CN109591128B - Bamboo tube preparation device - Google Patents

Bamboo tube preparation device Download PDF

Info

Publication number
CN109591128B
CN109591128B CN201811396630.XA CN201811396630A CN109591128B CN 109591128 B CN109591128 B CN 109591128B CN 201811396630 A CN201811396630 A CN 201811396630A CN 109591128 B CN109591128 B CN 109591128B
Authority
CN
China
Prior art keywords
bamboo
bamboo tube
wall
positioning cylinder
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811396630.XA
Other languages
Chinese (zh)
Other versions
CN109591128A (en
Inventor
刘达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Green Time Innovation Technology Co ltd
Original Assignee
Wuhan Green Time Innovation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Green Time Innovation Technology Co ltd filed Critical Wuhan Green Time Innovation Technology Co ltd
Priority to CN201811396630.XA priority Critical patent/CN109591128B/en
Publication of CN109591128A publication Critical patent/CN109591128A/en
Application granted granted Critical
Publication of CN109591128B publication Critical patent/CN109591128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27JMECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
    • B27J1/00Mechanical working of cane or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B19/00Single-purpose machines or devices for particular grinding operations not covered by any other main group
    • B24B19/22Single-purpose machines or devices for particular grinding operations not covered by any other main group characterised by a special design with respect to properties of the material of non-metallic articles to be ground
    • B24B19/24Single-purpose machines or devices for particular grinding operations not covered by any other main group characterised by a special design with respect to properties of the material of non-metallic articles to be ground of wood, e.g. furniture
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B41/00Component parts such as frames, beds, carriages, headstocks
    • B24B41/06Work supports, e.g. adjustable steadies

Abstract

The invention discloses a bamboo tube preparation device, which relates to the technical field of bamboo tube processing and comprises a machine table, a clamping device and a bamboo communicating device; the clamping device comprises a positioning cylinder, the inner wall of the positioning cylinder is hinged with a plurality of power rods, one end of each power rod, facing the axis of the positioning cylinder, is hinged with a pressing plate, one end, far away from the pressing plate, of each power rod penetrates through the outer wall of the positioning cylinder, and the outer wall of the positioning cylinder is provided with a linkage assembly; the bamboo passing device comprises a sliding seat arranged in the machine table in a sliding mode, a rotating shaft is arranged at one end of the sliding seat in a rotating mode, a cutter is fixed on the peripheral wall of the rotating shaft, a driving motor is fixed in the sliding seat, and a driving cylinder is fixed in the machine table. The bamboo tube cutter can realize quick positioning and accurate opening of a bamboo tube, not only can open a bamboo partition through the cutter, but also can polish the inner wall of the bamboo tube, the cutter which advances spirally can process the inner wall of the bamboo tube at one time, the damage to the structure of the bamboo tube is small, the processing quality of the bamboo tube is ensured, the automatic processing and one-time forming of the bamboo tube are realized, and the processing efficiency of the bamboo tube is improved.

Description

Bamboo tube preparation device
Technical Field
The invention relates to the technical field of bamboo tube processing, in particular to a bamboo tube preparation device.
Background
At present, a plurality of bamboo salt products exist in the market, the bamboo salt is rich in mineral substances and has wide application fields, but the production process is relatively complicated, and the production steps can be roughly divided into: 1. filling salt into a bamboo tube; 2. the bamboo tube is arranged in the kiln; 3. baking the bamboo tube by burning pine; 4. repeating the steps for 6-10 times; 5. and finally taking out the formed bamboo salt. Because the production of bamboo salt requires the use of a large amount of nandina, large-scale bamboo tube production is required.
Because south bamboo is multisection structure itself, all there is the bamboo distance between each festival, and the head and the tail end diameter of south bamboo is different, this leads to hardly having the efficient mode to concentrate the bamboo distance in the bamboo tube after the processing cuts off, prior art scheme all uses the bamboo distance in the bamboo tube that the jump bit breaks with the jump bit for the manual work to be the owner, prior art scheme has following defect, the impact causes the bamboo tube to receive structural damage easily, in addition, it is also not complete to break through the bamboo distance, there is the corner of leaving over to exist inside the bamboo tube, use when finally influencing follow-up bamboo tube filling bamboo salt.
Disclosure of Invention
The invention aims to provide a bamboo tube manufacturing device for quickly opening bamboo claps.
The invention is realized by the following technical scheme:
a bamboo tube preparation device comprises a machine table, wherein a plurality of groups of clamping devices for fixing the positions of bamboo tubes and bamboo penetrating devices which are arranged corresponding to the clamping devices and are used for penetrating the bamboo tubes with different diameters are arranged on the machine table in parallel;
the clamping device comprises a positioning cylinder fixed at the top end of the machine table, the inner wall of the positioning cylinder is hinged with a plurality of power rods, one end, facing the axis of the positioning cylinder, of each power rod is hinged with a pressing plate, one end, far away from the pressing plate, of each power rod penetrates through the outer wall of the positioning cylinder, and the outer wall of the positioning cylinder is provided with a linkage assembly for driving the power rods to synchronously rotate;
lead to the bamboo device including sliding and arranging in slide in the board, the rotatory one end that is provided with of slide extends to the inside pivot of a location section of thick bamboo, the perisporium of pivot is fixed with the heliciform and is used for getting through the cutter that the bamboo separates, the slide internal fixation have with the driving motor that the pivot transmission is connected, the board internal fixation has and is used for the drive the slide slides drive actuating cylinder.
Through adopting above-mentioned technical scheme, wait to process the thick bamboo tube and place get into with the location section of thick bamboo that corresponds in, the central point that a plurality of power poles rotate the in-process in step is fixed in the thick bamboo tube through the clamp plate puts in the location section of thick bamboo, drives actuating cylinder and driving motor and starts the back, and the slide promotes rotatory cutter and puts through the bamboo partition. The bamboo tube processing machine can realize quick positioning and accurate opening of a bamboo tube, can open the bamboo partition through the cutter and can also polish the inner wall of the bamboo tube, the cutter which advances spirally can process the inner wall of the bamboo tube in one step, the damage to the structure of the bamboo tube is small, and the processing quality of the bamboo tube is ensured.
Further setting the following steps: the linkage subassembly is located including the cover that slides the power ring of a location section of thick bamboo outer wall, the power pole in the outside one end of a location section of thick bamboo has seted up the spout along its length direction, the power ring outer wall be fixed with slide set up in the locating pin of spout, the board outer wall is fixed with a plurality of power cylinders that are used for the drive the power ring slides.
By adopting the technical scheme, after the power cylinder is started, the power cylinder pushes the power ring to slide along the outer wall of the positioning cylinder, and the positioning pin at the end part of the power ring slides in the sliding groove of the power rod, so that all the power rods finally rotate synchronously, and the bamboo tube is firmly pressed at the central position of the positioning cylinder.
Further setting the following steps: a discharging device used for pushing out the bamboo tubes is further arranged on the machine table corresponding to the bamboo penetrating device;
the blanking device comprises a plurality of guide rods arranged in the positioning cylinder and fixed to the machine table, the guide rods and the pressing plates are arranged in a staggered mode and are multiple, the guide rods are simultaneously sleeved with pushing rings, and a plurality of thrust cylinders used for pushing the pushing rings to slide are fixed to the machine table in an internal mode.
Through adopting above-mentioned technical scheme, when the thick bamboo tube sent into a location section of thick bamboo, it can settle on the guide bar, and the clamp of the later stage clamp plate of being convenient for is tight, and after thick bamboo tube processing was accomplished, thrust cylinder promoted to push away and expects that the ring slided along the guide bar, and the ejector pin is released the thick bamboo tube from a location section of thick bamboo, realizes automatic discharge.
Further setting the following steps: the material pushing ring is provided with a through hole matched with the guide rod in a sliding manner.
Through adopting above-mentioned technical scheme, the guide bar is worn out from pushing away the through-hole of material ring, and the guarantee pushes away the stability of sliding of material ring.
Further setting the following steps: an elastic assembly used for keeping the pressing plate stable is arranged between the pressing plate and the power rod;
the elastic component comprises an inner rod and an outer barrel, the inner rod is connected with the outer wall of the pressing plate in a hinged mode, the outer wall of the power rod is connected with the outer wall of the outer barrel in a hinged mode, the inner rod is arranged in the outer barrel in a sliding mode, and a spring is sleeved inside the outer barrel.
Through adopting above-mentioned technical scheme, when the clamp plate did not compress tightly the thick bamboo tube, make through elastic component and keep being parallel to each other between a plurality of clamp plates, ensure the unobstructed of business turn over location section of thick bamboo tube.
Further setting the following steps: and a non-slip mat is fixed on one side of the pressure plate, which faces the axis of the positioning cylinder.
Through adopting above-mentioned technical scheme, the clamp plate passes through slipmat and thick bamboo tube direct contact, plays anti-skidding effect on the one hand, and on the other hand reduces the damage to the thick bamboo tube outer wall.
Further setting the following steps: the positioning barrel is characterized in that a discharge opening is formed in one end, away from the sliding seat, of the positioning barrel, a fan is fixed in the machine table, a hose is communicated between the fan and the discharge opening, and a plurality of air inlets are formed in one end, away from the discharge opening, of the positioning barrel.
Through adopting above-mentioned technical scheme, the in-process of getting through the thick bamboo tube, the fan starts and inhales the hose with the sweeps that produces in the course of working.
Further setting the following steps: the fan with be provided with the collecting box between the hose, the collecting box can dismantle set up in the board, be fixed with the filter screen in the collecting box.
Through adopting above-mentioned technical scheme, the waste material that produces after the thick bamboo tube processing all deposits in the collecting box and cross the filter screen isolation after the filter screen filters, and collecting box and pouring out are dismantled down to the waste material after accumulating to a certain extent.
In conclusion, the beneficial technical effects of the invention are as follows:
(1) the bamboo tube is pre-positioned through the guide rod, and the bamboo tube is accurately positioned through the pressure rod, so that the processing position of the cutter is ensured to be over against the positioning position of the bamboo tube, the cutter can not only get through the bamboo partition, but also can polish the inner wall of the bamboo tube, and the cutter which is spirally advanced can be used for processing the inner wall of the bamboo tube in one-step forming and has small damage to the structure of the bamboo tube;
(2) the bamboo tube can realize automatic clamping, conduction and blanking, has high automation degree, reduces the difficulty of manual operation, improves the processing efficiency of the bamboo tube, and is convenient for the later-stage filling of bamboo salt;
(3) the scraps produced in the bamboo tube processing process can be quickly recovered, the pollution of the scraps to the environment is reduced, and the bamboo tube processing process is cleaner and more environment-friendly.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1;
FIG. 3 is an enlarged view of a portion B of FIG. 2;
fig. 4 is a partially enlarged view of portion C of fig. 2.
Reference numerals: 1. a machine platform; 2. a positioning cylinder; 3. a power rod; 4. pressing a plate; 5. a slide base; 6. a rotating shaft; 7. a cutter; 8. a drive motor; 9. a driving cylinder; 10. a power ring; 11. a chute; 12. positioning pins; 13. a power cylinder; 14. a guide bar; 15. a material pushing ring; 16. a thrust cylinder; 17. a through hole; 18. an inner rod; 19. an outer cylinder; 20. a spring; 21. a non-slip mat; 22. a discharge opening; 23. a fan; 24. a hose; 25. an air inlet; 26. a material collecting box; 27. and (4) a filter screen.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the bamboo tube manufacturing device disclosed by the invention comprises a machine table 1, wherein the machine table 1 is provided with a plurality of groups of clamping devices, bamboo passing devices and discharging devices. Clamping device sets up side by side in the position of board 1 up end and being used for fixed thick bamboo tube, leads to the bamboo device and corresponds clamping device setting and can get through the thick bamboo tube of different diameters, and discharge apparatus sees off board 1 with the thick bamboo tube after thick bamboo tube processing is accomplished.
Referring to fig. 1 and 2, clamping device is including being fixed in a location section of thick bamboo 2 on board 1 top, location section of thick bamboo 2 level sets up and its inner wall is articulated to be connected with a plurality of power rods 3, power rods 3 are preferred three and use location section of thick bamboo 2 axis as centre of a circle rotational symmetry setting, power rods 3 are connected with clamp plate 4 towards the articulated one end of location section of thick bamboo 2 axis, clamp plate 4 parallel arrangement each other under the free state, the one end that clamp plate 4 was kept away from to power rod 3 runs through location section of thick bamboo 2 outer walls and extends to location section of thick bamboo 2 outsides, 2 outer walls of location section of thick bamboo are provided with the linkage subassembly that is used for driving the synchronous pivoted of a plurality of power rods 3, be provided with between. The power rod 3 pushes the pressing plates 4 to approach to the axis of the positioning cylinder 2 in the rotating process, and the synchronous motion of the pressing plates 4 can simultaneously clamp the bamboo cylinder.
Referring to fig. 2 and 3, the linkage subassembly is including sliding the power ring 10 that the cover located 2 outer walls of a location section of thick bamboo, spout 11 has been seted up along its length direction in the outside one end of a location section of thick bamboo 2 to power pole 3, power ring 10 outer wall is fixed with to slide and sets up in the locating pin 12 of spout 11, locating pin 12 can slide along spout 11 directions, 1 outer wall of board is fixed with a plurality of power cylinder 13 that are used for driving power ring 10 to slide, power cylinder 13 is preferred three and uses a location section of thick bamboo 2 axis to set up as centre of a circle rotational symmetry. After the power cylinder 13 is started, the power ring 10 is pushed to slide along the outer wall of the positioning cylinder 2, the positioning pin 12 at the end part of the power ring 10 slides in the sliding groove 11 of the power rod 3, and finally all the power rods 3 synchronously rotate, so that the bamboo tube is firmly pressed at the central position of the positioning cylinder 2.
Referring to fig. 3, the elastic component includes an inner rod 18 hinged to one side of the pressure plate 4 away from the axis of the positioning cylinder 2, an outer cylinder 19 hinged to the outer wall of the power rod 3 inside the positioning cylinder 2, a free end of the inner rod 18 penetrates through the outer cylinder 19 and is slidably disposed in the outer cylinder 19, and a spring 20 is sleeved at one end of the inner rod 18 inside the outer cylinder 19. When the pressing plates 4 do not press the bamboo tube, the pressing plates 4 are kept parallel to each other through the elastic assembly, and the smoothness of the bamboo tube entering and exiting the positioning tube 2 is ensured. The side of the pressure plate 4 facing the axis of the positioning cylinder 2 is fixed with a non-slip mat 21. Through slipmat 21 clamp plate 4 and thick bamboo tube direct contact, play the antiskid effect on the one hand, on the other hand reduces the damage to the thick bamboo tube outer wall.
Referring to fig. 2 and 4, lead to bamboo device including sliding and arrange slide 5 in board 1 in, the direction of sliding of slide 5 is located the 2 axis directions of a location section of thick bamboo, the rotatory pivot 6 that is provided with to extend to the inside of a location section of thick bamboo 2 of one end of slide 5, the perisporium of pivot 6 is fixed with the heliciform and is used for getting through the cutter 7 that the bamboo separates, slide 5 internal fixation has the driving motor 8 of being connected with the transmission of pivot 6, driving motor 8's drive shaft passes through the shaft coupling with pivot 6 and can dismantle the connection, one side that board 1 kept away from a location section of thick bamboo 2 is fixed with the actuating cylinder 9 that drives that. After the driving cylinder 9 and the driving motor 8 are started, the sliding seat 5 drives the rotating shaft 6 to slide, and the rotating cutter 7 is used for penetrating the bamboo partition of the bamboo tube, so that the rapid processing and one-step forming are realized.
The blanking device comprises a plurality of guide rods 14 which are arranged in a positioning cylinder 2 and fixed with a machine table 1, the guide rods 14 are arranged in parallel with the axis of the positioning cylinder 2, the guide rods 14 are preferably arranged in a three-dimensional mode and are arranged in a rotational symmetry mode by taking the axis of the positioning cylinder 2 as the circle center, the guide rods 14 and a pressing plate 4 are arranged in a staggered mode, a material pushing ring 15 is sleeved on the guide rods 14, the sliding direction of the material pushing ring 15 is consistent with the axis direction of the positioning cylinder 2, a through hole 17 matched with the guide rods 14 in a sliding mode is formed in the material pushing ring 15, one end, far away from the positioning cylinder 2, of the machine table 1 is fixed with a plurality of thrust cylinders 16 used for pushing the material pushing ring 15 to slide, and the thrust cylinders 16. When the thick bamboo tube is sent into a location section of thick bamboo 2, it can be settled on guide bar 14, the clamp of the later stage clamp plate 4 of being convenient for is tight, and after the thick bamboo tube processing was accomplished, thrust cylinder 16 promoted material pushing ring 15 and slided along guide bar 14, and the material pushing rod steadily released the thick bamboo tube from a location section of thick bamboo 2 to realize automatic discharge.
Referring to fig. 1 and 2, a discharge opening 22 is formed in an opening of the positioning cylinder 2, which is far away from one end of the slide carriage 5, the discharge opening 22 is annular, a fan 23 is fixed in the machine table 1, a hose 24 is arranged between the fan 23 and the discharge opening 22 in a communicating manner, and a plurality of air inlets 25 are formed in one end of the positioning cylinder 2, which is far away from the discharge opening 22. In the process of opening the bamboo tube, the fan 23 is started and sucks the scraps generated in the processing process into the hose 24. Be provided with material collecting box 26 between fan 23 and the hose 24, material collecting box 26 can dismantle and set up in board 1, material collecting box 26, and material collecting box 26 internal fixation has filter screen 27, and filter screen 27 is just to hose 24 setting. Waste materials generated after the bamboo tube is processed are filtered by the filter screen 27 and then are deposited in the material collecting box 26 and isolated by the filter screen 27, and when the waste materials are accumulated to a certain degree, the material collecting box 26 is detached and poured out.
The implementation principle and the beneficial effects of the embodiment are as follows:
the diameter of a bamboo tube is classified by a processing worker, the bamboo tube to be processed is placed into the positioning tube 2 with the corresponding diameter, the bamboo tube is placed between the guide rods 14, the power cylinder 13 is started, the power cylinder 13 drives the power rod 3 to rotate in the process of pushing the power ring 10 to slide, and the bamboo tube is clamped tightly through the pressing plate 4 and is positioned at the center of the positioning tube 2. After the driving cylinder 9 and the driving motor 8 are started, the sliding base 5 pushes the rotating cutter 7 to process the bamboo tube, the bamboo partitions are gradually opened, at the moment, the fan 23 is started, and scraps generated in the processing process can be discharged into the collecting box 26 through the discharge port 22 and finally collected in a centralized mode. After the bamboo tube is processed, the thrust cylinder 16 is started and pushes the material pushing ring 15 to slide in the positioning tube 2, and the processed bamboo tube is pushed out from the positioning tube 2. The processing personnel replaces the next bamboo tube.
The bamboo tube processing device can realize quick positioning, accurate punching, automatic discharging and scrap recovery of the bamboo tube, ensures the correspondence between the position of the bamboo tube and the position of the cutter 7, ensures that the cutter 7 not only can punch through the bamboo partition but also can polish the inner wall of the bamboo tube, the cutter 7 which advances spirally can process the inner wall of the bamboo tube by one-step forming and has small damage to the structure of the bamboo tube, and the automatic processing mode ensures that the bamboo tube is formed more quickly, thereby greatly improving the processing efficiency of the bamboo tube, ensuring the processing quality of the bamboo tube and facilitating the filling of bamboo salt in the later period.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (4)

1. A bamboo tube preparation facilities which characterized in that: the bamboo tube punching machine comprises a machine table (1), wherein a plurality of groups of clamping devices for fixing the positions of bamboo tubes and bamboo penetrating devices which are arranged corresponding to the clamping devices and are used for penetrating the bamboo tubes with different diameters are arranged on the machine table (1) in parallel;
the clamping device comprises a positioning cylinder (2) fixed at the top end of the machine table (1), the inner wall of the positioning cylinder is hinged with a plurality of power rods (3), one end, facing the axis of the positioning cylinder (2), of each power rod (3) is hinged with a pressing plate (4), one end, away from the pressing plate (4), of each power rod (3) penetrates through the outer wall of the positioning cylinder (2), and a linkage assembly used for driving the power rods (3) to synchronously rotate is arranged on the outer wall of the positioning cylinder (2);
the bamboo penetrating device comprises a sliding seat (5) which is arranged in the machine table (1) in a sliding mode, one end of the sliding seat (5) is rotatably provided with a rotating shaft (6) which extends into the positioning cylinder (2), a spiral cutter (7) which is used for penetrating bamboo partitions is fixed on the peripheral wall of the rotating shaft (6), a driving motor (8) which is in transmission connection with the rotating shaft (6) is fixed in the sliding seat (5), and a driving cylinder (9) which is used for driving the sliding seat (5) to slide is fixed in the machine table (1);
the linkage assembly comprises a power ring (10) which is sleeved on the outer wall of the positioning cylinder (2) in a sliding manner, a sliding groove (11) is formed in one end, outside the positioning cylinder (2), of the power rod (3) along the length direction of the power rod, a positioning pin (12) which is arranged in the sliding groove (11) in a sliding manner is fixed on the outer wall of the power ring (10), and a plurality of power cylinders (13) which are used for driving the power ring (10) to slide are fixed on the outer wall of the machine table (1);
an elastic component for keeping the pressing plate (4) stable is arranged between the pressing plate (4) and the power rod (3);
the elastic component comprises an inner rod (18) hinged with the outer wall of the pressure plate (4) and an outer cylinder (19) hinged with the outer wall of the power rod (3), the inner rod (18) is arranged in the outer cylinder (19) in a sliding mode, and a spring (20) is sleeved inside the outer cylinder (19) of the inner rod (18);
a discharge opening (22) is formed in one end, away from the slide seat (5), of the positioning cylinder (2), a fan (23) is fixed in the machine table (1), a hose (24) is communicated between the fan (23) and the discharge opening (22), and a plurality of air inlets (25) are formed in one end, away from the discharge opening (22), of the positioning cylinder (2);
the fan (23) and be provided with material collection box (26) between hose (24), material collection box (26) can dismantle set up in board (1), material collection box (26) internal fixation has filter screen (27).
2. Bamboo tube manufacturing apparatus according to claim 1, wherein: a discharging device used for pushing out the bamboo tubes is further arranged on the machine table (1) corresponding to the bamboo penetrating device;
unloader include a plurality of arrange in a location section of thick bamboo (2) and with guide bar (14) that board (1) is fixed, guide bar (14) with clamp plate (4) set up in the crisscross, a plurality of the cover is equipped with material pushing ring (15) simultaneously on guide bar (14), board (1) internal fixation has a plurality of thrust cylinders (16) that are used for promoting material pushing ring (15) slide.
3. Bamboo tube manufacturing apparatus according to claim 2, wherein: the material pushing ring (15) is provided with a through hole (17) matched with the guide rod (14) in a sliding manner.
4. Bamboo tube manufacturing apparatus according to claim 1, wherein: and an anti-slip pad (21) is fixed on one side of the pressure plate (4) facing the axis of the positioning cylinder (2).
CN201811396630.XA 2018-11-22 2018-11-22 Bamboo tube preparation device Active CN109591128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811396630.XA CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811396630.XA CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Publications (2)

Publication Number Publication Date
CN109591128A CN109591128A (en) 2019-04-09
CN109591128B true CN109591128B (en) 2021-04-13

Family

ID=65960210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811396630.XA Active CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Country Status (1)

Country Link
CN (1) CN109591128B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039622A (en) * 2019-04-25 2019-07-23 赖成凤 A kind of bamboo cutter device
CN111660387A (en) * 2020-06-17 2020-09-15 湖南家乐竹木有限公司 Bamboo tube goes up outer blue or green tabasheer remove device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202480186U (en) * 2012-03-13 2012-10-10 沈德长 Machine for removing inner bamboo joints of moso bamboo
CN103801957A (en) * 2014-02-14 2014-05-21 南京霞光新能源科技有限公司 Clamp for circular tube
CN204772864U (en) * 2015-07-02 2015-11-18 浙江九川竹木股份有限公司 Thick bamboo tube automatic production equipment
DE202017100993U1 (en) * 2017-02-23 2017-03-08 Desconpro Engineering Gmbh Gripping device with increased flexibility
CN107756559A (en) * 2017-10-26 2018-03-06 福建呈祥机械制造有限公司 A kind of Mao bamboo tube goes internal segment equipment
CN207288479U (en) * 2017-10-20 2018-05-01 巴中市新越不锈钢有限公司 There is the cylindrical element automatic punching device of automatic discharging
CN207415579U (en) * 2017-11-09 2018-05-29 杨发明 A kind of bamboo removes internal segment de-etiolation machine
CN207447407U (en) * 2017-09-12 2018-06-05 温州国正机械有限公司 A kind of axis pin Automatic-clamping and the drilling device of ejection
CN108724373A (en) * 2018-07-27 2018-11-02 安吉竹福工艺品有限公司 A kind of dust-proof cutter device of bamboo and wood products

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202480186U (en) * 2012-03-13 2012-10-10 沈德长 Machine for removing inner bamboo joints of moso bamboo
CN103801957A (en) * 2014-02-14 2014-05-21 南京霞光新能源科技有限公司 Clamp for circular tube
CN204772864U (en) * 2015-07-02 2015-11-18 浙江九川竹木股份有限公司 Thick bamboo tube automatic production equipment
DE202017100993U1 (en) * 2017-02-23 2017-03-08 Desconpro Engineering Gmbh Gripping device with increased flexibility
CN207447407U (en) * 2017-09-12 2018-06-05 温州国正机械有限公司 A kind of axis pin Automatic-clamping and the drilling device of ejection
CN207288479U (en) * 2017-10-20 2018-05-01 巴中市新越不锈钢有限公司 There is the cylindrical element automatic punching device of automatic discharging
CN107756559A (en) * 2017-10-26 2018-03-06 福建呈祥机械制造有限公司 A kind of Mao bamboo tube goes internal segment equipment
CN207415579U (en) * 2017-11-09 2018-05-29 杨发明 A kind of bamboo removes internal segment de-etiolation machine
CN108724373A (en) * 2018-07-27 2018-11-02 安吉竹福工艺品有限公司 A kind of dust-proof cutter device of bamboo and wood products

Also Published As

Publication number Publication date
CN109591128A (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN109591128B (en) Bamboo tube preparation device
CN107469457B (en) A kind of cutting material separating and reclaiming device
CN208195347U (en) A kind of trim press convenient for collecting clast
CN113211520B (en) Intelligent traditional Chinese medicine slicer and traditional Chinese medicine processing technology
CN213350520U (en) Electric punch capable of automatically removing dust
CN208234037U (en) A kind of collection cutter automatic turning device
CN106002293B (en) A kind of brake disc automatic assembly line
CN105881023A (en) Equipment for machining disc type workpieces
CN208555766U (en) NC turret punch machine waste material collection device
CN111687337A (en) Stamping die shedder with clear away sweeps
CN110480717A (en) A kind of acrylic board processing and forming mold
CN112959079B (en) Kitchen guarding's lampblack absorber collection petticoat pipe shaping processing equipment
CN115246137A (en) Environment-friendly raw material extraction equipment
CN210017808U (en) Full-automatic efficient processing peeling mechanism of garlic
CN115121482A (en) Separator-containing traditional Chinese medicine sorting device for processing traditional Chinese medicine decoction pieces
CN112772934A (en) Gourd pulp removing machine
CN217909275U (en) A filter cauldron for cellulose production
CN106001780B (en) Burr removal device
CN220753228U (en) Magnetic ring pressing embryo collecting mechanism
CN220463223U (en) Hole internal grinding device
CN205996060U (en) Stamping machine waste material collection device
CN214861632U (en) Sewage filtering and recycling device for sewage treatment
CN209548829U (en) A kind of cleaning device filtered for cigarette with feed liquid
CN220408036U (en) High-precision high-efficiency fixed beam type gantry machining center
CN219817012U (en) Material collecting device for tea processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant