CN109589036A - A kind of multi-functional roofing cleaning device fixed structure - Google Patents

A kind of multi-functional roofing cleaning device fixed structure Download PDF

Info

Publication number
CN109589036A
CN109589036A CN201811604424.3A CN201811604424A CN109589036A CN 109589036 A CN109589036 A CN 109589036A CN 201811604424 A CN201811604424 A CN 201811604424A CN 109589036 A CN109589036 A CN 109589036A
Authority
CN
China
Prior art keywords
tube
square tube
firm banking
vertical tube
roofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811604424.3A
Other languages
Chinese (zh)
Inventor
吴昌华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Suxin Huaan Curtain Wall Decoration Engineering Co Ltd
Original Assignee
Beijing Suxin Huaan Curtain Wall Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Suxin Huaan Curtain Wall Decoration Engineering Co Ltd filed Critical Beijing Suxin Huaan Curtain Wall Decoration Engineering Co Ltd
Priority to CN201811604424.3A priority Critical patent/CN109589036A/en
Publication of CN109589036A publication Critical patent/CN109589036A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47LDOMESTIC WASHING OR CLEANING; SUCTION CLEANERS IN GENERAL
    • A47L3/00Safety devices for use in window-cleaning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/002Arrangements for cleaning building facades

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The present invention relates to the technical fields of curtain cleaning, more particularly, to a kind of multi-functional roofing cleaning device fixed structure, it includes firm banking, the head relative to firm banking sliding is embedded in firm banking, being equipped on firm banking and head makes the two keep relatively-stationary fastener;Square tube bracket is connected between firm banking and roofing inner wall surface, square tube bracket includes the bracket transverse tube that both ends are separately fixed in firm banking and roofing inner wall surface and both ends are connected to the bracket inclined tube in firm banking and roofing inner wall surface.The present invention enables boom quickly and to be fixedly mounted in roofing inner wall surface, manpower needed for advantageously reducing installation process, effectively increases the washing and cleaning operation efficiency of curtain wall by providing a kind of multi-functional roofing cleaning device fixed structure.

Description

A kind of multi-functional roofing cleaning device fixed structure
Technical field
The present invention relates to the technical fields of curtain cleaning, more particularly, to a kind of multi-functional roofing cleaning device fixed knot Structure.
Background technique
With the development of society, the high buildings and large mansions in city are seen everywhere, all installed on the metope of major part high building now Curtain wall.Curtain wall will appear spot after prolonged use, to influence the aesthetics of whole building appearance.Work as curtain When occurring spot on wall, the mode that " artificial+platform sling " or " artificial+hanging basket " is usually used in traditional method is cleaned.
Existing notification number be CN106917514A a kind of spider-man's lifting rope device, including hanging basket clump weight, hanging basket boom, Main rope, slide plate, pulley and safety rope, the hanging basket boom are fixed on hanging basket clump weight, and the pulley is mounted on hanging basket boom Top, the main rope and safety rope bind across pulley in hanging basket boom front end, and the slide plate binding is in main rope and safety rope Bottom, in the operating condition, the spider-man is fixed on slide plate, and the spider-man is buckled on safety rope.
Prior art among the above have the following deficiencies: the lifting rope device in documents in a pre-installation firstly the need of Hanging basket boom accessory is transported to corresponding position of the roofing close to alien invasion with corresponding hanging basket clump weight, due to hanging basket clump weight Volume is larger, therefore the whole process that hanging basket clump weight is transported to roofing and is transported hanging basket clump weight from roofing is relative complex, And need to spend biggish manpower, thus greatly reduce the washing and cleaning operation efficiency of curtain wall.
Summary of the invention
The object of the present invention is to provide a kind of multi-functional roofing cleaning device fixed structures, enable boom quick And be fixedly mounted in roofing inner wall surface, manpower needed for advantageously reducing installation process effectively increases the cleaning of curtain wall Operating efficiency.
Foregoing invention purpose of the invention has the technical scheme that
A kind of multi-functional roofing cleaning device fixed structure, including firm banking are embedded with relative to solid in firm banking The head for determining pedestal sliding, being equipped on firm banking and head makes the two keep relatively-stationary fastener; Be connected with square tube bracket between firm banking and roofing inner wall surface, square tube bracket include both ends be separately fixed at firm banking with Bracket transverse tube and both ends in roofing inner wall surface are connected to the bracket inclined tube in firm banking and roofing inner wall surface.
By using above-mentioned technical proposal, firm banking is directly anchored in roofing inner wall surface by square tube bracket, one Come be conducive to increase firm banking and roofing inner wall surface integraty, enhance the fastness of connection;Two is every to be conducive to save The time of secondary installation firm banking, substantially increase the washing and cleaning operation efficiency of curtain wall.Setting head is slidably mounted on fixation On pedestal, be conducive to the efficiency of loading and unloading for improving head, and after each washing and cleaning operation, it can also be by head It removes and is saved from firm banking, to reduce erosion and destruction of the external environment to head.Firm banking with Square tube bracket of the setting for connection between roofing inner wall surface is stablized using the triangle that square tube bracket and roofing inner wall surface are formed Structure bears to shear, and is conducive to the power dispersion of firm banking passing to roofing and wall, avoids occurring because concentrated force is excessive due to The case where damaging wall by pressure.
The present invention is further arranged to: firm banking includes first square tube vertical tube disposed in parallel and second square tube vertical tube, Several first square tube transverse tubes are connected between first square tube vertical tube and second square tube vertical tube, the both ends of the bracket transverse tube are welded respectively It connects on first square tube vertical tube and roofing inner wall surface.
By using above-mentioned technical proposal, for being bolted, welding has bonding strength height, high production efficiency The advantages that with good seal performance, is conducive to improve by the way of welding bracket transverse tube and roofing inner wall surface, bracket transverse tube and the The compactness connected between one square tube vertical tube, to increase the integraty of firm banking Yu roofing inner wall surface.
The present invention is further arranged to: second square tube cross is also welded between first square tube vertical tube and roofing inner wall surface Pipe, second square tube transverse tube are located at bracket inclined tube backwards to the side of bracket transverse tube.
By using above-mentioned technical proposal, welding setting second square tube is horizontal between first square tube vertical tube and roofing inner wall surface Pipe, and second square tube transverse tube is made to be located at bracket inclined tube backwards to the side of bracket transverse tube so that second square tube transverse tube, bracket inclined tube and Second stable triangular structure is formed between first square tube vertical tube three, is conducive to the installation for further enhancing firm banking Fastness.
The present invention is further arranged to: the quantity of the first square tube transverse tube is at least three, adjacent two first square tubes The distance between transverse tube is equal.
By using above-mentioned technical proposal, the quantity that first square tube transverse tube is arranged is at least three, is conducive to increase by first The fastness connected between square tube vertical tube and second square tube vertical tube.The distance between adjacent two first square tube transverse tubes phase is set Deng, make the first square tube transverse tube of different location can uniform force, be conducive to improve the integrally-built stability of firm banking.
The present invention is further arranged to: the welding manner is argon arc welding.
By using above-mentioned technical proposal, due to argon gas protection can completely cut off oxygen in air, nitrogen, hydrogen etc. to electric arc and The adverse effect that molten bath generates, reduces the scaling loss of alloying element, therefore is easy to get to densification, without the welding point to splash, quality is high.This Outside, the arc burning of argon arc welding is stablized, and heat is concentrated, and arc column temperature is high, and welding production efficiency is high, and heat affected area is narrow, is welded Weldment stress, deformation, crackle tendency are small.
The present invention is further arranged to: head includes third party tube vertical tube and the 4th square tube vertical tube disposed in parallel, And it is fixed on the third party tube transverse tube between third party tube vertical tube and the 4th square tube vertical tube;In first square tube vertical tube and second party The cavity for penetrating third party tube vertical tube and the 4th square tube vertical tube is offered in pipe vertical tube.
By using above-mentioned technical proposal, being respectively provided on first square tube vertical tube and second square tube vertical tube keeps third party tube perpendicular The cavity that tetra- square tube vertical tube of Guan Yu penetrates, enables head to be more convenient to be installed on firm banking more easily, favorably The time needed for reducing operator and loading and unloading head every time, substantially increase washing and cleaning operation efficiency.
The present invention is further arranged to: waterproof plastic cap is cased in the opening of cavity.
By using above-mentioned technical proposal, when head is not attached on firm banking, waterproof plastic cap is set It sets and advantageously reduces extraneous aqueous vapor or a possibility that dust is entered in cavity, effectively increase the use quality of firm banking.
The present invention is further arranged to: being equipped with several the second bolts on third party tube vertical tube and the 4th square tube vertical tube Hole is equipped with several the first bolts hole corresponding with the second bolt hole, institute on first square tube vertical tube and second square tube vertical tube Fastener is stated to be fastening bolt and be threaded through in the first bolt hole and the second bolt hole.
By using above-mentioned technical proposal, first square tube is penetrated from top to down in third party tube vertical tube and the 4th square tube vertical tube After the cavity of vertical tube and second square tube vertical tube, it is aligned with each other the second bolt hole of the first bolt hole and corresponding position, is then used Fastening bolt makes head and firm banking keep relatively fixed across the first bolt hole with corresponding second bolt hole, Be conducive to increase the fastness connected between head and firm banking.
The present invention is further arranged to: the quantity of first bolt hole or the second bolt hole is at least three, and adjacent two The distance between a first bolt hole or two neighboring second bolt hole are equal.
By using above-mentioned technical proposal, the quantity that the first bolt hole or the second bolt hole is arranged is at least three, favorably The fastness connected between increase head and firm banking.Two neighboring first bolt hole or two neighboring second are set The distance between bolt hole is equal, makes the fastening bolt of different location being capable of uniform force.
The present invention is further arranged to: third party tube vertical tube is fixed with the 4th square tube vertical tube in the side backwards to firm banking There is boom, boom is fixed with hanging ring in the one end for stretching out exterion walls face, and hanging ring is located at boom backwards to the side of firm banking.
By using above-mentioned technical proposal, boom is arranged in hanging ring and stretches out the one end in exterion walls face and positioned at boom back To the side of firm banking, the positioning action that making hanging ring only needs to play the role of to safety rope and main rope has without playing carrying Conducive to the service life for extending hanging ring.
In conclusion advantageous effects of the invention are as follows:
1. by the way that firm banking to be directly anchored in roofing inner wall surface by square tube bracket, one is conducive to increase firm banking With the integraty of roofing inner wall surface, the fastness of connection is enhanced;Two are conducive to save time of installation firm banking every time, Substantially increase the washing and cleaning operation efficiency of curtain wall.
2. by welding setting second square tube transverse tube between first square tube vertical tube and roofing inner wall surface, and making second square tube Transverse tube is located at bracket inclined tube backwards to the side of bracket transverse tube, so that second square tube transverse tube, bracket inclined tube and first square tube vertical tube three Second stable triangular structure is formed between person, is conducive to the installation fastness for further enhancing firm banking.
3. stretching out the one end in exterion walls face and positioned at boom backwards to the one of firm banking by the way that boom is arranged in hanging ring Side, the positioning action that making hanging ring only needs to play the role of to safety rope and main rope have been conducive to extend hanging ring without playing carrying Service life.
Detailed description of the invention
Fig. 1 is the schematic view of the mounting position of firm banking in the embodiment of the present invention one.
Fig. 2 is the structural schematic diagram of firm banking in the embodiment of the present invention one.
Fig. 3 is a kind of overall structure signal of multi-functional roofing cleaning device fixed structure in the embodiment of the present invention one Figure.
Fig. 4 is the structural schematic diagram of head in the embodiment of the present invention one.
Fig. 5 is the schematic diagram of internal structure of first square tube vertical tube in the embodiment of the present invention two.
Fig. 6 is the enlarged drawing of part A in Fig. 5.
In figure, 1, firm banking;11, first square tube vertical tube;111, first square tube transverse tube;112, second square tube transverse tube; 113, waterproof plastic cap;114, slot;12, second square tube vertical tube;121, the first bolt hole;13, square tube bracket;131, bracket is horizontal Pipe;132, bracket inclined tube;133, sliding block;14, positioning plate;141, spring;142, connecting rod;15, limited block;16, mounting plate;
2, head;21, boom;22, hanging ring;23, third party tube vertical tube;231, third party tube transverse tube;232, the second bolt Hole;24, the 4th square tube vertical tube.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one
Referring to Fig.1, it is a kind of multi-functional roofing cleaning device fixed structure disclosed by the invention, including is fixed on roofing vertically Firm banking 1 in inner wall surface.In the present embodiment, firm banking 1 includes first square tube vertical tube 11 and second disposed in parallel Square tube vertical tube 12 is successively welded with three first square tubes from top to down between first square tube vertical tube 11 and second square tube vertical tube 12 Transverse tube 111, the distance between adjacent two first square tube transverse tubes 111 are equal.
Referring to Fig.1, vertical cavity is offered in first square tube vertical tube 11 and second square tube vertical tube 12.In this implementation In example, the opening of cavity is arranged vertically upwards, and waterproof plastic cap 113 is cased in the opening of cavity.
Referring to Fig.1 with Fig. 2, it is all provided with that there are three from top to down successively on first square tube vertical tube 11 and second square tube vertical tube 12 First bolt hole 121 of arrangement.In the present embodiment, the distance between two neighboring first bolt hole 121 is equal.
Referring to Fig.1 with Fig. 2, square tube bracket 13 is connected between first square tube vertical tube 11 and roofing inner wall surface.In this reality It applies in example, square tube bracket 13 includes the bracket transverse tube 131 that both ends are respectively welded in first square tube vertical tube 11 and roofing inner wall surface, And both ends are connected to the bracket inclined tube 132 in first square tube vertical tube 11 and roofing inner wall surface.Wherein bracket inclined tube 132 In bracket transverse tube 131 towards the side on roof ground.Welding manner is argon arc welding.
Referring to Fig.1 with Fig. 2, second square tube transverse tube 112 is also welded between first square tube vertical tube 11 and roofing inner wall surface, Second square tube transverse tube 112 is located at side of the bracket inclined tube 132 backwards to bracket transverse tube 131.
Referring to Fig. 3 and Fig. 4, head 2 is installed on firm banking 1.In the present embodiment, head 2 includes Third party tube vertical tube 23 and the 4th square tube vertical tube 24 disposed in parallel and both ends are respectively welded and are fixed on third party tube vertical tube 23 With the third party tube transverse tube 231 on the 4th square tube vertical tube 24.
Referring to Fig. 3 and Fig. 4, be all provided on third party tube vertical tube 23 and the 4th square tube vertical tube 24 there are three from top to down successively Second bolt hole 232 of arrangement.In the present embodiment, the distance between two neighboring second bolt hole 232 is equal.
Referring to Fig. 3 and Fig. 4, lateral boom 21 is fixed on third party tube vertical tube 23 and the 4th square tube vertical tube 24.? In the present embodiment, hanging ring 22 is equipped on boom 21, hanging ring 22 is fixed on boom 21 and stretches out the one end in exterion walls face and be located at Boom 21 is backwards to the side of firm banking 1.
The working principle of the present embodiment are as follows: in installation activity device 2, first open the waterproof plastic covered on cavities open Then third party tube vertical tube 23 and the 4th square tube vertical tube 24 are respectively penetrated first square tube vertical tube 11 and by cap 113 from top to down After the cavity of two square tube vertical tubes 12, it is aligned with each other the first bolt hole 121 and the second bolt hole 232 of corresponding position, is then used Fastening bolt passes through the first bolt hole 121 with corresponding second bolt hole 232 to make head 2 and firm banking 1 keep It is relatively fixed.
After washing and cleaning operation, fastening bolt is unscrewed, head 2 is vertically lifted relative to firm banking 1. After head 2 and firm banking 1 are kept completely separate, waterproof plastic cap 113 is covered on cavities open again.
For the present embodiment by the way that firm banking 1 to be directly anchored in roofing inner wall surface by square tube bracket 13, one is advantageous In the integraty for increasing firm banking 1 and roofing inner wall surface, the fastness of connection is enhanced;Two are conducive to save each installation The time of firm banking 1 substantially increases the washing and cleaning operation efficiency of curtain wall.In addition, setting head 2 is slidably mounted on fixation On pedestal 1, be conducive to the efficiency of loading and unloading for improving head 2, and after each washing and cleaning operation, activity can also be filled It sets 2 to remove and saved from firm banking 1, to reduce erosion and destruction of the external environment to head 2.
Embodiment two
A kind of multi-functional roofing cleaning device fixed structure illustrates embodiment two and embodiment one referring to Fig. 5 in Fig. 5 Distinguish part.It is embedded in cavity of the first square tube vertical tube 11 with second square tube vertical tube 12 and determines relative to what cavity slided up and down Position plate 14.In the present embodiment, positioning plate 14 is hinged with connecting rod 142 in the side towards roof ground.
Referring to Fig. 5 and Fig. 6, mounting plate is further fixed in the cavity of first square tube vertical tube 11 and second square tube vertical tube 12 16.In the present embodiment, mounting plate 16 has the side of connecting rod 142 close to positioning plate 14, and in mounting plate 16 and positioning plate 14 Between be connected with spring 141.The axis of spring 141 is perpendicular to roof ground, and the both ends of spring 141 are individually fixed in mounting plate 16 with positioning plate 14 on.
Referring to Fig. 5 and Fig. 6, limited block is further fixed in the cavity of first square tube vertical tube 11 and second square tube vertical tube 12 15.In the present embodiment, limited block 15 is between mounting plate 16 and positioning plate 14.When positioning plate 14 is connected on limited block 15 When, the first bolt hole 121 of the second bolt hole 232 and corresponding position is coaxial.
Referring to Fig. 5 and Fig. 6, sliding block 133, sliding block 133 are slidably connected backwards to the side on roof ground in bracket transverse tube 131 Glide direction perpendicular to roofing inner wall surface and be parallel to roof ground.In the present embodiment, first square tube vertical tube 11 is in direction The side of roofing inner wall surface, which offers, is connected to its cavity and extraneous slot 114, and 114 length of slot extends perpendicularly to room Push up ground.Connecting rod 142 is pierced by from slot 114 relative to one end of positioning plate 14 and is rotationally connected on sliding block 133, works as positioning plate 14 when being connected on limited block 15, and sliding block 133 is also connected in roofing inner wall surface simultaneously, at this time connecting rod 142, bracket transverse tube 131 Triangle stable support structure is constituted between 11 three of first square tube vertical tube.
The working principle of the present embodiment are as follows: when third party tube vertical tube 23 and the 4th square tube vertical tube 24 are penetrated first from the external world When the cavity of square tube vertical tube 11 and second square tube vertical tube 12, third party tube vertical tube 23 and the 4th square tube vertical tube 24 are first connected to positioning On plate 14, positioning plate 14 is then pressed to limited block 15.At this point, positioning plate 14 and the cooperation of mounting plate 16 squeeze spring 141, and lead to Crossing connecting rod 142 pushes sliding block 133 to slide towards roofing inner wall surface direction.
When positioning plate 14 is connected on limited block 15, sliding block 133 is also connected in roofing inner wall surface simultaneously, and at this time second Bolt hole 232 and the first bolt hole 121 of corresponding position are coaxial.The first bolt hole 121 and corresponding the are passed through with fastening bolt Two bolts hole 232 are to make head 2 keep relatively fixed with firm banking 1.
The present embodiment is by the setting limited block 15 in the cavity of first square tube vertical tube 11 and second square tube vertical tube 12 and slides Dynamic positioning plate 14 allows the operator to quickly be directed at the first bolt hole 121 and corresponding second bolt hole 232, favorably Required set-up time when reducing operator in installation activity device 2.It is perpendicular in first square tube vertical tube 11 and second square tube Mounting plate 16 is set in the cavity of pipe 12, and the spring 141 of connection is set between mounting plate 16 and positioning plate 14, works as positioning plate 14 when pressing to limited block 15 by head 2 from top to down, and being provided with for spring 141 is conducive to buffer positioning plate 14, subtracts Shock kinetic energy between few positioning plate 14 and limited block 15, and then the impact damage between positioning plate 14 and limited block 15 is reduced, Be conducive to protect positioning plate 14 and limited block 15.The sliding block slid relative to bracket transverse tube 131 is set on bracket transverse tube 131 133, and connecting rod 142 is set between positioning plate 14 and sliding block 133, make the first bolt when positioning plate 14 is connected on limited block 15 When hole 121 can be directed at corresponding second bolt hole 232, connecting rod 142, bracket transverse tube 131 and 11 three of first square tube vertical tube it Between also constitute third triangle stable support structure, be conducive to the installation fastness for further enhancing firm banking 1.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of multi-functional roofing cleaning device fixed structure, it is characterised in that: including firm banking (1), in firm banking (1) it is embedded with the head (2) relative to firm banking (1) sliding in, is worn on firm banking (1) and head (2) Equipped with both making to keep relatively-stationary fastener;
It is connected between firm banking (1) and roofing inner wall surface square tube bracket (13), square tube bracket (13) includes both ends difference The bracket transverse tube (131) and both ends being fixed in firm banking (1) and roofing inner wall surface are connected to firm banking (1) With the bracket inclined tube (132) in roofing inner wall surface.
2. a kind of multi-functional roofing cleaning device fixed structure according to claim 1, it is characterised in that: firm banking It (1) include first square tube vertical tube (11) disposed in parallel and second square tube vertical tube (12), first square tube vertical tube (11) and second party Several first square tube transverse tubes (111) are connected between pipe vertical tube (12), the both ends of the bracket transverse tube (131) are respectively welded at On one square tube vertical tube (11) and roofing inner wall surface.
3. a kind of multi-functional roofing cleaning device fixed structure according to claim 2, it is characterised in that: in first party It is also welded between pipe vertical tube (11) and roofing inner wall surface second square tube transverse tube (112), second square tube transverse tube (112) is located at bracket Side of the inclined tube (132) backwards to bracket transverse tube (131).
4. a kind of multi-functional roofing cleaning device fixed structure according to claim 3, it is characterised in that: described first The quantity of square tube transverse tube (111) is at least three, and the distance between adjacent two first square tube transverse tubes (111) are equal.
5. a kind of multi-functional roofing cleaning device fixed structure according to claim 4, it is characterised in that: the welding Mode is argon arc welding.
6. a kind of multi-functional roofing cleaning device fixed structure according to claim 1, it is characterised in that: head (2) include third party tube vertical tube (23) disposed in parallel and the 4th square tube vertical tube (24), and be fixed on third party tube vertical tube (23) the third party tube transverse tube (231) between the 4th square tube vertical tube (24);
Offering in first square tube vertical tube (11) and second square tube vertical tube (12) makes third party tube vertical tube (23) and four directions The cavity that pipe vertical tube (24) penetrates.
7. a kind of multi-functional roofing cleaning device fixed structure according to claim 6, it is characterised in that: in cavity Waterproof plastic cap (113) are cased in opening.
8. a kind of multi-functional roofing cleaning device fixed structure according to claim 7, it is characterised in that: in third party Several the second bolts hole (232) are equipped on pipe vertical tube (23) and the 4th square tube vertical tube (24), in first square tube vertical tube (11) And several the first bolts hole (121) corresponding with the second bolt hole (232) are equipped on second square tube vertical tube (12), it is described tight Firmware is fastening bolt and is threaded through in the first bolt hole (121) and the second bolt hole (232).
9. a kind of multi-functional roofing cleaning device fixed structure according to claim 8, it is characterised in that: described first The quantity of bolt hole (121) or the second bolt hole (232) is at least three, two neighboring first bolt hole (121) or adjacent two The distance between a second bolt hole (232) is equal.
10. a kind of multi-functional roofing cleaning device fixed structure according to claim 9, it is characterised in that: third party Pipe vertical tube (23) and the 4th square tube vertical tube (24) are fixed with boom (21) in the side backwards to firm banking (1), and boom (21) exists The one end for stretching out exterion walls face is fixed with hanging ring (22), and hanging ring (22) is located at the side of boom (21) backwards to firm banking (1).
CN201811604424.3A 2018-12-26 2018-12-26 A kind of multi-functional roofing cleaning device fixed structure Pending CN109589036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811604424.3A CN109589036A (en) 2018-12-26 2018-12-26 A kind of multi-functional roofing cleaning device fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811604424.3A CN109589036A (en) 2018-12-26 2018-12-26 A kind of multi-functional roofing cleaning device fixed structure

Publications (1)

Publication Number Publication Date
CN109589036A true CN109589036A (en) 2019-04-09

Family

ID=65963461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811604424.3A Pending CN109589036A (en) 2018-12-26 2018-12-26 A kind of multi-functional roofing cleaning device fixed structure

Country Status (1)

Country Link
CN (1) CN109589036A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW576169U (en) * 2002-10-21 2004-02-11 Wen-An Tzeng Rope for sedan chair
CN201053200Y (en) * 2007-06-28 2008-04-30 宏润建设集团股份有限公司 Assembled
CN201102869Y (en) * 2007-07-25 2008-08-20 湖南省第六工程公司 Large arm device of midair-disassembling horizontal lazy-arm type tower crane
US20100032235A1 (en) * 2008-08-08 2010-02-11 Michael Barendregt Safety arrangement for use in constructing a wood frame building
CN205502548U (en) * 2016-03-22 2016-08-24 姚雲 Scaffold for building portable
CN206822574U (en) * 2017-01-19 2018-01-02 广州歌德幕墙设计咨询有限公司 A kind of spider-man wipes window cleaning mounting system
CN206941586U (en) * 2017-05-31 2018-01-30 中建二局第二建筑工程有限公司 A kind of device for improving pile crown and abolishing efficiency
CN207597845U (en) * 2017-12-11 2018-07-10 广西互恒建筑材料有限公司 Z-shaped support structure
CN207774631U (en) * 2017-11-13 2018-08-28 广西电网有限责任公司柳州供电局 A kind of light-duty tunable capacitor attaching/detaching apparatus
CN208200121U (en) * 2018-05-31 2018-12-07 广西玉柴机器股份有限公司 A kind of casting sand core suspender
CN209750913U (en) * 2018-12-26 2019-12-10 北京苏鑫华安幕墙装饰工程有限公司 Multi-functional roofing belt cleaning device fixed knot constructs

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW576169U (en) * 2002-10-21 2004-02-11 Wen-An Tzeng Rope for sedan chair
CN201053200Y (en) * 2007-06-28 2008-04-30 宏润建设集团股份有限公司 Assembled
CN201102869Y (en) * 2007-07-25 2008-08-20 湖南省第六工程公司 Large arm device of midair-disassembling horizontal lazy-arm type tower crane
US20100032235A1 (en) * 2008-08-08 2010-02-11 Michael Barendregt Safety arrangement for use in constructing a wood frame building
CN205502548U (en) * 2016-03-22 2016-08-24 姚雲 Scaffold for building portable
CN206822574U (en) * 2017-01-19 2018-01-02 广州歌德幕墙设计咨询有限公司 A kind of spider-man wipes window cleaning mounting system
CN206941586U (en) * 2017-05-31 2018-01-30 中建二局第二建筑工程有限公司 A kind of device for improving pile crown and abolishing efficiency
CN207774631U (en) * 2017-11-13 2018-08-28 广西电网有限责任公司柳州供电局 A kind of light-duty tunable capacitor attaching/detaching apparatus
CN207597845U (en) * 2017-12-11 2018-07-10 广西互恒建筑材料有限公司 Z-shaped support structure
CN208200121U (en) * 2018-05-31 2018-12-07 广西玉柴机器股份有限公司 A kind of casting sand core suspender
CN209750913U (en) * 2018-12-26 2019-12-10 北京苏鑫华安幕墙装饰工程有限公司 Multi-functional roofing belt cleaning device fixed knot constructs

Similar Documents

Publication Publication Date Title
CN204960269U (en) Integral pylon
CN101830415A (en) Multifunctional boiler hearth overhauling platform
CN106006498A (en) Reverse wall straddling type basket hanging mechanism
CN203497959U (en) Support structure without inclined rod for tower crane
CN109589036A (en) A kind of multi-functional roofing cleaning device fixed structure
CN201721597U (en) Flat deck track type marine hanging basket suspension
CN208816029U (en) A kind of aluminium alloy door with warning function
CN209750913U (en) Multi-functional roofing belt cleaning device fixed knot constructs
CN207499592U (en) A kind of construction place bounding wall guardrail structure
CN209712744U (en) A kind of roofing cleaning device fixed structure
CN216042530U (en) Heightening hanging basket system
CN212249129U (en) Protective net fixing rod for attached lifting scaffold
CN210147064U (en) High-efficient perforator of portable floor
CN108483284B (en) A kind of derrick crane base steel plinth suspension installation method
CN202054586U (en) Multifunctional boiler furnace overhauling platform
CN206693730U (en) Composite construction formula power transmission tower
CN205662235U (en) Making wine rice steamer bucket hanger device
CN211258725U (en) Gas monitoring and early warning system
CN210563337U (en) Portable postposition embedded part capable of replacing hanging basket counterweight
CN213326288U (en) Prefabricated wall hoist and mount shoulder pole roof beam of assembly type structure
CN213297368U (en) Tower support device for high-altitude torch
CN213205096U (en) Combined normal-temperature swimming pool machine
CN214696715U (en) Building wallboard erecting machine
CN217501100U (en) Large-span supporting structure of steel structure factory building
CN215803105U (en) Suspension bracket without counterweight

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 331, shiziying village, Baishan Town, Changping District, Beijing 102200

Applicant after: BEIJING SUXIN HUA'AN CURTAIN WALL DECORATIVE ENGINEERING Co.,Ltd.

Address before: 102200 South of Zhangying Village, Nanshao Town, Changping District, Beijing

Applicant before: BEIJING SUXIN HUA'AN CURTAIN WALL DECORATIVE ENGINEERING Co.,Ltd.