CN109611148A - A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway - Google Patents

A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway Download PDF

Info

Publication number
CN109611148A
CN109611148A CN201811266942.9A CN201811266942A CN109611148A CN 109611148 A CN109611148 A CN 109611148A CN 201811266942 A CN201811266942 A CN 201811266942A CN 109611148 A CN109611148 A CN 109611148A
Authority
CN
China
Prior art keywords
tunnel
water
waste water
clear water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811266942.9A
Other languages
Chinese (zh)
Other versions
CN109611148B (en
Inventor
李传松
李绍平
茹旭
曾庆华
薛正
张皓
李宗明
辛思远
黑见星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
China State Railway Group Co Ltd
China Railway Economic and Planning Research Institute
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway Corp
China Railway Economic and Planning Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC, China Railway Corp, China Railway Economic and Planning Research Institute filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201811266942.9A priority Critical patent/CN109611148B/en
Publication of CN109611148A publication Critical patent/CN109611148A/en
Application granted granted Critical
Publication of CN109611148B publication Critical patent/CN109611148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of shunt methods of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway, in the tunnel different construction stages, pass through the synchronous waste water for building two sides and clear water gutter, the water burst (clear water) for independently collecting face and just the construction waste water of lining section and two lining sections realizes the sub-prime shunting of removing contamination of the water burst (clear water) of face and just the construction waste water of lining section and two lining sections.A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway disclosed by the invention, manipulation is simple, and shunting effect is good, and management is easy, rich water tunnel strong for mountain area or the biggish tunnel of water yield, application value with higher.After the construction and operating cost of waste water processing station can be reduced substantially compared with Pollen sterility wastewater treatment scale and processing water.

Description

A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway
Technical field
The invention belongs to railway tunnel construction field of engineering technology, in particular to the constructing tunnel in a kind of horizontal hole of single-track railway The shunt method of removing contamination of waste water.
Background technique
With the fast development of Railway Construction Projects, the increasingly reinforcement of ecological environmental protection, railway tunnel construction is brought Environment influence also to cause the growing interest of people, wherein constructing tunnel waste water is considered as one of pollution sources.In recent years, national Also the investment to constructing tunnel wastewater treatment is being increased year by year.The construction of railway tunnel construction waste water treatment engineering, is protected well The ecological environment in area along having protected promotes the coordinated development of local economy society and environmental protection, but its huge cost of investment Also biggish economic pressures are brought to railway construction.
Investigation discovery, the contaminated underground water that the main source of constructing tunnel waste water is discharged during being constructing tunnel, packet Two parts collected by blind pipe (including lateral blind pipe and longitudinal blind pipe) after including operation side (face) and tunnel-liner Underground water, remaining construction operation process are as less such as wastewater flow rate caused by the processes such as drilling and explosion, injection and slip casting.In addition, Underground water burst (being originally clear water) near face just becomes after rock powder, landwaste, cement slurry etc. are gushed out and encountered to face nearby It is the main source of construction waste water for waste water;And water collected by the blind pipe of tunnel double-lining section is mostly clear water, and construction waste water Important sources.If can realize in tunnel, face (driving section), just the construction waste water of lining section and the water burst of two lining sections are (clear Water) remove contamination sub-prime shunting, can not only be effectively reduced scale, the processing difficulty of constructing tunnel waste water disposal facility, can also The construction cost and processing cost of this part is greatly reduced.The constructing tunnel that this patent proposes a kind of horizontal hole of single-track railway is useless The shunt method of removing contamination of water has important engineering application value, to provide reference for correlative study and engineer application.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of removing contamination point for the constructing tunnel waste water in the horizontal hole of single-track railway Stream method, the dress method can be effectively reduced the scale of constructing tunnel waste water disposal facility, processing difficulty, can also substantially drop The construction cost and processing cost of this low part have important engineering application value.
For achieving the above object, the invention adopts the following technical scheme:
A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway passes through in the tunnel different construction stages The waste water of synchronous build two sides and clear water gutter, independently collect face and just the construction waste water of lining section and two serves as a contrast sections Water burst (clear water) realizes the sub-prime shunting of removing contamination of the water burst (clear water) of face and just the construction waste water of lining section and two lining sections.
Further, the tunnel different construction stages include tunnel horizontal hole construction time and tunnel main tunnel construction time;Institute The suitable slope construction section for stating tunnel horizontal hole construction early period and tunnel main tunnel construction time, by face and the construction waste water of first lining section through collecting Puddle leads to waste drain, while the clear water of the lining cutting behind of the collection of the circumferential blind pipe of two lining sections and longitudinal blind pipe being led to Clear water gutter, and block water board in the setting of clear water gutter origin or beginning, construct waste water and clear water flow automatically under gravity again appears Outside.Alternatively, waste drain side two to be served as a contrast to the clear water of the collection of section circumferential direction blind pipe and longitudinal blind pipe, connect by clear water connecting tube Enter clear water gutter, clear water through clear water ditch Artesian Drainage appear it is outer after discharge nearby.
Further, the tunnel main tunnel construction time includes early period, mid-term and later period.Before tunnel main tunnel construction Phase sets catch pit and movable lifting pumping plant in the face of counter-slope construction section, and construction waste water lifting to main tunnel and horizontal hole is intersected Waste drain at mileage, and gravity Artesian Drainage is appeared outside.In tunnel main tunnel construction mid-term and later period, in counter-slope section Construct waste water water it is excessive or when required promotions lift is excessive, several waste water centres water is set at comprehensive cavern using proposing on the way The waste water that waste water movable lifting pumps is promoted to energy-dissipating installation step by step, is then exhausted from outside hole by pond and booster pump station.The tunnel just Hole is constructed mid-term and later period, and when the clear water water of counter-slope section is excessive, several clear water collection are set at comprehensive cavern using proposing on the way Clear water is promoted to the clear water gutter intersected at mileage by pond and clean water pump station.
Further, it is set at the gutter where waste water intermediate pool and booster pump station, clean water pump station and blocks water board.
Further, the waste water catch pit is arranged naturally using low-lying place in tunnel or builds catch pit using concrete (pond), it is useless for collecting the construction water burst of face and serving as a contrast construction caused by the low-lying place below the trestle of section at the beginning of construction period Water.
Further, the waste drain is synchronous with inverted arch in Tunnel and roadbed builds, and width 300-500mm is deep 400-500mm is spent, the gradient is consistent with the tunnel line gradient;The waste drain uses concrete material, grade and tunnel base Plinth concrete is consistent.
Further, the clear water gutter is synchronous with inverted arch in Tunnel and roadbed builds, and width 300-500mm is deep 400-500mm is spent, the gradient is consistent with the tunnel line gradient, and edge is higher by road surface 1-3cm in tunnel, to prevent road surface mud etc. Waste water is mixed into clear water ditch;The clear water gutter uses concrete material, and grade is consistent with tunnel basis concrete.
Further, the clear water connecting tube is arranged waste water using materials or composite pipes such as cast iron, steel pipe, PVC plastics The draining of the two lining section circumferential direction blind pipes and longitudinal blind pipe of ditch side leads to opposite side clear water gutter.When not considering to collect this side When clear water, clear water connecting tube can also be cancelled, only collect the blind pipe clear water that unilateral side two serves as a contrast section.
Further, the water board that blocks is process using steel plate, stainless steel plate, plank or plastic plate etc., clear Water gutter front end lays, is fixed, and blocks the seam between water board and gutter using the filling of the materials such as cement mortar or glass cement Gap.
Further, mobile take out rises pumping plant using submersible sewage pump, by the construction waste water in the catch pit of main tunnel counter-slope section It is promoted.
Further, (tower wagon hole is directly put using comprehensive Dong Shichu is proposed in hole for the waste water intermediate pool and booster pump station Stand, transformer pit, switchyard, big refuge chamber etc.), set elevator pump and tank level control system in collecting-tank, to construction waste water into Row relaying is promoted to the waste drain in horizontal hole.
The present invention is a kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway, and manipulation is simple, shunts effect Fruit is good, and management is easy, rich water tunnel strong for mountain area or the biggish tunnel of water yield, application value with higher.After The construction and operating cost of waste water processing station can be reduced substantially compared with Pollen sterility wastewater treatment scale and processing water.
Detailed description of the invention
Fig. 1 is the flat of the shunt method of removing contamination for the construction waste water that the horizontal hole of single-track railway constructs early period and (do not enter main tunnel construction) Face schematic diagram;
Fig. 2 is the plane of the shunt method of removing contamination of the construction waste water of single-track railway main tunnel construction early period (main tunnel is constructed early period) Schematic diagram;
Fig. 3 is the shunt method of removing contamination for the construction waste water that single-track railway main tunnel constructs early period and (enters main tunnel to construct the middle and later periods) Floor map;
Fig. 4 is tunnel under the conditions of two single-track railways are connected using transverse passage-way and carry out construction drainage through the horizontal hole of same place The floor map of interior shunt method of removing contamination;
Fig. 5 is the schematic diagram for blocking water board.
1- waste water catch pit;2- waste drain;3- clear water gutter;4- clear water connecting tube;5- blocks water board;6- is mobile It takes out and rises pump;7- waste water intermediate pool and booster pump station;8- clear water collecting-tank and pumping plant;9- energy-dissipating installation.
Specific embodiment
It is right below with reference to the attached drawing in a kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway of the present invention A specific embodiment of the invention is described in further detail.The following examples are intended to illustrate the invention, but is not limited to this The range of invention.
The invention discloses a kind of shunt methods of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway.Such as the institute of Fig. 1 to 5 Show, the facility that shunt method of removing contamination of the invention is related to includes: waste water catch pit 1, waste drain (temporary drain) 2, clear Water gutter (temporary drain) 3, clear water connecting tube 4 block water board 5, mobile pumping liter pump 6, waste water intermediate pool and relay pump It stands 7, clear water collecting-tank and pumping plant 8 and energy-dissipating installation 9.
When constructing early period (not entering main tunnel) in horizontal hole, is synchronized in tunnel double-lining section two sides and build temporary drain, Waste water of constructing in waste water catch pit 1 is led into side waste drain 2 at face, through gravity flow appear it is outer after, it is heavy to be discharged into waste water Sand pond.Origin or beginning in the clear water gutter 3 of opposite side, which is set, temporarily blocks water board 5, prevents construction waste water from entering, and can receive this side two Serve as a contrast clear water collected by the circumferential blind pipe and longitudinal blind pipe of section;Also waste drain side two can be served as a contrast section circumferential direction blind pipe and longitudinal direction The clear water of the collection of blind pipe accesses clear water gutter 3 by clear water connecting tube 4.Clear water through 3 Artesian Drainage of clear water ditch appear it is outer after just Nearly discharge.As Tunnel Construction Schedule builds waste drain 2 and clear water gutter 3 in time, water board 5 will be blocked in time and will be moved to clearly The origin or beginning of water gutter 4.
Tunnel main tunnel is constructed early period (after horizontal hole construction enters main tunnel), and both ends are synchronous to build temporary drain, and will wherein Enter the former waste effluent flume Heng Dong through 2 drop-over of waste drain along the construction waste water of slope section, water board will be blocked and move to rising for clear water gutter 4 End, and the clear water of circumferential blind pipe and longitudinal blind pipe that this section two serves as a contrast section is accessed into clear water gutter, drop-over enters the clear water in former horizontal hole Gutter.The counter-slope section face of main tunnel sets catch pit 1 and mobile take out of waste water rises pumping plant 6, by the construction waste water of this section through pressure Waste pipe drains into the energy-dissipating installation 9 intersected at mileage, imports the waste drain 2 at horizontal hole, flows out outside hole.
Tunnel main tunnel is constructed the middle and later periods, and the construction waste water and clear water along slope section are drained along waste drain 2 and clear water respectively 3 Artesian Drainage of ditch is appeared outer;It is comprehensive in tunnel when the construction waste water water of counter-slope section is excessive or required primary promotion lift is excessive Waste water intermediate pool and booster pump station 7 are set at cavern, and the waste water of waste water movable lifting pump 6 is promoted to energy-dissipating installation 9 step by step, then It is discharged outside hole.It such as has to, sets clear water collecting-tank and clean water pump station 8 in the other side of counter-slope section, collect one's respective area two and serve as a contrast section The clear water of circumferential blind pipe and longitudinal blind pipe imports former horizontal hole clear water gutter 3 through pressure water pipe after energy-dissipating installation 9.
When two single-track railways are parallel, are connected through transverse passage-way and carry out construction drainage through the horizontal hole of same seat, along slope section Construction waste water and clear water enters the waste drain 2 of the two sides Heng Dong by drop-over respectively and 3 Artesian Drainage of clear water gutter is appeared Outside;The construction waste water of counter-slope section is promoted to energy-dissipating installation 9 through movable lifting pump 6 and waste water intermediate pool and booster pump station 7, drains into In horizontal hole waste drain, and to flow into horizontal hole after clear water collecting-tank and pumping plant are promoted to energy-dissipating installation 9 clear for the clear water of counter-slope section Water gutter, it is rear construct waste water and clear water respectively gravity flow appear it is outer.
It sets and blocks at the gutter where the front end in clear water gutter, waste water intermediate pool and booster pump station, clean water pump station Water board.With the propulsion of construction speed, in clear water gutter front end, setting is blocked water board and is removed and existing blocks water board in time.
It carries out removing contamination in the present invention, in tunnel after shunting, construction waste water should be reached by sewage treatment facility processing outside hole Discharge or reuse, clear water can discharge nearby after mark.
This method using when effectively realize shuntings of removing contamination of constructing tunnel production waste water, reduce the scale of waste water processing station with Construction investment after shunting clear water, can reduce variation water quality and the water fluctuation of sewage, can effectively reduce the place of construction waste water Water and scale are managed, the construction cost of waste water processing station is reduced, is also beneficial to the stable operation of tunnel waste water processing station, at raising Manage effect.
Based on description of the preferred embodiment of the present invention, it should be apparent that the sheet being defined by the appended claims Invention is not limited only to the specific detail that is illustrated in specification above, without departing from present inventive concept or range to this hair Bright many obviously change equally possible reaches the purpose of the present invention.

Claims (10)

1. a kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway, which is characterized in that construct in tunnel difference Stage independently collects face and just the construction waste water of lining section by the synchronous waste water for building two sides and clear water gutter With the clear water of two lining sections, the sub-prime shunting of removing contamination of the clear water of face and just the construction waste water of lining section and two lining sections is realized.
2. the shunt method of removing contamination of constructing tunnel waste water according to claim 1, which is characterized in that the tunnel difference is applied The work stage includes tunnel horizontal hole construction time and tunnel main tunnel construction time;In the tunnel horizontal hole construction early period and the construction of tunnel main tunnel The construction waste water of face and first lining section is led to waste drain through catch pit, while serving as a contrast sections for two by the suitable slope construction section of phase Circumferential blind pipe and the clear water of lining cutting behind of collection of longitudinal blind pipe lead to clear water gutter, and set in clear water gutter origin or beginning Set and block water board, construct waste water and clear water again under gravity gravity flow appear it is outer, alternatively, waste drain side two is served as a contrast Duan Huan To the clear water of the collection of blind pipe and longitudinal blind pipe, clear water gutter is accessed by clear water connecting tube, clear water is through clear water ditch Artesian Drainage Appear it is outer after nearby discharge.
3. the shunt method of removing contamination of constructing tunnel waste water according to claim 1, which is characterized in that the tunnel main tunnel is applied Duration includes early period, mid-term and later period;The tunnel main tunnel construct early period, the face of counter-slope construction section set catch pit and Construction waste water lifting to main tunnel and horizontal hole is intersected the waste drain at mileage by movable lifting pumping plant, and gravity Artesian Drainage goes out Outside hole;It constructs mid-term and later period in the tunnel main tunnel, the water of the construction waste water of counter-slope section is excessive or required promotion lift When excessive, several waste water intermediate pools and booster pump station are set at comprehensive cavern using proposing on the way, waste water movable lifting is pumped Waste water is promoted to energy-dissipating installation step by step, is then exhausted from outside hole;In tunnel main tunnel construction mid-term and later period, in the clear water of counter-slope section When water is excessive, several clear water collecting-tanks and clean water pump station are set at comprehensive cavern using proposing on the way, clear water is promoted to intersection Clear water gutter at mileage.
4. the shunt method of removing contamination of constructing tunnel waste water according to claim 3, which is characterized in that in waste water intermediate pool And it is set at the gutter where booster pump station, clean water pump station and blocks water board.
5. the shunt method of removing contamination of constructing tunnel waste water according to claim 2 or 3, which is characterized in that the waste water collection Puddle be arranged using low-lying place in tunnel naturally or using concrete build catch pit, for collect the construction water burst of face with Waste water of constructing caused by the low-lying place below the trestle of section is served as a contrast at the beginning of construction period.
6. the shunt method of removing contamination of constructing tunnel waste water according to claim 2 or 3, which is characterized in that the waste water row Ditch is synchronous with inverted arch in Tunnel and roadbed to build, width 300-500mm, depth 400-500mm, the gradient and tunnel line slope Degree is consistent;The waste drain uses concrete material, and grade is consistent with tunnel basis concrete.
7. the shunt method of removing contamination of constructing tunnel waste water according to claim 1, which is characterized in that the clear water gutter Build synchronous with inverted arch in Tunnel and roadbed, width 300-500mm, depth 400-500mm, the gradient and the tunnel line gradient one It causes, edge is higher by road surface 1-3cm in tunnel, to prevent the waste water such as road surface mud to be mixed into clear water ditch;The clear water gutter Using concrete material, grade is consistent with tunnel basis concrete.
8. the shunt method of removing contamination of constructing tunnel waste water according to claim 3, which is characterized in that the clear water connecting tube Using the materials such as cast iron, steel pipe, PVC plastic or composite pipe, section circumferential direction blind pipe and longitudinal direction are served as a contrast by the two of waste drain side The draining of blind pipe leads to opposite side clear water gutter;When not considering to collect this side when clear water, cancel clear water connecting tube, only collects single The blind pipe clear water of the lining section of side two.
9. the shunt method of removing contamination of constructing tunnel waste water according to claim 2 or 4, which is characterized in that described to block sluice Plate is process using steel plate, stainless steel plate, plank or plastic plate, laying, fixation in clear water gutter front end, and uses water The gap between water board and gutter is blocked in the filling of the materials such as cement mortar or glass cement.
10. the shunt method of removing contamination of constructing tunnel waste water according to claim 2 or 4, which is characterized in that in the waste water Between pond and booster pump station using comprehensive Dong Shichu is set in hole, elevator pump and tank level control system are set in collecting-tank, it is useless to construction Water carries out the waste drain that relaying is promoted to horizontal hole.
CN201811266942.9A 2018-10-29 2018-10-29 Method for removing dirt and shunting tunnel construction wastewater of single-track railway crosshole Active CN109611148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811266942.9A CN109611148B (en) 2018-10-29 2018-10-29 Method for removing dirt and shunting tunnel construction wastewater of single-track railway crosshole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811266942.9A CN109611148B (en) 2018-10-29 2018-10-29 Method for removing dirt and shunting tunnel construction wastewater of single-track railway crosshole

Publications (2)

Publication Number Publication Date
CN109611148A true CN109611148A (en) 2019-04-12
CN109611148B CN109611148B (en) 2021-02-05

Family

ID=66002435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811266942.9A Active CN109611148B (en) 2018-10-29 2018-10-29 Method for removing dirt and shunting tunnel construction wastewater of single-track railway crosshole

Country Status (1)

Country Link
CN (1) CN109611148B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111396124A (en) * 2020-03-18 2020-07-10 中铁十六局集团第三工程有限公司 High-permeability water tunnel sewage disposal and diversion system and method
WO2021109537A1 (en) * 2019-12-04 2021-06-10 中交第二公路勘察设计研究院有限公司 Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
CN113482714A (en) * 2021-08-17 2021-10-08 中铁隧道局集团有限公司 Long-distance high-permeability tunnel large reverse slope construction sewage disposal and diversion system
CN114109395A (en) * 2021-11-08 2022-03-01 中铁十八局集团有限公司 Tunnel decontamination and diversion construction method and structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619560A (en) * 2012-04-17 2012-08-01 中铁十六局集团有限公司 Drainage and drainage method for long-distance reverse-slope tunnels
CN104829012A (en) * 2015-05-28 2015-08-12 中铁十四局集团第五工程有限公司 Tunnel counter-slope dewatering and purifying device and control method and purifying method thereof
CN106437842A (en) * 2016-12-05 2017-02-22 铁道第三勘察设计院集团有限公司 Auxiliary transfer pump station of drainage tunnel in subway crossing
CN107131001A (en) * 2017-06-28 2017-09-05 中铁第四勘察设计院集团有限公司 A kind of and water delivery and the Railway Tunnel of communication function
CN206636602U (en) * 2017-04-14 2017-11-14 北京市市政工程设计研究总院有限公司 Vault song wall tunnel structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619560A (en) * 2012-04-17 2012-08-01 中铁十六局集团有限公司 Drainage and drainage method for long-distance reverse-slope tunnels
CN104829012A (en) * 2015-05-28 2015-08-12 中铁十四局集团第五工程有限公司 Tunnel counter-slope dewatering and purifying device and control method and purifying method thereof
CN106437842A (en) * 2016-12-05 2017-02-22 铁道第三勘察设计院集团有限公司 Auxiliary transfer pump station of drainage tunnel in subway crossing
CN206636602U (en) * 2017-04-14 2017-11-14 北京市市政工程设计研究总院有限公司 Vault song wall tunnel structure
CN107131001A (en) * 2017-06-28 2017-09-05 中铁第四勘察设计院集团有限公司 A kind of and water delivery and the Railway Tunnel of communication function

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021109537A1 (en) * 2019-12-04 2021-06-10 中交第二公路勘察设计研究院有限公司 Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
US11753937B2 (en) 2019-12-04 2023-09-12 Cccc Second Highway Consultants Co., Ltd. Ultra-long tunnel sewage disposal, separation and drainage structure suitable for cold regions
CN111396124A (en) * 2020-03-18 2020-07-10 中铁十六局集团第三工程有限公司 High-permeability water tunnel sewage disposal and diversion system and method
CN113482714A (en) * 2021-08-17 2021-10-08 中铁隧道局集团有限公司 Long-distance high-permeability tunnel large reverse slope construction sewage disposal and diversion system
CN113482714B (en) * 2021-08-17 2023-07-07 中铁隧道局集团有限公司 Sewage-cleaning and shunting system for large-counter-slope construction of long-distance high-permeability tunnel
CN114109395A (en) * 2021-11-08 2022-03-01 中铁十八局集团有限公司 Tunnel decontamination and diversion construction method and structure

Also Published As

Publication number Publication date
CN109611148B (en) 2021-02-05

Similar Documents

Publication Publication Date Title
CN109611148A (en) A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of single-track railway
CN106968712B (en) Tunnel bottom drainage structure of water-rich stratum and construction method thereof
CN103031837B (en) Well-points dewatering combined stack-load ground preloading deep soft soil foundation method
CN110410143A (en) A kind of reverse-slope tunnel construction drainage system
CN109763859A (en) A kind of shunt method of removing contamination of the constructing tunnel waste water in the horizontal hole of double track railway
CN104174191A (en) Integral grit chamber for treating rainwater and treating method
CN105648873B (en) A kind of cabin storage formula kerbstone
CN206267267U (en) A kind of rainwater-collecting reclaiming system
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN205474681U (en) Formula curb is held in cabin
CN104060620A (en) Karst fissure water control method for deep foundation pit
CN103224298A (en) Construction site sewage precipitation purification treatment and recovery utilization method
CN107354949B (en) Cyclic utilization system for the Metro station excavation water resource close to high slope
CN210737511U (en) Tower type groundwater pressure recharge equipment
CN104294806A (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
CN216240796U (en) Tunnel construction structure of shunting of decontaminating
CN103055579B (en) Sand separating and concentrating-dewatering system for building mortar
CN107237348B (en) The temporary punching and restorative procedure of industrial underground pipe gallery
CN105525646B (en) The method that overhead road surface inlet for stom water collects rainwater installation and Collection utilization rainwater
CN204447424U (en) A kind of architectural engineering groundwater treatment and reclamation set
CN108035369A (en) Build underground water drop row and reuse method
CN210062931U (en) Automatic electromagnetic valve flushing device for rolling concrete transport vehicle
CN209509149U (en) One kind can have enough to meet the need automatic adjustable regularization staircase and cut off the water supply high-altitude spray system
CN107218080B (en) It is profound apart from rich water tunnel underground water multistage filtering excretory system and construction method
CN208748792U (en) Hexagon honeycomb structure rainwater-collecting nature diacolation pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant