CN109614223A - Hardware resource dispatching method, device and hardware resource controlling equipment - Google Patents
Hardware resource dispatching method, device and hardware resource controlling equipment Download PDFInfo
- Publication number
- CN109614223A CN109614223A CN201811294678.XA CN201811294678A CN109614223A CN 109614223 A CN109614223 A CN 109614223A CN 201811294678 A CN201811294678 A CN 201811294678A CN 109614223 A CN109614223 A CN 109614223A
- Authority
- CN
- China
- Prior art keywords
- user
- cell
- resource
- hardware resource
- physical resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5011—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resources being hardware resources other than CPUs, Servers and Terminals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiment of the present application provides a kind of hardware resource dispatching method, device and hardware resource controlling equipment, when receiving scheduling of resource instruction, according to scheduling of resource instruct in the specification of cell to be established and the specification of preconfigured unit cell between relationship, and preset baseline hardware resource, the corresponding hardware resource scheduling data of cell to be established are obtained, wherein the baseline hardware resource is to support that customer service and common service run corresponding hardware resource in preconfigured unit cell specification.So, by pre-establishing the service operation of unit cell and the mapping relations of required hardware resource, required hardware resource scheduling data can be more accurately calculated in newly-built community, realize reasonable, effective distribution to hardware resource, in the case where hardware resource having the same, can be improved whole hardware resource can processing business amount.
Description
Technical field
This application involves resource allocation technical field, in particular to a kind of hardware resource dispatching method, device and hard
Part scheduling of resource equipment.
Background technique
In current mobile radio networks, with market demand diversification, big flow, big bandwidth, low time delay, Gao Ke
By the proposition of the business demands such as property, to communication equipment hardware ability, more stringent requirements are proposed.Core especially on communication node
Heart network element, such as base station, terminal and core net network element are all more from storage capacity, dispatching efficiency, exchange capacity, forwarding rate etc.
A dimension is in the processing capacity for reinforcing equipment.How effectively the ability of hardware device is more and more stronger, and hardware resource is also more and more,
Use and manage hardware resource, improve the unit efficiency of hardware resource, especially central processing unit
(CentralProcessing Unit, CPU) resource and digital signal processor (Digital Signal Processing,
DSP) resource is the key that wireless telecom equipment processing capacity is promoted.
Summary of the invention
In view of this, the purpose of the application is, a kind of hardware resource dispatching method, device and hardware resource scheduling are provided
Equipment improves the unit efficiency of hardware resource to realize reasonable, effective management to hardware resource.
To achieve the goals above, the embodiment of the present application the technical solution adopted is as follows:
In a first aspect, the embodiment of the present application provides a kind of hardware resource dispatching method, applied in wireless communication system
Hardware resource controlling equipment, which comprises
Scheduling of resource instruction is received, includes cell specification information to be established in the scheduling of resource instruction;
According to the relationship between the specification of the cell to be established and the specification of preconfigured unit cell and preset
Baseline hardware resource, obtain hardware resource scheduling data corresponding with the cell to be established, wherein the baseline hardware money
Source is to support that customer service and common service run corresponding hardware resource in the preconfigured unit cell specification;
It is that the cell to be established distributes corresponding cell-level hardware money according to obtained hardware resource scheduling data
Source.
Second aspect, the embodiment of the present application provides a kind of hardware resource dispatching device, applied in wireless communication system
Hardware resource controlling equipment, described device include:
Receiving module includes cell specification letter to be established in the scheduling of resource instruction for receiving scheduling of resource instruction
Breath;
Computing module, for according between the specification of cell to be established and the specification of preconfigured unit cell
Relationship and preset baseline hardware resource obtain hardware resource scheduling data corresponding with the cell to be established, wherein institute
Baseline hardware resource is stated for supporting that customer service and common service operation institute are right in the preconfigured unit cell specification
The hardware resource answered;
Cell-level hardware resource distribution module, for being described wait establish according to obtained hardware resource scheduling data
Cell distributes corresponding cell-level hardware resource.
The third aspect, the embodiment of the present application also provide a kind of hardware resource controlling equipment, including memory, processor and deposit
The computer program that can be run on the memory and on the processor is stored up, the processor executes real when described program
Existing above-mentioned method and step.
A kind of hardware resource dispatching method, device and hardware resource controlling equipment provided by the embodiments of the present application, are receiving
To scheduling of resource instruction when, according between the specification of cell to be established and the specification of preconfigured unit cell relationship and
Preset baseline hardware resource obtains cell to be established corresponding hardware resource scheduling data, wherein the baseline hardware resource is
Support that customer service and common service run corresponding hardware resource in the preconfigured unit cell specification.In this way,
It, can be more smart in newly-built community by pre-establishing the service operation of unit cell and the mapping relations of required hardware resource
Required hardware resource scheduling data really are calculated, reasonable, effective distribution to hardware resource are realized, with identical
Hardware resource in the case where, can be improved whole hardware resource can processing business amount.
To enable the above objects, features, and advantages of the application to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate
Appended attached drawing, is described in detail below.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the application scenarios schematic diagram of hardware resource dispatching method provided by the embodiments of the present application.
Fig. 2 is the flow chart of hardware resource dispatching method provided by the embodiments of the present application.
Fig. 3 is another flow chart of hardware resource dispatching method provided by the embodiments of the present application.
Fig. 4 is another flow chart of hardware resource dispatching method provided by the embodiments of the present application.
Fig. 5 is another flow chart of hardware resource dispatching method provided by the embodiments of the present application.
Fig. 6 is the functional block diagram of hardware resource dispatching device provided by the embodiments of the present application.
Fig. 7 is another functional block diagram of hardware resource dispatching device provided by the embodiments of the present application.
Fig. 8 is another functional block diagram of hardware resource dispatching device provided by the embodiments of the present application.
Fig. 9 is the functional block diagram of user class resource distribution module provided by the embodiments of the present application.
Figure 10 is another functional block diagram of hardware resource dispatching device provided by the embodiments of the present application.
Figure 11 is the block diagram of hardware resource controlling equipment provided by the embodiments of the present application.
Icon: 100- base station equipment;110- hardware resource dispatching device;111- receiving module;112- computing module;113-
Cell-level hardware resource distribution module;114- configuration module;1141- core child resource acquiring unit;1142- configuration unit;
115- physical resource number of blocks obtains module;116- user class resource distribution module;1161- detection unit;1162- first is distributed
Unit;The second allocation unit of 1163-;1164- third allocation unit;1165- target user's acquiring unit;1166- the 4th is distributed
Unit;117- first detection module;The second detection module of 118-;119- release module;120- memory;130- processor;
140- communication unit;200- user equipment.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete
Ground description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.Usually exist
The component of the embodiment of the present application described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause
This, is not intended to limit claimed the application's to the detailed description of the embodiments herein provided in the accompanying drawings below
Range, but it is merely representative of the selected embodiment of the application.Based on embodiments herein, those skilled in the art are not being done
Every other embodiment obtained under the premise of creative work out, shall fall in the protection scope of this application.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile the application's
In description unless specifically defined or limited otherwise, term " installation ", " setting ", " connection " shall be understood in a broad sense, for example, can
To be to be fixedly connected, may be a detachable connection, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can
To be to be connected directly, the connection inside two elements can also be can be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in this application can be understood with concrete condition.
In the prior art, it when configuring hardware resource for newly-built community, is often examined according to staff's experience and synthesis
Consider equipment cost and selects suitable hardware resource in a manner of using artificial selection.This selection mode particle to hardware resource
Degree is big, and due to lacking the quantum chemical method to the specific processing capacity of hardware resource, selected hardware resource often exists
With the unmatched phenomenon of service operation in the cell of required foundation.Such as may Shortcomings to support newly-built community completely
The case where interior service operation, or there is a situation where hardware resource surplus.In the case where hardware resource surplus, hardware is caused
The waste of resource, cause hardware resource it is whole can processing business amount it is lower, it is subsequent also to need and in the insufficient situation of hardware resource
Hardware resource is added, is easy to influence regular traffic operation.
Find that the embodiment of the present application provides a kind of hardware resource scheduling scheme, small by pre-establishing based on the studies above
The mapping relations of area's service operation and hardware resource, can more be precisely calculated required hardware resource number in newly-built community
According to realizing reasonable, effective management to hardware resource, that improves hardware resource can processing business amount.
Referring to Fig. 1, Fig. 1 is the application scenarios schematic diagram of hardware resource dispatching method provided by the embodiments of the present application.It should
Include wireless communication system in scene, includes hardware resource controlling equipment in the system, such as base station equipment 100, the base station are set
Standby 100 can be responsible for controlling multiple cells.The wireless communication system further includes user equipment 200, and user equipment 200 can pass through network
The base station equipment 100 is accessed to realize that customer service is run, wherein the user equipment 200 is wireless communication terminal, such as just
Prompt formula phone or smart phone etc..
Referring to figure 2., Fig. 2 is a kind of process of hardware resource dispatching method applied to base station equipment 100 shown in FIG. 1
Figure, below by the method includes each step be described in detail.
Step S110 receives scheduling of resource instruction, includes cell specification information to be established in the scheduling of resource instruction.
Step S120, according to the relationship between the specification of the cell to be established and the specification of preconfigured unit cell
And preset baseline hardware resource, obtain hardware resource scheduling data corresponding with the cell to be established, wherein the base
Line hard ware resource is support customer service and common service operation in the preconfigured unit cell specification corresponding hard
Part resource.
Base station equipment 100 needs first to distribute for supporting intra-cell traffic to run hard when being responsible for control cell operation
Part resource.The hardware resource for having processing capacity, storage capacity or transfer capability involved by base station equipment 100 usually has
Cpu chip, dsp chip, exchange chip, PCIe interface bus, network interface/optical port module, memory chip, radio frequency (Radio
Frequency, RF) etc. components.It is hard that processing type of hardware resource, forwarding type can be divided into according to the ability difference of hardware resource
Part resource and storage class hardware resource.Such as processing type of hardware resource mainly includes cpu chip, dsp chip etc..Forward class
Type hardware resource mainly includes exchange chip, PCIe interface bus, network interface/optical port module.And storage class hardware resource is main
Including storage chip.
In the present embodiment, can be obtained by the way of quantization in advance can support user in pre-set unit cell specification
Business and the baseline hardware resource of common service operation.Unit cell specification information mainly includes the number of users accessed in cell
And the information such as frequency range.For example, the unit cell specification that can be lifted as listed in Table 1, as unit cell can be frequency band be 20MHz,
Accessing user's quantity is the cell of 300 users or the cell that frequency band is 10MHz, accessing user's quantity is 200 users
Etc., it is specific unlimited.
1 unit cell specification information of table
Frequency band | Number of users | |
Unit cell 1 | 20MHz | 300 |
Unit cell 2 | 10MHz | 200 |
The core child resource of all types of hardware resources is dealt with to the quantification treatment of ability, wherein all kinds of in the present embodiment
The core child resource of type hardware resource refers to the resource in all types of hardware resources to service operation with larger impact, this reality
It applies in example, is illustrated by taking cpu chip, dsp chip and storage chip as an example.Wherein, the core child resource of cpu chip mainly wraps
Include dominant frequency, outer frequency, Clock Multiplier Factor, L2 cache size and number of cores etc..The core child resource of dsp chip mainly includes master
Frequently, nucleus number, instruction cycle, multiply-accumulate time, FFT Fast Fourier Transform processing time, cache size etc..Storage chip
Core child resource mainly include frequency, rate and capacity etc..
It is alternatively possible to which the mode of half quantification is by core child resource relevant to the operational capability of hardware resource and business
Ability is mapped.Such as the core child resource relevant to operational capability of CPU can be expressed as aggregate form in advance, it is denoted as
The core child resource set Pcpu={ dominant frequency, caching, number of cores } of CPU, core relevant to operational capability of DSP is provided
Source is expressed as aggregate form, is denoted as the core child resource set Pdsp={ dominant frequency, caching, number of cores } of DSP.Similarly, will
The core child resource relevant to operational capability of storage chip is expressed as aggregate form, is denoted as storage hardware core child resource set
Pmem={ frequency, rate, capacity }.Then the core child resource of the whole hardware of base station equipment 100 can be expressed as P=Pcpu,
Pdsp,Pmem}。
It should be noted that the determination of the core child resource in the above-mentioned hardware resource for base station equipment 100 is only
For example, can select other resources of all types of hardware resources as core child resource, tool in practical application according to demand
Body is unlimited.
Referring to Fig. 3, the use that can be used for support unit's cell specification can be pre-configured in the following manner in the present embodiment
Family business and the baseline hardware resource of common service operation:
Step S101 is obtained according to the pre-access number of users of unit cell and required frequency range and is supported the unit cell
It interior customer service and the processing type of hardware resource of common service operation, the forwarding type of hardware resource and described deposits
Store up the quantity of the core child resource in type of hardware resource.
Step S102, according to the processing type of hardware resource, the forwarding type of hardware resource and the storage class
The quantity configuration of core child resource in type hardware resource obtains the baseline hardware resource.
Optionally, unit cell, such as a 20MHz cell, 10MHz cell either 2 20MHz cells are preset
Etc..The pre-access number of users and required frequency range etc. that the unit cell is arranged obtain that the unit intra-cell traffic is supported to run
All types of hardware resources.Wherein, the hardware resource which needs is baseline hardware resource Pbasecell, can be by CPU
Baseline hardware resource Pcpu-basecell, DSP baseline hardware resource Pdsp-basecell and storage baseline hardware resource Pmem-
Basecell composition, is expressed as Pbasecell={ Pcpu-basecell, Pdsp-basecell, Pmem-basecell }.Its
In, baseline hardware resource is to support that customer service and common service are run corresponding hard in preconfigured unit cell specification
Part resource, the corresponding hardware resource can be the minimum of resources that the unit Zone can be supported to run, and be also possible to can
Added on the basis of the minimum of resources for supporting the unit Zone to run it is a certain amount of after the hardware resource that is constituted of resource, or
Person can also be configured obtained hardware resource corresponding with the operation of unit Zone according to actual needs.
Optionally, the mode for first passing through simulation run in advance obtains the required all types of hardware resources of unit cell operation
The quantity of core child resource, such as when unit cell is 2 20MHz cells, wherein support the unit intra-cell users business
And the core child resource quantity of the cpu chip of common service operation is Pcpu-basecell={ 1.6GHz, 4M, 1/16 }.It supports
The unit intra-cell users business and the core child resource quantity of the dsp chip of common service operation are Pcpu-basecell=
{800MHz,8M,1/18}.The core child resource for the storage chip for supporting the unit intra-cell users business and common service to run
Quantity is Pcpu-basecell={ 2133MHz, 1600MT/s, 2G/32G }.
Wherein, it is meant expressed by above-mentioned set, base station needs to occupy dominant frequency in the case where running 2 20MHz cell conditions
For 1.6GHz, 4M caching, 1 nuclear resource of 16 core CPU;Needing to occupy dominant frequency is 800MHz, 8M caching, 1 core of 18 core DSP
Resource;Need to occupy 2G memory headroom.By being converted to operational capability to hardware processing resources and storage resource above, identical
Dominant frequency and cache cache memory under, the processing capacity of business is converted into the kernel of hardware core resource occupancy
The occupancy of number and memory size.
It is established through the above steps with after baseline hardware resource corresponding to unit cell, is then receiving scheduling of resource
When instruction, can be instructed according to scheduling of resource in cell specification and the specification of unit cell to be established between relationship, Yi Jidan
The corresponding hardware resource scheduling data of cell to be established are calculated in cell corresponding baseline hardware resource in position.Wherein, wait establish
Cell is cell that is current pre-established but not being successfully established also.
For example, wherein X can be 5,10,15,20 etc. in the case where unit cell is 2 X MHz cells.It can pass through
The scheduling data of hardware resource corresponding to n cell to be established are calculated in following formula:
Pcelln=((n+1)/2) * Pbasecell (n is odd number)
Pcelln=(n/2) * Pbasecell (n is even number)
Wherein, Pcelln is to dispatch data wait establish hardware resource corresponding to cell, and Pbasecell is unit cell pair
The baseline hardware resource answered, n are the number of cell to be established.
For example, when establishing cell is 4 X MHz cells, the hardware resource of required distribution are as follows: Pcell4=2*
Pbasecell={ 2*Pcpu-basecell, 2*Pdsp-basecell, 2*Pmem-basecell }, that is, need to occupy 2
A CPU core resource and 2 DSP core resources and 4G memory size.
Step S130 is that the cell to be established distributes corresponding cell according to obtained hardware resource scheduling data
Grade hardware resource.
After being obtained through the above steps wait establish the scheduling data of hardware resource corresponding to cell, it can be set from base station
Corresponding cell-level hardware resource is distributed in standby 100 hardware resource for cell to be established.The cell-level hardware resource can prop up
It holds this and waits establishing the customer service and common service operation in cell.
In the present embodiment, cell is carried on cell-level hardware resource, can set up user by the concept of cell
Business and the mapping relations of common service operation and required cell-level hardware resource.Cell-level hardware resource counterlogic concept
Cell, cell can be quantified as physical resource.In order to utilize cell-level hardware resource rationally to support the access of user terminal, branch
Customer service operation is held, the customer service and common service processing capacity of cell-level hardware resource correspond to multiple physics after quantifying
Resource block, the corresponding cell-level hardware resource of each Physical Resource Block support corresponding customer service and common service fortune
Row.The Physical Resource Block of different business demand information and required occupancy can be established into corresponding relationship in advance, thus pre- in user
When access, the quantity of the Physical Resource Block occupied needed for user can be calculated, to realize rationally to cell-level hardware resource
Control, scheduling.
Such as support the corresponding cell of cell-level hardware resource of 20MHz cell operation that can be divided into 100 physics
Resource block, wherein assuming that the common service operation in cell need to occupy 10 Physical Resource Block, then remaining 90 physical resources
Block can be used for customer service operation.
In the present embodiment, the Physical Resource Block of business demand information and required occupancy as shown in the table can be pre-established
Corresponding relationship:
The mapping table of the Physical Resource Block of 2 business demand information of table and required occupancy
Wherein, QCI (QoS Class Identifier) is a scale value, is specifically supplied to service number for measuring
Behavior is forwarded according to the packet of stream, such as packet loss, Packet Delay Budget, it is applied to guarantee bit rate (Guranteed Bit simultaneously
Rate, GBR) service bearer and non-guaranteed bit rate (Non-Guranteed Bit Rate, Non-GBR) service bearer, it uses
In the control carrying grade grouping pass-through mode defined in specified accessed node, such as dispatch weight receives thresholding, queue management door
Limit, link layer protocol configuration etc..PRB (Physical Resource Block, Physical Resource Block) is above-mentioned physical resource
Block.RAB is radio access bearer (Radio Access Bearer).
When to define QCI be 1-4, corresponding GBR bearer service, and when QCI is 5-9, corresponds to Non-GBR bearer service.
For GBR bearer service (QCI:1-4), the number of the corresponding PRB of cell-level hardware resource of occupancy is Uprb=
((RAB*dataRate)/64)/2;
(QCI:5-9) is carried for no-GBR, the number of the corresponding PRB of cell-level hardware resource of occupancy is Uprb-no
=((RAB*dataRate)/64)/8;
The Physical Resource Block that user User1 is occupied: Uprb1+Uprb-no1;
The Physical Resource Block that user User2 is occupied: Uprb2+Uprb-no2;
The Physical Resource Block that user User3 is occupied: Uprb3+Uprb-no3;
……
The Physical Resource Block that user UserN is occupied: UprbN+Uprb-noN.
If some current cell has accessed N number of user, the Physical Resource Block of the total occupancy of user is denoted as: UTotalPRB
=Uprb1+Uprb-no1+Uprb2+Uprb-no2+ ...+UprbN+Uprb-noN.
The corresponding relationship of business demand information and the Physical Resource Block of required occupancy is pre-established by above step and is deposited
After storage, referring to Fig. 4, can be user's distributing user grade according to following steps when there is user's pre-access base station equipment 100
Resource:
Step S210 when monitoring the access request of user, carries the business demand of the user in the access request
Information, the corresponding relationship based on pre-stored business demand information Yu the Physical Resource Block of required occupancy, according to the user
Business demand information acquisition described in the quantity of Physical Resource Block that occupies needed for user.
Step S220 is that the user distributes corresponding object according to the quantity of the Physical Resource Block of occupancy needed for the user
Manage resource block.
It can be seen from the above, base station equipment 100 can be responsible for managing multiple cells, corresponding cell-level can be distributed for multiple cells
Hardware resource.In the present embodiment, in the access request for monitoring user, the target that also can get user's pre-access is small
Area, wherein the access request of user is issued by corresponding to user terminal 200.When distributing corresponding Physical Resource Block for the user,
Also need whether the distributable physical resource number of blocks for detecting user Target cell to be accessed can meet the need of the user
It asks.
Optionally, the corresponding relationship based on the above-mentioned business demand information pre-established Yu the Physical Resource Block of required occupancy
Can the occupancy according to needed for the business demand information acquisition of the user to be accessed user Physical Resource Block quantity.
Needed for the distributable physical resource number of blocks of user Target cell to be accessed is less than the user
Physical resource number of blocks, then detect whether exist in addition to the Target cell have assignable free physical resource block
Other built cells.Wherein, Target cell is the cell that active user wants access.There is the assignable free time if it exists
Other built cells of physical resource then need for user to be accessed to be dispatched to other built cells, wherein built cell
As currently-established successful cell.
For example, if Target cell to be accessed has 90 physical resources that can be used for distributing to support customer service to run
Block.The quantity of the Physical Resource Block occupied needed for current access customer waiting is plus occupied in the Target cell to be accessed
The sum of quantity of Physical Resource Block has been more than 90, then the cell to be accessed does not have the user's industry that can meet the access customer waiting
The Physical Resource Block of business operation, then need the user to be accessed being dispatched to other cells.
Can the occupancy according to needed for the user to be accessed Physical Resource Block quantity from assignable free physical
Corresponding Physical Resource Block is distributed in the Physical Resource Block of other built cells of resource block for the user to be accessed.
It should be noted that after establishing cell activation processing need to be carried out to cell, the cell being active can be
User to be accessed distributes corresponding user class resource.
Therefore, do not have the Physical Resource Block for the customer service operation that can meet the access customer waiting in cell to be accessed
When, it can be the access customer allotment reason money waiting from other with free physical resource block and in state of activation cells
Source block.
Certainly, if the distributable physical resource number of blocks of user Target cell to be accessed is greater than or equal to institute
Physical resource number of blocks needed for stating user, then the quantity of the Physical Resource Block of the occupancy according to needed for the user is from described waiting
It is that the user distributes corresponding Physical Resource Block in the Physical Resource Block of the Target cell entered.
It is above-mentioned be exist have assignable free physical resource block other built cells in the case where, can be used by
User is dispatched to the mode of other built cells to solve the problems, such as that user accesses.But the target to be accessed as the user
The distributable physical resource number of blocks of cell is less than physical resource number of blocks needed for the user and there is no except described
When other built cells with assignable free physical resource block except Target cell, then the side of newly-built community can be used
Formula solves the problems, such as that user accesses.
Base station equipment 100 is when obtaining new scheduling of resource instruction, by the way of above-mentioned distribution cell-level hardware resource
Corresponding cell-level hardware resource is distributed for the cell of newly establishing in new scheduling of resource instruction.And it is accounted for according to needed for the user
The quantity of Physical Resource Block instructs in the corresponding new free physical resource block for establishing cell from the new scheduling of resource
Corresponding Physical Resource Block is distributed for the user.
It should be appreciated that the hardware resource of base station equipment 100 is limited, when user Target cell to be accessed for point
Physical resource number of blocks needed for the physical resource number of blocks matched is less than the user, and there is no in addition to the Target cell
Other built cells with assignable free physical resource block, and there is no can be used for distributing to newly-established cell
Cell-level hardware resource when, then need to solve the problems, such as in such a way that resource is seized user access.
Optionally, it can get the priority of user to be accessed, in the present embodiment, different types of service can be set in advance
Setting the stronger business of the real-times such as different priority, such as call type, video type may be configured as higher priority, and
The business such as information inquiry, retrieval may be configured as lower priority.Optionally, it is obtained according to the type of service of user to be accessed
The priority of access customer waiting.
Optionally, the priority of the accessed user in user's cell to be accessed is obtained, in the present embodiment, each user is being connect
When entering local resource, the access information of the recordable lower user of base station equipment 100 such as be can record as UserCtxtInfoList=
{ RNTI, Pri, Uprb, Uprb-no, activetime, isBusy }, wherein RNTI (RNTI Radio Network
Tempory Identity) it is radio network temporary identifier, Pri can be used for identifying the priority of corresponding user, Uprb and Uprb-
No respectively indicates the physical resource number of blocks that the GBR bearer service established needed for corresponding user and no-GBR bearer service occupy,
Activetime indicates that corresponding user accesses the temporal information of local resource, isBusy describe user service condition whether
For busy condition.
In the present embodiment, the priority of accessed user can be obtained by the access information of accessed user.It finds
Priority is lower than the user of the priority of the user of pre-access in accessing user, using the accessed user as target user.
Optionally, can detect the target user whether meet it is preset be preempted condition, if satisfied, then recycling the target
The occupied Physical Resource Block of user, and the quantity of the Physical Resource Block of the occupancy according to needed for the user is provided from the physics of recycling
It is that the user distributes corresponding Physical Resource Block in source block.
In the present embodiment, it can detect whether the target user meets the preset condition that is preempted in the following manner: detection
Whether the activationary time of the target user is longer, such as detects whether duration of the activationary time apart from current time is more than default
Duration, if being more than that preset duration carries out subsequent detection again.Alternatively, when target user is multiple, i.e., multiple target user's
Priority is identical and is lower than the priority of the user of pre-access, then when can select its correspondence activation from multiple target user
Between apart from current time the longest user of duration, then subsequent detection is carried out to the target user that selects.
Optionally, whether the service condition for the target user that detection meets above-mentioned requirements is in idle condition, if in sky
Not busy state then detects Uprb and Uprb-no in the access information of the target user again and whether is all larger than user to be accessed and builds
The physical resource number of blocks that vertical GBR bearer service and no-GBR bearer service occupy.If meeting above-mentioned condition, the target can determine that
User meet it is preset be preempted condition, the occupied Physical Resource Block of the target user can be recycled, and therefrom to be to be accessed
User distributes corresponding Physical Resource Block.
Optionally, in the present embodiment, carry out Physical Resource Block recycling when, for target user can be one, i.e.,
When some target user meets above-mentioned condition, the Physical Resource Block for recycling the target user can meet access customer waiting
Access demand.But the quantity of the occupied Physical Resource Block of single target user is greater than or equal to user to be accessed if it does not exist
In the case where the quantity of required Physical Resource Block, that is, the target that there are multiple priority lower than the priority of access customer waiting is used
Family, and the summation of the occupied Physical Resource Block of multiple target user is provided more than or equal to physics needed for user to be accessed
It, then can be by recycling multiple occupied Physical Resource Block of target user when the quantity of source block, and assign them to be accessed
User mode to solve the problems, such as the access of user.
In the present embodiment, change is initiated in the business of user's release either user of access local resource and causes cell
When the variation for the cell Physical Resource Block that grade hardware resource is carried, need to carry out the Physical Resource Block of cell-level hardware resource
Dynamic retrieval management.The quantity of i.e. current occupied Physical Resource Block is equal to before user's release the either industry of user
Business initiate change before in the cell the quantity of occupied Physical Resource Block subtract Physical Resource Block that user discharges or
It is the Physical Resource Block that the reduction caused by being changed customer service is occupied.In this way, realizing the object to cell-level hardware resource
Manage the dynamic management of resource block.
Further, for the dynamic allocation to cell-level hardware resource, the power wastage of hardware resource is avoided, is please referred to
Fig. 5, in the present embodiment, the method also includes following steps:
Step S310 detects whether there is the cell for not distributing Physical Resource Block to user, does not distribute if it exists to user
The cell of Physical Resource Block, thens follow the steps S320.If it does not exist, then operation is not executed.
Whether step S320, detecting has the built small of idle Physical Resource Block there is also other other than the cell
Area thens follow the steps S330 if having the built cell of idle Physical Resource Block there are other other than the cell.If no
In the presence of not executing operation then.
Step S330 is not discharged described to the corresponding cell-level hardware resource of cell that user distributes Physical Resource Block.
Optionally, in the present embodiment, can real-time detection, or interval predetermined period detects whether to exist to user point
The cell of cell with Physical Resource Block, i.e., no user's access or long-time no user business.I.e. the cell is corresponding small
The case where area's grade hardware resource dallies, which does not have user's access or long-time no user business.In order to avoid
In this case there is useless power wastage in the cell-level hardware resource, needs the corresponding cell-level hardware resource of the cell
Release is with the hardware resource distribution for subsequent other newly-built communities.
In the present embodiment, in order to ensure, there is also can be used for supporting after being discharged above-mentioned cell-level hardware resource
There are other cells that can be used for supporting potential user to access in other cells of customer service operation, therefore, to above-mentioned
Whether before cell-level hardware resource is discharged, also needing to detect has idle object there is also other other than above-mentioned cell
The built cell of resource block is managed, and the built cell is active.If it exists, then it can be performed above-mentioned cell-level hardware
The step of resource is discharged.
Referring to Fig. 6, the embodiment of the present application also provides a kind of hardware resource scheduling dress applied to above-mentioned base station equipment 100
110 are set, the hardware resource dispatching device 110 includes receiving module 111, computing module 112 and the distribution of cell-level hardware resource
Module 113.
The receiving module 111 includes cell to be established in the scheduling of resource instruction for receiving scheduling of resource instruction
Specification information.
In the present embodiment, the description as described in receiving module 111 is specifically referred to the detailed of step S110 shown in Fig. 2
Description, i.e. step S110 can be executed by receiving module 111.
The computing module 112 is used for the specification of specification and preconfigured unit cell according to the cell to be established
Between relationship and preset baseline hardware resource, obtain hardware resource scheduling data corresponding with the cell to be established,
Wherein, the baseline hardware resource is to support customer service and common service operation in the preconfigured unit cell specification
Corresponding hardware resource.
In the present embodiment, the description as described in computing module 112 is specifically referred to the detailed of step S120 shown in Fig. 2
Description, i.e. step S120 can be executed by computing module 112.
The cell-level hardware resource distribution module 113 is used to according to obtained hardware resource scheduling data be described
Cell to be established distributes corresponding cell-level hardware resource.
In the present embodiment, the description as described in cell-level hardware resource distribution module 113 is specifically referred to shown in Fig. 2
The detailed description of step S130, i.e. step S130 can be executed by cell-level hardware resource distribution module 113.
In the present embodiment, the baseline hardware resource includes processing type of hardware resource, forwarding type of hardware resource and deposits
Store up type of hardware resource.Referring to Fig. 7, the hardware resource dispatching device 110 further includes being pre-configured with the baseline hardware money
The configuration module 114 in source.The configuration module 114 includes core child resource acquiring unit 1141 and configuration unit 1142.
The core child resource acquiring unit 1141 is used for pre-access number of users and required frequency according to unit cell
Section obtains the processing type of hardware resource for supporting the unit intra-cell users business and common service operation, the forwarding
The quantity of type of hardware resource and the core child resource in the storage class hardware resource.
In the present embodiment, the description as described in core child resource acquiring unit 1141 is specifically referred to step shown in Fig. 3
The detailed description of rapid S101, i.e. step S101 can be executed by core child resource acquiring unit 1141.
The configuration unit 1142 be used for according to the processing type of hardware resource, the forwarding type of hardware resource and
The quantity configuration of core child resource in the storage class hardware resource obtains the baseline hardware resource.
In the present embodiment, the description as described in configuration unit 1142 is specifically referred to the detailed of step S102 shown in Fig. 3
Thin description, i.e. step S102 can be executed by configuration unit 1142.
In the present embodiment, the customer service and common service processing capacity of the cell-level hardware resource are corresponding after quantifying
Multiple Physical Resource Block, the corresponding cell-level hardware resource of each Physical Resource Block support corresponding customer service and public
Service operation.Referring to Fig. 8, the hardware resource dispatching device 110 further includes that physical resource number of blocks obtains module 115 and uses
Family grade resource distribution module 116.
The physical resource number of blocks obtains module 115 and is used in the access request for monitoring user, and the access is asked
Ask the middle business demand information for carrying the user, the physical resource based on pre-stored business demand information and required occupancy
The corresponding relationship of block, according to the number of the Physical Resource Block of occupancy needed for user described in the business demand information acquisition of the user
Amount.
In the present embodiment, the description as described in physical resource number of blocks obtains module 115 is specifically referred to shown in Fig. 4
The detailed description of step S210, i.e. step S210 can obtain module 115 by physical resource number of blocks and execute.
The quantity of Physical Resource Block of the user class resource distribution module 116 for the occupancy according to needed for the user is
The user distributes corresponding Physical Resource Block.
In the present embodiment, the description as described in user class resource distribution module 116 is specifically referred to step shown in Fig. 4
The detailed description of S220, i.e. step S220 can be executed by user class resource distribution module 116.
Referring to Fig. 9, in the present embodiment, the user class resource distribution module 116 includes detection unit 1161, first
Allocation unit 1162 and the second allocation unit 1163.
The detection unit 1161 is used for the distributable Physical Resource Block in user Target cell to be accessed
When physical resource number of blocks needed for quantity is less than the user, detecting whether can in the presence of having in addition to the Target cell
Other built cells of the free physical resource block of distribution.
First allocation unit 1162, which is used to exist, has assignable free physical in addition to the Target cell
When other built cells of resource block, according to the quantity of the Physical Resource Block of occupancy needed for the user, other are built small from described
It is that the user distributes corresponding Physical Resource Block in the Physical Resource Block in area.
Second allocation unit 1163 is used to provide in the distributable physics of user Target cell to be accessed
When physical resource number of blocks needed for source block quantity is greater than or equal to the user, provided according to the physics of occupancy needed for the user
The quantity of source block is that the user distributes corresponding Physical Resource Block from the Physical Resource Block of the Target cell.
Optionally, the user class resource distribution module 116 further includes third allocation unit 1164, and the third distribution is single
Distributable physical resource number of blocks of the member 1164 in user Target cell to be accessed is less than the user institute
The physical resource number of blocks that needs and there is no its with assignable free physical resource block in addition to the Target cell
When his built cell, when obtaining new scheduling of resource instruction, according to the quantity of the Physical Resource Block of occupancy needed for the user
Instruct in the corresponding new free physical resource block for establishing cell from the new scheduling of resource is that user's distribution is corresponding
Physical Resource Block.
Optionally, in the present embodiment, the user class resource distribution module 116 further includes target user's acquiring unit 1165
And the 4th allocation unit 1166.
Target user's acquiring unit 1165 is used for the distributable object in user Target cell to be accessed
Physical resource number of blocks needed for resource block quantity is less than the user is managed, and having in addition to the Target cell is not present
Other built cells of assignable free physical resource block, and there is no the cell-levels that can be used for distributing to newly-established cell
When hardware resource, according to the acquisition of the priority of the accessed user in the priority of the user and the Target cell
Target user in accessed user.
4th allocation unit 1166 be used for the target user meet it is preset be preempted condition when, described in recycling
The occupied Physical Resource Block of target user, and the quantity of the Physical Resource Block of the occupancy according to needed for the user is from the object of recycling
It is that the user distributes corresponding Physical Resource Block in reason resource block.
Referring to Fig. 10, in the present embodiment, the hardware resource dispatching device 110 further include first detection module 117,
Second detection module 118 and release module 119.
The first detection module 117 is for detecting whether in the presence of the cell for not distributing Physical Resource Block to user.
In the present embodiment, the description as described in first detection module 117 is specifically referred to step S310 shown in fig. 5
Detailed description, i.e. step S310 can be executed by first detection module 117.
When second detection module 118 is used to have the cell not to user's distribution Physical Resource Block, detect in addition to this
Whether there is the built cell of idle Physical Resource Block except cell there is also other.
In the present embodiment, the description as described in the second detection module 118 is specifically referred to step S320 shown in fig. 5
Detailed description, i.e. step S320 can be executed by the second detection module 118.
The release module 119 other than the cell there is also other for having the built of idle Physical Resource Block
When cell, do not discharged described to the corresponding cell-level hardware resource of cell that user distributes Physical Resource Block.
In the present embodiment, the description as described in release module 119 is specifically referred to the detailed of step S330 shown in fig. 5
Description, i.e. step S330 can be executed by release module 119.
As shown in figure 11, the embodiment of the present application also provides a kind of hardware resource controlling equipment, and the hardware resource scheduling is set
Standby can be above-mentioned base station equipment 100, and the hardware resource controlling equipment includes hardware resource dispatching device 110, memory
120, processor 130 and communication unit 140.
The memory 120, processor 130 and each element of communication unit 140 are directly or indirectly electrical between each other
Connection, to realize the transmission or interaction of information.For example, these elements can pass through one or more communication bus or letter between each other
Number line, which is realized, to be electrically connected.It is stored in memory 120 and is stored in the storage in the form of software or firmware (Firmware)
Software function module in device 120, the software program and mould that the processor 130 is stored in memory 120 by operation
Block, such as the hardware resource dispatching device 110 in the embodiment of the present invention, thereby executing various function application and data processing, i.e.,
Realize the hardware resource dispatching method in the embodiment of the present invention.
Wherein, the memory 120 may be, but not limited to, random access memory (Random Access
Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable
Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only
Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only
Memory, EEPROM) etc..Wherein, memory 120 is for storing program, the processor 130 after receiving and executing instruction,
Execute described program.The communication unit 140 is used for the communication link established between hardware resource controlling equipment and user terminal 200
It connects.
The processor 130 may be a kind of IC chip, the processing capacity with signal.Above-mentioned processor
130 can be general processor, including central processing unit (Central Processing Unit, CPU), network processing unit
(Network Processor, NP) etc..It can also be digital signal processor (DSP), specific integrated circuit (ASIC), scene
Programmable gate array (FPGA) either other programmable logic device, discrete gate or transistor logic, discrete hardware group
Part.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor can be with
It is that microprocessor or the processor 130 are also possible to any conventional processors etc..
In conclusion a kind of hardware resource dispatching method provided by the embodiments of the present application, device and hardware resource scheduling are set
It is standby, receive scheduling of resource instruction when, according to scheduling of resource instruct in cell to be established specification and preconfigured list
Relationship and preset baseline hardware resource between the specification of position cell obtain the corresponding hardware resource scheduling of cell to be established
Data, wherein the baseline hardware resource is to support customer service and common service in the preconfigured unit cell specification
The corresponding hardware resource of operation.In this way, reflecting by the service operation that pre-establishes unit cell and required hardware resource
Relationship is penetrated, required hardware resource scheduling data can be more accurately calculated when establishing cell, realizes and hardware is provided
Reasonable, effective distribution in source, in the case where hardware resource having the same, can be improved whole hardware resource can processing business
Amount.
Further, the application is using the corresponding relationship for pre-establishing business demand information with the Physical Resource Block of required occupancy
Mode the quantity for supporting the Physical Resource Block of customer service operation can be calculated, further increase pair in user's access
Effective management of cell-level hardware resource.
Further, the application uses the scheduling strategy of user class resource priority-based, can be according to actual user
Service conditions carries out rational management, improves the processing capacity of the hardware resource of base station equipment 100.
In embodiment provided herein, it should be understood that disclosed device and method, it can also be by other
Mode realize.The apparatus embodiments described above are merely exemplary, for example, the flow chart and block diagram in attached drawing are shown
Architectural framework in the cards, function and the behaviour of device according to an embodiment of the present application, method and computer program product
Make.In this regard, each box in flowchart or block diagram can represent a part of a module, section or code, institute
The a part for stating module, section or code includes one or more executable instructions for implementing the specified logical function.
It should also be noted that function marked in the box can also be to be different from attached drawing in some implementations as replacement
The sequence marked occurs.For example, two continuous boxes can actually be basically executed in parallel, they sometimes can also be by
Opposite sequence executes, and this depends on the function involved.It is also noted that each box in block diagram and or flow chart,
And the combination of the box in block diagram and or flow chart, hardware can be based on the defined function of execution or the dedicated of movement
System realize, or can realize using a combination of dedicated hardware and computer instructions.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or equipment for including a series of elements not only includes those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute
State in the process, method, article or equipment of element that there is also other identical elements.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field
For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair
Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.It should also be noted that similar label and letter exist
Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing
It is further defined and explained.
Claims (15)
1. a kind of hardware resource dispatching method, which is characterized in that applied to the hardware resource controlling equipment in wireless communication system,
The described method includes:
Scheduling of resource instruction is received, includes cell specification information to be established in the scheduling of resource instruction;
According between the specification of the cell to be established and the specification of preconfigured unit cell relationship and preset base
Line hard ware resource obtains hardware resource scheduling data corresponding with the cell to be established, wherein the baseline hardware resource is
Support that customer service and common service run corresponding hardware resource in the preconfigured unit cell specification;
It is that the cell to be established distributes corresponding cell-level hardware resource according to obtained hardware resource scheduling data.
2. hardware resource dispatching method according to claim 1, which is characterized in that the user of the cell-level hardware resource
Business and common service processing capacity correspond to multiple Physical Resource Block after quantifying, the corresponding cell-level of each Physical Resource Block
Hardware resource supports corresponding customer service and common service operation, the hardware resource that the basis obtains to dispatch data
After the step of distributing corresponding cell-level hardware resource for the cell to be established, the method also includes:
When monitoring the access request of user, the business demand information of the user is carried in the access request;
Corresponding relationship based on pre-stored business demand information Yu the Physical Resource Block of required occupancy, according to the user's
The quantity of the Physical Resource Block occupied needed for user described in business demand information acquisition;
It is that the user distributes corresponding Physical Resource Block according to the quantity of the Physical Resource Block of occupancy needed for the user.
3. hardware resource dispatching method according to claim 2, which is characterized in that described to be occupied according to needed for the user
Physical Resource Block quantity be the user distribute corresponding Physical Resource Block the step of include:
The object needed for the distributable physical resource number of blocks of user Target cell to be accessed is less than the user
Resource block quantity is managed, then detects whether its with assignable free physical resource block for having in addition to the Target cell
His built cell;
If it exists, then the quantity of the Physical Resource Block of the occupancy according to needed for the user is provided from the physics of other built cells
It is that the user distributes corresponding Physical Resource Block in source block;
When the distributable physical resource number of blocks of user Target cell to be accessed is greater than or equal to the user institute
The physical resource number of blocks needed, then object of the quantity of the Physical Resource Block of the occupancy according to needed for the user from the Target cell
It is that the user distributes corresponding Physical Resource Block in reason resource block.
4. hardware resource dispatching method according to claim 3, which is characterized in that described to be occupied according to needed for the user
Physical Resource Block quantity be the user distribute corresponding Physical Resource Block the step of further include:
The object needed for the distributable physical resource number of blocks of user Target cell to be accessed is less than the user
It manages resource block quantity and there is no other with assignable free physical resource block in addition to the Target cell are built
When cell, then when obtaining new scheduling of resource instruction, according to the quantity of the Physical Resource Block of occupancy needed for the user from institute
Stating new scheduling of resource and instructing in the corresponding new free physical resource block for establishing cell is that the user distributes corresponding physics
Resource block.
5. hardware resource dispatching method according to claim 3, which is characterized in that described to be occupied according to needed for the user
Physical Resource Block quantity be the user distribute corresponding Physical Resource Block the step of further include:
The object needed for the distributable physical resource number of blocks of user Target cell to be accessed is less than the user
Resource block quantity is managed, and there is no other with assignable free physical resource block in addition to the Target cell are built
Cell, and there is no can be used for distributing to newly-established cell cell-level hardware resource when, then according to the preferential of the user
Grade and the priority of the accessed user in the Target cell obtain the target user in the accessed user;
The target user meet it is preset be preempted condition when, recycle the occupied Physical Resource Block of the target user,
And the quantity of the Physical Resource Block of the occupancy according to needed for the user is user's distribution pair from the Physical Resource Block of recycling
The Physical Resource Block answered.
6. hardware resource dispatching method according to claim 2, which is characterized in that the hardware money that the basis obtains
After the step of data are the corresponding cell-level hardware resource of cell distribution to be established, is dispatched in source, the method also includes:
Detect whether there is the cell for not distributing Physical Resource Block to user;
Do not distribute the cell of Physical Resource Block to user if it exists, then whether there is also other to have other than the cell for detection
The built cell of idle Physical Resource Block;
It, will be described not to user point if having the built cell of idle Physical Resource Block there are other other than the cell
The corresponding cell-level hardware resource release of cell with Physical Resource Block.
7. hardware resource dispatching method according to claim 1, which is characterized in that the baseline hardware resource includes processing
Type of hardware resource, forwarding type of hardware resource and storage class hardware resource, the preconfigured step of baseline hardware resource
Suddenly include:
It is obtained according to the pre-access number of users of the unit cell and required frequency range and supports the unit intra-cell users industry
The processing type of hardware resource of business and common service operation, the forwarding type of hardware resource and the storage class are hard
The quantity of core child resource in part resource;
According in the processing type of hardware resource, the forwarding type of hardware resource and the storage class hardware resource
The quantity configuration of core child resource obtains the baseline hardware resource.
8. a kind of hardware resource dispatching device, which is characterized in that applied to the hardware resource controlling equipment in wireless communication system,
Described device includes:
Receiving module includes cell specification information to be established in the scheduling of resource instruction for receiving scheduling of resource instruction;
Computing module, for according to the relationship between the specification of cell to be established and the specification of preconfigured unit cell
And preset baseline hardware resource, obtain hardware resource scheduling data corresponding with the cell to be established, wherein the base
Line hard ware resource is support customer service and common service operation in the preconfigured unit cell specification corresponding hard
Part resource;
Cell-level hardware resource distribution module, for being the cell to be established according to obtained hardware resource scheduling data
Distribute corresponding cell-level hardware resource.
9. hardware resource dispatching device according to claim 8, which is characterized in that the user of the cell-level hardware resource
Business and common service processing capacity correspond to multiple Physical Resource Block after quantifying, the corresponding cell-level of each Physical Resource Block
Hardware resource supports corresponding customer service and common service operation, described device further include:
Physical resource number of blocks obtains module, for carrying institute in the access request in the access request for monitoring user
The business demand information for stating user, based on pre-stored business demand information pass corresponding with the Physical Resource Block of required occupancy
System, according to the quantity of the Physical Resource Block of occupancy needed for user described in the business demand information acquisition of the user;
User class resource distribution module, the quantity of the Physical Resource Block for the occupancy according to needed for the user are the user point
With corresponding Physical Resource Block.
10. hardware resource dispatching device according to claim 9, which is characterized in that the user class resource distribution module
Include:
Detection unit is less than described for the distributable physical resource number of blocks in user Target cell to be accessed
Needed for user when physical resource number of blocks, detecting whether to exist has assignable idle object in addition to the Target cell
Manage other built cells of resource block;
First allocation unit, for there are other with assignable free physical resource block in addition to the Target cell
When built cell, according to the quantity of the Physical Resource Block of occupancy needed for the user from the physical resource of other built cells
It is that the user distributes corresponding Physical Resource Block in block;
Second allocation unit is greater than for the distributable physical resource number of blocks in user Target cell to be accessed
Or equal to needed for the user when physical resource number of blocks, according to the quantity of the Physical Resource Block of occupancy needed for the user from
It is that the user distributes corresponding Physical Resource Block in the Physical Resource Block of the Target cell.
11. hardware resource dispatching device according to claim 10, which is characterized in that the user class resource distribution module
Further include:
Third allocation unit is less than for the distributable physical resource number of blocks in user Target cell to be accessed
Physical resource number of blocks needed for the user and there is no in addition to the Target cell have assignable free physical
When other built cells of resource block, when obtaining new scheduling of resource instruction, provided according to the physics of occupancy needed for the user
It is the user that the quantity of source block instructs in the corresponding new free physical resource block for establishing cell from the new scheduling of resource
Distribute corresponding Physical Resource Block.
12. hardware resource dispatching device according to claim 11, which is characterized in that the user class resource distribution module
Further include:
Target user's acquiring unit, for the distributable physical resource number of blocks in user Target cell to be accessed
Less than physical resource number of blocks needed for the user, and there is no have the assignable free time in addition to the Target cell
Other built cells of Physical Resource Block, and there is no can be used for distributing to newly-established cell cell-level hardware resource when,
The accessed user is obtained according to the priority of the accessed user in the priority of the user and the Target cell
In target user;
4th allocation unit, for the target user meet it is preset be preempted condition when, recycle the target user institute
The Physical Resource Block of occupancy, and the quantity of the Physical Resource Block of the occupancy according to needed for the user is from the Physical Resource Block of recycling
Corresponding Physical Resource Block is distributed for the user.
13. hardware resource dispatching device according to claim 9, which is characterized in that described device further include:
First detection module, for detecting whether in the presence of the cell for not distributing Physical Resource Block to user;
Second detection module, when not distributing the cell of Physical Resource Block to user for existing, detection is other than the cell
The no built cell there is also other with idle Physical Resource Block;
Release module will when for having the built cell of idle Physical Resource Block there is also other other than the cell
It is described not discharged to the corresponding cell-level hardware resource of cell that user distributes Physical Resource Block.
14. hardware resource dispatching device according to claim 8, which is characterized in that the baseline hardware resource includes place
Managing type of hardware resource, forwarding type of hardware resource and storage class hardware resource, described device further includes for being pre-configured with
The configuration module of the baseline hardware resource, the configuration module include:
Core child resource acquiring unit, for being propped up according to the pre-access number of users and required frequency range of the unit cell
Hold the processing type of hardware resource, the forwarding type of hardware of the unit intra-cell users business and common service operation
The quantity of resource and the core child resource in the storage class hardware resource;
Configuration unit, for according to the processing type of hardware resource, the forwarding type of hardware resource and the storage class
The quantity configuration of core child resource in type hardware resource obtains the baseline hardware resource.
15. a kind of hardware resource controlling equipment, including memory, processor and it is stored on the memory and can be at the place
The computer program run on reason device, which is characterized in that the processor realizes that claim 1-7 is any when executing described program
Method and step described in one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811294678.XA CN109614223B (en) | 2018-11-01 | 2018-11-01 | Hardware resource scheduling method and device and hardware resource scheduling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811294678.XA CN109614223B (en) | 2018-11-01 | 2018-11-01 | Hardware resource scheduling method and device and hardware resource scheduling equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109614223A true CN109614223A (en) | 2019-04-12 |
CN109614223B CN109614223B (en) | 2023-06-09 |
Family
ID=66002893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811294678.XA Active CN109614223B (en) | 2018-11-01 | 2018-11-01 | Hardware resource scheduling method and device and hardware resource scheduling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109614223B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111010712A (en) * | 2019-12-16 | 2020-04-14 | 烽火通信科技股份有限公司 | Centralized resource management system and method |
CN112543489A (en) * | 2020-11-24 | 2021-03-23 | 上海擎昆信息科技有限公司 | Method and device for controlling user equipment admission |
CN114661495A (en) * | 2022-03-23 | 2022-06-24 | 支付宝(杭州)信息技术有限公司 | Application system and application device in meshed device set |
CN114979026A (en) * | 2022-05-18 | 2022-08-30 | 中国电信股份有限公司 | Resource allocation method, device, electronic equipment and medium |
CN117725014A (en) * | 2024-02-04 | 2024-03-19 | 珠海星云智联科技有限公司 | PCIE equipment attribute modification method and related device in DPU scene |
CN117858262A (en) * | 2024-03-07 | 2024-04-09 | 成都爱瑞无线科技有限公司 | Base station resource scheduling optimization method, device, base station, equipment, medium and product |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040185884A1 (en) * | 2001-06-29 | 2004-09-23 | Jukka Marin | Base station resource management and a base station |
CN102047711A (en) * | 2008-04-16 | 2011-05-04 | 意大利电信股份公司 | Method and system for dynamically configuring a telecommunications network |
CN102065544A (en) * | 2009-11-17 | 2011-05-18 | 索尼株式会社 | Resource management method and system |
CN103889005A (en) * | 2014-03-03 | 2014-06-25 | 大唐移动通信设备有限公司 | Coordinated multi-point transmission scheduling method and device |
CN104618915A (en) * | 2009-11-17 | 2015-05-13 | 索尼公司 | Resource management system and method, and measuring device and method of resource management system |
CN105580407A (en) * | 2014-12-05 | 2016-05-11 | 华为技术有限公司 | Network resource deployment method and device |
US20160365959A1 (en) * | 2015-06-12 | 2016-12-15 | Ofinno Technologies, Llc | Scheduling Request on a Secondary Cell of a Wireless Device |
CN107333300A (en) * | 2016-04-29 | 2017-11-07 | 大唐移动通信设备有限公司 | The method of adjustment and device of a kind of cell load |
CN108347776A (en) * | 2017-01-25 | 2018-07-31 | 华为技术有限公司 | The method and apparatus of resource allocation in a kind of communication system |
-
2018
- 2018-11-01 CN CN201811294678.XA patent/CN109614223B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040185884A1 (en) * | 2001-06-29 | 2004-09-23 | Jukka Marin | Base station resource management and a base station |
CN102047711A (en) * | 2008-04-16 | 2011-05-04 | 意大利电信股份公司 | Method and system for dynamically configuring a telecommunications network |
CN102065544A (en) * | 2009-11-17 | 2011-05-18 | 索尼株式会社 | Resource management method and system |
CN104618915A (en) * | 2009-11-17 | 2015-05-13 | 索尼公司 | Resource management system and method, and measuring device and method of resource management system |
CN103889005A (en) * | 2014-03-03 | 2014-06-25 | 大唐移动通信设备有限公司 | Coordinated multi-point transmission scheduling method and device |
CN105580407A (en) * | 2014-12-05 | 2016-05-11 | 华为技术有限公司 | Network resource deployment method and device |
US20160365959A1 (en) * | 2015-06-12 | 2016-12-15 | Ofinno Technologies, Llc | Scheduling Request on a Secondary Cell of a Wireless Device |
CN107333300A (en) * | 2016-04-29 | 2017-11-07 | 大唐移动通信设备有限公司 | The method of adjustment and device of a kind of cell load |
CN108347776A (en) * | 2017-01-25 | 2018-07-31 | 华为技术有限公司 | The method and apparatus of resource allocation in a kind of communication system |
Non-Patent Citations (1)
Title |
---|
吕磊: "LTE-A CoMP下行链路减小反馈开销方案" * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111010712A (en) * | 2019-12-16 | 2020-04-14 | 烽火通信科技股份有限公司 | Centralized resource management system and method |
CN112543489A (en) * | 2020-11-24 | 2021-03-23 | 上海擎昆信息科技有限公司 | Method and device for controlling user equipment admission |
CN114661495A (en) * | 2022-03-23 | 2022-06-24 | 支付宝(杭州)信息技术有限公司 | Application system and application device in meshed device set |
CN114979026A (en) * | 2022-05-18 | 2022-08-30 | 中国电信股份有限公司 | Resource allocation method, device, electronic equipment and medium |
CN117725014A (en) * | 2024-02-04 | 2024-03-19 | 珠海星云智联科技有限公司 | PCIE equipment attribute modification method and related device in DPU scene |
CN117725014B (en) * | 2024-02-04 | 2024-05-28 | 珠海星云智联科技有限公司 | PCIE equipment attribute modification method and related device in DPU scene |
CN117858262A (en) * | 2024-03-07 | 2024-04-09 | 成都爱瑞无线科技有限公司 | Base station resource scheduling optimization method, device, base station, equipment, medium and product |
CN117858262B (en) * | 2024-03-07 | 2024-05-14 | 成都爱瑞无线科技有限公司 | Base station resource scheduling optimization method, device, base station, equipment, medium and product |
Also Published As
Publication number | Publication date |
---|---|
CN109614223B (en) | 2023-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109614223A (en) | Hardware resource dispatching method, device and hardware resource controlling equipment | |
US9652150B2 (en) | Global memory sharing method and apparatus, and communications system | |
CN105183565A (en) | Computer and service quality control method and device | |
CN104468407A (en) | Method and device for performing service platform resource elastic allocation | |
CN103365726A (en) | Resource management method and system facing GPU (Graphic Processing Unit) cluster | |
CN104301257B (en) | A kind of resource allocation methods, device and equipment | |
CN105828380B (en) | A kind of method for controlling network congestion and base station | |
CN111818581A (en) | User access method and access network equipment | |
WO2023151268A1 (en) | Service distribution method, apparatus and system | |
CN109673061A (en) | A kind of method and apparatus of PDU Dialog processing | |
CN106973377B (en) | The control method and control device and management equipment and terminal of data communication | |
CN104714845B (en) | Resource dynamic regulation method, device and more kernel operating systems | |
CN112703774A (en) | Network slice management | |
CN114816738A (en) | Method, device and equipment for determining calculation force node and computer readable storage medium | |
EP3224727B1 (en) | Generating approximate usage measurements for shared cache memory systems | |
CN110795202B (en) | Resource allocation method and device of virtualized cluster resource management system | |
CN113438689B (en) | Base station energy saving method, device, equipment and storage medium | |
CN115378879A (en) | Data control method and related device | |
CN104602315B (en) | A kind of access and jamming control method and equipment | |
CN105792223B (en) | A kind of method and apparatus distributing frequency spectrum | |
JP2004254201A (en) | Radio resource management method in radio base station device and radio resource management system in radio base station device | |
CN108174387B (en) | CE resource scheduling method and device | |
CN115391042B (en) | Resource allocation method and device, electronic equipment and storage medium | |
CN115202858A (en) | Cloud resource allocation method and related equipment | |
CN116709184A (en) | Region determination method, device, server and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |