CN109586216A - Keel bracket is used in a kind of suspention of cable - Google Patents
Keel bracket is used in a kind of suspention of cable Download PDFInfo
- Publication number
- CN109586216A CN109586216A CN201811539263.4A CN201811539263A CN109586216A CN 109586216 A CN109586216 A CN 109586216A CN 201811539263 A CN201811539263 A CN 201811539263A CN 109586216 A CN109586216 A CN 109586216A
- Authority
- CN
- China
- Prior art keywords
- cable
- keel
- top plate
- suspention
- bridge type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A kind of cable suspention keel bracket; it include: at least two suspension hangs muscle groups; the suspension hangs muscle group is made of left and right two keel hangs muscles disposed in parallel; in the suspension hangs muscle group from top to bottom successively cable protection shell, support gantry; the support gantry includes the bridge type top plate of upward arc-shaped bend, and the vertex of the bridge type top plate and the bottom center position of the cable protection shell offset.The present invention is completed by setting cable protection shell, support gantry and is supported while protecting cable to the center of protection shell.
Description
Technical field
The present invention relates to the mounting device technical fields of cable, and in particular to keel bracket is used in a kind of suspention of cable.
Background technique
Inevitably it is related to what part wiring was routed from ceiling cabling, traditional furred ceiling when cable distribution
Mode is the support force using furred ceiling and keel itself, and cable is taken and is placed on keel or furred ceiling, and this mode has several lack
Point, first, since cable weight itself is higher, prolonged this placement is easy to cause keel to deform;Second, cable is exposed to
Outside is easy the damage that bitten by mouse.The prior art stores cable by the way that cabling channel is arranged in keel, and this mode is being put
Set that the time is long long afterwards, the middle position of cable is easy to cause keel to deform because of gravity sag, and this mode equally lacks pair
The protection of cable surface.
Summary of the invention
The object of the present invention is to provide a kind of cable suspention keel bracket, the present invention by setting cable protection shell,
Support gantry, which is completed, is supported the center of protection shell while protecting cable.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of cable suspention keel branch
Frame, comprising: at least two suspension hangs muscle groups, the suspension hangs muscle group are made of left and right two keel hangs muscles disposed in parallel,
In the suspension hangs muscle group from top to bottom successively cable protection shell, support gantry, the support gantry includes upward arc
The curved bridge type top plate of shape, the vertex of the bridge type top plate and the bottom center position of the cable protection shell offset.
As a preference of the present invention, the support gantry is socketed by set fishplate bar and the keel hangs muscle, the bridge
The both ends of type top plate are provided with jack, are provided on the set fishplate bar and the jack, plug.
As a preference of the present invention, the bridge type top plate includes arc panel and A-frame, the A-frame is set
It is placed in the lower section of the arc panel, and the vertex of the A-frame and the back side on the vertex of the arc panel offset.
As a preference of the present invention, the equal and plug of the both ends of the A-frame and the arc panel is solid
It connects.
As a preference of the present invention, the cable protection shell includes upper cover plate and lower supporting plate, the upper cover plate
It is provided with arc groove with the opposite flank of the lower supporting plate, arc groove split described in two sides forms cable passage.
As a preference of the present invention, the spacing of keel hangs muscle described in two be the cable passage diameter 1.1~
1.2 again.
As a preference of the present invention, the width of the bridge type top plate is greater than the diameter of the cable passage.
As a preference of the present invention, the cable protection shell is nylon plastic(s) material, the bridge type top plate is modeling
Steel material.
In conclusion the invention has the following beneficial effects:
The present invention, which possesses, can protect cable surface, and the advantages of promoted to the supportive of cable.
Detailed description of the invention
Fig. 1 is the side structure schematic view of the embodiment of the present invention;
Fig. 2 is that the embodiment of the present invention faces view structural schematic diagram;
Fig. 3 is the structural schematic diagram of the support gantry of the embodiment of the present invention;
In figure:
1- hangs hangs muscle group;1-1- keel hangs muscle;2- cable protection shell;3- supports gantry;4-T type keel;3-1- bridge
Type top plate;3-2- covers fishplate bar;5- sleeve joint hole;6- nut;7- jack;8- plug;3-1-1- arc panel;3-1-2- A-frame;
2-1- upper cover plate;2-2- lower supporting plate;9- upper joint sleeve plate;10- lower joint sleeve plate;11-1- arc groove;11- cable passage.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As shown in Figure 1 and Figure 2, it is successively set before and after the laying extending direction of cable the embodiment of the present invention includes at least two
At least two suspension hangs muscle groups 1 set, suspension hangs muscle group 1 are arranged threaded keel by left and right two surfaces disposed in parallel and hang
Muscle 1-1 composition, hang hangs muscle group 1 on pass sequentially through from top to bottom nut 6 be fixed with cable protection shell 2, support gantry 3 and
T-type keel 4, support gantry 3 include the bridge type top plate 3-1 of upward arc-shaped bend, the vertex of bridge type top plate 3-1 and cable protection shell
The bottom center position along laying cable extending direction of body 2 offsets.Cable protection shell 2 is nylon plastic(s) material, bridge type top
Plate 3-1 is plastic-steel material.
As shown in Figure 1, Figure 2, Figure 3 shows, support gantry 3 of the embodiment of the present invention is hung by covering the sleeve joint hole 5 of fishplate bar 3-2 with keel
Muscle 1-1 is socketed, and is provided with nut 6 on the downside of set fishplate bar 3-2 and is supported fixation, the both ends of bridge type top plate 3-1 are provided with slotting
Hole 7 covers and is provided on fishplate bar 3-2 with the plug 8 of 7 plug of jack cooperation so that it is convenient to which construction personnel's more cable weight is replaced
The bridge type top plate 3-1 of dimension.Bridge type top plate 3-1 includes arc panel 3-1-1 and A-frame 3-1-2, A-frame 3-1-2
It is set to the lower section of arc panel 3-1-1, and the vertex of A-frame 3-1-2 and the back side on the vertex of arc panel 3-1-1 offset.Three
The both ends of angle support 3-1-2 and the equal and plug 8 of arc panel 3-1-1 are affixed.
As shown in Figure 1 and Figure 2, cable protection of embodiment of the present invention shell 2 includes upper cover plate 2-1 and lower supporting plate 2-2, bridge
The vertex of type top plate 3-1 and the bottom center position along laying cable extending direction of lower supporting plate 2-2 offset, upper cover plate 2-1
It is socketed on keel hangs muscle 1-1 by upper joint sleeve plate 9, the upside of upper joint sleeve plate 9 is limited by nut 6, lower supporting plate 2-2
It is socketed on keel hangs muscle 1-1 by lower joint sleeve plate 10, the downside of lower joint sleeve plate 10 is fixed by the support of nut 6, upper cover
The opposite flank of plate 2-1 and lower supporting plate 2-2 is provided with the arc groove 11-1 for accommodating cable, and two sides arc groove 11-1 is spelled
Conjunction forms cable passage 11.The spacing of two keel hangs muscle 1-1 is the diameter of cable passage 11 in same suspension hangs muscle group 1
1.1~1.2 times.The width of bridge type top plate 3-1 is greater than the diameter of cable passage 11, and width refers to the spacing of two keel hangs muscle 1-1
Length dimension on direction.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (8)
1. a kind of cable suspention keel bracket characterized by comprising at least two suspensions hangs muscle group (1), the suspension
Hangs muscle group (1) is made of left and right two keel hangs muscles (1-1) disposed in parallel, in the suspension hangs muscle group (1) from top to bottom
Successively cable protection shell (2), support gantry (3), the support gantry (3) includes the bridge type top plate of upward arc-shaped bend
(3-1), the vertex of the bridge type top plate (3-1) and the bottom center position of the cable protection shell (2) offset.
2. a kind of cable suspention keel bracket according to claim 1, it is characterised in that: the support gantry (3)
It is socketed by set fishplate bar (3-2) and the keel hangs muscle (1-1), the both ends of the bridge type top plate (3-1) are provided with jack
(7), it is provided on the set fishplate bar (3-2) and the jack (7) plug (8).
3. a kind of cable suspention keel bracket according to claim 2, it is characterised in that: the bridge type top plate (3-
It 1) include arc panel (3-1-1) and A-frame (3-1-2), the A-frame (3-1-2) is set to the arc panel (3-
Lower section 1-1), and the back side on the vertex and the vertex of the arc panel (3-1-1) of the A-frame (3-1-2) offsets.
4. a kind of cable suspention keel bracket according to claim 3, it is characterised in that: the A-frame (3-
Both ends 1-2) are equal affixed with the described plug (8) with the arc panel (3-1-1).
5. a kind of cable suspention keel bracket according to claim 1, it is characterised in that: the cable protection shell
It (2) include upper cover plate (2-1) and lower supporting plate (2-2), the phase of the upper cover plate (2-1) and the lower supporting plate (2-2)
Side is provided with arc groove (11-1), arc groove (11-1) split described in two sides forms cable passage (11).
6. a kind of cable suspention keel bracket according to claim 5, it is characterised in that: keel hangs muscle described in two
The spacing of (1-1) is 1.1~1.2 times of the diameter of the cable passage (11).
7. a kind of cable suspention keel bracket according to claim 5, it is characterised in that: the bridge type top plate (3-
1) width is greater than the diameter of the cable passage (11).
8. a kind of cable suspention keel bracket according to claim 1, it is characterised in that: the cable protection shell
It (2) is nylon plastic(s) material, the bridge type top plate (3-1) is plastic-steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811539263.4A CN109586216B (en) | 2018-12-14 | 2018-12-14 | Keel support for cable suspension |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811539263.4A CN109586216B (en) | 2018-12-14 | 2018-12-14 | Keel support for cable suspension |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109586216A true CN109586216A (en) | 2019-04-05 |
CN109586216B CN109586216B (en) | 2022-01-18 |
Family
ID=65930378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811539263.4A Active CN109586216B (en) | 2018-12-14 | 2018-12-14 | Keel support for cable suspension |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109586216B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070006086A (en) * | 2005-07-07 | 2007-01-11 | 주식회사 제원에이스산업 | A cable tray hanger |
KR20140010811A (en) * | 2012-07-17 | 2014-01-27 | 이태평 | Cable hanger |
CN204597389U (en) * | 2015-05-20 | 2015-08-26 | 大连船舶重工集团有限公司 | Offshore petroleum drilling umbilical cable jockey |
CN105514890A (en) * | 2016-02-02 | 2016-04-20 | 杨刚 | Suspension clamp device |
CN106558855A (en) * | 2017-01-22 | 2017-04-05 | 中航光电科技股份有限公司 | Drive cable saddle rack in top |
CN206225928U (en) * | 2016-08-18 | 2017-06-06 | 孙向进 | A kind of novel power cable crane span structure |
CN207339132U (en) * | 2017-09-04 | 2018-05-08 | 四川锐明电力工程有限公司 | A kind of adjustable cable testing bridge suspension apparatus of vibrationproof |
CN207459613U (en) * | 2017-10-20 | 2018-06-05 | 济宁市技师学院 | A kind of cable testing bridge of power construction |
CN108847637A (en) * | 2018-07-12 | 2018-11-20 | 合肥甘来智能科技有限公司 | A kind of adjustable pipe-hanging hook of cable bridge buffer-type |
-
2018
- 2018-12-14 CN CN201811539263.4A patent/CN109586216B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070006086A (en) * | 2005-07-07 | 2007-01-11 | 주식회사 제원에이스산업 | A cable tray hanger |
KR20140010811A (en) * | 2012-07-17 | 2014-01-27 | 이태평 | Cable hanger |
CN204597389U (en) * | 2015-05-20 | 2015-08-26 | 大连船舶重工集团有限公司 | Offshore petroleum drilling umbilical cable jockey |
CN105514890A (en) * | 2016-02-02 | 2016-04-20 | 杨刚 | Suspension clamp device |
CN206225928U (en) * | 2016-08-18 | 2017-06-06 | 孙向进 | A kind of novel power cable crane span structure |
CN106558855A (en) * | 2017-01-22 | 2017-04-05 | 中航光电科技股份有限公司 | Drive cable saddle rack in top |
CN207339132U (en) * | 2017-09-04 | 2018-05-08 | 四川锐明电力工程有限公司 | A kind of adjustable cable testing bridge suspension apparatus of vibrationproof |
CN207459613U (en) * | 2017-10-20 | 2018-06-05 | 济宁市技师学院 | A kind of cable testing bridge of power construction |
CN108847637A (en) * | 2018-07-12 | 2018-11-20 | 合肥甘来智能科技有限公司 | A kind of adjustable pipe-hanging hook of cable bridge buffer-type |
Also Published As
Publication number | Publication date |
---|---|
CN109586216B (en) | 2022-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104969430B (en) | cable tray assembly | |
CN109340522A (en) | A kind of mosaic screen support construction | |
CN208535318U (en) | A kind of T-type hanger for adjustable installing bracket | |
CN109586216A (en) | Keel bracket is used in a kind of suspention of cable | |
CN205742635U (en) | A kind of glass wall base of high stability and easily disassembled installation | |
CN201822568U (en) | Wall surface hanging device | |
CN207349578U (en) | A kind of pipeline layout stent | |
CN209097719U (en) | A kind of logistics industrial robot crawl fixture | |
CN106968593A (en) | A kind of rotatable collapsible hard ladder | |
CN108589998A (en) | Resistance to deformation curtain wall jointing apparatus and its construction method | |
CN106064375A (en) | Driving belt Multifunctional rack | |
CN106049727A (en) | Glass curtain wall installing structure | |
CN206088838U (en) | Silder combination spare suitable for crane telescopic boom | |
CN209767105U (en) | U-shaped strain wire rack | |
CN205860446U (en) | A kind of assembled air-conditioner pipe fixing bracket | |
CN204030454U (en) | Wire casing wiring sorting unit | |
CN208253692U (en) | A kind of fixed device of floor heating pipe bending part | |
CN219359450U (en) | Aluminum wire rod material rack with material positioning structure | |
CN205134862U (en) | Splint formula aluminum strip board mounting structure | |
CN209242665U (en) | Overhead sebific duct suspender and fuel charger | |
CN205424350U (en) | Fixed ware of hanging of computer LCD | |
CN207653864U (en) | Magnetic hanging chart board | |
CN205076700U (en) | Hoist cable pulley | |
JP2019058646A (en) | Indoor space part net and method for hanging and stretching the indoor space part net | |
CN204275427U (en) | Badminton grid frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211230 Address after: 062455 Hejian Economic Development Zone, Cangzhou City, Hebei Province (East District) Applicant after: Hebei Yongji Power Equipment Co.,Ltd. Address before: 313000 room B310, building 3, No. 666, Qixing Road, Wuxing District, Huzhou City, Zhejiang Province Applicant before: HUZHOU GRAY POWER CABLE Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |