US20170022776A1 - Wellhead Shear/Blind Ram Assembly - Google Patents

Wellhead Shear/Blind Ram Assembly Download PDF

Info

Publication number
US20170022776A1
US20170022776A1 US15/078,198 US201615078198A US2017022776A1 US 20170022776 A1 US20170022776 A1 US 20170022776A1 US 201615078198 A US201615078198 A US 201615078198A US 2017022776 A1 US2017022776 A1 US 2017022776A1
Authority
US
United States
Prior art keywords
wellhead
neck
housing
main body
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/078,198
Inventor
David B. Redden
Frank McCormack
Larry E. Huskins
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US15/078,198 priority Critical patent/US20170022776A1/en
Publication of US20170022776A1 publication Critical patent/US20170022776A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
    • E21B33/063Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams for shearing drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/04Construction of housing; Use of materials therefor of sliding valves
    • F16K27/044Construction of housing; Use of materials therefor of sliding valves slide valves with flat obturating members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K3/00Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing
    • F16K3/02Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing with flat sealing faces; Packings therefor
    • F16K3/029Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing with flat sealing faces; Packings therefor with two or more gates
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/04Manipulators for underwater operations, e.g. temporarily connected to well heads

Definitions

  • This invention pertains to blowout prevention systems for subsea wellheads, and more particularly to blowout prevention systems that serve as a backup or fail safe system to existing primary blowout prevention systems.
  • blowout emergency For subsea drilling operations, if the pressure of the formation fluids exceeds the hydrostatic of the fluid in the well bore and the associated surface pressure applied, a blowout emergency may develop.
  • the blowout emergency is managed by the operational personnel on the offshore drilling unit using a subsea blowout prevention system (hereinafter referred to as ‘BOP system’) that is attached to the wellhead on the seafloor.
  • BOP system subsea blowout prevention system
  • BOP system that include different types of ram assemblies, annular seals, remote operated valves, a marine riser, diverter, tensioners, and a redundant control system managed from the drilling unit located on the surface of the water.
  • a typical ‘BOP system’ connects to the top of the wellhead housing using a cylindrical wellhead connector.
  • the wellhead housing is found near the seabed and remains in place after the drilling unit has completed its operation and has been removed.
  • the wellhead housing is designed to withstand all the stresses generated by the ‘BOP system’ and the marine riser running back to the drilling rig.
  • An important aspect of the following invention is the discovery that existing wellheads with ‘BOP systems’ can fail and that a backup blowout preventing systems that operates independent from the offshore drilling operation or the primary ‘BOP system’ is needed.
  • a fail-safe, independently controlled and operated backup blowout prevention system for a subsea wellhead that also uses a primary BOP system.
  • the backup blowout prevention system which is positioned between the primary BOP system and the wellhead allows the fluid flowing from the well to be shut off prior to reaching the primary BOP system so that the primary BOP system may be repaired or replaced. In some instances, the backup prevention system may be capped altogether.
  • the backup blowout prevention system includes an independently operated shear/blind ram assembly designed to attach to a standard wellhead connector.
  • the ram assembly includes a horizontally aligned main body with two opposing hydraulic ram units located at its opposite ends which when activated are designed to shut off the flow of fluid through the transversely aligned bore extending vertically through the main body.
  • Perpendicularly aligned and mounted on opposite sides of the main body and aligned with the bore inside the main body is an upper neck and a lower neck. Formed on the upper and lower necks are perpendicularly aligned connection flanges. The connection flange on the lower neck is attached to the connection flange on the wellhead connector and the connection flange on the upper neck is attached to the dual housing assembly.
  • the dual housing assembly includes an upper primary housing longitudinally aligned and stacked over a lower secondary housing.
  • the primary and secondary housings each include a wide, cylindrical lower body and a narrow, cylindrical upper neck that have the same diameters as a standard internal bore.
  • Formed on the primary housing is a perpendicularly aligned flange surface that rests on a perpendicularly aligned upper flange on the secondary housing.
  • the secondary housing also includes a lower flange that connects to the upper flange on the upper neck on the ram assembly.
  • Each housing includes a longitudinally aligned center internal bore that runs throughout the system.
  • the adjacent flanges on the ram assembly and the dual housing assembly are connected together with suitable threaded bolts.
  • the ram assembly can be remotely activated to close the well.
  • the primary housing may be disconnected from the secondary housing thereby exposing the profile on the neck on the secondary housing.
  • a replacement BOP system may be attached to the secondary housing.
  • a cap may be attached to the secondary housing to stop the blowout.
  • the primary BOP system is under the control of personnel located on the drilling unit while the operation of the ram assembly and cutting of the threaded bolts used to hold the primary and second housing together are controlled remotely or operated by an independent remote operated vehicle (ROV) vehicle.
  • ROV remote operated vehicle
  • the control system is located on the system to ensure a quick and independent response in emergency situations. Remote controls for this system can be provided using multiple alternative options such as acoustics or ROV interface.
  • FIG. 1 is an illustration of the system.
  • FIG. 2 is a sectional side elevation view of the primary housing.
  • FIG. 3 is a sectional side elevation view of the secondary housing.
  • FIG. 4 is an illustration of the subsea backup blowout prevention system showing the replacement blowout prevention system in an installed position.
  • FIG. 5 is an illustration of the subsea backup blowout prevention system showing a capping system in an installed position.
  • FIG. 1 there is shown a subsea backup blowout prevention system 10 designed to be placed between the wellhead 90 and the primary BOP 102 .
  • the flow of fluids 105 from the wellhead 90 may be stopped and a partially concealed secondary housing 50 may be exposed and connected to a replacement primary BOP system 102 ′.
  • the system 10 includes a blind/shear ram assembly 20 mounted on a wellhead connector 30 designed to connect to a wellhead 90 .
  • the wellhead connector 30 includes a main body 32 with a longitudinally aligned neck 34 attached or formed thereon. Attached or formed on the top edge of the neck 34 is a connection flange 36 . Formed inside the main body 32 and in the neck 34 is a continuous internal bore 38 that communicates with the well bore 92 in the wellhead 90 .
  • the ram assembly 20 is designed to selectively shear or close off the wellbore 92 .
  • the ram assembly 20 is an independently operated shear/blind ram assembly designed to attach to the wellhead connector 30 .
  • the ram assembly 20 includes a horizontally aligned main body 21 with two opposing hydraulic ram units 22 , 23 located at its opposite ends which when activated are designed to shut off the flow of fluids 92 through the transversely aligned bore 24 extending through the main body 21 .
  • Perpendicularly aligned and mounted on opposite sides of the main body 21 and aligned with the bore 24 is an upper neck 25 and a lower neck 27 .
  • connection flange 28 on the lower neck 27 is attached to the connection flange 36 on the wellhead connector 30 and the connection flange 26 on the upper neck 25 is attached to the dual housing assembly 40 .
  • the dual housing assembly 40 is disposed between the ram assembly 20 and the primary BOP system 102 .
  • the dual housing assembly 40 includes an upper primary housing 60 longitudinally aligned and stacked over a lower secondary housing 50 .
  • the secondary and primary housings 50 , 60 are inverted T-shaped structures.
  • Each housing 50 , 60 includes a wide, cylindrical lower body 52 , 62 , and a narrow, cylindrical upper neck 54 , 64 , respectively, that have the same diameters as the wellhead 90 .
  • Formed inside the lower body 62 of the primary housing 60 is a recessed cavity 66 that is sufficient in depth and diameter to receive the neck 54 on the secondary housing 50 .
  • Formed inside the upper neck 64 and communicating with the recessed cavity 66 is a longitudinally aligned bore 68 .
  • a longitudinally aligned bore 58 is formed inside the secondary housing 50 and extends continuously through the main body 52 and the upper neck 54 .
  • a flange surface 63 Formed on the lower edge of the lower body 62 is a flange surface 63 .
  • a lower flange surface 51 Formed on the lower edge of the wide body 52 of the secondary housing 50 is a lower flange surface 51 that connects to the upper flange 26 on the upper neck 25 on the ram assembly 20 .
  • the secondary housing 50 also includes an upper flange surface 59 located along the top edge of the wide body 52 that is placed under and adjacent to the flange surface 63 on the main body 62 on the primary housing 60 during assembly.
  • Suitable threaded bolts 85 are used to attach the lower flange surface 51 on the secondary housing 50 to the upper connection flange 26 on the ram assembly 20 and suitable threaded bolts 85 ′ are used to attach the upper flange surface 59 to the lower flange surface 63 .
  • an optional guide funnel 80 may be longitudinally aligned and extended around the upper neck 64 on the primary housing 60 to facilitate attachment of the BOP system 102 to the primary housing 60 .
  • the ram assembly 20 may be activated to shear or close off the wellbore 92 .
  • the threaded bolts 85 ′ used to connect the primary housing 60 to the secondary housing 50 are then cut or sheared with suitable cutting tools (not shown) so that the primary housing 60 and the primary BOP system 102 attached thereto may be removed.
  • primary housing 60 When the primary housing 60 is removed, primary housing 60 also removed thereby exposing the neck 54 on the secondary housing 50 .
  • a new primary BOP system 102 ′ or capping system 104 may then be positioned over and attached to the neck 54 on the secondary housing 50 .
  • the entire system 10 would be coupled to a control system that receives signals from a remote station 110 to selectively activate the ram assembly 20 .
  • the system 10 may also include a remote operated vehicle intervention system that uses a hydraulic pump sub and hot stab and manual high-torque threaded connectors to close the ram assembly 20 .
  • a method of replacing a blowout preventing system or capping a subsea drilling operation includes the following steps:
  • a wellhead connector configured to be attached to a wellhead, a shear/blind ram assembly, a dual housing assembly that includes an upper primary housing with an exposed upper neck a lower secondary housing with a upper neck covered by said primary housing, and a plurality of connectors used to selectively connect said wellhead connector to said wellhead, to selectively connect said ram assembly to said wellhead connector, to selectively connect said secondary housing to said ram assembly, and to selectively connect said primary housing to said secondary housing;

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A shear/blind ram assembly for a subsea wellhead that is positioned between a blowout preventer system and the wellhead configured to selectively discontinue the flow of oil from the wellhead to the blowout preventer system. The shear/blind ram assembly includes a horizontally aligned main body with a vertical bore that is aligned and registered over the well bore on the wellhead. The main body includes a perpendicularly aligned lower neck and a perpendicularly aligned upper neck. Located inside each neck is a hydraulic ram unit which when activated discontinues the flow of a fluid through the main body's fluid. The main body also includes a lower connection flange surface formed on the lower neck configured to selectively connect to a wellhead connector and an upper connector flange formed on the upper neck and configured to selectively attached to a blowout prevention assembly.

Description

  • This is a continuation patent application based on the divisional patent application (application Ser. No. 14/537,377) filed on Nov. 10, 2014 which is based on U.S. patent application (application Ser. No. 13/253,605) filed on Oct. 5, 2011 now U.S. Utility Pat. No. 8,881,829 which is based on U.S. Provisional patent application (Application No. 61/390,745) filed on Oct. 7, 2010.
  • Notice is hereby given that the following patent document contains original material which is subject to copyright protection. The copyright owner has no objection to the facsimile or digital download reproduction of all or part of the patent document, but otherwise reserves all copyrights whatsoever.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • This invention pertains to blowout prevention systems for subsea wellheads, and more particularly to blowout prevention systems that serve as a backup or fail safe system to existing primary blowout prevention systems.
  • 2. Description of the Related Art
  • For subsea drilling operations, if the pressure of the formation fluids exceeds the hydrostatic of the fluid in the well bore and the associated surface pressure applied, a blowout emergency may develop. Heretofore, the blowout emergency is managed by the operational personnel on the offshore drilling unit using a subsea blowout prevention system (hereinafter referred to as ‘BOP system’) that is attached to the wellhead on the seafloor.
  • Federal regulations require that all offshore drilling operations use a ‘BOP system’ that include different types of ram assemblies, annular seals, remote operated valves, a marine riser, diverter, tensioners, and a redundant control system managed from the drilling unit located on the surface of the water.
  • A typical ‘BOP system’ connects to the top of the wellhead housing using a cylindrical wellhead connector. The wellhead housing is found near the seabed and remains in place after the drilling unit has completed its operation and has been removed. The wellhead housing is designed to withstand all the stresses generated by the ‘BOP system’ and the marine riser running back to the drilling rig.
  • SUMMARY OF THE INVENTION
  • An important aspect of the following invention is the discovery that existing wellheads with ‘BOP systems’ can fail and that a backup blowout preventing systems that operates independent from the offshore drilling operation or the primary ‘BOP system’ is needed.
  • Disclosed herein is a fail-safe, independently controlled and operated backup blowout prevention system for a subsea wellhead that also uses a primary BOP system. The backup blowout prevention system which is positioned between the primary BOP system and the wellhead allows the fluid flowing from the well to be shut off prior to reaching the primary BOP system so that the primary BOP system may be repaired or replaced. In some instances, the backup prevention system may be capped altogether.
  • The backup blowout prevention system includes an independently operated shear/blind ram assembly designed to attach to a standard wellhead connector. The ram assembly includes a horizontally aligned main body with two opposing hydraulic ram units located at its opposite ends which when activated are designed to shut off the flow of fluid through the transversely aligned bore extending vertically through the main body. Perpendicularly aligned and mounted on opposite sides of the main body and aligned with the bore inside the main body is an upper neck and a lower neck. Formed on the upper and lower necks are perpendicularly aligned connection flanges. The connection flange on the lower neck is attached to the connection flange on the wellhead connector and the connection flange on the upper neck is attached to the dual housing assembly.
  • The dual housing assembly includes an upper primary housing longitudinally aligned and stacked over a lower secondary housing. The primary and secondary housings each include a wide, cylindrical lower body and a narrow, cylindrical upper neck that have the same diameters as a standard internal bore. Formed on the primary housing is a perpendicularly aligned flange surface that rests on a perpendicularly aligned upper flange on the secondary housing. The secondary housing also includes a lower flange that connects to the upper flange on the upper neck on the ram assembly. Each housing includes a longitudinally aligned center internal bore that runs throughout the system.
  • The adjacent flanges on the ram assembly and the dual housing assembly are connected together with suitable threaded bolts. When the primary housing or the primary BOP system is damaged, the ram assembly can be remotely activated to close the well. The primary housing may be disconnected from the secondary housing thereby exposing the profile on the neck on the secondary housing. A replacement BOP system may be attached to the secondary housing. In some instances, a cap may be attached to the secondary housing to stop the blowout.
  • The primary BOP system is under the control of personnel located on the drilling unit while the operation of the ram assembly and cutting of the threaded bolts used to hold the primary and second housing together are controlled remotely or operated by an independent remote operated vehicle (ROV) vehicle. In the preferred embodiment, the control system is located on the system to ensure a quick and independent response in emergency situations. Remote controls for this system can be provided using multiple alternative options such as acoustics or ROV interface.
  • DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an illustration of the system.
  • FIG. 2 is a sectional side elevation view of the primary housing.
  • FIG. 3 is a sectional side elevation view of the secondary housing.
  • FIG. 4 is an illustration of the subsea backup blowout prevention system showing the replacement blowout prevention system in an installed position.
  • FIG. 5 is an illustration of the subsea backup blowout prevention system showing a capping system in an installed position.
  • DESCRIPTION OF THE PREFERRED EMBODIMENT(S)
  • Referring to the FIG. 1, there is shown a subsea backup blowout prevention system 10 designed to be placed between the wellhead 90 and the primary BOP 102. When damage occurs to the primary BOP system 102 or to the primary housing 60 used to connect the primary BOP system 102 to the wellhead 90, the flow of fluids 105 from the wellhead 90 may be stopped and a partially concealed secondary housing 50 may be exposed and connected to a replacement primary BOP system 102′.
  • The system 10 includes a blind/shear ram assembly 20 mounted on a wellhead connector 30 designed to connect to a wellhead 90. The wellhead connector 30 includes a main body 32 with a longitudinally aligned neck 34 attached or formed thereon. Attached or formed on the top edge of the neck 34 is a connection flange 36. Formed inside the main body 32 and in the neck 34 is a continuous internal bore 38 that communicates with the well bore 92 in the wellhead 90.
  • The ram assembly 20 is designed to selectively shear or close off the wellbore 92. The ram assembly 20 is an independently operated shear/blind ram assembly designed to attach to the wellhead connector 30. The ram assembly 20 includes a horizontally aligned main body 21 with two opposing hydraulic ram units 22, 23 located at its opposite ends which when activated are designed to shut off the flow of fluids 92 through the transversely aligned bore 24 extending through the main body 21. Perpendicularly aligned and mounted on opposite sides of the main body 21 and aligned with the bore 24 is an upper neck 25 and a lower neck 27. Formed on the upper and lower necks 25, 27 are perpendicularly aligned connection flanges 26, 28, respectively. During assembly, the connection flange 28 on the lower neck 27 is attached to the connection flange 36 on the wellhead connector 30 and the connection flange 26 on the upper neck 25 is attached to the dual housing assembly 40.
  • The dual housing assembly 40 is disposed between the ram assembly 20 and the primary BOP system 102. The dual housing assembly 40 includes an upper primary housing 60 longitudinally aligned and stacked over a lower secondary housing 50. As shown more clearly in FIGS. 2 and 3, the secondary and primary housings 50, 60 are inverted T-shaped structures. Each housing 50, 60 includes a wide, cylindrical lower body 52, 62, and a narrow, cylindrical upper neck 54, 64, respectively, that have the same diameters as the wellhead 90. Formed inside the lower body 62 of the primary housing 60 is a recessed cavity 66 that is sufficient in depth and diameter to receive the neck 54 on the secondary housing 50. Formed inside the upper neck 64 and communicating with the recessed cavity 66 is a longitudinally aligned bore 68. A longitudinally aligned bore 58 is formed inside the secondary housing 50 and extends continuously through the main body 52 and the upper neck 54.
  • Formed on the lower edge of the lower body 62 is a flange surface 63. Formed on the lower edge of the wide body 52 of the secondary housing 50 is a lower flange surface 51 that connects to the upper flange 26 on the upper neck 25 on the ram assembly 20. The secondary housing 50 also includes an upper flange surface 59 located along the top edge of the wide body 52 that is placed under and adjacent to the flange surface 63 on the main body 62 on the primary housing 60 during assembly. Suitable threaded bolts 85 are used to attach the lower flange surface 51 on the secondary housing 50 to the upper connection flange 26 on the ram assembly 20 and suitable threaded bolts 85′ are used to attach the upper flange surface 59 to the lower flange surface 63.
  • As shown in FIG. 1, an optional guide funnel 80 may be longitudinally aligned and extended around the upper neck 64 on the primary housing 60 to facilitate attachment of the BOP system 102 to the primary housing 60.
  • If an emergency condition occurs that results in damage to the primary BOP system 102, the ram assembly 20 may be activated to shear or close off the wellbore 92. The threaded bolts 85′ used to connect the primary housing 60 to the secondary housing 50 are then cut or sheared with suitable cutting tools (not shown) so that the primary housing 60 and the primary BOP system 102 attached thereto may be removed. When the primary housing 60 is removed, primary housing 60 also removed thereby exposing the neck 54 on the secondary housing 50. A new primary BOP system 102′ or capping system 104 may then be positioned over and attached to the neck 54 on the secondary housing 50.
  • The entire system 10 would be coupled to a control system that receives signals from a remote station 110 to selectively activate the ram assembly 20. The system 10 may also include a remote operated vehicle intervention system that uses a hydraulic pump sub and hot stab and manual high-torque threaded connectors to close the ram assembly 20.
  • Using the above described system 10, a method of replacing a blowout preventing system or capping a subsea drilling operation is provided that includes the following steps:
  • a. creating a subsea wellhead;
  • b. selecting a backup blowout assembly that includes;
  • a wellhead connector configured to be attached to a wellhead, a shear/blind ram assembly, a dual housing assembly that includes an upper primary housing with an exposed upper neck a lower secondary housing with a upper neck covered by said primary housing, and a plurality of connectors used to selectively connect said wellhead connector to said wellhead, to selectively connect said ram assembly to said wellhead connector, to selectively connect said secondary housing to said ram assembly, and to selectively connect said primary housing to said secondary housing;
  • c. connecting said wellhead connector to said wellhead;
  • d. connecting said ram assembly to said wellhead connector;
  • e. connecting said dual housing assembly to said ram assembly;
  • f. attaching a primary blowout prevention assembly to said primary housing on said dual housing assembly;
  • g. disconnecting said primary housing from said secondary housing thereby exposing the upper neck of said secondary housing; and,
  • h. connecting a replacement blowout prevention assembly or cap to said upper neck on said secondary housing.
  • In compliance with the statute, the invention described herein has been described in language more or less specific as to structural features. It should be understood however, that the invention is not limited to the specific features shown, since the means and construction shown, is comprised only of the preferred embodiments for putting the invention into effect. The invention is therefore claimed in any of its forms or modifications within the legitimate and valid scope of the amended claims, appropriately interpreted in accordance with the doctrine of equivalents.

Claims (1)

We claim:
1. A shear/blind ram assembly for a backup blowout system, comprising:
a. a horizontally aligned main body that includes a perpendicularly aligned lower neck and a perpendicularly aligned upper neck, said main body includes a vertical fluid bore;
b. two opposite hydraulic ram units located on opposite sides of said fluid bore that when activated discontinues the flow of a fluid through said fluid bore;
c. a lower connection flange surface formed on said lower neck configured to selectively connect to a wellhead connector;
d. an upper connector flange formed on said upper neck and configured to selectively attached to a blowout prevention assembly.
US15/078,198 2010-10-07 2016-03-23 Wellhead Shear/Blind Ram Assembly Abandoned US20170022776A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/078,198 US20170022776A1 (en) 2010-10-07 2016-03-23 Wellhead Shear/Blind Ram Assembly

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US39074510P 2010-10-07 2010-10-07
US13/253,605 US8881829B2 (en) 2010-10-07 2011-10-05 Backup wellhead blowout prevention system and method
US14/537,377 US9388659B2 (en) 2010-10-07 2014-11-10 Backup wellhead adapter
US15/078,198 US20170022776A1 (en) 2010-10-07 2016-03-23 Wellhead Shear/Blind Ram Assembly

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US14/537,377 Continuation US9388659B2 (en) 2010-10-07 2014-11-10 Backup wellhead adapter

Publications (1)

Publication Number Publication Date
US20170022776A1 true US20170022776A1 (en) 2017-01-26

Family

ID=45924230

Family Applications (3)

Application Number Title Priority Date Filing Date
US13/253,605 Expired - Fee Related US8881829B2 (en) 2010-10-07 2011-10-05 Backup wellhead blowout prevention system and method
US14/537,377 Expired - Fee Related US9388659B2 (en) 2010-10-07 2014-11-10 Backup wellhead adapter
US15/078,198 Abandoned US20170022776A1 (en) 2010-10-07 2016-03-23 Wellhead Shear/Blind Ram Assembly

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US13/253,605 Expired - Fee Related US8881829B2 (en) 2010-10-07 2011-10-05 Backup wellhead blowout prevention system and method
US14/537,377 Expired - Fee Related US9388659B2 (en) 2010-10-07 2014-11-10 Backup wellhead adapter

Country Status (2)

Country Link
US (3) US8881829B2 (en)
WO (1) WO2013050826A1 (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9085950B2 (en) * 2010-12-20 2015-07-21 Joe Spacek Oil well improvement system
MX2013008333A (en) * 2011-01-18 2014-01-23 Noble Drilling Services Inc Method for capping a well in the event of subsea blowout preventer failure.
US9033049B2 (en) * 2011-11-10 2015-05-19 Johnnie E. Kotrla Blowout preventer shut-in assembly of last resort
US9222327B2 (en) * 2012-11-28 2015-12-29 Stena Drilling Ltd. Well safety equipment
US9255446B2 (en) * 2013-07-18 2016-02-09 Conocophillips Company Pre-positioned capping device for source control with independent management system
CA2873762C (en) 2013-12-06 2022-10-04 Conocophillips Company Flow control device simulation
US20160305216A1 (en) * 2013-12-30 2016-10-20 Michael Linley Fripp Fluidic adjustable choke
WO2015116836A1 (en) * 2014-01-29 2015-08-06 Oceaneering International, Inc. Battery powered subsea pumping system
US10655419B2 (en) 2014-09-29 2020-05-19 Saudi Arabian Oil Company Vehicle mounted blowout preventor equipment
USD749644S1 (en) * 2014-10-28 2016-02-16 David B. Redden Subsea dual housing assembly
AU2017273551B2 (en) 2016-05-31 2022-06-02 Transocean Innovation Labs Ltd Methods for assessing the reliability of hydraulically-actuated devices and related systems
EP3922809B1 (en) 2016-09-06 2023-03-29 Transocean Innovation Labs Ltd Systems and methods for actuating hydraulically-actuated devices
CN106761530A (en) * 2017-01-16 2017-05-31 中国海洋石油总公司 A kind of emergent well-sealing device and method for deepwater drilling blowout out of control
US10309575B2 (en) 2017-04-12 2019-06-04 Inner Cure Technologies Underground pipe repair device with radial annular spacers and related systems and methods
US11255144B2 (en) * 2019-12-08 2022-02-22 Hughes Tool Company LLC Annular pressure cap drilling method
US11168532B2 (en) 2020-03-06 2021-11-09 Saudi Arabian Oil Company Method and apparatus for sacrificial wellhead protector and testing adapter
CN113187442B (en) * 2021-04-30 2022-08-26 刘刚 Sealing device for isolating and collecting cover
US11555372B1 (en) 2021-09-22 2023-01-17 Saudi Arabian Oil Company Smart blow off preventer shear ram system and methods

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2964284A (en) * 1958-04-01 1960-12-13 Cameron Iron Works Inc Ram type blowout preventer
US6230824B1 (en) * 1998-03-27 2001-05-15 Hydril Company Rotating subsea diverter

Family Cites Families (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3052301A (en) * 1957-05-15 1962-09-04 Gray Tool Co Multiple tubing string well completion equipment
US2904357A (en) * 1958-03-10 1959-09-15 Hydril Co Rotatable well pressure seal
US3096999A (en) * 1958-07-07 1963-07-09 Cameron Iron Works Inc Pipe joint having remote control coupling means
US3298699A (en) * 1963-12-12 1967-01-17 Trojan Inc Pressure control device
US3324943A (en) 1964-07-13 1967-06-13 Texaco Inc Off-shore drilling
US3608932A (en) * 1970-02-18 1971-09-28 Cicero C Brown Powered coupling device
US4478287A (en) * 1983-01-27 1984-10-23 Hydril Company Well control method and apparatus
US4531580A (en) * 1983-07-07 1985-07-30 Cameron Iron Works, Inc. Rotating blowout preventers
US4626135A (en) * 1984-10-22 1986-12-02 Hydril Company Marine riser well control method and apparatus
US4685521A (en) 1985-04-17 1987-08-11 Raulins George M Well apparatus
US4718495A (en) * 1986-05-08 1988-01-12 Halliburton Company Surface packer and method for using the same
US5195361A (en) * 1991-11-25 1993-03-23 Petco Equipment Tools Co. Test method and apparatus for BOP equipment
US5411085A (en) * 1993-11-01 1995-05-02 Camco International Inc. Spoolable coiled tubing completion system
US5492373A (en) * 1994-09-28 1996-02-20 J. M. Huber Corporation Wellhead flange for interconnecting a threaded wellhead and a flanged blowout preventer
CA2153612C (en) * 1995-07-11 1999-09-14 Andrew Squires Integral blowout preventer and flow tee
US5988274A (en) 1997-07-30 1999-11-23 Funk; Kelly Method of and apparatus for inserting pipes and tools into wells
CA2216456C (en) * 1997-09-25 2000-12-12 Daniel Lee Blow-out preventer
BR9812854A (en) * 1997-10-07 2000-08-08 Fmc Corp Underwater completion system and method with small internal diameter
US6626245B1 (en) * 2000-03-29 2003-09-30 L Murray Dallas Blowout preventer protector and method of using same
US6772843B2 (en) * 2000-12-05 2004-08-10 Baker Hughes Incorporated Sea-floor pressure head assembly
US7431092B2 (en) * 2002-06-28 2008-10-07 Vetco Gray Scandinavia As Assembly and method for intervention of a subsea well
WO2004044368A2 (en) * 2002-11-12 2004-05-27 Vetco Gray, Inc. Orientation system for a subsea well
GB2402409B (en) 2003-06-03 2006-04-12 Schlumberger Holdings Safety shut-in systems for subsea wells, and blowout preventer stacks incorporating such systems
CA2434801C (en) * 2003-07-09 2005-07-26 Bob Mcguire Adapters for double-locking casing mandrel and method of using same
US7032691B2 (en) * 2003-10-30 2006-04-25 Stena Drilling Ltd. Underbalanced well drilling and production
US7000888B2 (en) * 2004-03-29 2006-02-21 Gadu, Inc. Pump rod clamp and blowout preventer
US6969042B2 (en) * 2004-05-01 2005-11-29 Varco I/P, Inc. Blowout preventer and ram actuator
US7216714B2 (en) * 2004-08-20 2007-05-15 Oceaneering International, Inc. Modular, distributed, ROV retrievable subsea control system, associated deepwater subsea blowout preventer stack configuration, and methods of use
NO322519B1 (en) * 2004-09-20 2006-10-16 Fmc Kongsberg Subsea As Device by joint
CA2576333C (en) * 2006-01-27 2013-11-12 Stream-Flo Industries Ltd. Wellhead blowout preventer with extended ram for sealing central bore
GB2440940B (en) * 2006-08-18 2009-12-16 Cameron Internat Corp Us Wellhead assembly
US7374146B2 (en) * 2006-08-22 2008-05-20 Cameron International Corporation Dual-cylinder blowout preventer operator system
US7921917B2 (en) * 2007-06-08 2011-04-12 Cameron International Corporation Multi-deployable subsea stack system
AU2008302141B2 (en) 2007-09-21 2011-06-09 Transocean Sedco Forex Ventures Ltd. System and method for providing additional blowout preventer control redundancy
US20090260830A1 (en) * 2008-04-18 2009-10-22 Henning Hansen Rigless well completion method
WO2011153524A2 (en) * 2010-06-05 2011-12-08 Jay Vandelden Magnetorheological blowout preventer

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2964284A (en) * 1958-04-01 1960-12-13 Cameron Iron Works Inc Ram type blowout preventer
US6230824B1 (en) * 1998-03-27 2001-05-15 Hydril Company Rotating subsea diverter

Also Published As

Publication number Publication date
US20120085543A1 (en) 2012-04-12
US9388659B2 (en) 2016-07-12
WO2013050826A1 (en) 2013-04-11
US20150167418A1 (en) 2015-06-18
US8881829B2 (en) 2014-11-11

Similar Documents

Publication Publication Date Title
US9388659B2 (en) Backup wellhead adapter
EP0709545B1 (en) Deep water slim hole drilling system
US8297359B2 (en) Subsea well intervention systems and methods
US8511387B2 (en) Made-up flange locking cap
US7464751B1 (en) High pressure adapter assembly for use on blow out preventers
US7383887B1 (en) Method for rapid installation of a smaller diameter pressure control device usable on blow out preventers
NO20140567A1 (en) BOP assembly for emergency shutdown
US9255446B2 (en) Pre-positioned capping device for source control with independent management system
US10337277B2 (en) Closed-loop solenoid system
US9222327B2 (en) Well safety equipment
US11168532B2 (en) Method and apparatus for sacrificial wellhead protector and testing adapter
US10081986B2 (en) Subsea casing tieback
US11136857B2 (en) Rapid response well control assembly
US11414949B2 (en) Deepwater riser intervention system
RU2768811C1 (en) Hydraulic string control system for lowering
US20130248198A1 (en) Safety System for Deep Water Drilling Units Using a Dual Blow Out Preventer System
Adam et al. HT Technology-A1l-meta Sealing Answers Safety & Environmental Concerns
US20170191336A1 (en) Closure member including a replaceable insert

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION