CN109609900A - A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface - Google Patents
A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface Download PDFInfo
- Publication number
- CN109609900A CN109609900A CN201811612631.3A CN201811612631A CN109609900A CN 109609900 A CN109609900 A CN 109609900A CN 201811612631 A CN201811612631 A CN 201811612631A CN 109609900 A CN109609900 A CN 109609900A
- Authority
- CN
- China
- Prior art keywords
- steel piece
- zincizing
- cleaning
- completion
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C10/00—Solid state diffusion of only metal elements or silicon into metallic material surfaces
- C23C10/60—After-treatment
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C10/00—Solid state diffusion of only metal elements or silicon into metallic material surfaces
- C23C10/28—Solid state diffusion of only metal elements or silicon into metallic material surfaces using solids, e.g. powders, pastes
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Cleaning By Liquid Or Steam (AREA)
- Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)
Abstract
The invention discloses a kind of aftertreatment technologies on energy-saving and environment-friendly metal zincizing surface, S1, cool processing: first after the completion of steel piece zincizing processing, stop heating into steel piece Sherardizing furnace, S2, steel piece clean for the first time, second of the cleaning of S3, steel piece, S4, drying and processing, the present invention relates to field of metal surface treatment technology.The energy-saving and environment-friendly metal zincizing surface aftertreatment technology, the treatment effect of aftertreatment technology can be greatly enhanced, and it avoids can waste a large amount of thermal energy and cleaning solution in carrying out cooling and cleaning process to product well, it realizes when the product completed to zincizing processing cools down, the thermal energy of absorption is recycled, reach and secondary cleaning is carried out to zincizing product, and to the purpose that cleaning solution is recycled, it is realized on the basis of guaranteeing to post-process effect to zincizing product well, reaches energy-saving and environment-friendly purpose.
Description
Technical field
The present invention relates to field of metal surface treatment technology, behind specially a kind of energy-saving and environment-friendly metal zincizing surface
Treatment process.
Background technique
What steel piece was related to multiple industries such as electric power, railway, on-highway motor vehicle and military industry equipment must be with accessory, these
The inherent quality that the steel piece used in industry does not require nothing more than product is good, also requires the anticorrosion effect of product good, metal powder
The principle of last zincizing technology is that zincizing agent and steel piece are placed in Sherardizing furnace, is heated to 400 DEG C or so, active zinc atom
It is then permeated from outward appearance to inner essence to steel piece, at the same time, iron atom is spread from inside to outside, this is just on the surface layer of steel piece
Zinc-iron intermetallic compound, i.e. zinc coat are formed, the product after powder zincizing includes first is that corrosion resistance is strong, and burn into corrodes
It is the natural enemy of steel material.It corrodes it is estimated that world's output of steel is lost there are about 1/10th in burn into, in marine atmosphere, dislikes
Under a variety of environment such as bad industrial atmosphere, the corrosion resistance of zinc coat is big in same industry better than heat, electrogalvanizing and stainless steel
In gas, Corrosion of Stainless Steel 600 days, surface was just covered with rust spot, and galvanizing production corrodes more than 1600 days, and surface does not have any rusty stains;
Second is that it is wear-resisting, antifraying property is good, zinc coat surface hardness can reach Hv250-400, and heat, electrogalvanizing article surface are pure
Zinc, coating hardness is only Hv70 or so, therefore zincizing specific heat, electrogalvanizing are wear-resisting and antifraying property is much better.
It needs to carry out the product after the completion of zincizing at perfect rear place after the completion of handling metal surface zincizing at present
Reason, to guarantee the complete zincizing treatment process of zincizing product completion and product is enable to have good mechanical property, however, existing
Some aftertreatment technology treatment effects are poor, and a large amount of thermal energy can be wasted in carrying out cooling and cleaning process to product
And cleaning solution, it can not achieve when the product completed to zincizing processing cools down, the thermal energy of absorption be recycled,
It is unable to reach and secondary cleaning is carried out to zincizing product, and to the purpose that cleaning solution is recycled, can not achieve in guarantee pair
On the basis of zincizing product post-processes effect, reach energy-saving and environment-friendly purpose, thus to the zincizing system of metal zincizing processing enterprise
Part post-processing work brings great inconvenience.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of post-processing works on energy-saving and environment-friendly metal zincizing surface
It is poor to solve existing aftertreatment technology treatment effect, and can waste greatly in carrying out cooling and cleaning process to product for skill
The thermal energy and cleaning solution of amount can not achieve when the product completed to zincizing processing cools down, the thermal energy of absorption carried out
It recycles, is unable to reach and secondary cleaning is carried out to zincizing product, and to the purpose that cleaning solution is recycled, Bu Nengshi
The problem of guaranteeing on the basis of post-processing effect to zincizing product now, reaching energy conservation and environmental protection purpose.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of energy-saving and environment-friendly metal zincizing
The aftertreatment technology on surface, specifically includes the following steps:
S1, cool processing: first after the completion of steel piece zincizing processing, stopping into steel piece Sherardizing furnace
Heating, then by being passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, makes heat-conductive water and steel system
Part is come into full contact with, and the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into it by exhaust valve in heat conducting pipe
The water that his steel piece zincizing pretreatment process position heats, and is not gasified totally can return in water storage apparatus, so i.e.
The Ke Xunhuanliyong processing mode that cools of an achievable heat, until by the steel piece in vacuum zincizing furnace, zincizing
Until agent, filler and auxiliary agent are cooled to 80-90 DEG C together and come out of the stove;
S2, steel piece clean for the first time: first by the steel piece after coming out of the stove and zincizing agent, filler and auxiliary agent point
From, and be put into washing pool and be rinsed;
Second of the cleaning of S3, steel piece: it is clear that the steel piece after the completion of later cleaning S2 for the first time is put into ultrasonic wave
In the service sink of washing machine, the clear water of respective volume is then injected into service sink, is then started supersonic wave cleaning machine and is cleaned 1-
2h cleans supersonic wave cleaning machine sufficiently to the impurity on steel piece surface after Shot Blasting, after the completion of ultrasonic cleaning
Steel piece is taken out from service sink, then opens the tapping valve of cleaning bottom of pond portion, passes through the cleaning solution after the completion of cleaning
After cleaning the filter screen filtration of bottom of pond portion, cleaning solution after drip is net from drain line drains to recycling bin in stored, in case under
Secondary use, staff can clear up the filter residue that cleaning bottom of pond portion filters down later, be can be completed in this way to ejected wash water
Recovery operation, steel piece can be taken out from service sink after the completion of cleaning;
S4, drying and processing: the steel piece after the completion of S3 secondary cleaning is taken out, and is put into the drying box of dryer
40-50min is dried at 113-125 DEG C, the post-processing to steel piece Zinized surface can be completed.
Preferably, the water in the step S1 in heat conducting pipe is connected to extraneous water pumping equipment and water storage apparatus, may make up
One complete hydraulic circuit.
Preferably, the heating of the exhaust pipe in the step S1 and other steel piece zincizing pretreatment process Sherardizing furnaces
Component connection, it is achievable that pre-add heat treatment is carried out to steel piece in Sherardizing furnace by high-temperature vapor.
Preferably, washing pool used in the step S2 includes pond one and pond two, and the steel piece after coming out of the stove is put into
It is rinsed in pond one, the liquid after flushing is pumped into pond two and is precipitated, and then takes out the clear water in upper half area in pond two
Enter and steel piece is rinsed in pond one.
Preferably, cleaning solution is neutral organic cleaning fluid in the step S3, and be added in neutral organic cleaning fluid have it is non-
Ionic surfactant, the nonionic surface active agent are ethers, esters, the group of amides and polyethers organic solvent
It closes.
Preferably, supersonic wave cleaning machine is high-frequency ultrasonic cleaning machine in the step S3, and frequency is 20-50KHz.
(3) beneficial effect
The present invention provides a kind of aftertreatment technologies on energy-saving and environment-friendly metal zincizing surface.Have compared with prior art
It is standby following the utility model has the advantages that the energy-saving and environment-friendly metal zincizing surface aftertreatment technology, by specifically includes the following steps: S1,
Cool processing: first after the completion of steel piece zincizing processing, stopping heating into steel piece Sherardizing furnace, then lead to
It crosses and is passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, carry out heat-conductive water and steel piece abundant
Contact, the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into other steel pieces by exhaust valve in heat conducting pipe
The water that zincizing pretreatment process position is heated, and is not gasified totally can return in water storage apparatus, S2, steel piece first
Secondary cleaning: the steel piece after coming out of the stove is separated with zincizing agent, filler and auxiliary agent first, and is put into washing pool and is rushed
It washes, second of the cleaning of S3, steel piece: the steel piece after the completion of later cleaning S2 for the first time is put into supersonic wave cleaning machine
Service sink in, then into service sink inject respective volume clear water, then start supersonic wave cleaning machine clean 1-2h, make
Supersonic wave cleaning machine sufficiently cleans the impurity on steel piece surface after Shot Blasting, by steel after the completion of ultrasonic cleaning
Iron piece takes out from service sink, then opens the tapping valve of cleaning bottom of pond portion, makes the cleaning solution after the completion of cleaning through over cleaning
S4, drying and processing: the filter screen filtration of bottom of pond portion the steel piece after the completion of S3 secondary cleaning is taken out, and is put into drying
40-50min is dried at 113-125 DEG C in the drying box of machine, can be completed to after steel piece Zinized surface
Processing can greatly enhance the treatment effect of aftertreatment technology, and avoid carrying out cooling and cleaning process to product well
In can waste a large amount of thermal energy and cleaning solution, realize when the product completed to zincizing processing cools down, by absorption
Thermal energy is recycled, and has been reached and has been carried out secondary cleaning to zincizing product, and to the purpose that cleaning solution is recycled,
It is realized on the basis of guaranteeing to post-process effect to zincizing product well, reaches energy-saving and environment-friendly purpose, thus big generous
Metal zincizing processing enterprise zincizing product post-process work.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched
It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention
In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of three kinds of technical solutions: aftertreatment technology on energy-saving and environment-friendly metal zincizing surface,
Specifically include following embodiment:
Embodiment 1
S1, cool processing: first after the completion of steel piece zincizing processing, stopping into steel piece Sherardizing furnace
Heating, then by being passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, makes heat-conductive water and steel system
Part is come into full contact with, and the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into it by exhaust valve in heat conducting pipe
The water that his steel piece zincizing pretreatment process position heats, and is not gasified totally can return in water storage apparatus, heat conducting pipe
Interior water is connected to extraneous water pumping equipment and water storage apparatus, may make up a complete hydraulic circuit, exhaust pipe and its
The heating component of his steel piece zincizing pretreatment process Sherardizing furnace is connected to, it is achievable by high-temperature vapor in Sherardizing furnace
Steel piece carries out pre-add heat treatment, and the Ke Xunhuanliyong processing mode that cools of a heat can be completed in this way, until
Until steel piece, zincizing agent, filler and auxiliary agent in vacuum zincizing furnace is cooled to 85 DEG C together and come out of the stove;
S2, steel piece clean for the first time: first by the steel piece after coming out of the stove and zincizing agent, filler and auxiliary agent point
From, and be put into washing pool and be rinsed, washing pool includes pond one and pond two, the steel piece after coming out of the stove be put into pond one into
Row rinses, and the liquid after flushing is pumped into pond two and is precipitated, and then the clear water in upper half area in pond two is pumped into pond one
Steel piece is rinsed;
Second of the cleaning of S3, steel piece: it is clear that the steel piece after the completion of later cleaning S2 for the first time is put into ultrasonic wave
In the service sink of washing machine, the clear water of respective volume is then injected into service sink, then starts supersonic wave cleaning machine cleaning
1.5h cleans supersonic wave cleaning machine sufficiently to the impurity on steel piece surface after Shot Blasting, and ultrasonic cleaning is completed
Steel piece is taken out from service sink afterwards, then opens the tapping valve of cleaning bottom of pond portion, makes the cleaning solution warp after the completion of cleaning
After the filter screen filtration of over cleaning bottom of pond portion, cleaning solution after drip is net from drain line drains to recycling bin in stored, in case
Next time uses, and staff can clear up the filter residue that cleaning bottom of pond portion filters down later, is can be completed in this way to cleaning
The recovery operation of water can take out steel piece after the completion of cleaning from service sink, and cleaning solution is neutral organic cleaning fluid, and
Being added in neutral organic cleaning fluid has a nonionic surface active agent, the nonionic surface active agent be ethers, esters,
The combination of amides and polyethers organic solvent, supersonic wave cleaning machine is high-frequency ultrasonic cleaning machine, and frequency is 40KHz;
S4, drying and processing: the steel piece after the completion of S3 secondary cleaning is taken out, and is put into the drying box of dryer
45min is dried at 120 DEG C, the post-processing to steel piece Zinized surface can be completed.
Embodiment 2
S1, cool processing: first after the completion of steel piece zincizing processing, stopping into steel piece Sherardizing furnace
Heating, then by being passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, makes heat-conductive water and steel system
Part is come into full contact with, and the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into it by exhaust valve in heat conducting pipe
The water that his steel piece zincizing pretreatment process position heats, and is not gasified totally can return in water storage apparatus, heat conducting pipe
Interior water is connected to extraneous water pumping equipment and water storage apparatus, may make up a complete hydraulic circuit, exhaust pipe and its
The heating component of his steel piece zincizing pretreatment process Sherardizing furnace is connected to, it is achievable by high-temperature vapor in Sherardizing furnace
Steel piece carries out pre-add heat treatment, and the Ke Xunhuanliyong processing mode that cools of a heat can be completed in this way, until
Until steel piece, zincizing agent, filler and auxiliary agent in vacuum zincizing furnace is cooled to 80 DEG C together and come out of the stove;
S2, steel piece clean for the first time: first by the steel piece after coming out of the stove and zincizing agent, filler and auxiliary agent point
From, and be put into washing pool and be rinsed, washing pool includes pond one and pond two, the steel piece after coming out of the stove be put into pond one into
Row rinses, and the liquid after flushing is pumped into pond two and is precipitated, and then the clear water in upper half area in pond two is pumped into pond one
Steel piece is rinsed;
Second of the cleaning of S3, steel piece: it is clear that the steel piece after the completion of later cleaning S2 for the first time is put into ultrasonic wave
In the service sink of washing machine, the clear water of respective volume is then injected into service sink, is then started supersonic wave cleaning machine and is cleaned 1h,
Clean supersonic wave cleaning machine sufficiently to the impurity on steel piece surface after Shot Blasting, it will after the completion of ultrasonic cleaning
Steel piece takes out from service sink, then opens the tapping valve of cleaning bottom of pond portion, passes through the cleaning solution after the completion of cleaning clearly
After the filter screen filtration of wash pool bottom, cleaning solution after drip is net from drain line drains to recycling bin in stored, in case next time
It uses, staff can clear up the filter residue that cleaning bottom of pond portion filters down later, be can be completed in this way to ejected wash water
Recovery operation can take out steel piece after the completion of cleaning from service sink, and cleaning solution is neutral organic cleaning fluid, and neutral
Being added in organic cleaning fluid has nonionic surface active agent, and the nonionic surface active agent is ethers, esters, amide
The combination of class and polyethers organic solvent, supersonic wave cleaning machine is high-frequency ultrasonic cleaning machine, and frequency is 20KHz;
S4, drying and processing: the steel piece after the completion of S3 secondary cleaning is taken out, and is put into the drying box of dryer
40min is dried at 113 DEG C, the post-processing to steel piece Zinized surface can be completed.
Embodiment 3
S1, cool processing: first after the completion of steel piece zincizing processing, stopping into steel piece Sherardizing furnace
Heating, then by being passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, makes heat-conductive water and steel system
Part is come into full contact with, and the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into it by exhaust valve in heat conducting pipe
The water that his steel piece zincizing pretreatment process position heats, and is not gasified totally can return in water storage apparatus, heat conducting pipe
Interior water is connected to extraneous water pumping equipment and water storage apparatus, may make up a complete hydraulic circuit, exhaust pipe and its
The heating component of his steel piece zincizing pretreatment process Sherardizing furnace is connected to, it is achievable by high-temperature vapor in Sherardizing furnace
Steel piece carries out pre-add heat treatment, and the Ke Xunhuanliyong processing mode that cools of a heat can be completed in this way, until
Until steel piece, zincizing agent, filler and auxiliary agent in vacuum zincizing furnace is cooled to 90 DEG C together and come out of the stove;
S2, steel piece clean for the first time: first by the steel piece after coming out of the stove and zincizing agent, filler and auxiliary agent point
From, and be put into washing pool and be rinsed, washing pool includes pond one and pond two, the steel piece after coming out of the stove be put into pond one into
Row rinses, and the liquid after flushing is pumped into pond two and is precipitated, and then the clear water in upper half area in pond two is pumped into pond one
Steel piece is rinsed;
Second of the cleaning of S3, steel piece: it is clear that the steel piece after the completion of later cleaning S2 for the first time is put into ultrasonic wave
In the service sink of washing machine, the clear water of respective volume is then injected into service sink, is then started supersonic wave cleaning machine and is cleaned 2h,
Clean supersonic wave cleaning machine sufficiently to the impurity on steel piece surface after Shot Blasting, it will after the completion of ultrasonic cleaning
Steel piece takes out from service sink, then opens the tapping valve of cleaning bottom of pond portion, passes through the cleaning solution after the completion of cleaning clearly
After the filter screen filtration of wash pool bottom, cleaning solution after drip is net from drain line drains to recycling bin in stored, in case next time
It uses, staff can clear up the filter residue that cleaning bottom of pond portion filters down later, be can be completed in this way to ejected wash water
Recovery operation can take out steel piece after the completion of cleaning from service sink, and cleaning solution is neutral organic cleaning fluid, and neutral
Being added in organic cleaning fluid has nonionic surface active agent, and the nonionic surface active agent is ethers, esters, amide
The combination of class and polyethers organic solvent, supersonic wave cleaning machine is high-frequency ultrasonic cleaning machine, and frequency is 50KHz;
S4, drying and processing: the steel piece after the completion of S3 secondary cleaning is taken out, and is put into the drying box of dryer
50min is dried at 125 DEG C, the post-processing to steel piece Zinized surface can be completed.
Experimental comparison
Steel piece after the completion of 1-3 zincizing of embodiment of the present invention processing is post-processed respectively, later to being seeped
Steel piece carries out salt spray test after zinc, and salt spray test is to examine an important indicator of zincizing effect, and salt spray test result is such as
Under:
Salt spray test shows that 1 first time of the embodiment of the present invention time of rust spot occurs the latest, therefore the preceding place of embodiment 1
Science and engineering skill is best.
It therefore, can be significantly in conclusion a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface of the invention
Enhance the treatment effect of aftertreatment technology, and good avoid can waste greatly in carrying out cooling and cleaning process to product
The thermal energy and cleaning solution of amount realize when the product completed to zincizing processing cools down, the thermal energy of absorption are returned
It receives and utilizes, reached and secondary cleaning is carried out to zincizing product, and to the purpose that cleaning solution is recycled, realize well
On the basis of guaranteeing to post-process effect to zincizing product, reach energy-saving and environment-friendly purpose, to greatly facilitate metal infiltration
The zincizing product that zinc handles enterprise post-processes work.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, without necessarily requiring or implying between these entities or operation
There are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface, it is characterised in that: specifically includes the following steps:
S1, cool processing: first after the completion of steel piece zincizing processing, stops heating into steel piece Sherardizing furnace,
Then by being passed through heat-conductive water in furnace inner wall in advance mounted spiral shape thermal conductive pipe, carry out heat-conductive water and steel piece
It comes into full contact with, the water after the completion of absorbing heat can be gasificated into high-temperature vapor and be discharged into other steel systems by exhaust valve in heat conducting pipe
The water that part zincizing pretreatment process position is heated, and is not gasified totally can return in water storage apparatus, and one can be completed in this way
The Ke Xunhuanliyong processing mode that cools of a heat, until by steel piece, zincizing agent, the filler in vacuum zincizing furnace
Until being cooled to 80-90 DEG C together with auxiliary agent and come out of the stove;
S2, steel piece clean for the first time: the steel piece after coming out of the stove separated with zincizing agent, filler and auxiliary agent first, and
It is put into washing pool and is rinsed;
Second of the cleaning of S3, steel piece: the steel piece after the completion of later cleaning S2 for the first time is put into supersonic wave cleaning machine
Service sink in, then into service sink inject respective volume clear water, then start supersonic wave cleaning machine clean 1-2h, make to surpass
Sound wave cleaning machine sufficiently cleans the impurity on steel piece surface after Shot Blasting, by steel system after the completion of ultrasonic cleaning
Part takes out from service sink, then opens the tapping valve of cleaning bottom of pond portion, and the cleaning solution after the completion of cleaning is made to pass through service sink bottom
After the filter screen filtration in portion, cleaning solution after drip is net from drain line drains to recycling bin in stored, in case next time uses, it
Staff can clear up the filter residue that cleaning bottom of pond portion filters down afterwards, and the recycling work to ejected wash water can be completed in this way
Make, steel piece can be taken out from service sink after the completion of cleaning;
S4, drying and processing: the steel piece after the completion of S3 secondary cleaning is taken out, and is put into the drying box of dryer in 113-
40-50min is dried at 125 DEG C, the post-processing to steel piece Zinized surface can be completed.
2. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface according to claim 1, it is characterised in that: institute
It states the water in step S1 in heat conducting pipe to be connected to extraneous water pumping equipment and water storage apparatus, may make up a complete hydraulic circulation
Circuit.
3. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface according to claim 1, it is characterised in that: institute
The exhaust pipe stated in step S1 is connected to the heating component of other steel piece zincizing pretreatment process Sherardizing furnaces, achievable to pass through
High-temperature vapor carries out pre-add heat treatment to steel piece in Sherardizing furnace.
4. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface according to claim 1, it is characterised in that: institute
Stating washing pool used in step S2 includes pond one and pond two, and the steel piece after coming out of the stove is put into pond one and is rinsed, punching
Liquid after washing, which is pumped into pond two, to be precipitated, and then the clear water in upper half area in pond two is pumped into pond one to steel piece
It is rinsed.
5. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface according to claim 1, it is characterised in that: institute
Stating cleaning solution in step S3 is neutral organic cleaning fluid, and addition has nonionic surface active agent in neutral organic cleaning fluid,
The nonionic surface active agent is the combination of ethers, esters, amides and polyethers organic solvent.
6. a kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface according to claim 1, it is characterised in that: institute
Stating supersonic wave cleaning machine in step S3 is high-frequency ultrasonic cleaning machine, and frequency is 20-50KHz.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811612631.3A CN109609900A (en) | 2018-12-27 | 2018-12-27 | A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811612631.3A CN109609900A (en) | 2018-12-27 | 2018-12-27 | A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109609900A true CN109609900A (en) | 2019-04-12 |
Family
ID=66012190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811612631.3A Pending CN109609900A (en) | 2018-12-27 | 2018-12-27 | A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109609900A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102528193A (en) * | 2011-12-30 | 2012-07-04 | 刘字冬 | Copper and stainless steel brazing process |
CN107502852A (en) * | 2017-08-18 | 2017-12-22 | 无锡市奕珺金属改性技术有限公司 | Component surface processing equipment and component surface handling process |
CN108914168A (en) * | 2018-08-01 | 2018-11-30 | 苏州嘉迈德电子科技有限公司 | A kind of sheet metal surface treatment process |
-
2018
- 2018-12-27 CN CN201811612631.3A patent/CN109609900A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102528193A (en) * | 2011-12-30 | 2012-07-04 | 刘字冬 | Copper and stainless steel brazing process |
CN107502852A (en) * | 2017-08-18 | 2017-12-22 | 无锡市奕珺金属改性技术有限公司 | Component surface processing equipment and component surface handling process |
CN108914168A (en) * | 2018-08-01 | 2018-11-30 | 苏州嘉迈德电子科技有限公司 | A kind of sheet metal surface treatment process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106283075A (en) | Water-solube and biodegradable abluent and Cleaning application method | |
CN106076930B (en) | A kind of hydrocarbon cleaning drying equipment | |
CN103143533A (en) | Cleaning and blockage relieving technology of gathering and transportation system for oil and natural gas field highly containing sulfuric acid | |
WO2021103509A1 (en) | Workpiece cleaning apparatus and cleaning method | |
CN104047008A (en) | Copper cleaning process | |
CN109881133A (en) | A kind of electric power tower component hot dip galvanizing process | |
CN106086907A (en) | A kind of Pretreatment Technology Before Finishing of band pickling process | |
CN105779921A (en) | Zinc plating technology achieving vibrating dezincification | |
CN113617741A (en) | Efficient cleaning method for automobile shock absorber parts | |
CN102304711A (en) | Environmentally friendly chromium-free passivation solution for aluminum and aluminum alloy surface and application thereof | |
CN109261915A (en) | A kind of Copper-Aluminum compound band production technology | |
CN208758215U (en) | Full-automatic hydrocarbon vacuum ring protects cleaning machine | |
CN109609900A (en) | A kind of aftertreatment technology on energy-saving and environment-friendly metal zincizing surface | |
CN106312491B (en) | A kind of steel descaling method efficiently, environmentally friendly | |
CN111118517A (en) | Clamp paint removing system and method | |
CN212883842U (en) | Workpiece cleaning device with multiple integrated pollution layers | |
CN216574452U (en) | Part cleaning device for metal heat treatment processing | |
CN1544701A (en) | Steel pipe acid pickling process | |
CN102071430B (en) | Preparation method of novel hot galvanizing pretreatment solution | |
CN207362350U (en) | A kind of protective atmosphere ionic liquid treatment before plating equipment | |
CN212285111U (en) | Article washs and air-dries device before coating 823 protective agent | |
CN110102545B (en) | Protection method for compressor cooling system | |
CN109701852A (en) | A kind of surface defect treatment process for water pump vane | |
CN107794351B (en) | A kind of middle low temperature oil bath tempering equipment | |
CN100338260C (en) | Composite nickel plating method for aluminum alloy heating piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |
|
RJ01 | Rejection of invention patent application after publication |