CN109579647A - Digital primer detonation monitoring and managing method based on cloud control - Google Patents

Digital primer detonation monitoring and managing method based on cloud control Download PDF

Info

Publication number
CN109579647A
CN109579647A CN201811389290.8A CN201811389290A CN109579647A CN 109579647 A CN109579647 A CN 109579647A CN 201811389290 A CN201811389290 A CN 201811389290A CN 109579647 A CN109579647 A CN 109579647A
Authority
CN
China
Prior art keywords
detonation
digital primer
terminal
information
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811389290.8A
Other languages
Chinese (zh)
Inventor
毛龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811389290.8A priority Critical patent/CN109579647A/en
Publication of CN109579647A publication Critical patent/CN109579647A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/04Arrangements for ignition

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The present invention relates to a kind of digital primer detonation monitoring and managing methods managed based on cloud, including step S01, upload explosion application information, data center's examination & approval to generate authorization message packet after passing through;Step S02, detonate terminal downloads authorization message packet, the digital primer ID for checking detonation personal information according to authorization message packet and having provided;Step S03, after verification passes through, it is established that quick-fried network, detonation terminal check the digital primer ID for being connected into initiation net again;Step S04, it compares and corresponding digital primer is written into preset delay time after passing through;Step S05, detonation terminal carries out environment measuring and authorization detects, and time break, digital primer ignition and detonation after corresponding delay time are issued after detection passes through.Digital primer detonation monitoring and managing method of the present invention based on cloud control, cloud acquires all information of the digital primer from application to detonation, audits relevant parameter step by step, can evaluate enterprise after detonation, accomplish to avoid risk when operation, responsibility is clear after accident.

Description

Digital primer detonation monitoring and managing method based on cloud control
Technical field
The present invention relates to digital primer detonation fields, and in particular to a kind of digital primer detonation monitoring party based on cloud control Method.
Background technique
China is still in the large-scaled construction period, and various construction and mining require a large amount of bursting work, such as Only Qingdao City just has a blasting site more than 200 for 1 year, needs more than 20,000 tons of explosive, detonator 100,000,000 is multiple.Explosion causes largely Casualty accident, demolition accident occupies very high specific gravity in coal mining accident, accounts for 1/3 or more in severe and great casualty, gas and coal 40% or more is accounted in dust explosion accident.One of the main reason for causing colliery blasting accident is exactly that initiator technology is too backward, all It is 60 years last century pervious technology, does not have safety interlocking function, not to the monitoring function of initiator.And it is domestic at present right The production of digital primer and manually reporting using still use, whole process someone participate in, and this mode has safe leak The authenticity in hole, data cannot be guaranteed.
Summary of the invention
The object of the present invention is to provide a kind of digital primer detonation monitoring and managing methods managed based on cloud, have and are managed based on cloud The supervision that overall salary strategy is carried out to digital blasting cap initiation operation, can accomplish that everyone has responsibility, to increase substantially detonation operation Safety, while can avoid generation accident after the unclear problem of responsibility.
The purpose of the present invention is be achieved through the following technical solutions:
A kind of digital primer detonation monitoring and managing method based on cloud control, comprising the following steps:
Step S01, explosion application information is uploaded, data center's examination & approval generate authorization message packet after passing through.
Step S02, detonate terminal downloads authorization message packet, checks detonation personal information according to authorization message packet and has provided Digital primer ID.
Step S03, after verification passes through, it is established that quick-fried network, detonation terminal check the digital thunder for being connected into initiation net again Pipe ID.
Step S04, it compares and corresponding digital primer is written into preset delay time after passing through.
Step S05, detonation terminal carries out environment measuring and authorization detects, and time break is issued after detection passes through, digital Detonator ignition and detonation after corresponding delay time.
It in preferred embodiments, include explosion personal information including the explosion application information in the step S01, The data center connects explosion employer's organization server, audits to explosion personal information.
In preferred embodiments, the preset delay time of the detonation terminal typing, the delay time and explosion It places position to correspond, after digital primer is connected into initiation net, detonation terminal places position according to explosion and delay time is written Corresponding digital primer.
In preferred embodiments, it is described acquisition detonation personnel biometric information, by biometric information with award The registration detonation personal information weighed in packet compares, and the detonation personal information includes dynamiter, security official, in administrator It is at least one.
In preferred embodiments, after verification detonation personal information passes through in the step S02, to every number of granting Code detonator ID is audited, and it is associated with the digital primer ID that it is got to establish detonation personal information.
In preferred embodiments, the specific steps of the environment measuring include: acquisition environment gas value, environment dust Value, ambient temperature and humidity value, and carried out respectively with standard gas value, standard dust value and the standard atmosphere value in authorization message packet It compares, if wherein arbitrary parameter is unqualified, terminal of detonating uploads alarm signal, and locks.
In preferred embodiments, the specific steps of the authorization detection include: acquisition detonation terminal time, positioning letter Breath, digital primer ID, punching can be worth, and digital with the detonating authorization time in authorization message packet, authorization location information, authorization respectively Detonator ID, standard punching can value be compared, if wherein arbitrary parameter is unqualified, terminal of detonating upload alarm signal and is locked.
In preferred embodiments, terminal of detonating in the step S05 includes: acquisition confirmation before issuing time break The biometric information of the explosion personnel of detonation, is compared with the biometric information in authorization message packet, after comparison passes through Terminal of detonating issues time break.
In preferred embodiments, after the step S05, the detonation terminal uploads detonation video information.
In preferred embodiments, the explosion application information includes sponsor's information, explosion project information, quick-fried kind Class quantity information, the data center are equipped with explosion credit grade server, for for its credit of sponsor's signal auditing etc. Grade, and explosion project information and quick-fried kind class quantity information are audited by credit grade.
The invention has the benefit that
Digital primer detonation monitoring and managing method of the present invention based on cloud control, cloud acquisition digital primer is from application to Quick-fried all information audits relevant parameter step by step, can evaluate enterprise after detonation, avoids wind when to accomplishing operation Dangerous, responsibility is clear after accident.And detonation operator and individual can be served as a warning, entire detonation can be improved The construction level of industry.
Digital primer detonation monitoring and managing method of the present invention based on cloud control, using detonation terminal typing digital primer Delay time, the defect that the delay time of existing detonator can be overcome fixed, realizes and adjusts and set in time according to the situation at scene The delay time of digital primer is set, to meet explosion precision and the demanding occasion of demolition effect.
Detailed description of the invention
Below according to attached drawing, invention is further described in detail.
Fig. 1 is the method flow diagram of the digital primer detonation monitoring and managing method described in the embodiment of the present invention based on cloud control;
Fig. 2 is the expanded view of environment measuring in Fig. 1;
Fig. 3 is the expanded view that detection is authorized in Fig. 1.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the invention provided in the accompanying drawings The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts Every other embodiment, shall fall within the protection scope of the present invention.
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
The present invention is further illustrated with specific embodiment below with reference to accompanying drawings.
As shown in Figs. 1-2, a kind of digital primer detonation monitoring and managing method based on cloud control of the embodiment of the present invention, including with Lower step:
Step S01, explosion application information is uploaded, data center's examination & approval generate authorization message packet after passing through.
Step S02, detonate terminal downloads authorization message packet, checks detonation personal information according to authorization message packet and has provided Digital primer ID.
Step S03, after verification passes through, it is established that quick-fried network, detonation terminal check the digital thunder for being connected into initiation net again Pipe ID.
Step S04, it compares and corresponding digital primer is written into preset delay time after passing through.
Step S05, detonation terminal carries out environment measuring and authorization detects, and time break is issued after detection passes through, digital Detonator ignition and detonation after corresponding delay time.
Above-mentioned each step is illustrated separately below:
The particular content of the step S01 includes:
When needing to carry out digital primer bursting work, explosion application information is uploaded by detonation terminal in advance, detonation is eventually End can be handheld terminal or desktop computer, and the data center positioned at cloud is received by internet, and is examined explosion application information Core.Include applicant's information, such as enterprise name, business license, corporate message in explosion application information, further includes entry name Title, explosion position information, burst time range, digital primer type and quantity, explosion personal information etc..Data center's connection is more A department server audits the major technique personnel with industry certificate or qualification such as explosion employer's organization server, For another example industrial and commercial server, audits company information, but also carries out technology audit according to national standard, is believed according to explosion position Breath, burst time range, quantity and type of digital primer etc. carry out joint audit, when all after the approval, generation authorizes Packet, the authorization message packet include that above- mentioned information and corresponding digital primer ID gather, and quick-fried product warehouse can be according to the number thunder Pipe ID set carries out quick-fried product granting.
For each explosion applicant of the management more refined, data center is equipped with explosion credit grade server, uses In carrying out credit grade division to explosion applicant, the weight of multiple dimensions, explosion application are set to each explosion applicant (there is alarm signal in the plus-minus that the every progress once detonation operation in side, the job information uploaded according to it and warning message carry out weight Breath can reduce weight), the credit grade range that is finally according to the weight and explosion applicant is divided, difference letter The bursting work degree that can be applied with the explosion applicant of grade is different, and credit grade is higher, the bursting work rule that can apply Mould is bigger, i.e. the burst size of digital primer is bigger, applies for that the frequency of bursting work is higher, to carry out to each explosion applicant Fine-grained management can integrally improve the level of operation of entire explosion industry.
The particular content of the step S02 includes:
Detonate terminal downloads authorization message packet, and detonation terminal checks detonation personal information according to authorization message packet, people of detonating Member includes the people contacted with digital primer, such as dynamiter, security official, administrator, by the bio-identification for acquiring detonation personnel Information, such as fingerprint, iris, facial recognition information, sound information, the detonation people that will have been examined in the information and authorization message packet Member's information is compared, if few people or wrong people, detonate terminal locking, can not carry out pre-seting for delay time.
When personal information of detonating compare by after digital primer can be audited, acquire digital primer or electronics mark thereon Id information in label is compared with the digital primer ID examined in authorization message packet, if there is matching error, detonates Terminal sends alarm signal, and data center, which can be known according to alarm signal in current detonation operation, has illegal quick-fried product to occur, can Local department is notified to carry out censorship.Send alarm signal while, detonation terminal will do it is self-locking, when can not be delayed Between pre-set.
Since detonation work flow is complicated, it is related to overstaffed, therefore security risk has very much, but it is past accident occur Toward being all that can damage scene, lead to not inquire.Therefore after verification detonation personal information passes through, to each number of granting Detonator ID and receiptor are associated, it is established that quick-fried personal information is associated with the digital primer ID that it is got, and generates quick-fried product neck Take packet, after there is accident can more accurately everyone has responsibility, while police is played to explosion personnel in bursting work The effect shown.
The particular content of the step S03 includes:
After the verification of detonation personnel and digital primer passes through, it is established that quick-fried network is put into pair according to the distribution of the quick-fried product of design The digital primer answered, detonation terminal can connect digital primer by twisted wire, and carry out ID to the digital primer of each connection and examine Core, if matching error occur or omitting association responsible person, terminal of detonating sends alarm signal, and data center can be according to alarm Signal, which is known in current detonation operation, has illegal quick-fried product to occur, and local department can be notified to carry out censorship, send alarm signal While, detonation terminal will do it self-locking, can not carry out the write-in of delay time.
The particular content of the step S04 includes:
The preset delay time of the detonation terminal typing, delay time is according to Project design to each quick-fried product installation position point It is not arranged, quick-fried product installation position is subjected to serial number sequence in detonation terminal, digital primer is according to the connection position and serial number of skew-wire line It is corresponding, it is written into the delay time of corresponding serial number, the delay time and explosion are placed position and corresponded.When digital primer is connected into After initiation net, detonation terminal is placed position according to explosion and is associated with the digital primer ID audited, and should by delay time write-in In digital primer, at the same detonate terminal can by be added digital primer ID quick-fried product distributed intelligence be uploaded to data center carry out it is standby Part.
The particular content of the step S05 includes:
Terminal of detonating carries out environment measuring and authorization detects, and terminal of detonating after detection passes through issues time break, fills energy Digital primer starts the read latch time afterwards, to delay time after ignition and detonation, while by vialog detect vibration values, Upload that cloud records and whether detect the vibration values exceeded, if vibration values are exceeded, data center records this violation operation, can Reason is found according to the parameter value that detonation terminal uploads.Explosion credit grade server reduces the explosion credit of explosion applicant Grade.
Wherein, the specific steps of the environment measuring include:
Acquire environment gas value, environment dust value, ambient temperature and humidity value, and respectively with the standard gas in authorization message packet Value, standard dust value and standard atmosphere value are compared, if wherein arbitrary parameter is unqualified, terminal of detonating uploads alarm signal Number, and lock.
Gas management: using the gas measured value of the firedamp sensor detection current environment of detonation terminal built-in, and respectively It is compared with the standard Gas explosion burns in authorization message packet, if exceeded, terminal of detonating sends alarm signal and from locking, eventually The only transmission of time break.
Dust detection: using the dust measured value of the dust sensor detection current environment of detonation terminal built-in, and respectively It is compared with the standard dust parameter in authorization message packet, if exceeded, terminal of detonating sends alarm signal and from locking, eventually The only transmission of time break.
Temperature and Humidity: detecting the temperature and humidity measured value of current environment using the Temperature Humidity Sensor of detonation terminal built-in, And be compared respectively with the mark temperature parameter in authorization message packet with standard humidity parameter respectively, if the two has, one is exceeded, Terminal of then detonating sends alarm signal and from locking, and terminates the transmission of time break.
Wherein, the specific steps of the authorization detection include:
Acquisition detonation terminal time, location information, digital primer ID, and carry out short-circuit detecting, and respectively with authorization message Detonating authorization time, authorization location information in packet, authorization digital primer ID are compared, if wherein arbitrary parameter is unqualified, Or short-circuit detecting is unqualified, then terminal of detonating uploads alarm signal, and locks.
Detonate terminal time: data center carries out time service by locating module to detonation terminal time service, or detonation terminal, The current time of acquisition detonation terminal after time service, and be compared with the detonating authorization time in authorization message packet, if exceeding The scope of authority of quick-fried authorization time, then terminal of detonating upload alarm signal, and from locking, terminate the transmission of time break.
Location information: detonation terminal acquires current location information by built-in locating module, or acquires digital primer Location information is compared with the authorization location information in authorization message packet, if detonating in terminal beyond authorization position range Alarm signal is passed, and from locking, terminates the transmission of time break.
Quick-fried product quantity and species detection: detonation terminal calculates the digital primer quantity for being connected into initiation net, with authorization message It authorizes digital primer ID to be compared in packet, is encoded in digital primer ID comprising type, detect whether the number missed or had more Detonator ID, and the digital primer ID for missing or having more upload data center is alarmed, detonation terminal terminates detonation from locking The transmission of signal then passes through count off in detonation terminal if the digital primer of section entitlement is not available since field condition limits Put on record according to center, detonation terminal can be unlocked and carry out follow-up process.
Short-circuit detecting: whether the short-circuit detecting circuit for terminal built-in of detonating, it is short-circuit to detect entire initiation net, that is, detects The resistance of voltage and entire initiation net between quick-fried terminal connection column analyzes and determines detonation net by the detection to resistance Whether network construction meets the requirements, and with the presence or absence of the problems such as short-circuit, breaking, only resistance detection is qualified, just releases resistance inspection Locking of the flow gauge to detonation.Detonate terminal in be equipped with DC voltage detection circuit, be equipped with resistance check circuit, detection voltage and Resistance parameter.If range (too low short circuit or excessively high open circuit) of the actually detected above-mentioned resistance arrived beyond measuring resistance parameter, Detonation terminal uploads alarm signal and alarms to data center, and detonation terminal terminates the transmission of time break from locking, until Short-circuit detecting is qualified, can release the locking of detonation terminal.
Following ABC is also specifically included in the step S05:
A, it before detonation terminal sends time break, for the more accurately safety of confirmation detonation operation, needs By the confirmation of multiple key operation responsible persons, i.e. five people are chain or three people are chain, respectively dynamiter, security official, technician, The five class people such as Quality Inspector, warehouse keeper or dynamiter, security official, warehouse keeper three classes people.The life of the explosion personnel of acquisition confirmation detonation Object identification information is compared with the biometric information in authorization message packet, and detonation terminal issues detonation letter after comparison passes through Number.
B, after environment measuring and authorization detection all pass through, into charging flow, terminal of detonating charges, has charged Cheng Hou, terminal access state of emergency module of detonating, if it exists state of emergency order then terminate detonation, fill energy element release electricity, Locking detonation terminal, if not finding time break to be sent, when digital primer starts read latch there are state of emergency instruction Between.The state of emergency order is issued by data center, and state of emergency instruction includes weather reason, emergency event (riot, the masses Parade etc. just occur around it), situation of playing tricks etc. is accused by people.
C, the detonation terminal uploads detonation video information.Detonation video information includes reaching operation field from digital primer Start, successively includes interim storage video recording, quick-fried product granting video recording, powder charge process video recording, the record of Security alert video recording, initiation process Picture, shock detection video recording, blind shot processing video recording etc., are both needed to record a video and are automatically uploaded to data center.The work people of data center Member can pay close attention in real time field operation situation according to detonation video information, and detonation terminal can set video to necessary process, i.e., respectively If not uploading corresponding detonation video information in a step, terminal of detonating issues alarm signal, and self-locking.
Detonate terminal configure camera, can collection site video, by upload different resolution video, with detect camera shooting Head it is whether working properly, if upload video image be not up to normal video parameter request (such as resolution ratio not enough, fogging image Deng), then the prompt of terminal of detonating automatic alarm.After the later period detonate operation after, if upload video number not enough, video definition not Not enough or not the video comprising key content (such as requires to identify content containing explosion installation content, explosion product enough, video time Equal videos), then data center can carry out deduction evaluation to the credit grade of this detonation operation.
Finally, it should be noted that above-described embodiments are merely to illustrate the technical scheme, rather than to it Limitation;Although the present invention is described in detail referring to the foregoing embodiments, those skilled in the art should understand that: It can still modify to technical solution documented by previous embodiment, or to part of or all technical features into Row equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case.

Claims (10)

  1. The monitoring and managing method 1. a kind of digital primer based on cloud control detonates, which comprises the following steps:
    Step S01, explosion application information is uploaded, data center's examination & approval generate authorization message packet after passing through;
    Step S02, detonate terminal downloads authorization message packet, the number checking detonation personal information according to authorization message packet and having provided Code detonator ID;
    Step S03, after verification passes through, it is established that quick-fried network, detonation terminal check the digital primer ID for being connected into initiation net again;
    Step S04, it compares and corresponding digital primer is written into preset delay time after passing through;
    Step S05, detonation terminal carries out environment measuring and authorization detects, and time break, digital primer are issued after detection passes through Ignition and detonation after corresponding delay time.
  2. The monitoring and managing method 2. digital primer according to claim 1 based on cloud control detonates, it is characterised in that: the step It include the explosion application information in S01 include explosion personal information, the data center connects explosion employer's organization server, Explosion personal information is audited.
  3. The monitoring and managing method 3. digital primer according to claim 1 based on cloud control detonates, it is characterised in that: the detonation The preset delay time of terminal typing, the delay time and explosion are placed position and are corresponded, when digital primer is connected into detonation net After network, detonation terminal places position according to explosion and corresponding digital primer is written in delay time.
  4. The monitoring and managing method 4. digital primer according to claim 1 based on cloud control detonates, it is characterised in that: the acquisition The biometric information of detonation personnel compares biometric information and the registration detonation personal information in authorization message packet, institute Stating detonation personal information includes at least one of dynamiter, security official, administrator.
  5. The monitoring and managing method 5. digital primer according to claim 1 based on cloud control detonates, it is characterised in that: the step After verification detonation personal information passes through in S02, each digital primer ID of granting is audited, and establish detonation personal information It is associated with the digital primer ID that it is got.
  6. The monitoring and managing method 6. digital primer according to claim 1 based on cloud control detonates, which is characterized in that the environment The specific steps of detection include: acquisition environment gas value, environment dust value, ambient temperature and humidity value, and respectively with authorization message packet In standard gas value, standard dust value and standard atmosphere value be compared, if wherein arbitrary parameter is unqualified, detonate end End uploads alarm signal, and locks.
  7. The monitoring and managing method 7. digital primer according to claim 1 based on cloud control detonates, which is characterized in that the authorization The specific steps of detection include: acquisition detonation terminal time, location information, digital primer ID, punching can value, and respectively with authorize letter Breath packet in the detonating authorization time, authorization location information, authorization digital primer ID, standard punching can value be compared, if wherein appointing Parameter of anticipating is unqualified, then terminal of detonating uploads alarm signal, and locks.
  8. The monitoring and managing method 8. digital primer according to claim 1 based on cloud control detonates, which is characterized in that the step Terminal of detonating in S05 includes: the biometric information for acquiring the explosion personnel of confirmation detonation before issuing time break, with authorization Biometric information in packet is compared, and detonation terminal issues time break after comparison passes through.
  9. The monitoring and managing method 9. digital primer according to claim 1 based on cloud control detonates, which is characterized in that the step After S05, the detonation terminal uploads detonation video information.
  10. The monitoring and managing method 10. digital primer according to claim 1 based on cloud control detonates, it is characterised in that: described quick-fried Broken application information includes sponsor's information, explosion project information, quick-fried kind class quantity information, and the data center believes equipped with explosion With rating server, explosion project information is audited for being directed to its credit grade of sponsor's signal auditing, and by credit grade With quick-fried kind class quantity information.
CN201811389290.8A 2018-11-21 2018-11-21 Digital primer detonation monitoring and managing method based on cloud control Pending CN109579647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811389290.8A CN109579647A (en) 2018-11-21 2018-11-21 Digital primer detonation monitoring and managing method based on cloud control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811389290.8A CN109579647A (en) 2018-11-21 2018-11-21 Digital primer detonation monitoring and managing method based on cloud control

Publications (1)

Publication Number Publication Date
CN109579647A true CN109579647A (en) 2019-04-05

Family

ID=65923522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811389290.8A Pending CN109579647A (en) 2018-11-21 2018-11-21 Digital primer detonation monitoring and managing method based on cloud control

Country Status (1)

Country Link
CN (1) CN109579647A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110823029A (en) * 2019-09-10 2020-02-21 贵州全安密灵科技有限公司 Separated detonation control system and detonation control method
CN111006559A (en) * 2019-12-04 2020-04-14 北京龙德时代技术服务有限公司 Multifunctional detonation process and detonation system for digital electronic detonator
CN111998744A (en) * 2020-08-24 2020-11-27 广西中爆电子科技有限公司 Detonation method, device and system for gas electronic excitation tube
CN112033242A (en) * 2020-08-14 2020-12-04 六盘水华安爆破工程有限公司 Onsite mobile terminal detonation system and control method
CN112212751A (en) * 2020-10-12 2021-01-12 长园共创电力安全技术股份有限公司 Blasting error prevention system, blasting error prevention method and storage medium
WO2021030497A1 (en) * 2019-08-15 2021-02-18 X Development Llc Improving blast patterns
CN112943178A (en) * 2021-03-01 2021-06-11 川南航天能源科技有限公司 Digital electronic detonator initiation control system and method for perforation
CN113028917A (en) * 2021-03-05 2021-06-25 苏州一路连科科技有限公司 Time-adjustable electronic detonator control method and device and storage medium
CN113218260A (en) * 2021-03-05 2021-08-06 北京煋邦数码科技有限公司 Curing time-delay electronic detonator control method and device and storage medium
CN113624085A (en) * 2021-08-13 2021-11-09 天津中智弘信防务科技有限公司 Safe detonation control system with modular design
CN113654421A (en) * 2021-08-03 2021-11-16 六盘水华安爆破工程有限公司 Linked mobile end detonation system and control method
CN113701578A (en) * 2021-09-05 2021-11-26 北京伊拜科技有限责任公司 Safety type detonation ignition system for safely detonating industrial detonators on blasting operation site
CN113703037A (en) * 2021-09-02 2021-11-26 北京伊拜科技有限责任公司 Data acquisition method for industrial detonator in blasting operation field
CN117910983A (en) * 2024-03-19 2024-04-19 太原新欣微电科技有限公司 Electronic detonator detonation safety real-time detection and evaluation system based on data analysis

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944140A (en) * 2012-11-15 2013-02-27 湖南长信畅中科技股份有限公司 Detonation control method of digital detonator
CN107450444A (en) * 2017-09-05 2017-12-08 北京龙德时代技术服务有限公司 A kind of control method and control system of explosion-proof cloud initiator

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944140A (en) * 2012-11-15 2013-02-27 湖南长信畅中科技股份有限公司 Detonation control method of digital detonator
CN107450444A (en) * 2017-09-05 2017-12-08 北京龙德时代技术服务有限公司 A kind of control method and control system of explosion-proof cloud initiator

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021030497A1 (en) * 2019-08-15 2021-02-18 X Development Llc Improving blast patterns
US11828582B2 (en) 2019-08-15 2023-11-28 X Development Llc Improving blast patterns
AU2020328017B2 (en) * 2019-08-15 2023-02-23 X Development Llc Improving blast patterns
US11475659B2 (en) 2019-08-15 2022-10-18 X Development Llc Blast patterns
CN110823029A (en) * 2019-09-10 2020-02-21 贵州全安密灵科技有限公司 Separated detonation control system and detonation control method
CN111006559B (en) * 2019-12-04 2022-04-26 北京龙德时代技术服务有限公司 Multifunctional detonation process and detonation system for digital electronic detonator
CN111006559A (en) * 2019-12-04 2020-04-14 北京龙德时代技术服务有限公司 Multifunctional detonation process and detonation system for digital electronic detonator
CN112033242A (en) * 2020-08-14 2020-12-04 六盘水华安爆破工程有限公司 Onsite mobile terminal detonation system and control method
CN111998744A (en) * 2020-08-24 2020-11-27 广西中爆电子科技有限公司 Detonation method, device and system for gas electronic excitation tube
CN111998744B (en) * 2020-08-24 2022-11-01 广西中爆电子科技有限公司 Detonation method, device and system for gas electronic excitation tube
CN112212751A (en) * 2020-10-12 2021-01-12 长园共创电力安全技术股份有限公司 Blasting error prevention system, blasting error prevention method and storage medium
CN112943178A (en) * 2021-03-01 2021-06-11 川南航天能源科技有限公司 Digital electronic detonator initiation control system and method for perforation
CN112943178B (en) * 2021-03-01 2022-04-15 川南航天能源科技有限公司 Digital electronic detonator initiation control system and method for perforation
CN113218260A (en) * 2021-03-05 2021-08-06 北京煋邦数码科技有限公司 Curing time-delay electronic detonator control method and device and storage medium
CN113028917A (en) * 2021-03-05 2021-06-25 苏州一路连科科技有限公司 Time-adjustable electronic detonator control method and device and storage medium
CN113218260B (en) * 2021-03-05 2024-01-19 北京煋邦数码科技有限公司 Method and device for controlling electronic detonator with curing delay and storage medium
CN113654421A (en) * 2021-08-03 2021-11-16 六盘水华安爆破工程有限公司 Linked mobile end detonation system and control method
CN113624085A (en) * 2021-08-13 2021-11-09 天津中智弘信防务科技有限公司 Safe detonation control system with modular design
CN113624085B (en) * 2021-08-13 2023-01-20 天津中智弘信防务科技有限公司 Safe detonation control system with modular design
CN113703037A (en) * 2021-09-02 2021-11-26 北京伊拜科技有限责任公司 Data acquisition method for industrial detonator in blasting operation field
CN113703037B (en) * 2021-09-02 2023-08-22 北京伊拜科技有限责任公司 Industrial detonator data acquisition method for blasting operation site
CN113701578A (en) * 2021-09-05 2021-11-26 北京伊拜科技有限责任公司 Safety type detonation ignition system for safely detonating industrial detonators on blasting operation site
CN117910983A (en) * 2024-03-19 2024-04-19 太原新欣微电科技有限公司 Electronic detonator detonation safety real-time detection and evaluation system based on data analysis
CN117910983B (en) * 2024-03-19 2024-06-04 太原新欣微电科技有限公司 Electronic detonator detonation safety real-time detection and evaluation system based on data analysis

Similar Documents

Publication Publication Date Title
CN109579647A (en) Digital primer detonation monitoring and managing method based on cloud control
CN205879007U (en) Intelligence pistol
CN104700535B (en) A kind of video for illegal invasion nuclear power plant checks alarm method and device
CN102956107A (en) Parking lot vehicle parking information acquisition and false license, slip license and illegal vehicle recognition system and method
CN107563634B (en) Beidou system-based blasting supervision system and blasting supervision method
CN108397235B (en) A kind of coal mine safety monitoring-inspecting management system
CN109712290A (en) Security system
US11580229B2 (en) Computer-implemented method of security-related control or configuration of a digital system
CN106384325A (en) Intelligent cloud explosive monitoring IoT (Internet of Things) system
CN110132214A (en) A kind of out-of-home media angle tilt offset automatic recognition system
CN106295470A (en) A kind of bank self-help service area early-warning monitoring method, Apparatus and system
CN111899371A (en) Real-name system information acquisition device based on big data
CN114124450A (en) Network security system and method for remote storage battery capacity checking
CN202563546U (en) Ammunition management system
CN106330886A (en) Method and equipment for protecting video privacy in remote monitoring
CN206003235U (en) Intelligent bullet management equipment
CN212748058U (en) High voltage equipment overhauls intelligent alarm device based on safe light curtain and infrared temperature measurement
CN207541673U (en) High in the clouds iris recognition instrument
CN112800896A (en) Security emergency measure self-response method and system based on knowledge graph
CN109934534A (en) Civil explosive material receives monitoring method of clearing up and discharging
KR101736789B1 (en) Apparatus and method for managing data of black box
CN115065937A (en) Intelligent bullet management system and method based on positioning recognition
CN110289964A (en) A kind of novel network security control device and method
CN110225298A (en) Image information providing method, device and system in a kind of car networking
KR20230166207A (en) Modular smart gun management device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405