Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811381491.3A
Other languages
Chinese (zh)
Inventor
张雷
满宁宁
孙丽锋
董秀峰
张星
黄子洋
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201811381491.3A priority Critical patent/CN109610496A/en
Publication of CN109610496A publication Critical patent/CN109610496A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of high-rise pile cap cast-in-place bed die construction systems entirely, comprising: several supporting beams several shelve beam, support platform, several formwork supporting plates;Several supporting beam perforation are held on several pile foundation of bearing platform steel pile castings, the beam of shelving vertically is held on supporting beam, the support platform be held on it is several shelve on beam, several formwork supporting plates are completely laid on support platform, are spliced between two neighboring formwork supporting plate plate.The present invention can solve high-rise pile cap full cast-in-situ steel reinforced concrete bed die and the problems such as be not easy to construct.

Description

A kind of high-rise pile cap cast-in-place bed die construction system entirely
Technical field
The invention belongs to engineering construction fields, especially provide a kind of high-rise pile cap cast-in-place bed die construction system entirely.
Background technique
High-rise pile cap is used as forming panel frequently with steel suspended box cofferdam+back cover plate etc., wherein common back cover plate form has Steel bed die, assembled steel reinforced concrete bottom die, full cast-in-situ steel reinforced concrete bed die etc..
Itself Lack of support of steel bed die can not adapt to the functional requirements such as resistance to compression and anti-floating under different operating conditions, often need with Bulk concrete bed die is used cooperatively;Assembled steel reinforced concrete bottom die required precision is high, process and cost of wheeling is big, whole Body is poor;Full cast-in-situ steel reinforced concrete bed die can overcome the above deficiency, but traditional formwork way is unable to satisfy complete cast-in-place bottom The construction requirement of mould.
Summary of the invention
It is complete for solving high-rise pile cap the purpose of the present invention is to provide a kind of high-rise pile cap cast-in-place bed die construction system entirely Cast-in-situ steel reinforced concrete bed die such as is not easy to construct the problems.
The technical scheme is that a kind of high-rise pile cap cast-in-place bed die construction system entirely, comprising: several supporting beams 1, number It is a to shelve beam 2, support platform 3, several formwork supporting plates 4;The perforation of several supporting beams 1 is held on several pile foundation of bearing platform steel pile castings 5 On, the beam 2 of shelving vertically is held on supporting beam 1, the support platform 3 be held on it is several shelve on beam 2, it is described Several formwork supporting plates 4 are completely laid on support platform 3, are spliced between two neighboring 4 plate of formwork supporting plate.
Preferably, sheet iron or aluminium foil are filled with when splicing between 4 plate of two neighboring formwork supporting plate.
Preferably, the supporting beam 1 is the I-steel that specification is 56a.
Preferably, described to shelve beam 2 and support platform 3 is the channel steel that specification is 28b.
Preferably, the formwork supporting plate 4 is the wooden glued board with a thickness of 15mm~18mm.
The present invention has following beneficial effect:
The invention belongs to the construction scope of anhydrous dry operation, construction cost is low, security performance is high, easy to operate and have reliable Theory of mechanics as support, bearing capacity transfer route science, rationally;Meet power conservation requirement, passes through the I-shaped for being 56a to specification Steel and specification are the recycling of the channel steel of 28b, realize the recycling to bed die bracket, meet green, environmental protection, save, can The principle of circulation;Strong flexibility, material specification and formwork way etc. can be adjusted flexibly according to actual needs, conducive to there is snag It is used cooperatively in the project that base cushion cap back cover plate formwork requires with steel suspended box cofferdam.
Detailed description of the invention
Fig. 1 is plan view of the invention;
Fig. 2 is elevation of the invention;
In figure: 1, supporting beam;2, beam is shelved;3, support platform;4, formwork supporting plate;5, pile foundation of bearing platform steel pile casting.
Specific embodiment
The present invention will be described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, 2, a kind of high-rise pile cap cast-in-place bed die construction system entirely, comprising: several supporting beams 1 several are shelved Beam 2, support platform 3, several formwork supporting plates 4;Several perforation of supporting beam 1 are held on several pile foundation of bearing platform steel pile castings 5, shelve beam 2 are vertically held on supporting beam 1, support platform 3 be held on it is several shelve on beam 2, it is flat that several formwork supporting plates 4 are completely laid on support On platform 3, piece needs closed butt joint between two neighboring 4 plate of formwork supporting plate, can increase sheet iron or aluminium foil closing when necessary.
Wherein: supporting beam 1 is the I-steel that specification is 56a, shelves beam 2 and support platform 3 is the channel steel that specification is 28b, Formwork supporting plate 4 is the wooden glued board with a thickness of 15mm~18mm.
Recycled for convenience of by root, supporting beam 1 and pile foundation of bearing platform steel pile casting 5, shelve beam 2 and supporting beam 1, support platform 3 with It shelves and is all made of the mode of shelving between beam 2 and is attached, it must not be using connection types such as welding, peg connections.
Branch mold materials is recyclable in the present invention, but considers that working security and cost recovery, wooden form are refused back It receives, laterally the support between two pile foundation of bearing platform steel pile castings 5 is not removed, will be lateral when installing steel pile casting periphery collar tie beam side form Support short beam and collar tie beam steel side form firm welding between two steel pile castings.
Before formwork construction, the former materials quality such as channel steel used, steel plate need to be checked, it is tight for deforming excessive, damaged or corrosion Weight and the material for being unable to satisfy requirement are forbidden using considering also to need to make at anti-corrosion all material for a long time when being used in turn Reason.
Concreting should be carried out according to the sequence of " first strong support, rear weak support ", the non-overhanging section position of the Construction Support beam that takes the lead in, Construction Support beam overhangs section position again.
After steel lifted trunk is integrally promoted, channel steel panel is successively removed from top to bottom, shelves beam and supporting beam, realizes returning for material It receives and utilizes.
The specification, quantity of branch mold materials used in the present invention can be according to material self-bearing capacities, full cast-in-situ steel reinforced concrete The calculating such as back cover plate self weight and bottom plate projected area are determining, and should be according to flow rate of water flow when construction etc. to 1 site of perforation of supporting beam It takes plug timber wedge, be welded with the strengthening measures such as steel plate;The present invention weighs about 200t, projection for full cast-in-situ steel reinforced concrete back cover plate certainly It is used in the case where area about 136m2, attached drawing illustrated dimension is only for reference;Needed for formwork way under the influence of other composite factors Material specification and quantity etc. not illustrate, factually calculate adjustment on this basis.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art Scholar cans understand the content of the present invention and implement it accordingly, and it is not intended to limit the scope of the present invention.It is all according to the present invention Equivalent change or modification made by Spirit Essence, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of high-rise pile cap cast-in-place bed die construction system entirely characterized by comprising several supporting beams (1) several shelve beam (2), support platform (3), several formwork supporting plates (4);Several supporting beams (1) perforation is held on several pile foundation of bearing platform steel pile castings (5) on, the beam (2) of shelving vertically is held on supporting beam (1), and the support platform (3), which is held on, several shelves beam (2) on, several formwork supporting plates (4) are completely laid on support platform (3), are spliced between two neighboring formwork supporting plate (4) plate.
2. a kind of high-rise pile cap described in accordance with the claim 1 cast-in-place bed die construction system entirely, which is characterized in that described adjacent two Sheet iron or aluminium foil are filled with when splicing between a formwork supporting plate (4) plate.
3. a kind of high-rise pile cap described in accordance with the claim 1 cast-in-place bed die construction system entirely, which is characterized in that the supporting beam (1) it is I-steel that specification is 56a.
4. a kind of high-rise pile cap described in accordance with the claim 1 cast-in-place bed die construction system entirely, which is characterized in that described to shelve beam (2) and support platform (3) is channel steel that specification is 28b.
5. a kind of high-rise pile cap described in accordance with the claim 1 cast-in-place bed die construction system entirely, which is characterized in that the formwork supporting plate It (4) is the wooden glued board with a thickness of 15mm~18mm.
CN201811381491.3A 2018-11-20 2018-11-20 A kind of high-rise pile cap cast-in-place bed die construction system entirely Pending CN109610496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811381491.3A CN109610496A (en) 2018-11-20 2018-11-20 A kind of high-rise pile cap cast-in-place bed die construction system entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811381491.3A CN109610496A (en) 2018-11-20 2018-11-20 A kind of high-rise pile cap cast-in-place bed die construction system entirely

Publications (1)

Publication Number Publication Date
CN109610496A true CN109610496A (en) 2019-04-12

Family

ID=66003916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811381491.3A Pending CN109610496A (en) 2018-11-20 2018-11-20 A kind of high-rise pile cap cast-in-place bed die construction system entirely

Country Status (1)

Country Link
CN (1) CN109610496A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643688A (en) * 2013-12-26 2014-03-19 上海市基础工程集团有限公司 Filled earth-free steel sheet pile cofferdam for construction of high-rise pile cap in shallow water area
CN204875821U (en) * 2015-05-20 2015-12-16 中铁建大桥工程局集团第三工程有限公司 Steel cofferdam structure is used in construction of high pile platform of bridge
CN105951668A (en) * 2016-06-22 2016-09-21 中交第二航务工程局有限公司 Bottom die supporting system of long-piled wharf cast-in-place beam and construction method of bottom die supporting system
CN209211477U (en) * 2018-11-20 2019-08-06 中国建筑第四工程局有限公司 A kind of high-rise pile cap cast-in-place bed die construction system entirely

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643688A (en) * 2013-12-26 2014-03-19 上海市基础工程集团有限公司 Filled earth-free steel sheet pile cofferdam for construction of high-rise pile cap in shallow water area
CN204875821U (en) * 2015-05-20 2015-12-16 中铁建大桥工程局集团第三工程有限公司 Steel cofferdam structure is used in construction of high pile platform of bridge
CN105951668A (en) * 2016-06-22 2016-09-21 中交第二航务工程局有限公司 Bottom die supporting system of long-piled wharf cast-in-place beam and construction method of bottom die supporting system
CN209211477U (en) * 2018-11-20 2019-08-06 中国建筑第四工程局有限公司 A kind of high-rise pile cap cast-in-place bed die construction system entirely

Similar Documents

Publication Publication Date Title
CN207568180U (en) Water stopping thresholds formwork ruggedized construction
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN206873730U (en) A kind of steel bar truss floor structure
CN106284787A (en) Assembled superimposed sheet is installed and localization method
CN206279631U (en) A kind of built-in fitting connected for girder steel and Core Walls Structure
CN100547174C (en) The prefab form and the construction technology thereof of concrete flow passage gradual change fillet segment top board construction
CN209211477U (en) A kind of high-rise pile cap cast-in-place bed die construction system entirely
CN116480133A (en) Supporting system and method for Gaussian curved surface bare concrete construction formwork in sea environment
CN205894668U (en) Superimposed sheet is pour and is used mould
CN206219997U (en) A kind of box crossbeam of bridge is reinforced and mounting structure
CN103952979A (en) Bracket-free construction device and construction method for steel-concrete superposed beam top plate
CN204418000U (en) A kind of Long span steel-concrete composite beam cable-stayed bridge ballast system
CN109610496A (en) A kind of high-rise pile cap cast-in-place bed die construction system entirely
CN212561185U (en) Pier stud tie beam integral casting's construction template
CN109518861A (en) A kind of steel bar truss floor support plate being applied in combination with cast-in-situ wall
CN202809639U (en) Construction elevator girder steel basis
CN209339419U (en) A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
CN205502242U (en) Connecting joint of top plate template and wall body
CN208685617U (en) A kind of foundation underpinning system of old brick foundation building
CN110080111A (en) Cast-in-Situ Box Girders pre-pressing bracket construction method
CN201972152U (en) Large multi-opening steel concrete chute system
CN208586890U (en) A kind of concrete circular arc type formwork structure
CN206859660U (en) A kind of beam column template system of reserved opening
CN206034486U (en) It consolidates to draw formula to one side system for major structure subsides post -cast strip department
CN207392744U (en) Prefabricated concrete structure primary-secondary beam connecting integration support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination