CN109610809B CN201811335927.5A CN201811335927A CN109610809B CN 109610809 B CN109610809 B CN 109610809B CN 201811335927 A CN201811335927 A CN 201811335927A CN 109610809 B CN109610809 B CN 109610809B
Authority
CN
China
Prior art keywords
side plate
aluminum
limiting
plate
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811335927.5A
Other languages
Chinese (zh)
Other versions
CN109610809A (en
Inventor
杨泓斌
胡高
梁艺光
郑泽杭
王丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG BOSHENG BUILDING TECHNOLOGY Co.,Ltd.
Original Assignee
Guangdong Bozhilin Robot Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bozhilin Robot Co Ltd filed Critical Guangdong Bozhilin Robot Co Ltd
Priority to CN201811335927.5A priority Critical patent/CN109610809B/en
Publication of CN109610809A publication Critical patent/CN109610809A/en
Application granted granted Critical
Publication of CN109610809B publication Critical patent/CN109610809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/08Forming boards or similar elements, which are collapsible, foldable, or able to be rolled up
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/10Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air

Abstract

The invention discloses an aluminum template device capable of being quickly disassembled and assembled and a construction method thereof. According to the invention, the first half-thread column and the second half-thread column which are arranged outwards can enable a user to easily screw the second hand-screwed screw, so that rapid disassembly and assembly are realized; the second limiting groove and the second limiting block, and the third limiting groove and the third limiting block can realize the pre-positioning of two adjacent aluminum templates, and the first limiting groove and the first limiting block are arranged to position the aluminum templates again, so that the mounting flatness and precision are improved; the air drying of the wall body after pouring can be accelerated through the exposed air outlet dry holes, the construction period is shortened, and the practicability is high.

Description

Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof
Technical Field
The invention relates to the technical field of building templates, in particular to an aluminum template device capable of being quickly disassembled and assembled and a construction method thereof.
Background
The aluminum template is called as an aluminum alloy template system for the building, is a new-generation novel template supporting system which is arranged behind a bamboo template and a steel template, and the aluminum template system is applied to the building industry, so that the overall construction efficiency of the building industry is improved, and the aluminum template system greatly saves a lot of construction materials and manual arrangement.
At present, when the existing aluminum formwork is spliced in construction, the bolt installation position is hidden in the inner cavity of the aluminum formwork, the problem of time and labor consumption exists when the bolt is installed and disassembled, and the natural air drying speed of the existing aluminum formwork after pouring can not be guaranteed, so that the construction period is prolonged. Therefore, the aluminum formwork device capable of being rapidly assembled and disassembled and the construction method thereof are provided.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides an aluminum formwork device capable of being quickly disassembled and assembled and a construction method thereof.
In order to solve the technical problems, the invention provides the following technical scheme:
the invention relates to an aluminum template device capable of being quickly disassembled and assembled, which comprises an aluminum template group, wherein the aluminum template group consists of a plurality of aluminum templates and is characterized in that,
the aluminum template comprises a base and a top plate, wherein the base comprises a bottom plate and a side plate arranged around the bottom plate;
a limit post is fixedly arranged at the corner of the bottom plate, and a first limit sleeve matched with the limit post is arranged at the corner of the top plate; a threaded rod is arranged in the middle of the bottom plate, a second limiting sleeve matched with the threaded rod is arranged in the middle of the top plate, and the threaded rod is connected and fixed with the top plate and the base through matching with a first hand-screwed screw;
the side plates comprise an upper side plate, a right side plate, a lower side plate and a left side plate which are connected end to end respectively; the upper side plate is provided with a second limiting groove, the lower side plate is fixedly provided with a second limiting block, the left side plate is provided with a third limiting groove, and the right side plate is fixedly provided with a third limiting block; the upper side plate, the right side plate, the lower side plate and the left side plate are far away from one end of the bottom plate is respectively provided with a half-thread column, and the two adjacent aluminum templates are fixed through the matching of the adjacent half-thread columns and the second hand-screwed screws.
Further, the half-threaded columns include a first half-threaded column and a second half-threaded column; the upper side plate and the left side plate are provided with second half-thread columns; the lower side plate and the right side plate are provided with first half-thread columns; the first half-thread column is provided with a first limiting block, and the second half-thread column is provided with a first limiting groove matched with the first limiting block.
Furthermore, a reinforcing plate is arranged between the first limiting sleeve and the second limiting sleeve on the top plate.
Furthermore, a plurality of auxiliary holes are respectively formed in the upper side plate, the right side plate, the lower side plate and the left side plate.
Furthermore, a plurality of air drying holes are formed in the bottom plate, and sealing columns matched with the plurality of air drying holes are arranged on the top plate.
The invention provides a construction method of an aluminum formwork device capable of being quickly disassembled and assembled, which comprises the following steps:
s1: mounting;
s2: auxiliary supporting;
s3: accelerating air drying;
s4: and (4) dismantling.
Further, the step S1 includes aligning the second limiting groove and the second limiting block adjacent to each other or aligning the third limiting groove and the third limiting block adjacent to each other when the aluminum formworks are spliced and installed, that is, the first alignment is realized, the first limiting grooves on the two first half-threaded columns in contact or the first limiting grooves on the two second half-threaded columns in contact are aligned with the first limiting blocks, that is, the second alignment is realized, and at this time, the two aluminum formworks can be fixed together by screwing the second hand on the two first half-threaded columns in contact or the two second half-threaded columns in contact, so that the wall body can be formed by splicing the plurality of aluminum formworks in sequence.
Further, the step S2 includes fixing one end of the inclined strut with an iron wire through the set auxiliary hole, and the other end of the inclined strut is supported on the ground, so as to realize the function of supporting the wall body, and to make the structure between the adjacent aluminum formworks more stable, the inclined strut is fixed on the auxiliary hole with a fastening bolt, so as to realize the function of strengthening the structural stability.
Further, the step S3 includes unscrewing the first hand screw and removing the top plate after a period of time of pouring cement, that is, when the cement in the wall body does not automatically fall off, exposing the plurality of air drying holes, so as to accelerate the air drying efficiency of the poured wall body.
Further, the step S4 includes that after the wall body after the pouring is formed, the second hand-screwed screw is unscrewed to realize quick disassembly of the aluminum formworks, and time and labor are saved.
The invention has the beneficial effects that:
1. according to the aluminum template device capable of being quickly disassembled and assembled and the construction method thereof, the top plate and the base are fixedly connected through the matching of the first hand-screwed screw and the threaded rod, and the limiting column on the bottom plate can play a role in positioning the installation between the bottom plate and the top plate. The two adjacent aluminum templates are fixedly connected through the matching of the half-thread column and the second hand-screwed screw, and the second limiting groove, the second limiting block, the third limiting groove and the third limiting block can realize the pre-positioning of the two adjacent aluminum templates, so that the installation flatness and precision are improved.
2. The air drying of the wall body after pouring can be accelerated through the exposed air outlet dry holes, the construction period is shortened, and the practicability is high.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of an assembly structure of a quick-detachable aluminum formwork apparatus according to the present invention;
FIG. 2 is a second schematic view of an assembly structure of a quickly detachable aluminum form device according to the present invention;
FIG. 3 is a schematic structural view of a quickly detachable aluminum shuttering apparatus according to the present invention;
FIG. 4 is a schematic view of a disassembled structure of a quick-detachable aluminum shuttering apparatus according to the present invention;
FIG. 5 is a rear view of the aluminum formwork apparatus of the present invention;
fig. 6 is a schematic front view of an aluminum mold plate of the aluminum mold plate device capable of being quickly disassembled and assembled according to the present invention.
In the figure: 1. an aluminum template; 2. a limiting column; 3. a first stopper; 4. a first half-threaded post; 5. a base plate; 6. an auxiliary hole; 7. a reinforcing plate; 8. a first limit sleeve; 9. a threaded rod; 10. a first hand-screwed screw; 11. a second half-threaded post; 12. a second limit sleeve; 13. a first limit groove; 14. a second limit groove; 15. a third limiting groove; 16. air drying the holes; 17. sealing the column; 18. a second limiting block; 19. a third limiting block; 20. and a second hand-screwed screw.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Example (b): as shown in fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6, the aluminum formwork apparatus capable of being quickly disassembled and assembled and the construction method thereof according to the present invention includes an aluminum formwork group, the aluminum formwork group is composed of a plurality of aluminum formworks 1, the aluminum formwork 1 includes a base and a top plate, the base includes a bottom plate 5 and a side plate surrounding the bottom plate 5;
a limit column 2 is fixedly arranged at the corner of the bottom plate 5, and a first limit sleeve 8 matched with the limit column 2 is arranged at the corner of the top plate; a threaded rod 9 is arranged in the middle of the bottom plate 5, a second limiting sleeve 12 matched with the threaded rod 9 is arranged in the middle of the top plate, and the threaded rod 9 is connected and fixed with the top plate and the base through a first hand-screwed screw 10;
the side plates comprise an upper side plate, a right side plate, a lower side plate and a left side plate which are connected end to end respectively; the upper side plate is provided with a second limiting groove 14, the lower side plate is fixedly provided with a second limiting block 18, the left side plate is provided with a third limiting groove 15, and the right side plate is fixedly provided with a third limiting block 19; the upper side plate, the right side plate, the lower side plate and the left side plate are far away from one end of the bottom plate 5 is respectively provided with a half-thread column, and the two adjacent aluminum templates 1 are fixed through the matching of the adjacent half-thread columns and the second hand-screwed screws 20.
Specifically, a plurality of air drying holes 16 are formed in the bottom plate 5, and sealing columns 17 matched with the air drying holes 16 are arranged on the top plate. Wherein, air-dry hole 16 is regular hexagon hole, and regular hexagon's setting has guaranteed the structural stability who air-dries hole 16.
In particular, the half-threaded columns comprise a first half-threaded column 4 and a second half-threaded column 11; the upper side plate and the left side plate are provided with second half-thread columns 11; the lower side plate and the right side plate are provided with a first half-thread column 4; first half-thread post 4 is equipped with first stopper 3, second half-thread post 11 be equipped with first stopper matching's first spacing groove 13.
Specifically, a reinforcing plate 7 is arranged between the first limiting sleeve 8 and the second limiting sleeve 12 on the top plate. The reinforcing plate 7 can make the structure of the bottom plate 5 more stable, i.e. when pouring, the sealing column 17 on the bottom plate 5 can effectively plug the air drying hole 16, i.e. the back of the aluminum template 1 forms a flat plane.
Specifically, a plurality of auxiliary holes 6 are respectively arranged on the upper side plate, the right side plate, the lower side plate and the left side plate. Because the wall body that a plurality of aluminum mould boards 1 constitute may stability variation, the one end of fixed bracing such as iron wire can be used through the auxiliary hole 6 that sets up this moment, and the other end of bracing props on the ground, can realize supporting wall's effect, if will make between the adjacent aluminum mould board 1 when the structure is more stable simultaneously, can use fastening bolt to fix on auxiliary hole 6, realizes the function of additional strengthening structural stability.
A construction method of an aluminum formwork device capable of being quickly disassembled and assembled comprises the following steps:
s1: mounting;
s2: auxiliary supporting;
s3: accelerating air drying;
s4: and (4) dismantling.
Specifically, the step S1 includes aligning the second limiting groove 14 and the second limiting block 18 adjacent to each other of the two aluminum formworks 1 or aligning the third limiting groove 15 and the third limiting block 19 adjacent to each other of the two aluminum formworks 1 when the aluminum formworks 1 are spliced and installed, that is, the first alignment is realized, the first limiting grooves 13 on the two first half-threaded columns 4 that are in contact with each other or the two second half-threaded columns 11 that are in contact with each other are aligned with the first limiting blocks 3, that is, the second alignment is realized, at this time, the second hand-screwed screws 20 are screwed on the two first half-threaded columns 4 that are in contact with each other or the two second half-threaded columns 11 that are in contact with each other, that is, the two aluminum formworks 1 can be fixed together, and the multiple aluminum formworks 1 can be spliced in sequence to form the wall body.
Specifically, the step S2 includes fixing one end of the inclined strut through the arranged auxiliary hole 6 by using an iron wire, and supporting the other end of the inclined strut on the ground, so as to realize the function of supporting the wall, and fixing the inclined strut on the auxiliary hole 6 by using a fastening bolt for making the structure between the adjacent aluminum formworks 1 more stable, thereby realizing the function of enhancing the structural stability.
Specifically, the step S3 includes unscrewing the first hand screw 10 and removing the top plate after a period of time of pouring cement, that is, when the cement in the wall body does not automatically fall off, the air drying holes 16 are exposed, so that the air drying efficiency of the poured wall body can be accelerated.
Specifically, the step S4 includes that after the wall body after pouring is formed, the second hand-screwed screw 20 is unscrewed to rapidly detach the plurality of aluminum formworks 1, which is time-saving and labor-saving.
During operation, when the aluminum formworks 1 are spliced and installed, firstly, the second limit grooves 14 and the second limit blocks 18 adjacent to the two aluminum formworks 1 are aligned together or the third limit grooves 15 and the third limit blocks 19 adjacent to the two aluminum formworks 1 are aligned together, namely, the first alignment is realized, at the moment, the first limit grooves 13 on the two first half-thread columns 4 which are contacted with each other or the two second half-thread columns 11 which are contacted with each other are aligned with the first limit blocks 3, namely, the second alignment and position correction are realized, at the moment, the two aluminum formworks 1 can be fixed together through the threads of the second hand-screwed screws 20 on the two first half-thread columns 4 which are contacted with each other or the two second half-thread columns 11 which are contacted with each other, and the aluminum formworks 1 can be spliced together rapidly to form a wall body in sequence.
The wall body that comprises a plurality of aluminum mould boards 1 is probably stability variation, and the one end of fixed bracing such as iron wire can be used through the auxiliary hole 6 that sets up this moment, and the other end of bracing props on the ground, can realize supporting wall's effect, if will make between the adjacent aluminum mould board 1 structure more stable simultaneously, can use fastening bolt to fix on auxiliary hole 6, realizes the function of additional strengthening structural stability.
Can make the structure of supporting board 5 more firm through gusset plate 7 that sets up, even get when the pouring, sealing post 17 on the supporting board 5 can effectively plug up air-dry hole 16, cooperate the first hand screw 10 and the spacing post of screwing up, even get the back of aluminium template 1 and form a smooth plane, after the period of pouring cement, when the cement in the wall body can not drop automatically promptly, can twist off first hand screw 10 and take off supporting board 5, expose a plurality of air-dry hole 16 this moment, alright realize accelerating the air-dry efficiency of pouring back wall body, air-dry hole 16 is the regular hexagon setting, the structural stability who air-dries hole 16 has been guaranteed in the setting of regular hexagon.
After the wall body after pouring is formed, the second hand-screwed screw 20 can be unscrewed to rapidly disassemble the aluminum formworks 1, and time and labor are saved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that various changes, modifications and substitutions can be made without departing from the spirit and scope of the invention as defined by the appended claims. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The aluminum template device capable of being quickly disassembled and assembled comprises an aluminum template group, wherein the aluminum template group consists of a plurality of aluminum templates (1), and is characterized in that the aluminum templates (1) comprise a base and a top plate, and the base comprises a bottom plate (5) and side plates arranged on the bottom plate (5) in an enclosing manner; a limit column (2) is fixedly arranged at the corner of the bottom plate (5), and a first limit sleeve (8) matched with the limit column (2) is arranged at the corner of the top plate; a threaded rod (9) is arranged in the middle of the bottom plate (5), a second limiting sleeve (12) matched with the threaded rod (9) is arranged in the middle of the top plate, and the threaded rod (9) is connected and fixed with the top plate and the base through a first hand-screwed screw (10) in a matched mode; the side plates comprise an upper side plate, a right side plate, a lower side plate and a left side plate which are connected end to end respectively; the upper side plate is provided with a second limiting groove (14), the lower side plate is fixedly provided with a second limiting block (18), the left side plate is provided with a third limiting groove (15), and the right side plate is fixedly provided with a third limiting block (19); one ends, far away from the bottom plate (5), of the upper side plate, the right side plate, the lower side plate and the left side plate are respectively provided with a half-thread column, and two adjacent aluminum templates (1) are fixed through the matching of the adjacent half-thread columns and second hand-screwed screws (20); wherein the content of the first and second substances,
the half-thread columns comprise a first half-thread column (4) and a second half-thread column (11); the upper side plate and the left side plate are provided with a second half-thread column (11); the lower side plate and the right side plate are provided with a first half-thread column (4); first half-thread post (4) are equipped with first stopper (3), second half-thread post (11) be equipped with first stopper matching's first spacing groove (13).
2. The aluminum formwork apparatus of claim 1, wherein a reinforcing plate (7) is disposed between the first limiting sleeve (8) and the second limiting sleeve (12) on the top plate.
3. The aluminum formwork apparatus capable of being disassembled and assembled rapidly as claimed in claim 2, wherein the upper side plate, the right side plate, the lower side plate and the left side plate are respectively provided with a plurality of auxiliary holes (6).
4. The aluminum formwork apparatus capable of being disassembled and assembled rapidly as claimed in claim 3, wherein the bottom plate (5) is provided with a plurality of air drying holes (16), and the top plate is provided with a plurality of sealing columns (17) matching with the air drying holes (16).
5. The construction method of the aluminum formwork apparatus capable of being disassembled and assembled quickly as claimed in claim 4, comprising the steps of: s1: mounting; s2: auxiliary supporting; s3: accelerating air drying; s4: and (4) dismantling.
6. The method for constructing an aluminum formwork apparatus capable of being disassembled and assembled quickly as claimed in claim 5, wherein the step S1 includes aligning the adjacent second limiting grooves (14) and second limiting blocks (18) of two aluminum formworks (1) or the adjacent third limiting grooves (15) and third limiting blocks (19) of two aluminum formworks (1) when assembling and assembling the aluminum formworks (1), that is, the first alignment is achieved, and the first limiting grooves (13) on the two first half-threaded columns (4) in contact or the two second half-threaded columns (11) in contact and the first limiting blocks (3) are aligned together, that is, the second alignment is achieved, and the second hand-screwed screw (20) is screwed on the two first half-threaded columns (4) in contact or the two second half-threaded columns (11) in contact, the two aluminum formworks (1) can be fixed together, and the plurality of aluminum formworks (1) can be spliced quickly in sequence to form the wall body.
7. The method of claim 6, wherein the step S2 includes fixing one end of the brace with iron wire through the auxiliary hole (6), and the other end of the brace is supported on the ground to support the wall, so that the adjacent aluminum forms (1) are structurally stable, and the brace is fixed to the auxiliary hole (6) with fastening bolts to reinforce the structural stability.
8. The method of claim 7, wherein the step S3 includes unscrewing the first hand screw (10) and removing the top plate to expose the plurality of air drying holes (16) after a period of time for pouring cement, i.e. the cement in the wall body does not fall off automatically, thereby accelerating the air drying efficiency of the poured wall body.
9. The method for constructing an aluminum formwork apparatus capable of being disassembled and assembled quickly as claimed in claim 8, wherein the step S4 includes unscrewing the second hand screw (20) after the wall body is formed, so as to disassemble the aluminum formworks (1) quickly, thereby saving time and labor.
CN201811335927.5A 2018-11-11 2018-11-11 Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof Active CN109610809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811335927.5A CN109610809B (en) 2018-11-11 2018-11-11 Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811335927.5A CN109610809B (en) 2018-11-11 2018-11-11 Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof

Publications (2)

Publication Number Publication Date
CN109610809A CN109610809A (en) 2019-04-12
CN109610809B true CN109610809B (en) 2021-03-16

Family

ID=66004047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811335927.5A Active CN109610809B (en) 2018-11-11 2018-11-11 Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof

Country Status (1)

Country Link
CN (1) CN109610809B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01102103A (en) * 1987-10-16 1989-04-19 Hayashi Prod Corp Base mold for constituting walking road panel
JPH0238664A (en) * 1988-07-27 1990-02-08 Central Eng:Kk Concrete form panel
CN204456866U (en) * 2015-01-13 2015-07-08 李震 Construction formwork syndeton
CN104790654A (en) * 2015-04-24 2015-07-22 江苏程禾高科模板有限责任公司 Combined type plane building template structure
CN206376529U (en) * 2016-11-29 2017-08-04 深圳市中铝南方铝模科技有限公司 A kind of building template back cord component
CN206441497U (en) * 2016-12-21 2017-08-25 新昌县兰君广告有限公司 A kind of quick-replaceable advertising fixed plate
CN207296382U (en) * 2017-07-11 2018-05-01 新昌县城南乡量创机械厂 A kind of building template
CN207633748U (en) * 2017-11-09 2018-07-20 中建八局第二建设有限公司 A kind of aluminum alloy pattern plate with ventilative duct
CN207905348U (en) * 2018-02-11 2018-09-25 沭阳县亚威木业有限公司 A kind of universal building template of heat preservation dehumidifying

Also Published As

Publication number Publication date
CN109610809A (en) 2019-04-12

Similar Documents

Publication Publication Date Title
WO2019233193A1 (en) Integrally-formed aluminum alloy construction template
WO2013139102A1 (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN109610808B (en) High-rise building aluminum formwork combined structure
CN105544970A (en) Composite floor slab cast-in-place slab fixing device with bottom mold and construction method
CN205330159U (en) Cast -in -place slab band die block fixing device of coincide floor
CN109610809B (en) Aluminum formwork device capable of being rapidly disassembled and assembled and construction method thereof
CN108729667A (en) A kind of building bearing column is with pouring mold
CN206091285U (en) Template is pour to back timber
CN107842195B (en) Beam formwork support reinforcing system
CN210797575U (en) Deep basal pit multilayer supporting steel truss strutting arrangement
CN107415029B (en) PC wallboard mould with window opening module
CN216587710U (en) Modular anti-bank reinforced structure of aluminum alloy template
CN215717125U (en) Based on detachable pre-buried wall spare that links of steel sleeve
CN113719112A (en) Template fastener is used in construction engineering aluminium mould construction
CN207048311U (en) One kind support Quick release
CN210002873U (en) assembling type construction shuttering
CN209066867U (en) Construction riser height and broad-adjustable stair template
CN209368682U (en) A kind of form surfacing structure
CN220747653U (en) Building outer facade line and bay window template supporting device
CN210195220U (en) Building site aluminum mould board
CN109057337A (en) The area prefabricated concrete structure Hou Jiao construction method
CN208830720U (en) Pulling-on piece formula aluminum alloy mould plate
CN206034909U (en) Pin -connected panel concrete group mould
CN100348816C (en) Form and position apparatus for form
CN215859034U (en) Shear wall template mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191125

Address after: 528311 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: 519000 -44144, 105 room 6, Baohua Road, Hengqin New District, Zhuhai, Guangdong (centralized office area)

Applicant before: Building dream high tech Construction Company Limited

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211216

Address after: 528311 a2-26, floor 2, building A3, No. 1, Panpu Road, Biguiyuan community, Beijiao Town, Shunde District, Foshan City, Guangdong Province (for office purposes only, residence declaration)

Patentee after: GUANGDONG BOSHENG BUILDING TECHNOLOGY Co.,Ltd.

Address before: 201-11, second floor, East office, No. 11, Junye East Road, Beijiao Industrial Park, Shunjiang neighborhood committee, Beijiao Town, Shunde District, Foshan City, Guangdong Province