CN109611633A - A kind of pressure pipeline open split device and on-line branching method - Google Patents

A kind of pressure pipeline open split device and on-line branching method Download PDF

Info

Publication number
CN109611633A
CN109611633A CN201910059412.5A CN201910059412A CN109611633A CN 109611633 A CN109611633 A CN 109611633A CN 201910059412 A CN201910059412 A CN 201910059412A CN 109611633 A CN109611633 A CN 109611633A
Authority
CN
China
Prior art keywords
knife bar
steel
pressure
process duct
cutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910059412.5A
Other languages
Chinese (zh)
Inventor
钊田
李洪民
钊洪智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN GONGMING NEW TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
JINAN GONGMING NEW TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN GONGMING NEW TECHNOLOGY DEVELOPMENT Co Ltd filed Critical JINAN GONGMING NEW TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201910059412.5A priority Critical patent/CN109611633A/en
Publication of CN109611633A publication Critical patent/CN109611633A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/08Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of the wall or to the axis of another pipe

Abstract

The present invention provides a kind of pressure pipeline open split device and on-line branching method, including main pipeline with pressure, newly-increased steel branch pipe(tube), steel process duct, aperture power head and blind plate, steel process duct is at least provided with three nozzles, wherein the upper end tube nozzle of steel process duct is provided with outward flange disk, steel process duct lower end is provided with the arc-shaped interface tube to match with main pipeline outer circle with pressure, side pipe interface is connect with newly-increased steel branch pipe(tube), knife bar guiding trestle is provided with the vertical tube of steel process duct is intracavitary, the upper end outer circle of knife bar guiding trestle is provided with inner flange, the upper end tube nozzle inner circle of steel process duct is provided with ring-shaped step, setting gasket is embedded among ring-shaped step and is fixed together by interior six square bolt below inner flange, advantage is: cutter is built in pipe fitting, valve is not added in Tapping procedures, do not influence pipeline It operates normally, aperture, which finishes, removes knife bar by the internal closure of cutter progress, and tapping equipment is small in size easy to operate and construction procedure is simple, short construction period, reduces the influence to pipeline user.

Description

A kind of pressure pipeline open split device and on-line branching method
Technical field
The present invention relates to steel pipe connection aperture technical field of construction with pressure, specifically a kind of pressure pipeline opening Part flow arrangement and on-line branching method.
Background technique
City gas, water supply, heat supply or factory's chemical pipeline are frequently encountered needs on former pipeline in normal operation The case where newly connecing branch line.And urban pipe network compares field long-distance transport pipes, complex distribution, it is on the ground to have building or public set more It applies, work progress needs to destroy road surface more, and with stopping transportation, has some impact on to the production and living of town users;How right Road surface or user's production and living influence in smaller situation, and the branch line connection with pressure quick to the progress of cities and towns pipeline of safety non-leakage is Urgent problem to be solved.
At present on pipeline there are two types of outer plus branch pipe construction known technologies:
One kind is that aperture is shorted and is welded to connect with former pipeline, is shorted with permanent valve, is fixed a cutting tool entrance using tapping equipment Pipe fitting cuts pipeline, after withdraw cutter and close valve, then valve it is suitable for reading again with newly connect branch line upper flange and couple.
Another kind is that two interfaces on pipe fitting are connect with former pipeline and new pipeline welding respectively, between tapping equipment and pipe fitting Temporary valve is installed, cutter is withdrawn after aperture and closes valve, then another set of lower occluding device is installed again, blocking is filled in It in pipe fitting and locks, tears equipment installation blind plate after medium is isolated from the outside open.
Above two method introduction is applied from foreign technology in the defeated petroleum of length or gas transmission line, in town gas pipe more Using not promoted always, it has following problems to main cause in the application at present:
1) compared with the isometric defeated high pressure line of petroleum pipeline for being located at field, although the urban publics such as combustion gas, heating power and water supply are managed Road pressure rank is low, but most positioned at down town or suburb, these regional roads prosperities, building stands in great numbers, densely populated, benefit With above-mentioned technology, due to being mounted with valve in Tapping procedures and equipment is huge increases excavation area, and construction period is longer, sternly Ghost image rings urban transportation and the normal life of people, and the method not had also at present solves;
2) permanent valve has leakage possible in pipeline longtime running on pipe fitting, increases conduit running risk, temporary valve Although can dismantle after aperture, one of process of lower blocking is increased, the installation of aperture work progress is complicated for operation and makes Forming apparatus is huge, and construction risk increases;
3) above two technology cutter is respectively positioned in tapping equipment, since its process increases with valve the height of equipment, is caused At a distance from pipeline farther out, cutter need to move relatively long distance could cut pipeline, and cutting force input point and output to perforating cutter Point distance is remote, and cutting is unstable, causes aperture to fail when serious.
Since there are above-mentioned drawbacks, pipeline with pressure opening technology with pressure does not adapt to the fast of current urban pipe network construction at present Fast demand for development.
Summary of the invention
The object of the present invention is to provide a kind of pressure pipeline open split device and on-line branching methods.
The purpose of the present invention is what is realized in the following manner, a kind of pressure pipeline open split device, structure includes:
Including steel main pipeline with pressure, newly-increased steel branch pipe(tube), steel process duct, aperture power head and blind plate, steel process duct At least provided with three nozzles, wherein the upper end tube nozzle of steel process duct is provided with outward flange disk, the setting of steel process duct lower end There is the arc-shaped interface tube to match with steel main pipeline outer circle with pressure, side pipe interface is connect with newly-increased steel branch pipe(tube), in steel The vertical tube of matter process duct is intracavitary to be provided with knife bar guiding trestle, and the upper end outer circle of knife bar guiding trestle is provided with inner flange, The upper end tube nozzle inner circle of steel process duct is provided with ring-shaped step, be embedded in after setting gasket below inner flange ring-shaped step it In and be fixed together by interior six square bolt, the central lumen lower end of knife bar guiding trestle is provided with internal screw thread, leads in knife bar To knife bar is provided among the central lumen of bracket, the upper end outer circle of knife bar is provided with upper sealing ring and knife bar guiding trestle center The inner circle of lumen is slidingly sealed, and is provided with lower sealing ring and knife bar outer circle in the lower end inner circle of the central lumen of knife bar guiding trestle It is slidingly sealed, the lower end of knife bar is connected with cutter.
The upper end of a kind of pressure pipeline open split device, knife bar is connected with power head driving by clamping screw Interface, the lower end of knife bar are provided with blind hole, and blind hole edge is machined with T-type gap, and the top of cutter is provided with boss, boss it is outer Positioning pin is provided on circle, the lower part of boss is machined with external screw thread, and boss and the blind hole of knife bar bottom are plugged in together, positioning pin It is connect with T-type gap, external screw thread engages connection, cutter and knife bar guiding trestle lower end with the internal screw thread of knife bar guiding trestle lower end Between install gasket additional, cutter is bowl-type cutter head.
A kind of pressure pipeline open split device is provided with venthole on bowl-type cutter head.
A kind of pressure pipeline open split device, the arc-shaped nozzle and steel main pipeline of steel process duct lower end Outer circle welds together.
A kind of pressure pipeline open split device, side pipe interface and the newly-increased branch pipe(tube) of steel process duct are welded on Together.
A kind of pressure pipeline open split device on-line branching method, steps are as follows for Specific construction:
(1) the steel process duct lower end arc nozzle of assembled pressure pipeline open split device is ridden over to be open with pressure On steel main pipeline, seam welds are sealed with electric welding, the test tube interface of steel process duct and newly-increased steel branch pipe(tube) are welded It is together spare;
(2) the upper orifice outward flange disk of steel process duct and the ring flange of power head lower end are bolted together, on knife bar The power head driving interface at end and the power output interface connection of power head are spare;
(3) power head is powered, and power head drives knife bar to rotate and cutter is driven to rotate forward downlink, cutter by power head interface External screw thread in the boss outer circle of top is separated with the internal screw thread in the lower end inner circle of knife bar guiding trestle, when tool contact is to pressure The outer bowlder of steel main pipeline starts to cut, until steel main pipeline with pressure is cut the aperture equal with cutter diameter, steel Main pipeline is cut the relic to get off and stays among bowl-type cutter head;
(4) after steel main pipeline aperture with pressure, newly-increased steel branch pipe detects the pressure and band of fluid media (medium) to upper pressure gauge After pressing the pressure in main pipeline equal, it is driven reverse by power head and above mentions cutter to the lower end of knife bar guiding trestle, cutter The internal screw thread of external screw thread and the lower end blind hole inner circle of knife bar guiding trestle on the boss of upper end meshes together again, and the two is simultaneously Gasket is compressed and is sealed;
(5) knife bar is gently rotated forward by the vertical position of positioning pin alignment T-type gap, is above griffed bar and is oriented to knife bar from knife bar It is extracted in the mesoporous of bracket;
(6) power head is unloaded by the program opposite with step (2);
(7) by blind plate encryption packing together with the flange bolt fastening of steel process duct upper orifice, main pipeline is with pressure newly-increased Branch pipe connection operation terminates.
The beneficial effects of the present invention are:
1) cutter is built in pipe fitting, and valve is not added in Tapping procedures, and pipe pressurized operation does not influence pipeline normal operation, aperture It finishes without proposing cutter, tapping equipment is small in size easy to operate and construction procedure is simple, short construction period, reduces and uses pipeline The influence at family;
2) since Tapping procedures are without valve, power output spline shaft is shortened at a distance from Tool in Cutting point, makes aperture more Add stabilization, while the leak source for reducing valve connection place reduces risk of leakage, increases safety coefficient;
3) work progress only needs mounting opening equipment without valve, and aperture finishes removal knife bar and passes through the internal closure of cutter progress, peace Overall coefficient increases operating space and reduces, and road pavement excavation area is small and Tapping procedures safely and fast No leakage, and it is multiple to solve cities and towns Miscellaneous pipe network newly connects the problem of branch line difficulty.
Detailed description of the invention
Fig. 1 is that pressure pipeline open split device installs the implementation status diagram after power head additional;
Fig. 2 is the vertical profile structural schematic diagram of pressure pipeline open split device;
Fig. 3 is cutter to the implementation status diagram before supervisor's cutting;
Fig. 4 is that main pipeline is cut the implementation status diagram penetrated by cutter;
Fig. 5 is that knife bar moves up and cutter is blocked the implementation status diagram in knife bar guiding trestle bottom;
Fig. 6 is to remove knife bar to install blind plate completion additional to the implementation status diagram after the sealing suitable for reading of steel process duct.
Description of symbols
It is arc-shaped interface tube 1, steel process duct 2, cutter 3, venthole 4, boss 5, lower sealing ring 6, knife bar 8, outward flange 10, interior Flange 11, interior six square bolt 12, blind plate sealing pad 13, knife bar guiding trestle 14, power head driving interface 15, clamping screw 16, Upper sealing ring 17, positioning pin 18, T-type gap 19, external screw thread 20, cutter gasket 21, steel main pipeline 22 with pressure, steel branch pipe Interface 23, steel branch pipe(tube) 24, main pipeline relic 17, blind plate 18, power head 19, annular groove 20, gasket 21, supervisor with pressure Road 22, side pipe interface 23 increase newly steel branch pipe(tube) 24, main pipeline relic 25, blind plate fastening bolt 26, blind plate 27, internal screw thread 28, Aperture power head 29.
Specific embodiment
Pressure pipeline open split device of the invention and its construction method are made in detail below referring to Figure of description Explanation.
Pressure pipeline open split device, structure include steel main pipeline 22 with pressure, newly-increased steel branch pipe(tube) 24, steel Process duct 2, aperture power head 29 and blind plate 27, steel process duct 2 is at least provided with three nozzles, wherein steel process duct 2 Upper end tube nozzle is provided with outward flange disk 10, and 2 lower end of steel process duct is provided with to match with 22 outer circle of steel main pipeline with pressure Arc-shaped interface tube 1, side pipe interface 23 are connect with newly-increased steel branch pipe(tube) 24, in the intracavitary setting of the vertical tube of steel process duct 2 There is knife bar guiding trestle 14, the upper end outer circle of knife bar guiding trestle 14 is provided with inner flange 11, the upper pipes of steel process duct 2 Mouth inner circle is provided with ring-shaped step, is embedded among ring-shaped step after gasket 13 is arranged below inner flange 11 and by interior six side Bolt 12 is fixed together, and the central lumen lower end of knife bar guiding trestle 14 is provided with internal screw thread 28, in knife bar guiding trestle 14 Central lumen among be provided with knife bar 8, the upper end outer circle of knife bar 8 is provided with upper sealing ring 17 and 14 center of knife bar guiding trestle The inner circle of lumen is slidingly sealed, and is provided with lower sealing ring 6 and knife bar 8 in the lower end inner circle of the central lumen of knife bar guiding trestle 14 Outer circle is slidingly sealed, and the lower end of knife bar 8 is connected with cutter 3.
The upper end of a kind of pressure pipeline open split device, knife bar 8 is connected with power head by clamping screw 16 Driving interface 15, the lower end of knife bar 8 are provided with blind hole 7, and 7 edge of blind hole is machined with T-type gap 19, and the top of cutter 3 is provided with Boss 5, positioning pin 18 is provided in the outer circle of boss 5, and the lower part of boss 5 is machined with external screw thread 20, boss 5 and 8 bottom of knife bar Blind hole 7 be plugged in together, positioning pin 18 is connect with T-type gap 19, the interior spiral shell of external screw thread 20 and 14 lower end of knife bar guiding trestle The engagement of line 28 connects, and installs gasket 21 between 14 lower end of cutter 3 and knife bar guiding trestle additional, cutter 3 is bowl-type cutter head.Wherein move Power head is the prior art, and applicant did abundant disclosure in pertinent literature, and no longer repeated herein.
A kind of pressure pipeline open split device is provided with venthole 4 on bowl-type cutter head.
A kind of pressure pipeline open split device, the arc-shaped nozzle 1 and steel of 2 lower end of steel process duct are responsible for 22 outer circle of road welds together.
A kind of pressure pipeline open split device, the side pipe interface 23 of steel process duct 2 and newly-increased steel branch pipe Road 24 welds together.
Embodiment
A kind of pressure pipeline open split device on-line branching method, steps are as follows for Specific construction:
(1) the steel process duct lower end arc nozzle of assembled pressure pipeline open split device is ridden over to be open with pressure On steel main pipeline, seam welds are sealed with electric welding, the test tube interface of steel process duct and newly-increased steel branch pipe(tube) are welded It is together spare;
(2) the upper orifice outward flange disk of steel process duct and the ring flange of power head lower end are bolted together, on knife bar The power head driving interface at end and the power output interface connection of power head are spare;
(3) power head is powered, and power head drives knife bar to rotate and cutter is driven to rotate forward downlink, cutter by power head interface External screw thread in the boss outer circle of top is separated with the internal screw thread in the lower end inner circle of knife bar guiding trestle, when tool contact is to pressure The outer bowlder of steel main pipeline starts to cut, until steel main pipeline with pressure is cut the aperture equal with cutter diameter, steel Main pipeline is cut the relic to get off and stays among bowl-type cutter head;
(4) after steel main pipeline aperture with pressure, newly-increased steel branch pipe detects the pressure and band of fluid media (medium) to upper pressure gauge After pressing the pressure in main pipeline equal, it is driven reverse by power head and above mentions cutter to the lower end of knife bar guiding trestle, cutter The internal screw thread of external screw thread and the lower end blind hole inner circle of knife bar guiding trestle on the boss of upper end meshes together again, and the two is simultaneously Gasket is compressed and is sealed;
(5) knife bar is gently rotated forward by the vertical position of positioning pin alignment T-type gap, is above griffed bar and is oriented to knife bar from knife bar It is extracted in the mesoporous of bracket;
(6) power head is unloaded by the program opposite with step (2);
(7) by blind plate encryption packing together with the flange bolt fastening of steel process duct upper orifice, main pipeline is with pressure newly-increased Branch pipe connection operation terminates.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, although referring to aforementioned reality Applying example, invention is explained in detail, for those skilled in the art, still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features.It is all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
It is the well-known technique of those skilled in the art in addition to claims and technical characteristic described in the specification.

Claims (6)

1. a kind of pressure pipeline open split device and on-line branching method, including steel main pipeline with pressure, newly-increased steel branch pipe Road, steel process duct, aperture power head and blind plate, it is characterised in that steel process duct is at least provided with three nozzles, wherein steel The upper end tube nozzle of matter process duct is provided with outward flange disk, and steel process duct lower end is provided with and steel main pipeline outer circle kissing with pressure The arc-shaped interface tube closed, side pipe interface connect with newly-increased steel branch pipe(tube), is provided with the vertical tube of steel process duct is intracavitary Knife bar guiding trestle, the upper end outer circle of knife bar guiding trestle are provided with inner flange, and the upper end tube nozzle inner circle of steel process duct is set It is equipped with ring-shaped step, is embedded among ring-shaped step after setting gasket below inner flange and is fixed on one by interior six square bolt It rises, the central lumen lower end of knife bar guiding trestle is provided with internal screw thread, is provided among the central lumen of knife bar guiding trestle Knife bar, the upper end outer circle of knife bar is provided with upper sealing ring and the inner circle of knife bar guiding trestle central lumen is slidingly sealed, and knife bar is led It is provided with lower sealing ring in the lower end inner circle of the central lumen of bracket to be slidingly sealed with knife bar outer circle, the lower end of knife bar is connected with Cutter.
2. a kind of pressure pipeline open split device according to claim 1, it is characterised in that the upper end of knife bar passes through lock It is tightly bolted dynamic head driving interface, the lower end of knife bar is provided with blind hole, and blind hole edge is machined with T-type gap, cutter Top is provided with boss, and positioning pin is provided in the outer circle of boss, and the lower part of boss is machined with external screw thread, boss and knife bar bottom Blind hole be plugged in together, positioning pin is connect with T-type gap, and external screw thread engages company with the internal screw thread of knife bar guiding trestle lower end It connects, installs gasket between cutter and knife bar guiding trestle lower end additional, cutter is bowl-type cutter head.
3. a kind of pressure pipeline open split device according to claim 2, it is characterised in that be provided on bowl-type cutter head logical Stomata.
4. a kind of pressure pipeline open split device according to claim 1, it is characterised in that steel process duct lower end Arc-shaped nozzle welds together with steel main pipeline outer circle.
5. a kind of pressure pipeline open split device according to claim 1, it is characterised in that the side pipe of steel process duct Interface welds together with newly-increased branch pipe(tube).
6. a kind of pressure pipeline open split device on-line branching method according to claim 1, it is characterised in that specific Construction procedure is as follows:
(1) the steel process duct lower end arc nozzle of assembled pressure pipeline open split device is ridden over to be open with pressure On steel main pipeline, seam welds are sealed with electric welding, the test tube interface of steel process duct and newly-increased steel branch pipe(tube) are welded It is together spare;
(2) the upper orifice outward flange disk of steel process duct and the ring flange of power head lower end are bolted together, on knife bar The power head driving interface at end and the power output interface connection of power head are spare;
(3) power head is powered, and power head drives knife bar to rotate and cutter is driven to rotate forward downlink, cutter by power head interface External screw thread in the boss outer circle of top is separated with the internal screw thread in the lower end inner circle of knife bar guiding trestle, when tool contact is to pressure The outer bowlder of steel main pipeline starts to cut, until steel main pipeline with pressure is cut the aperture equal with cutter diameter, steel Main pipeline is cut the relic to get off and stays among bowl-type cutter head;
(4) after steel main pipeline aperture with pressure, newly-increased steel branch pipe detects the pressure and band of fluid media (medium) to upper pressure gauge After pressing the pressure in main pipeline equal, it is driven reverse by power head and above mentions cutter to the lower end of knife bar guiding trestle, cutter The internal screw thread of external screw thread and the lower end blind hole inner circle of knife bar guiding trestle on the boss of upper end meshes together again, and the two is simultaneously Gasket is compressed and is sealed;
(5) knife bar is gently rotated forward by the vertical position of positioning pin alignment T-type gap, is above griffed bar and is oriented to knife bar from knife bar It is extracted in the mesoporous of bracket;
(6) power head is unloaded by the program opposite with step (2);
(7) by blind plate encryption packing together with the flange bolt fastening of steel process duct upper orifice, main pipeline is with pressure newly-increased Branch pipe connection operation terminates.
CN201910059412.5A 2019-01-22 2019-01-22 A kind of pressure pipeline open split device and on-line branching method Pending CN109611633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910059412.5A CN109611633A (en) 2019-01-22 2019-01-22 A kind of pressure pipeline open split device and on-line branching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910059412.5A CN109611633A (en) 2019-01-22 2019-01-22 A kind of pressure pipeline open split device and on-line branching method

Publications (1)

Publication Number Publication Date
CN109611633A true CN109611633A (en) 2019-04-12

Family

ID=66018112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910059412.5A Pending CN109611633A (en) 2019-01-22 2019-01-22 A kind of pressure pipeline open split device and on-line branching method

Country Status (1)

Country Link
CN (1) CN109611633A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1604972A (en) * 1978-05-31 1981-12-16 Forth V P Branch duct attachments
US4680848A (en) * 1985-11-25 1987-07-21 Goldner Erwin P Pipe tapping tool
US5345964A (en) * 1992-05-30 1994-09-13 Friatec Ag Keramik- Und Kunststoffwerke Pipe piercing fitting and valve
CN1263225A (en) * 1999-02-11 2000-08-16 济南市煤气公司 Pipe pressurized connector
CN1436291A (en) * 2000-06-16 2003-08-13 弗利亚特克公司 Drilling fitting
CN2705688Y (en) * 2004-04-29 2005-06-22 浙江中财管道科技股份有限公司 Novel plastic saddle shape pipe fitting
CN205173847U (en) * 2015-11-19 2016-04-20 重庆三英管道设备有限公司 Plugging device with small transfer line
CN209458548U (en) * 2019-01-22 2019-10-01 济南市公明新技术开发有限公司 A kind of pressure pipeline open split device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1604972A (en) * 1978-05-31 1981-12-16 Forth V P Branch duct attachments
US4680848A (en) * 1985-11-25 1987-07-21 Goldner Erwin P Pipe tapping tool
US5345964A (en) * 1992-05-30 1994-09-13 Friatec Ag Keramik- Und Kunststoffwerke Pipe piercing fitting and valve
CN1263225A (en) * 1999-02-11 2000-08-16 济南市煤气公司 Pipe pressurized connector
CN1436291A (en) * 2000-06-16 2003-08-13 弗利亚特克公司 Drilling fitting
CN2705688Y (en) * 2004-04-29 2005-06-22 浙江中财管道科技股份有限公司 Novel plastic saddle shape pipe fitting
CN205173847U (en) * 2015-11-19 2016-04-20 重庆三英管道设备有限公司 Plugging device with small transfer line
CN209458548U (en) * 2019-01-22 2019-10-01 济南市公明新技术开发有限公司 A kind of pressure pipeline open split device

Similar Documents

Publication Publication Date Title
CN103912758B (en) A kind of on-line production expansion duct closing type device
RU2493471C2 (en) Tee-piece with plug, which is intended for hot tapping
US20170022776A1 (en) Wellhead Shear/Blind Ram Assembly
KR200399091Y1 (en) Fitting for intercepting fluid flow in the pipe
US5161617A (en) Directly installed shut-off and diverter valve assembly for flowing oil well with concentric casings
CN204284788U (en) Chain pipe plugging fixture
CN202215185U (en) Five-combination blowout preventer
CN204554225U (en) The outer pod apertures of a kind of first-aid clamp tears valve self-closing device open
CN209458548U (en) A kind of pressure pipeline open split device
CN206230053U (en) Punching device under pressure
CN209458547U (en) A kind of pipeline with pressure aperture attachment device
CN203784553U (en) High-performance non-stop pipeline plugging device
US8136602B2 (en) Method and apparatus for sealing and venting pressurized casings of gas wells
CN109611632A (en) A kind of pipeline with pressure aperture attachment device and construction technology
CN109611633A (en) A kind of pressure pipeline open split device and on-line branching method
CN201786308U (en) Combination plugging device for replacing gate valve under pressure
CN103016898B (en) Rubber ball sealer embedded with butterfly plate
CN202349599U (en) Pipeline adjusting device and skid-mounted producing test device
CN108708427B (en) Non-stop production collision opening construction method for pipeline under pressure
KR100964629B1 (en) line stopping apparatus for flow pipe
CN202188264U (en) Additional plate type leaking stoppage body and clamping tool for rush repair of pipelines
CN207179026U (en) For blocking the pipe fitting of pipeline
CN203066924U (en) Combination-sealed direction-dividing wear-resisting fracture mining well head equipment
CN205805531U (en) Operating Pressure annulus logging wellhead assembly
CN210860271U (en) Split wedging type pipeline water plugging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination