CN109583785A - A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform - Google Patents

A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform Download PDF

Info

Publication number
CN109583785A
CN109583785A CN201811512138.4A CN201811512138A CN109583785A CN 109583785 A CN109583785 A CN 109583785A CN 201811512138 A CN201811512138 A CN 201811512138A CN 109583785 A CN109583785 A CN 109583785A
Authority
CN
China
Prior art keywords
target
module
hunter
data
seismo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811512138.4A
Other languages
Chinese (zh)
Inventor
李凯
颜庄妮
曾献峰
周进林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hungmeng Network Technology Co Ltd
Original Assignee
Guangzhou Hungmeng Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hungmeng Network Technology Co Ltd filed Critical Guangzhou Hungmeng Network Technology Co Ltd
Priority to CN201811512138.4A priority Critical patent/CN109583785A/en
Publication of CN109583785A publication Critical patent/CN109583785A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Abstract

The invention discloses the Objective Administrative Method In Seismo Logical and system of a kind of hunter's platform, a kind of Objective Administrative Method In Seismo Logical of hunter's platform includes: creation boss end, team end, group end, four, member end level;Obtain the target that each level is formulated;Obtain member end performance data;Data statistics is carried out according to performance data;According to the completeness of the target of formulation and data statistics result supervision target.A kind of Objective Administrative Method In Seismo Logical of hunter's platform of the present invention may help to user and record target and performance, improves working efficiency.Manager can adjust target and direction by achievement situation simultaneously, and employee is helped to complete target.

Description

A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform
Technical field
The present invention relates to objective management field, and in particular to a kind of Objective Administrative Method In Seismo Logical and system of hunter's platform.
Background technique
Target be to movable expected results subjectivity imagine, it is expected that reach achievement and as a result, and behavior guiding.Mesh Preceding SOHO hunter and hunt enterprise it is typically no explicitly fix to do single goal or oneself fix target to oneself do not record but The performance of pervious all targets and target.Manager is difficult to inquire the target performance of hunter in hunting enterprise, therefore The planning that cannot have been made.Under normal circumstances, hunter oneself records daily situation, manager when having arrived summary It is planned according to these results.
This system may help to user and record target and performance, improve working efficiency.Manager can lead to simultaneously Achievement situation adjustment target and direction are crossed, employee is helped to complete target.
Summary of the invention
Present invention solves the technical problem that being to provide the Objective Administrative Method In Seismo Logical and system of a kind of hunter's platform.Described A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform may help to user and record target and target performance, improve work Make efficiency.Manager can adjust target and direction by achievement situation simultaneously, and employee is helped to complete target.
In order to solve the above technical problem, the present invention provides technical solution are as follows:
Create boss end, team end, group end, four, member end level;
Obtain the target that each level is formulated;
Obtain member end performance data;
Data statistics is carried out according to performance data;
According to the completeness of the target of formulation and data statistics result supervision target.
Preferably, the boss end includes target performance enquiry module, and boss passes through each level of terminal inquiry Target data totality performance.Boss end primarily serves supervisory role, and manages and use to chief executive, this role The target data totality performance and detail of each level can be inquired.
Preferably, the team end includes target setup module and target performance enquiry module, Team Management person The annual objectives and of that month target of each group are set by terminal, target performance can be inquired.Team Management person can be with Target is arranged to each group, the annual objectives of group is first set, an annual objectives can be modified each season, be then arranged Of that month target, can be set the target in next month, be that cannot repair for past month in last week in every month Change, while target weekly can also be set.
Preferably, the group end includes target setup module and target performance enquiry module, this is arranged in group leader The target of group and the achievement for inquiring this group.This can be set in the same set-up mode with the manager of team, group group leader The performance objectives of group, while the achievement performance of this group can be inquired, analyze improvement.
Preferably, the member end includes achievement enquiry module and achievement recording module, the industry of this group of membership query Achievement situation.The access right of group member is to inquire the achievement situation of this group, while the achievement performance of typing is used In subsequent data statistics.
Preferably, the data statistics includes that statistics recommends number, interview number, offer number, make out an invoice number, returned money Data mode.According to the performance data statistics of member's typing about recommendation number, interview number, offer number, make out an invoice number, returned money Data cases number of targets and actual quantity, boss end can be in the data of annual report, monthly magazine, weekly, daily paper query statistic, really Recognize performance, the artificial counting statistics time can be saved.
Preferably, the data statistics includes being inquired according to year, the moon, week, day four.
Preferably, the data statistics further include from recommend number, offer number, the offer amount of money, gross profit, make out an invoice number, Returned money, returned money gross profit these dimensions have counted the gap between sum, actual quantity, reality and target respectively.
A kind of object management system of hunter's platform characterized by comprising
Team's creation module: team's creation module is for creating boss end, team end, group end, four, member end level;
Target Acquisition module: the Target Acquisition module is used to obtain the target that each level is formulated;
Achievement obtains module: the achievement obtains module for obtaining member end performance data;
Data statistics module: the data statistics module is used to carry out data statistics according to performance data;
Data comparison module: the data comparison module is used to supervise target according to the target and data statistics result of formulation Completeness.
Preferably, team's creation module creates four boss, team, group, member roles.
Preferably, team's creation module creates four roles, wherein including: Lao Banduan: completing feelings including target Condition enquiry module, boss pass through the target data totality performance of each level of this module polls, team end: set including target Module and target performance enquiry module are set, the annual and of that month target and inquiry mesh of each group is arranged in Team Management person Mark performance.Group end: including target setup module and target performance enquiry module, the target of this group is arranged in group leader With the achievement for inquiring this group.Member end: including achievement enquiry module and achievement recording module, the achievement of this group of membership query Situation, the achievement performance of typing oneself.
Preferably, the Target Acquisition module is stored for obtaining target set by team end, group end.
Preferably, the achievement obtains module, and it is complete that the achievement obtains achievement of the module for obtaining member's typing At situation.
Preferably, the data statistics module, the feelings being arranged according to the achievement performance and target of member's typing Condition statistics is about recommending number, interview number, interview rate, offer number, offer rate, make out an invoice, the target of returned money etc. and these data Quantity and actual quantity facilitate the inquiry of boss.
Preferably, the data comparison module, at the same according to the result of data statistics remind team end, group end, at Member end achievement performance.
A kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer Program instruction, the program instruction are suitable for being loaded by processor and executing method described in any of the above embodiments.
A kind of mobile terminal, which is characterized in that including processor and memory, the processor is for executing storage The program stored in device, to realize method described in any of the above embodiments.
Compared with prior art, the device have the advantages that are as follows: this method may help to user record target and Performance improves working efficiency, while manager can adjust target or direction by achievement situation, and employee is helped to complete mesh Mark.This method mainly creates four roles, respectively boss, team, group, member, and boss can inquire the target of each level Data totality performance, convenient for supervising the implementation degree of target;Team Management person and group group leader, can according to the actual situation into Row modification target, while can analyze performance;Member can inquire the performance of achievement, to supervise oneself;The present invention It can also will do in forms data input system, system carries out data processing, the gap between assistant analysis reality and target automatically.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of flow diagram of the Objective Administrative Method In Seismo Logical of hunter's platform of the present invention;
Fig. 2 is a kind of structure chart of the object management system of hunter's platform of the present invention.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates basic flow chart of the invention, therefore it only shows process related to the present invention.
As shown in Figure 1, the present invention is a kind of Objective Administrative Method In Seismo Logical of hunter's platform, the method specifically:
S1. boss end, team end, group end, four, member end level are created;
S2. the target that each level is formulated is obtained;
S3. member end performance data is obtained;
S4. data statistics is carried out according to performance data;
S5. according to the completeness of the target of formulation and data statistics result supervision target.
Step 1: creation boss end, team end, group end, four, member end level, mainly there are four roles for this system, and There is administrator's creation.According to different levels, different permissions is set.Wherein include: Lao Banduan: boss inquires each level Target data totality performance, team end: the annual and of that month target and inquiry mesh of each group is arranged in Team Management person Mark performance.Group end: group leader is arranged the target of this group and inquires the achievement of this group.Member end: membership query sheet is small The achievement situation of group.
Step 2: obtaining the target that each level is formulated.The specific target for obtaining team end and group end and formulating.Team Can target, such as offer number mark, target of making out an invoice, returned money target be arranged to each group respectively in manager.Group is first set Annual objectives, an annual objectives can be modified each season, then of that month target, last week in every month are set The target in next month can be set, cannot modify target in past month.In addition target weekly, such as client can be set Number destination number, position is recommended to recommend number destination number.
Step 3: obtaining member end performance data, specifically, member can enter data statistics interface, list is made in typing oneself Situation.
Step 4: data statistics is carried out according to performance data, specifically, one-state is done according to member's typing, it will be every in system The recommendation number of a project, interview number, offer number, the status datas such as number, returned money of making out an invoice are counted.
Step 5: according to the completeness of the target of formulation and data statistics result supervision target.It boss end can be according to statistical number It is inquired according to year, the moon, week and day at several time points.Wherein recommend number number, offer number, the offer amount of money, gross profit, makes out an invoice, returns Money, returned money gross profit these dimensions have counted the gap between sum, actual quantity, reality and target respectively, have also counted one side Several and one side rate, to understand the performance of target, team end, group end, member end can receive target performance It reminds.
As shown in Fig. 2, the present invention provides a kind of object management systems of hunter's platform:
Team's creation module 1: team's creation module is for creating boss end, team end, group end, four, member end layer Grade;
Target Acquisition module 2: the Target Acquisition module is used to obtain the target that each level is formulated;
Achievement obtains module 3: the achievement obtains module for obtaining member end performance data;
Data statistics module 4: the data statistics module is used to carry out data statistics according to performance data;
Data comparison module 5: the data comparison module is used to supervise target according to the target and data statistics result of formulation Completeness.
Team's creation module 1 creates four boss, team, group, member roles.Boss end: feelings are completed including target Condition enquiry module, boss pass through the target data totality performance of each level of this module polls, team end: set including target Module and target performance enquiry module are set, the annual and of that month target and inquiry mesh of each group is arranged in Team Management person Mark performance.Group end: including target setup module and target performance enquiry module, the target of this group is arranged in group leader With the achievement for inquiring this group.Member end: including achievement enquiry module and achievement recording module, the achievement of this group of membership query Situation, the achievement performance of typing oneself.
Target Acquisition module 2, the Target Acquisition module are used for the target according to set by acquisition team end, group end, It is stored.
Achievement obtains module 3, and the achievement obtains the achievement performance that module is used to obtain member's typing.
Data statistics module 4, the case where being arranged according to the achievement performance and target of member's typing, statistics was about recommending Number interview number, interview rate, offer number, offer rate, is made out an invoice, the destination number and actual quantity of returned money etc. and these data, Facilitate the inquiry of boss.
Data comparison module 5 reminds team end, group end, member end achievement performance according to the result of data statistics.
Above-listed detailed description is illustrating for possible embodiments of the present invention, and above embodiments are not to limit this The scope of the patents of invention, all equivalence enforcements or change without departing from carried out by the present invention, is intended to be limited solely by the scope of the patents of this case.

Claims (10)

1. a kind of Objective Administrative Method In Seismo Logical of hunter's platform characterized by comprising
Create boss end, team end, group end, four, member end level;
Obtain the target that each level is formulated;
Obtain member end performance data;
Data statistics is carried out according to performance data;
According to the completeness of the target of formulation and data statistics result supervision target.
2. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 1, which is characterized in that the boss end packet Include target performance enquiry module.
3. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 1, which is characterized in that the team end packet Include target setup module and target performance enquiry module.
4. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 1, which is characterized in that the group end packet Include target setup module and target performance enquiry module.
5. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 1, which is characterized in that the member end packet Include achievement enquiry module and achievement recording module.
6. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 1, which is characterized in that the data statistics Recommend the data mode of number, interview number, offer number, make out an invoice number, returned money including statistics.
7. a kind of Objective Administrative Method In Seismo Logical of hunter's platform according to claim 6, which is characterized in that the data statistics Further include from recommend number, offer number, the offer amount of money, gross profit, make out an invoice, returned money, returned money gross profit these dimensions count respectively Gap between sum, actual quantity, reality and target.
8. a kind of object management system of hunter's platform characterized by comprising
Team's creation module: team's creation module is for creating boss end, team end, group end, four, member end level;
Target Acquisition module: the Target Acquisition module is used to obtain the target that each level is formulated;
Achievement obtains module: the achievement obtains module for obtaining member end performance data;
Data statistics module: the data statistics module is used to carry out data statistics according to performance data;
Data comparison module: the data comparison module is used to supervise target according to the target and data statistics result of formulation Completeness.
9. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey Sequence instruction, which is suitable for by processor load and perform claim requires 1 ~ 7 described in any item methods.
10. a kind of mobile terminal, which is characterized in that including processor and memory, the processor is for executing storage The program stored in device, to realize the described in any item methods of claim 1 ~ 7.
CN201811512138.4A 2018-12-11 2018-12-11 A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform Pending CN109583785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811512138.4A CN109583785A (en) 2018-12-11 2018-12-11 A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811512138.4A CN109583785A (en) 2018-12-11 2018-12-11 A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform

Publications (1)

Publication Number Publication Date
CN109583785A true CN109583785A (en) 2019-04-05

Family

ID=65928960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811512138.4A Pending CN109583785A (en) 2018-12-11 2018-12-11 A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform

Country Status (1)

Country Link
CN (1) CN109583785A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105214A (en) * 2019-12-24 2020-05-05 新仁类(上海)网络科技有限公司 Direct recruitment system for improving recruitment authenticity and recruitment and job hunting efficiency

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1479232A (en) * 2002-08-30 2004-03-03 英业达股份有限公司 Labour power resources management system and method
CN106067091A (en) * 2016-06-02 2016-11-02 中国农业银行股份有限公司 Enterprise Institutions checking system and method
CN106169116A (en) * 2016-06-25 2016-11-30 牡丹江师范学院 A kind of human resources performance management system
CN107133711A (en) * 2016-11-01 2017-09-05 王红亮 A kind of performance check management system and management method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1479232A (en) * 2002-08-30 2004-03-03 英业达股份有限公司 Labour power resources management system and method
CN106067091A (en) * 2016-06-02 2016-11-02 中国农业银行股份有限公司 Enterprise Institutions checking system and method
CN106169116A (en) * 2016-06-25 2016-11-30 牡丹江师范学院 A kind of human resources performance management system
CN107133711A (en) * 2016-11-01 2017-09-05 王红亮 A kind of performance check management system and management method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105214A (en) * 2019-12-24 2020-05-05 新仁类(上海)网络科技有限公司 Direct recruitment system for improving recruitment authenticity and recruitment and job hunting efficiency

Similar Documents

Publication Publication Date Title
US7885846B2 (en) Method and system for planning of services workforce staffing using hiring, contracting and cross-training
Leachman et al. IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation—Semiconductor Sector
Atlason et al. Call center staffing with simulation and cutting plane methods
US20080183545A1 (en) Method and apparatus for designing and planning of workforce evolution
US20080183527A1 (en) Method and apparatus for designing and planning of workforce evolution
CN102262678A (en) System for sampling mass data and managing sampled data
CN105631600A (en) Method and system for publishing auto insurance survey tasks
CN114037311B (en) Information system engineering supervision project risk assessment method
US20150120370A1 (en) Advanced planning in a rapidly changing high technology electronics and computer industry through massively parallel processing of data using a distributed computing environment
CN112396206A (en) Comprehensive management method and system for cutting and using plate
Thürer et al. Towards an integrated workload control (WLC) concept: The performance of due date setting rules in job shops with contingent orders
CN105677549A (en) Software testing management method and system
CN107274141A (en) A kind of event-handling method and the network equipment
Kaplan et al. A probabilistic cost-based due date assignment model for job shops
CN109583785A (en) A kind of Objective Administrative Method In Seismo Logical and system of hunter's platform
CN105976170A (en) Method and device for automatically generating work plans
CN114118669A (en) Project management method based on Monte Carlo
CN109636223A (en) Industrial manufacturing performance calculation method and device
Novikova et al. Economic evaluation of mathematical methods application in the management systems of electronic component base development for forest machines
CN116630082A (en) Method and device for allocating production resources, electronic equipment and storage medium
CN110175196A (en) A kind of bill of materials problem statistical method and device
Alexander Parametric cost and schedule modeling for early technology development
US20150120371A1 (en) Automotive manufacturing optimization through advanced planning and forecasting through massively parallel processing of data using a distributed computing environment
Matta A simulation model for repairable items/spare parts inventory systems
Ahmad et al. Factors affecting material management in construction industry of Khyber Pakhtunkhwa Pakistan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405