CN109590970B - Positioning method for wire clamp mounting hole of power equipment - Google Patents

Positioning method for wire clamp mounting hole of power equipment Download PDF

Info

Publication number
CN109590970B
CN109590970B CN201811303149.1A CN201811303149A CN109590970B CN 109590970 B CN109590970 B CN 109590970B CN 201811303149 A CN201811303149 A CN 201811303149A CN 109590970 B CN109590970 B CN 109590970B
Authority
CN
China
Prior art keywords
vernier
positioning
scale
equipment
punching plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811303149.1A
Other languages
Chinese (zh)
Other versions
CN109590970A (en
Inventor
夏宗杰
汪年斌
刘芹
倪汇川
朱宁
孙长翔
吕孝平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811303149.1A priority Critical patent/CN109590970B/en
Publication of CN109590970A publication Critical patent/CN109590970A/en
Application granted granted Critical
Publication of CN109590970B publication Critical patent/CN109590970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking
    • B25H7/045Devices, e.g. scribers, for marking characterised by constructional details of the marking elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Of Terminals (AREA)

Abstract

本发明属于电力设备线夹领域,具体涉及一种电力设备线夹安装孔定位方法,S1、根据接线座上的安装孔位置确定定位冲孔板中哪些预加工安装孔内设有定位件;S2、将设备线夹的直角与游标定位尺的直角对准,分别调节两根刻度尺上的游标卡口至A/2和B/2处,分别调节游标刻度尺上的游标定位块至(A‑a)/2和(B‑b)/2处;S3、将定位冲孔板放置于设备线夹上,使得中心标与游标定位块对齐;S4、敲打锤击平台使得定位件在设备线夹表面形成安装孔的预冲孔凹痕,从而确定线夹安装孔的位置。本发明的有益效果是:可以快速准确的定位出线夹安装孔的位置,提高了工作效率,降低了施工、安装人员的工作强度。

Figure 201811303149

The invention belongs to the field of electric equipment wire clips, and in particular relates to a method for locating installation holes of electric equipment wire clips. S1. Determine which pre-machined installation holes in the positioning punching plate are provided with positioning pieces according to the positions of the installation holes on the terminal block; S2 , Align the right angle of the equipment wire clip with the right angle of the vernier positioning ruler, adjust the vernier bayonet on the two scales to A/2 and B/2, respectively adjust the vernier positioning block on the vernier scale to (A ‑a)/2 and (B‑b)/2; S3. Place the positioning punching plate on the equipment line clamp, so that the center mark is aligned with the vernier positioning block; S4, hit the hammer platform to make the positioning piece on the equipment line Pre-drilled indentations for mounting holes are formed on the surface of the clip to determine the location of the clip mounting holes. The beneficial effects of the invention are that the position of the installation hole of the outlet clip can be quickly and accurately located, the work efficiency is improved, and the work intensity of construction and installation personnel is reduced.

Figure 201811303149

Description

一种电力设备线夹安装孔定位方法A method for locating installation holes of wire clips for power equipment

技术领域technical field

本发明属于电力设备线夹领域,具体涉及一种电力设备线夹安装孔定位方法。The invention belongs to the field of electric equipment wire clips, and particularly relates to a method for locating installation holes of electric equipment wire clips.

背景技术Background technique

近年来,随着输变配等电力施工增多,设备线夹等电力金具现场应用越来越多。目前在电力新安装、大修、抢修等施工作业过程中,设备线夹的安装孔加工过程主要依赖人工用刻度尺进行测量并用标号笔进行标记,然后用羊角冲进行预冲孔后使用钻孔机打孔加工,整个过程费时费力,人工通过刻度尺测量标记、羊角冲进行预冲孔极易造成孔心距、边距的误差、偏斜,进一步造成设备线夹安装孔加工出现偏差,导致设备线夹无法正常连接,给施工电气设备的连接安全和质量造成极大隐患。In recent years, with the increase in power construction such as power transmission, transformation and distribution, more and more power fittings such as equipment clips are used on site. At present, in the process of new power installation, overhaul, emergency repair and other construction operations, the processing of the installation hole of the equipment wire clip mainly relies on manual measurement with a scale and marking with a marker pen, and then pre-punching with a claw punch and then using a drilling machine. The whole process of punching is time-consuming and labor-intensive. Manually measuring the marks with a scale and pre-punching with horn punches can easily lead to errors and deviations in the hole center distance and edge distance, which further causes deviations in the processing of the installation holes of the equipment wire clips, resulting in equipment failure. The cable clip cannot be connected normally, which will cause great hidden dangers to the connection safety and quality of construction electrical equipment.

发明内容SUMMARY OF THE INVENTION

为了解决上述问题,本发明的目的是提供一种电力设备线夹安装孔定位方法,可以快速准确的定位出线夹安装孔的位置,提高了工作效率,降低了施工、安装人员的工作强度。In order to solve the above problems, the purpose of the present invention is to provide a method for locating the installation hole of the electric equipment wire clip, which can quickly and accurately locate the position of the installation hole of the wire outlet clip, improve work efficiency, and reduce the work intensity of construction and installation personnel.

本发明提供了一种电力设备线夹安装孔定位方法,所述组合工具包括相互配合的游标定位尺和定位冲孔板;The invention provides a method for locating an installation hole of a wire clip of a power equipment. The combined tool comprises a vernier locating ruler and a locating punching plate which cooperate with each other;

所述游标定位尺包括两根彼此垂直的刻度尺,所述刻度尺上设有可沿着刻度尺长度方向移动的游标卡口,所述游标卡口上延伸出与刻度尺相互垂直的游标刻度尺,所述游标刻度尺上设有可沿着游标刻度尺长度方向移动的游标定位块;The vernier positioning ruler includes two mutually perpendicular scales, the scale is provided with a vernier bayonet that can move along the length direction of the scale, and a vernier scale that is perpendicular to the scale extends from the vernier bayonet. A ruler, the vernier scale is provided with a vernier positioning block that can move along the length of the vernier scale;

所述定位冲孔板包括底板,所述底板上还设有锤击平台,所述底板上设有多个预加工安装孔,所述预加工安装孔内设有定位件,所述定位件的安装位置与接线座上的安装孔的位置相适配;The positioning punching plate includes a bottom plate, which is further provided with a hammering platform, a plurality of pre-machined mounting holes are provided on the bottom plate, and positioning pieces are arranged in the pre-machined mounting holes. The installation position matches the position of the installation hole on the wiring seat;

所述底板边缘处还设有与游标定位块相互配合的中心标;The edge of the bottom plate is also provided with a center mark that cooperates with the vernier positioning block;

包括如下步骤,It includes the following steps,

S1、根据接线座上的安装孔位置确定定位冲孔板中哪些预加工安装孔内设有定位件;S1. Determine which pre-machined mounting holes in the positioning punching plate are provided with positioning pieces according to the positions of the mounting holes on the wiring seat;

S2、设设备线夹的板面长度为A,宽度为B,定位冲孔板的底板长度为a,宽度为b,将设备线夹的直角与游标定位尺的直角对准,分别调节两根刻度尺上的游标卡口至A/2和B/2处,分别调节游标刻度尺上的游标定位块至(A-a)/2和(B-b)/2处;S2. Set the length of the board surface of the equipment clamp as A, the width as B, the length of the bottom plate of the positioning punching plate as a, and the width as b, align the right angle of the equipment clamp with the right angle of the vernier positioning ruler, and adjust the two Move the vernier bayonet on the scale to A/2 and B/2, and adjust the vernier positioning block on the vernier scale to (A-a)/2 and (B-b)/2 respectively;

S3、将定位冲孔板放置于设备线夹上,使得中心标与游标定位块对齐;S3. Place the positioning punching plate on the equipment clamp, so that the center mark is aligned with the vernier positioning block;

S4、敲打锤击平台使得定位件在设备线夹表面形成安装孔的预冲孔凹痕,从而确定线夹安装孔的位置。S4. Hit the hammer platform so that the positioning piece forms a pre-punched dent of the installation hole on the surface of the equipment wire clamp, so as to determine the position of the wire clamp installation hole.

本发明的有益效果是:The beneficial effects of the present invention are:

传统方法中,设备线夹安装孔的定位过程费时费力,人工通过刻度尺测量标记、羊角冲进行预冲孔极易造成孔心距、边距的误差、偏斜,本发明的组合工具包括游标定位尺和定位冲孔板,首先根据接线座上的安装孔位置确定定位冲孔板中哪些预加工安装孔内设有定位件,然后将设备线夹的直角与游标定位尺的直角对准,分别调节游标卡口和游标定位至各自的设定位置(A/2、B/2、(A-a)/2和(B-b)/2),将定位冲孔板放置于设备线夹上,中心标分别设置在a/2和b/2处,使得中心标与游标定位块对齐,最后敲打锤击平台使得定位件在设备线夹表面形成安装孔的预冲孔凹痕,从而确定线夹安装孔的位置;In the traditional method, the positioning process of the installation hole of the equipment clip is time-consuming and labor-intensive. Manually measuring the mark with a scale and pre-punching with a horn punch can easily cause errors and skew in the hole center distance and edge distance. The combination tool of the present invention includes a vernier. For the positioning ruler and the positioning punching plate, first determine which pre-machined mounting holes in the positioning punching plate have positioning pieces according to the position of the mounting holes on the wiring seat, and then align the right angle of the equipment wire clip with the right angle of the vernier positioning ruler, Adjust the vernier bayonet and vernier positioning to their respective set positions (A/2, B/2, (A-a)/2 and (B-b)/2), place the positioning punching plate on the equipment clamp, and mark the center Set them at a/2 and b/2 respectively, so that the center mark is aligned with the vernier positioning block, and finally hit the hammer platform to make the positioning piece form the pre-punched dent of the installation hole on the surface of the equipment clamp, so as to determine the clamp installation hole s position;

相比于传统方法,实用本发明的组合工具可以快速准确的定位出线夹安装孔的位置,提高了工作效率,降低了施工、安装人员的工作强度。Compared with the traditional method, the combined tool of the present invention can quickly and accurately locate the position of the installation hole of the outlet clip, thereby improving the work efficiency and reducing the work intensity of construction and installation personnel.

附图说明Description of drawings

图1是组合工具的结构示意图;Fig. 1 is the structural representation of combination tool;

图2是游标定位尺的结构示意图;Fig. 2 is the structural representation of vernier positioning ruler;

图3是定位冲孔板的俯视图;Fig. 3 is the top view of positioning punching plate;

图4是定位冲孔板的侧视图;Figure 4 is a side view of the positioning punch plate;

图5是设备线夹的俯视图;Fig. 5 is the top view of the equipment wire clip;

图6是设备线夹与接线座配合的俯视图;Fig. 6 is the top view of the equipment wire clip and the connection seat;

图7是设备线夹与接线座配合的侧视图。FIG. 7 is a side view of the equipment wire clip mated with the wiring socket.

附图中标记的含义如下:The meanings of the symbols in the accompanying drawings are as follows:

1-游标定位尺 11-刻度尺 12-游标卡口 13-游标刻度尺 14-游标定位块 15-挡块1-Vernier positioning ruler 11-Scale ruler 12-Vernier bayonet 13-Vernier scale 14-Vernier positioning block 15-Block

2-定位冲孔板 21-底板 22-锤击平台 23-预加工安装孔 24-定位件 25-中心标2-Positioning punching plate 21-Bottom plate 22-Hammering platform 23-Pre-machined mounting hole 24-Positioning piece 25-Center mark

3-设备线夹 31-板面3-Equipment wire clip 31-Board surface

4-接线座 41-安装孔4- Terminal block 41- Mounting hole

具体实施方式Detailed ways

下面结合具体实施例对本发明做具体说明。The present invention will be specifically described below with reference to specific embodiments.

实施例1Example 1

如1-4所示,一种电力设备线夹安装孔定位组合工具,所述组合工具包括相互配合的游标定位尺1和定位冲孔板2;As shown in 1-4, a combined tool for positioning a mounting hole of a wire clip of a power equipment, the combined tool includes a vernier positioning ruler 1 and a positioning punching plate 2 that cooperate with each other;

所述游标定位尺1包括两根彼此垂直的刻度尺11,所述刻度尺11上设有可沿着刻度尺11长度方向移动的游标卡口12,所述游标卡口12上延伸出与刻度尺11相互垂直的游标刻度尺13,所述游标刻度尺13上设有可沿着游标刻度尺13长度方向移动的游标定位块14;The vernier positioning ruler 1 includes two mutually perpendicular scales 11, the scale 11 is provided with a vernier bayonet 12 that can move along the length direction of the scale 11, and the vernier bayonet 12 extends out with a scale. The vernier scale 13 with the rulers 11 perpendicular to each other, the vernier scale 13 is provided with a vernier positioning block 14 that can move along the length direction of the vernier scale 13;

所述定位冲孔板2包括底板21,所述底板21正面固接锤击平台22,所述底板21背面设有多个预加工安装孔23,所述预加工安装孔23定位件24,所述定位件24根据与设备线夹3相连的接线座4上的安装孔41位置对应设置。The positioning punching plate 2 includes a bottom plate 21, the front of the bottom plate 21 is fixedly connected to the hammering platform 22, and the back of the bottom plate 21 is provided with a plurality of pre-machined mounting holes 23, the pre-machined mounting holes 23 positioning pieces 24, so The positioning member 24 is correspondingly arranged according to the position of the mounting hole 41 on the wiring base 4 connected with the equipment wire clip 3 .

本实施例中预加工安装孔23优选为螺孔,定位件24优选为与所述螺孔构成螺纹配合的螺钉。In this embodiment, the pre-machined mounting holes 23 are preferably screw holes, and the positioning member 24 is preferably a screw that is threadedly matched with the screw holes.

本实施例中预加工安装孔23优选沿着底板21对角线设置。In this embodiment, the pre-machined mounting holes 23 are preferably arranged along the diagonal of the bottom plate 21 .

本实施例中,优选的,锤击平台22的中心与底板21的中心相互重合。In this embodiment, preferably, the center of the hammering platform 22 and the center of the bottom plate 21 coincide with each other.

实施例2Example 2

在实施例1的基础上,如3所示,所述底板21边缘处还设有与游标定位块14相互配合的中心标25。On the basis of Embodiment 1, as shown in 3, the edge of the bottom plate 21 is further provided with a center mark 25 that cooperates with the vernier positioning block 14 .

实施例3Example 3

在实施例1的基础上,如2所示,所述游标刻度尺13远离游标卡口12的一端上设有防止游标定位块14脱落的挡块15。On the basis of Embodiment 1, as shown in 2, the end of the vernier scale 13 away from the vernier bayonet 12 is provided with a stopper 15 for preventing the vernier positioning block 14 from falling off.

实施例4Example 4

在实施例2的基础上,如1-5所示,一种电力设备线夹安装孔定位方法,包括如下步骤,On the basis of Embodiment 2, as shown in 1-5, a method for locating an installation hole of a wire clip of a power equipment includes the following steps:

S1、根据接线座4上的安装孔41位置确定定位冲孔板2中哪些预加工安装孔23内设有定位件24;S1. Determine which pre-machined mounting holes 23 in the positioning punching plate 2 are provided with the positioning pieces 24 according to the positions of the mounting holes 41 on the terminal block 4;

S2、设设备线夹3的板面31长度为A,宽度为B,定位冲孔板2的底板21长度为a,宽度为b,将设备线夹3的直角与游标定位尺1的直角对准,分别调节两根刻度尺11上的游标卡口12至A/2和B/2处,分别调节游标刻度尺13上的游标定位块14至(A-a)/2和(B-b)/2处;S2. Set the length of the board surface 31 of the equipment clamp 3 as A, the width as B, the length of the bottom plate 21 of the positioning punching plate 2 as a, and the width as b, and align the right angle of the equipment clamp 3 with the right angle of the vernier positioning ruler 1 Adjust the vernier bayonet 12 on the two scales 11 to A/2 and B/2 respectively, and adjust the vernier positioning block 14 on the vernier scale 13 to (A-a)/2 and (B-b)/2 respectively. ;

S3、将定位冲孔板2放置于设备线夹上,使得中心标25与游标定位块14对齐;S3, place the positioning punching plate 2 on the equipment clamp, so that the center mark 25 is aligned with the vernier positioning block 14;

S4、敲打锤击平台22使得定位件24在设备线夹3表面形成安装孔的预冲孔凹痕,从而确定线夹安装孔的位置。S4, hitting the hammer platform 22 so that the positioning member 24 forms a pre-punched dent of the installation hole on the surface of the equipment wire clip 3, so as to determine the position of the wire clip installation hole.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still understand the foregoing embodiments. The technical solutions described are modified, or some technical features thereof are equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (1)

1.一种电力设备线夹安装孔定位方法,组合工具包括相互配合的游标定位尺(1)和定位冲孔板(2);1. A method for locating an installation hole of a wire clip of a power equipment, wherein the combined tool comprises a vernier positioning ruler (1) and a positioning punching plate (2) that cooperate with each other; 所述游标定位尺(1)包括两根彼此垂直的刻度尺(11),所述刻度尺(11)上设有可沿着刻度尺(11)长度方向移动的游标卡口(12),所述游标卡口(12)上延伸出与刻度尺(11)相互垂直的游标刻度尺(13),所述游标刻度尺(13)上设有可沿着游标刻度尺(13)长度方向移动的游标定位块(14);The vernier positioning ruler (1) includes two mutually perpendicular scales (11), and the scale (11) is provided with a vernier bayonet (12) that can move along the length direction of the scale (11), so the A vernier scale (13) perpendicular to the scale (11) extends from the vernier bayonet (12), and the vernier scale (13) is provided with a vernier scale (13) that can move along the length direction of the vernier scale (13). cursor positioning block(14); 所述定位冲孔板(2)包括底板(21),所述底板(21)上还设有锤击平台(22),所述底板(21)上设有多个预加工安装孔(23),所述预加工安装孔(23)内设有定位件(24),所述定位件(24)的安装位置与接线座(4)上的安装孔(41)的位置相适配;The positioning punching plate (2) includes a bottom plate (21), the bottom plate (21) is further provided with a hammering platform (22), and the bottom plate (21) is provided with a plurality of pre-machined mounting holes (23) , a positioning member (24) is provided in the pre-machined mounting hole (23), and the mounting position of the positioning member (24) is adapted to the position of the mounting hole (41) on the wiring seat (4); 所述底板(21)边缘处还设有与游标定位块(14)相互配合的中心标(25);The edge of the bottom plate (21) is also provided with a center marker (25) that cooperates with the vernier positioning block (14); 其特征在于,包括如下步骤,It is characterized in that, comprises the following steps: S1、根据接线座(4)上的安装孔(41)位置确定定位冲孔板(2)中哪些预加工安装孔(23)内设有定位件(24);S1. Determine which pre-machined mounting holes (23) in the positioning punching plate (2) are provided with positioning pieces (24) according to the positions of the mounting holes (41) on the wiring seat (4); S2、设设备线夹(3)的板面(31)长度为A,宽度为B,定位冲孔板(2)的底板(21)长度为a,宽度为b,将设备线夹(3)的直角与游标定位尺(1)的直角对准,分别调节两根刻度尺(11)上的游标卡口(12)至A/2和B/2处,分别调节游标刻度尺(13)上的游标定位块(14)至(A-a)/2和(B-b)/2处;S2. Set the length of the board surface (31) of the equipment wire clamp (3) as A, the width as B, the length of the bottom plate (21) of the positioning punching plate (2) as a, and the width as b, and the equipment wire clamp (3) Align the right angle of the vernier positioning ruler (1) with the right angle of the vernier positioning ruler (1), adjust the vernier bayonet (12) on the two scales (11) to A/2 and B/2 respectively, and adjust the The cursor positioning block (14) to (A-a)/2 and (B-b)/2; S3、将定位冲孔板(2)放置于设备线夹(3)上,使得中心标(25)与游标定位块(14)对齐;S3, placing the positioning punching plate (2) on the equipment wire clamp (3), so that the center mark (25) is aligned with the vernier positioning block (14); S4、敲打锤击平台(22)使得定位件(24)在设备线夹(3)表面形成安装孔的预冲孔凹痕,从而确定线夹安装孔的位置。S4, hitting the hammer platform (22) so that the positioning member (24) forms a pre-punched dent of the installation hole on the surface of the equipment wire clamp (3), thereby determining the position of the wire clamp installation hole.
CN201811303149.1A 2018-11-02 2018-11-02 Positioning method for wire clamp mounting hole of power equipment Active CN109590970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811303149.1A CN109590970B (en) 2018-11-02 2018-11-02 Positioning method for wire clamp mounting hole of power equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811303149.1A CN109590970B (en) 2018-11-02 2018-11-02 Positioning method for wire clamp mounting hole of power equipment

Publications (2)

Publication Number Publication Date
CN109590970A CN109590970A (en) 2019-04-09
CN109590970B true CN109590970B (en) 2020-06-30

Family

ID=65957465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811303149.1A Active CN109590970B (en) 2018-11-02 2018-11-02 Positioning method for wire clamp mounting hole of power equipment

Country Status (1)

Country Link
CN (1) CN109590970B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110586750A (en) * 2019-09-09 2019-12-20 国网河北省电力有限公司 Punching positioning device and application thereof
CN111207651A (en) * 2020-01-07 2020-05-29 国网河北省电力有限公司 All-angle clamps perforated to length

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4949183B2 (en) * 2007-10-03 2012-06-06 中国電力株式会社 Parallel clevis
CN102205499A (en) * 2010-03-31 2011-10-05 天津市臣涛精密机械设备有限公司 Part drilling clamp
CN102975057A (en) * 2012-11-15 2013-03-20 无锡市航鹄科技有限公司 Positioning tool for cambered surface drilling machining
CN203557374U (en) * 2013-11-12 2014-04-23 国家电网公司 Measuring and boring positioning rule for wiring clamp
CN206135180U (en) * 2016-09-30 2017-04-26 许昌许继昌龙电能科技股份有限公司 Drilling positioner of regulator cubicle copper bar

Also Published As

Publication number Publication date
CN109590970A (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN204255221U (en) A kind of device clamp boring positioning rule
US20120311880A1 (en) Measuring device system
CN109590970B (en) Positioning method for wire clamp mounting hole of power equipment
CN107538460A (en) Chalker
CN107024162A (en) Weaving scutcher leads regulation rule composition error calibration equipment and its application method
CN204194881U (en) Porous is apart from jig
CN208257093U (en) A kind of light projection wire clamp perforating locator
CN204188090U (en) A Portable Template Tool
CN206030885U (en) Wire terminal connector joins in marriage hole setting -out locator
CN102419145B (en) Hole pitch positioning device for copper row and wire clamp
CN203266623U (en) Rectangular bus lap joint rapid scribing template
CN109616948B (en) A combined tool for positioning the installation hole of a wire clip for power equipment
CN103506793A (en) Welding spot positioning device capable of being adapted to various automobile pre-silencers
CN203203524U (en) Caliper gauge for technical test panel
CN202373879U (en) Hole distance localizer for copper bar and wire clamp
CN204770827U (en) Rotor brake base jig frock
CN111207651A (en) All-angle clamps perforated to length
CN212264348U (en) Electric power wire clamp positioning ruler that punches
CN219233765U (en) A wire clip punching and positioning device
CN204934673U (en) A kind of box type rod piece via hole drilling equipment
CN103346456B (en) Sticker method for determining center position of machined hole on device clamp connection terminal
CN204525670U (en) Carpenter's round log tenon punching positioner
CN220145930U (en) Main conductive loop connection surface hole distance positioning marking tool
CN110586750A (en) Punching positioning device and application thereof
CN205436702U (en) Generating line processing bender

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant