable storage medium part refers to the description of the embodiment of data transmission method part, wouldn't go to live in the household of one's in-laws on getting married here It states.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond scope of the present application.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
A kind of data transmission method provided herein, data transmission device, data transmission system, electronics are set above Standby and computer readable storage medium is described in detail.Used herein principle and implementation of the specific case to the application Mode is expounded, the description of the example is only used to help understand the method for the present application and its core ideas.It should It points out, it for those skilled in the art, can also be to this Shen under the premise of not departing from the application principle Please some improvement and modification can also be carried out, these improvement and modification are also fallen into the protection scope of the claim of this application.

Claims (10)

1. a kind of data transmission method characterized by comprising
Standby gateway receives the first aperiodicity data of primary gateway transmission, and the first aperiodicity data are stored in It stores in equipment;
Judge whether the primary gateway breaks down;
When the primary gateway breaks down, the first aperiodicity data are transferred to master controller in preset time.
2. data transmission method according to claim 1, which is characterized in that when the primary gateway breaks down, pre- If the first aperiodicity data are transferred to after master controller by the time, further includes:
The fault message of the primary gateway is sent to display equipment.
3. data transmission method according to claim 1, which is characterized in that when the primary gateway breaks down, pre- If the first aperiodicity data are transferred to after master controller by the time, further includes:
The standby gateway receives the second aperiodicity data that input equipment is sent, and the second aperiodicity data are deposited Storage is in the storage device;
Judge whether the primary gateway restores normal;
When the primary gateway restores normal, the second aperiodicity data are transferred to the primary gateway, so as to when described Carried out data transmission when standby gateway failure using the primary gateway.
4. data transmission method according to any one of claims 1 to 3, which is characterized in that when event occurs in the primary gateway When barrier, the first aperiodicity data are transferred to master controller in preset time, comprising:
When the primary gateway breaks down, the preset time is determined according to the size of the first aperiodicity data;
The first aperiodicity data are transferred to the master controller in the preset time.
5. a kind of data transmission device characterized by comprising
First receives and memory module, the first aperiodicity data of primary gateway transmission is received for standby gateway, and by institute The first aperiodicity data are stated to be stored in storage equipment;
First judgment module, for judging whether the primary gateway breaks down;
First transmission module, for when the primary gateway breaks down, in preset time by the first aperiodicity data It is transferred to master controller.
6. data transmission device according to claim 5, which is characterized in that further include:
Second reception and memory module receive the second aperiodicity data that input equipment is sent for the standby gateway, and In the storage device by the second aperiodicity data storage;
Second judgment module, for judging whether the primary gateway restores normal;
Second module, for when the primary gateway restores normal, the second aperiodicity data to be transferred to the major network It closes, to be carried out data transmission using the primary gateway when the standby gateway failure.
7. data transmission device according to claim 5 or 6, which is characterized in that first transmission module includes:
Determination unit, for determining institute according to the size of the first aperiodicity data when the primary gateway breaks down State preset time;
Transmission unit, for the first aperiodicity data to be transferred to the master controller in the preset time.
8. a kind of data transmission system characterized by comprising
Master controller;
Primary gateway, the first aperiodicity data standby gateway for transmission;
The standby gateway, the first aperiodicity data sent for receiving the primary gateway, and by the described first non-week Phase property data are stored in storage equipment;Judge whether the primary gateway breaks down;When the primary gateway breaks down, The first aperiodicity data are transferred to the master controller by preset time.
9. a kind of electronic equipment characterized by comprising
Memory, for storing computer program;
Processor, realizing the data transmission method as described in any one of Claims 1-4 when for executing the computer program Step.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes the step of the data transmission method as described in any one of Claims 1-4 when the computer program is executed by processor Suddenly.
CN201811602984.5A 2018-12-26 2018-12-26 A kind of data transmission method and relevant apparatus Pending CN109617736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811602984.5A CN109617736A (en) 2018-12-26 2018-12-26 A kind of data transmission method and relevant apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811602984.5A CN109617736A (en) 2018-12-26 2018-12-26 A kind of data transmission method and relevant apparatus

Publications (1)

Publication Number Publication Date
CN109617736A true CN109617736A (en) 2019-04-12

Family

ID=66011719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811602984.5A Pending CN109617736A (en) 2018-12-26 2018-12-26 A kind of data transmission method and relevant apparatus

Country Status (1)

Country Link
CN (1) CN109617736A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115148013A (en) * 2022-06-27 2022-10-04 中国电信股份有限公司 Optical fiber sensing monitoring method, device and system, electronic equipment and storage medium

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102387514A (en) * 2010-08-27 2012-03-21 中兴通讯股份有限公司 Backup method and backup system of wireless sensor network gateway
CN102468907A (en) * 2010-11-05 2012-05-23 北京北方微电子基地设备工艺研究中心有限责任公司 Transmission method of process data, apparatus thereof and system thereof
CN202649800U (en) * 2012-06-27 2013-01-02 国核自仪系统工程有限公司 Distributed control system network architecture
CN102984244A (en) * 2012-11-21 2013-03-20 用友软件股份有限公司 Uploading system and uploading method of bill data
CN103167543A (en) * 2011-12-19 2013-06-19 中国科学院沈阳自动化研究所 Redundance gateway based on windows image acquisition (WIA) network
CN105306716A (en) * 2015-10-29 2016-02-03 小米科技有限责任公司 Data processing method, device and system
CN105376269A (en) * 2014-08-11 2016-03-02 中国电信股份有限公司 Virtual machine storage system, virtual machine storage system realizing method and virtual machine storage system realizing device
CN106878081A (en) * 2017-02-27 2017-06-20 中车青岛四方车辆研究所有限公司 Train gateway redundancy control system and its control method
CN106953904A (en) * 2017-03-13 2017-07-14 百度在线网络技术(北京)有限公司 Data transmission method, device, equipment and the storage medium of automatic driving vehicle
EP3253010A1 (en) * 2015-01-28 2017-12-06 Nec Corporation Network relay device, gateway redundancy system, program, and redundancy method
CN108255909A (en) * 2017-07-27 2018-07-06 平安科技(深圳)有限公司 Tables of data backup method and server based on oracle database
CN108270807A (en) * 2016-12-30 2018-07-10 阿里巴巴集团控股有限公司 A kind of data transmission method and device
CN108762224A (en) * 2018-08-23 2018-11-06 中国电力工程顾问集团西南电力设计院有限公司 A kind of wisdom power plant comprehensive monitoring management system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102387514A (en) * 2010-08-27 2012-03-21 中兴通讯股份有限公司 Backup method and backup system of wireless sensor network gateway
CN102468907A (en) * 2010-11-05 2012-05-23 北京北方微电子基地设备工艺研究中心有限责任公司 Transmission method of process data, apparatus thereof and system thereof
CN103167543A (en) * 2011-12-19 2013-06-19 中国科学院沈阳自动化研究所 Redundance gateway based on windows image acquisition (WIA) network
CN202649800U (en) * 2012-06-27 2013-01-02 国核自仪系统工程有限公司 Distributed control system network architecture
CN102984244A (en) * 2012-11-21 2013-03-20 用友软件股份有限公司 Uploading system and uploading method of bill data
CN105376269A (en) * 2014-08-11 2016-03-02 中国电信股份有限公司 Virtual machine storage system, virtual machine storage system realizing method and virtual machine storage system realizing device
EP3253010A1 (en) * 2015-01-28 2017-12-06 Nec Corporation Network relay device, gateway redundancy system, program, and redundancy method
CN105306716A (en) * 2015-10-29 2016-02-03 小米科技有限责任公司 Data processing method, device and system
CN108270807A (en) * 2016-12-30 2018-07-10 阿里巴巴集团控股有限公司 A kind of data transmission method and device
CN106878081A (en) * 2017-02-27 2017-06-20 中车青岛四方车辆研究所有限公司 Train gateway redundancy control system and its control method
CN106953904A (en) * 2017-03-13 2017-07-14 百度在线网络技术(北京)有限公司 Data transmission method, device, equipment and the storage medium of automatic driving vehicle
CN108255909A (en) * 2017-07-27 2018-07-06 平安科技(深圳)有限公司 Tables of data backup method and server based on oracle database
CN108762224A (en) * 2018-08-23 2018-11-06 中国电力工程顾问集团西南电力设计院有限公司 A kind of wisdom power plant comprehensive monitoring management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115148013A (en) * 2022-06-27 2022-10-04 中国电信股份有限公司 Optical fiber sensing monitoring method, device and system, electronic equipment and storage medium
CN115148013B (en) * 2022-06-27 2024-03-19 中国电信股份有限公司 Optical fiber sensing monitoring method, device, system, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
US10177993B2 (en) Event-based data transfer scheduling using elastic network optimization criteria
CN102622303B (en) A kind of method of internal memory premature beats and device
CN104468521B (en) Online moving method, device and system
CN103581225A (en) Distributed system node processing task method
CN103324156A (en) Process control system
US20200319983A1 (en) Redundancy Method, Device, and System
CN104516767A (en) Method and system for setting retransmission time of application client in virtual machine migration process
CN103139033B (en) Single main communications control bus main equipment redundancy switching method
CN109947585A (en) The processing method and processing device of PCIE device failure
CN103973476A (en) Gateway, and gateway hot backup system and method
CN103338240B (en) The Cloud Server automatic monitored control system of monitoring automatic drift and method
CN103414739B (en) Use Cloud Server automatic monitored control system and the method for automatic drift
CN110768840A (en) Control method, device, equipment and storage medium of communication equipment
CN105518547A (en) Automation system
CN109617736A (en) A kind of data transmission method and relevant apparatus
CN102053811A (en) Mosaic wall system shared resource display processing method and device thereof
CN103136139A (en) Read method and write-in method of field replaceable unit information
CN106528324A (en) Fault recovery method and apparatus
CN105550065A (en) Database server communication management method and device
CN105245387A (en) Method and system for processing message
CN105406989A (en) Message processing method, network card and system, information updating method and host
CN102355370B (en) Method for Ethernet board-level protection, device and system
CN105187482A (en) PaaS platform fault self-recovery realizing method and message server
CN104954388A (en) Distributed multi-memory-copy storing system and method for video stream data
CN112436983A (en) Analog wide area network data transmission method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412