CN109577314A - Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard - Google Patents

Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard Download PDF

Info

Publication number
CN109577314A
CN109577314A CN201811398918.0A CN201811398918A CN109577314A CN 109577314 A CN109577314 A CN 109577314A CN 201811398918 A CN201811398918 A CN 201811398918A CN 109577314 A CN109577314 A CN 109577314A
Authority
CN
China
Prior art keywords
concrete panel
vertical
prestressing force
soil cement
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811398918.0A
Other languages
Chinese (zh)
Inventor
江正兵
何東霖
江恩德
谢朋飞
张治纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jitong Ground Construction Technology Co Ltd
Original Assignee
Zhejiang Jitong Ground Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jitong Ground Construction Technology Co Ltd filed Critical Zhejiang Jitong Ground Construction Technology Co Ltd
Priority to CN201811398918.0A priority Critical patent/CN109577314A/en
Publication of CN109577314A publication Critical patent/CN109577314A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/105Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete of prestressed concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of canal formula soil cement interpolation assembled undergrounds to connect wall prestressing force wallboard, it is intended to provide a kind of construction period that can either shorten foundation pit enclosure, the stress performance that canal formula soil cement interpolation diaphragm wall can be effectively improved again, the canal formula soil cement interpolation assembled underground for alloing canal formula soil cement interpolation diaphragm wall effectively to resist active earth pressure connect wall prestressing force wallboard.It includes the reinforcement cage skeleton presenting the concrete panel of lower extension and being embedded in concrete panel, and the reinforcement cage skeleton includes several main reinforcements for presenting lower extension, and main reinforcement is prestressing force main reinforcement.

Description

Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard
Technical field
The present invention relates to the prestressing force assembled underground continuous wall fields of canal formula soil cement interpolation, and in particular to a kind of canal formula Soil cement interpolation assembled underground connects wall prestressing force wallboard.
Background technique
Deep foundation pit of construction, which is passed through, slots frequently with scene and the steel reinforcement cage of field fabrication is placed to placing concrete in slot Diaphram wall (this specification is referred to as " traditional cast-in-place ground-connecting-wall ") carries out foundation pit enclosure.Traditional cast-in-place ground-connecting-wall encloses Shield carries out foundation trench excavation using chute forming machine, then carries out the production of rebar cylinder mould at the scene, be put into foundation trench by lifting, and A width foundation pit enclosure wall is formed by concrete perfusion.
In order to further speed up construction period, there is the enclosing method of interpolation precast concrete diaphram wall at present.The party Method is using grooving first, and the prefabricated concrete panel of interior inserting, forms armored concrete ground-connecting-wall in the trench.The construction party Although method can accelerate construction period, the steel reinforcement cage nonprestressed reinforcement cage of the diaphragm wall, the performance of bending resistance is bad.Even For sealing, needing to construct in diaphram wall docking site is perfused water-seal pile for socket part position.Since this method is tested, do not obtain Effectively promote, it is to be improved.
Summary of the invention
The purpose of the invention is to provide a kind of canal formula soil cement interpolation assembled underground to connect wall prestressing force wallboard, The construction period of foundation pit enclosure can either be shortened, but can effectively improve canal formula soil cement interpolation RC Continuous wall by Power performance allows canal formula cement soil continuous wall effectively to resist active earth pressure and achievees the purpose that completely waterproof.
The technical scheme is that
A kind of canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard, including present lower extension concrete panel and The reinforcement cage skeleton being embedded in concrete panel, the reinforcement cage skeleton include several main reinforcements for presenting lower extension, and main Reinforcing bar is prestressing force main reinforcement.
The canal formula soil cement interpolation assembled underground of this programme connects wall prestressing force wallboard using prestressing force main reinforcement, effectively Improve the horizontal direction bending resistance cracking resistance and vertical compression performance of prestressing force wallboard;Practice of construction is used and is inserted in canal formula soil cement Prefabricated prestressing force wallboard forms prestressed reinforced concrete diaphragm wall, can either shorten the construction period of foundation pit enclosure, again The stress performance that the RC Continuous wall of canal formula soil cement interpolation can be effectively improved keeps canal formula soil cement interpolation reinforcing bar mixed Solidifying soil diaphragm wall can effectively resist active earth pressure, and play the advantage of soil cement sealing, reach i.e. earth-retaining and water blocking Function.On the other hand, since prestressing force wallboard uses prestressing force main reinforcement, bending resistance, the cracking resistance of prestressing force wallboard are effectively increased And Compressive Performance can effectively reduce the thickness of wallboard in identical bending resistance, cracking resistance and compressive property.
Preferably, the canal formula soil cement interpolation assembled underground connects the concrete that wall is centrifugal forming with prestressing force wallboard Wallboard.Centrifugal concrete wallboard can be further improved the intensity and bending resistance of prestressing force wallboard, anti-folding and compressive property.
Preferably, the cross section of concrete panel is in rectangle.
Preferably, the one side of concrete panel, which is equipped with, presents the vertical tongue-and-groove of lower extension, concrete panel it is another One side is equipped with vertical tenon corresponding with vertical tongue-and-groove, and vertical tongue-and-groove is located at the phase of concrete panel with vertical tenon To two sides.In this way, adjacent two block concretes wallboard can cooperate (i.e. adjacent two block concrete by vertical tongue-and-groove and vertical tenon Wallboard is connected as one by joinery and its construction), so that the concrete panel in canal formula cement soil continuous wall is connected as one, into One step improves the stress performance of canal formula soil cement interpolation diaphragm wall, and canal formula cement soil continuous wall is allow effectively to resist actively soil Pressure and water stopping function.
Preferably, being embedded with vertical detection pipe in concrete panel, and the upper end of vertical detection pipe and concrete panel Upper surface be connected.So prestressing force wallboard placement after, can by vertical detection pipe place deviational survey sensor come Detect vertical state of the prestressing force wallboard after placement.
Preferably, being embedded with the vertical Grouting Pipe for presenting lower extension in concrete panel.
Preferably, further including the base expanding and base expanding support device that the lower part of concrete panel is arranged in, in the concrete panel It is embedded with the vertical Grouting Pipe for presenting lower extension, the upper and lower ends opening of vertical Grouting Pipe, the base expanding and base expanding support device includes burying The horizontal slurry of crossing being located in concrete panel manages, several horizontal cylinder bodies being embedded in concrete panel, is slidably arranged in level The intracorporal piston of cylinder and the horizontally-supported column being connected with piston, the horizontal axis for crossing slurry pipe and mixing where vertical tongue-and-groove The side of solidifying cob wall plate is perpendicular, and one end that level crosses slurry pipe is connected with vertical Grouting Pipe, and level crosses another end seal for starching pipe It closes, the axis of the horizontal cylinder body and the horizontal axis perpendicular for crossing slurry pipe, the first end and level of horizontal cylinder body cross slurry pipe Between be connected by connecting pipe, the second end of horizontal cylinder body is connected with the lateral surface of concrete panel, close to horizontal cylinder body The medial surface of horizontal cylinder body of second end be equipped with piston limit block, horizontally-supported column is located at the same of piston with piston limit block Side, and when piston is against the first end of horizontal cylinder body, horizontally-supported column is located in horizontal cylinder body.
The setting of vertical Grouting Pipe can improve below concrete panel by vertical Grouting Pipe to the slip casting of wallboard bottom Foundation soil bearing capacity;Further, in the process by vertical Grouting Pipe to the slip casting of wallboard bottom, vertical Grouting Pipe Grouting pressure will be crossed slurry pipe by level and be entered in horizontal cylinder body with connecting pipe, and the second end of piston toward horizontal cylinder body is pushed away Move, until piston is against on piston limit block, during this horizontally-supported column of piston driving by horizontal cylinder body second end Port reaches in the cement soil continuous wall in the outside of horizontal cylinder body, to greatly improve the carrying of concrete panel lower part Power, to adapt to go along with sb. to guard him demand compared with deep basal pit.
Preferably, the lateral surface of horizontally-supported column is equipped with several grooves.
Preferably, being equipped with the wallboard through-hole through the upper and lower end face of concrete panel in concrete panel.It so can be with The dosage of concrete is reduced, and reduces the weight of concrete panel.
The beneficial effects of the present invention are: the construction period of foundation pit enclosure can either be shortened, and canal formula water can be effectively improved The stress performance of soil interpolation diaphragm wall allows canal formula soil cement interpolation diaphragm wall effectively to resist active earth pressure and satisfaction Water stopping function.
Detailed description of the invention
Fig. 1 is that the canal formula soil cement interpolation assembled underground of the embodiment of the present invention one connects the vertical view of wall prestressing force wallboard Figure.
Fig. 2 is that the canal formula soil cement interpolation assembled underground of the embodiment of the present invention one connects the side view of wall prestressing force wallboard Figure.
Fig. 3 is that the canal formula soil cement interpolation assembled underground of the embodiment of the present invention one connects wall prestressing force wallboard in reality One of construction top view.
Fig. 4 is that the canal formula soil cement interpolation assembled underground of the embodiment of the present invention two connects the vertical view of wall prestressing force wallboard Figure.
Fig. 5 is that the canal formula soil cement interpolation assembled underground of the embodiment of the present invention four connects the side view of wall prestressing force wallboard Figure.
Fig. 6 is a kind of the schematic diagram of the section structure in Fig. 5 at A-A.
In figure:
Prestressing force wallboard 1, concrete panel 1.1, wallboard through-hole 1.11, main reinforcement 1.2, vertical tongue-and-groove 1.3, the first angle steel 1.31, vertical tenon 1.4, the second angle steel 1.41, vertical anchor bolt pipe 1.5, vertical detection pipe 1.6, the first vertical insertion pipe 1.61, vertical Grouting Pipe 1.7, the second vertical insertion pipe 1.71, top steel end plate 1.8, vertical anchor bolt 1.9;
Base expanding and base expanding support device 2, level cross slurry pipe 2.1, horizontal cylinder body 2.2, piston 2.3, horizontally-supported column 2.4, piston limit block 2.5, groove 2.6, connecting pipe 2.7.
Specific embodiment
To keep technical solution of the present invention embodiment purposes, technical schemes and advantages clearer, with reference to the accompanying drawing to this The technical solution of inventive embodiments carries out clearly explanation and illustration, but following embodiments are merely a preferred embodiment of the present invention, Rather than whole embodiments.Based on the implementation example in the implementation mode, those skilled in the art are not making creative work Under the premise of obtained other embodiments, belong to protection scope of the present invention.
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining this programme, and cannot be construed to the limitation to the present invention program.
Referring to following description and drawings, it will be clear that these and other aspects of the embodiment of the present invention.In these descriptions In attached drawing, some particular implementations in the embodiment of the present invention are specifically disclosed to indicate to implement the embodiment of the present invention Principle some modes, but it is to be understood that the scope of embodiments of the invention is not limited.On the contrary, reality of the invention Applying example includes all changes, modification and the equivalent fallen within the scope of the spirit and intension of attached claims.
In the description of the present invention, it is to be understood that, term " thickness ", "upper", "lower", "horizontal", "top", "bottom", The orientation or positional relationship of the instructions such as "inner", "outside", " circumferential direction " be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In the description of the present invention, " multiple " It is meant that at least two, such as two, three etc., unless otherwise specifically defined, " several " are meant that expression one Or it is multiple.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral: can be mechanical connect It connects, is also possible to be electrically connected or can communicate each other;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field For those of ordinary skill, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
Embodiment one: as shown in Fig. 1, Fig. 2, a kind of canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard, Including the reinforcement cage skeleton presenting the concrete panel 1.1 of lower extension and being embedded in concrete panel.The cross of concrete panel Rectangular in cross-section.The wallboard through-hole 1.11 through the upper and lower end face of concrete panel is equipped in concrete panel.
If reinforcement cage skeleton includes the circumferential band that several main reinforcements 1.2 for presenting lower extension and capable person's main reinforcement are linked together Muscle.Main reinforcement in the present embodiment is in two rows of distributions, and two rows of main reinforcements are symmetrical.Main reinforcement is prestressing force main reinforcement, tool Body, the main reinforcement of reinforcement cage skeleton uses pre-tensioning system tensioning, and is anchored;Then casting concrete forms prestressing force wall Plate.
Vertical detection pipe 1.6, the upper end of vertical detection pipe and the upper surface of concrete panel are embedded in concrete panel It is connected, the lower end of vertical detection pipe is equipped with the first vertical insertion pipe 1.61 extended down, and the first vertical insertion pipe is outer Diameter is less than the internal diameter of vertical detection pipe.
The vertical Grouting Pipe 1.7 for presenting lower extension is embedded in concrete panel.The upper and lower ends opening of vertical Grouting Pipe, The vertical upper surface of Grouting Pipe is flushed with the upper surface of concrete panel, and it is perpendicular that vertical Grouting Pipe lower end is equipped with second extended down Straight cutting adapter tube 1.71, and the outer diameter of the second vertical insertion pipe is less than the internal diameter of vertical Grouting Pipe.
Several vertical anchor bolts 1.9 are buried on the lower end surface of concrete panel, and the lower end of vertical anchor bolt is located at The lower section of concrete panel, in the present embodiment, vertical anchor bolt is four.The upper surface of concrete panel be embedded with it is several with Vertical anchor bolt vertical anchor bolt pipe 1.5 correspondingly.The upper surface of coagulation wallboard is equipped with top steel end plate 1.8, Top steel end plate is weldingly connected with main reinforcement.Top steel end plate is equipped with and the vertical one-to-one anchor bolt of anchor bolt pipe Via hole.It is additionally provided on the steel end plate of top and the one-to-one mouth excessively of vertical detection pipe and vertical Grouting Pipe.
The one side of concrete panel is equipped with the vertical tongue-and-groove 1.3 for presenting lower extension, and the length direction of vertical tongue-and-groove is perpendicular Straight to be extended, vertical tongue-and-groove constitutes the upper and lower end faces of concrete panel.The another side of concrete panel is equipped with and erects To the corresponding vertical tenon 1.4 of tongue-and-groove, and vertical tongue-and-groove and vertical tenon are located at the opposite sides of concrete panel.
In the present embodiment, set on the one side of concrete panel there are two the first angle steel 1.31 for being vertically arranged, first jiao The side plate of steel is embedded in concrete panel, another side plate of the first angle steel and the side of the concrete panel where the first angle steel Face is parallel, and the space surrounded between two the first angle steel constitutes the vertical tongue-and-groove 1.3, and vertical tongue-and-groove runs through coagulation The upper and lower end faces of cob wall plate.The second angle steel 1.41 being vertically arranged there are two being set on the another side of concrete panel, second The side plate of angle steel is embedded in concrete panel, another side plate of the second angle steel and the concrete panel where the second angle steel Side is parallel, and two the second angle steel constitute the vertical tenon 1.4.
In practice of construction, shown in Fig. 3:
First, foundation soil cutting is carried out at wall equipment (TRD) or other equipment (two-wheel stirs) using canal formula cutting cement soil wall, and It injects cement grout or other colloid slurries forms canal formula cement soil wall;
Second, prestressing force wallboard 1 is inserted in canal formula cement soil wall, specific as follows:
(1), the vertical wallboard of a width is installed,
Firstly, lifting by crane first block of prestressing force wallboard 1 with lifting machinery, first block of prestressing force wallboard 1 is inserted into canal formula cement soil wall It is interior;
Then, second block of prestressing force wallboard 1, the vertical anchor bolt insertion first of the lower end surface of second block of prestressing force wallboard are sling (sulphide mastic is perfused in vertical anchor bolt pipe, for inserting in vertical anchor bolt pipe on block prestressing force wallboard upper surface Cementing fixation after entering vertical anchor bolt), meanwhile, the vertical insertion pipe of the first of the lower end of second block of prestressing force wallboard insertion the In the upper port of the vertical detection pipe of one block of prestressing force wallboard;The vertical insertion pipe of the second of the lower end of second block of prestressing force wallboard is inserted In the upper port for entering the vertical Grouting Pipe of first block of prestressing force wallboard;
So analogize, until the vertical wallboard of the width reaches set depth;
Followed by, after the vertical wallboard of a width is installed, by slip casting machine to vertical Grouting Pipe inject cement grout, pass through Vertical Grouting Pipe injects cement grout in the foundation soil below vertical wallboard, to improve the foundation soil below vertical wallboard Bearing capacity.
(2), next vertical wallboard of width is installed along the length direction of canal formula cement soil wall, leads between the adjacent vertical wallboard of two width It crosses joinery and its construction to be connected as one, i.e., wherein the vertical tenon of the vertical wallboard of a width is inserted into the vertical tongue-and-groove of the vertical wallboard of another width Interior (the adjacent vertical wallboard of two width is integrated by vertical tongue-and-groove and the mating connection of vertical tenon), until design foundation pit enclosure wallboard It places and finishes, form prestressing force soil cement interpolation diaphragm wall.
The canal formula soil cement interpolation assembled underground of the present embodiment connects wall prestressing force wallboard using prestressing force main reinforcement, has Effect improves bending resistance, cracking resistance and the compressive property of prestressing force wallboard;Practice of construction is prefabricated using inserting in canal formula cement soil wall Prestressing force wallboard, formed prestressing force soil cement interpolation diaphragm wall, the construction period of foundation pit enclosure can either be shortened, and can The stress performance for effectively improving canal formula soil cement interpolation diaphragm wall allows canal formula soil cement interpolation diaphragm wall effectively to resist master Dynamic soil pressure and raising water stopping function.
Embodiment two: remaining structure reference embodiment one of the present embodiment, the difference is that:
As shown in figure 4, vertical tongue-and-groove 1.3 is directly on the side for being molded over concrete panel 1.1, and the cross section of vertical tongue-and-groove Dovetail-shape trapezoidal T-shaped or semicircle or round or ellipse, in the present embodiment, the cross section of vertical tongue-and-groove is in dovetail Shape.Vertical tenon 1.4 is also directly on the side for being molded over concrete panel, the cross of the cross section of vertical tenon and vertical tongue-and-groove Section is corresponding.
Embodiment three: remaining structure the reference embodiment one or embodiment two of the present embodiment, the difference is that: canal formula It is centrifugal forming concrete panel that soil cement interpolation assembled underground, which connects wall with prestressing force wallboard,.
Example IV: remaining structure reference embodiment one or embodiment two or embodiment three of the present embodiment, difference Be in:
As shown in Figure 5, Figure 6, it further includes being arranged in concrete that canal formula soil cement interpolation assembled underground, which connects wall prestressing force wallboard, The base expanding and base expanding support device 2 of the lower part of wallboard 1.1.
Base expanding and base expanding support device includes that be embedded in concrete panel horizontal crosses slurry pipe 2.1, several is embedded in coagulation wallboard Interior horizontal cylinder body 2.2, the horizontally-supported column 2.4 for being slidably arranged in the intracorporal piston 2.3 of horizontal cylinder and being connected with piston.
The side that level crosses the axis and the concrete panel where vertical tongue-and-groove of slurry pipe is perpendicular, and level, which is crossed, starches the one of pipe End is connected with vertical Grouting Pipe, and level crosses the other end closing of slurry pipe.The axis of horizontal cylinder body and the horizontal axis for crossing slurry pipe Perpendicular, the first end of horizontal cylinder body is crossed between slurry pipe with level to be connected by connecting pipe 2.7, the second end of horizontal cylinder body It is connected with the lateral surface of coagulation wallboard.Medial surface close to the horizontal cylinder body of the second end of horizontal cylinder body is equipped with piston limit Block 2.5.Horizontally-supported column and piston limit block are located at the same side of piston.The lateral surface of horizontally-supported column is equipped with several grooves 2.6。
When piston is against the first end of horizontal cylinder body, horizontally-supported column is located in horizontal cylinder body.When piston is against piston On limited block, horizontally-supported column is reached the outside of horizontal cylinder body by the port of the second end of horizontal cylinder body.
The practice of construction process reference embodiment one of the present embodiment, the difference is that:
In the second step of embodiment one, after the vertical wallboard of a width is installed, passing through slip casting machine to vertical slip casting In pipe during injection cement grout, grouting pressure will enter water with connecting pipe by level slurry pipe in vertical Grouting Pipe In flat cylinder body, the second end of piston toward horizontal cylinder body is elapsed, until piston is against on piston limit block, piston during this Horizontally-supported column is driven to be reached in the canal formula cement soil wall in the outside of horizontal cylinder body by the port of the second end of horizontal cylinder body, from And the bearing capacity of concrete panel lower part is greatly improved, to adapt to go along with sb. to guard him demand compared with deep basal pit.

Claims (10)

1. a kind of canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard, characterized in that including presenting lower extension Concrete panel and the reinforcement cage skeleton being embedded in concrete panel, the reinforcement cage skeleton include several presenting lower extension Main reinforcement, and main reinforcement is prestressing force main reinforcement.
2. canal formula soil cement interpolation assembled underground according to claim 1 connects wall prestressing force wallboard, characterized in that should Canal formula soil cement interpolation assembled underground connects the concrete panel that wall is centrifugal forming with prestressing force wallboard.
3. canal formula soil cement interpolation assembled underground according to claim 2 connects wall prestressing force wallboard, characterized in that mixed The cross section of solidifying cob wall plate is in rectangle.
4. canal formula soil cement interpolation assembled underground according to claim 1 or 2 or 3 connects wall prestressing force wallboard, special Sign is, the one side of the concrete panel is equipped with the vertical tongue-and-groove for presenting lower extension, on the another side of concrete panel Equipped with vertical tenon corresponding with vertical tongue-and-groove, and vertical tongue-and-groove and vertical tenon are located at the opposite sides of concrete panel.
5. canal formula soil cement interpolation assembled underground according to claim 1 or 2 or 3 connects wall prestressing force wallboard, special Sign is several vertical anchor bolts to be buried on the lower end surface of the concrete panel, and the lower end of vertical anchor bolt is positioned at mixed The lower section of solidifying cob wall plate, the upper surface of concrete panel are embedded with several and vertical anchor bolt and anchor spiral shell vertically correspondingly Bolt pipe.
6. canal formula soil cement interpolation assembled underground according to claim 1 or 2 or 3 connects wall prestressing force wallboard, special Sign is that vertical detection pipe is embedded in the concrete panel, and the upper end of vertical detection pipe and the upper surface phase of coagulation wallboard Connection.
7. canal formula soil cement interpolation assembled underground according to claim 1 or 2 or 3 connects wall prestressing force wallboard, special Sign is that the vertical Grouting Pipe for presenting lower extension is embedded in the concrete panel.
8. canal formula soil cement interpolation assembled underground according to claim 4 connects wall prestressing force wallboard, characterized in that also Base expanding and base expanding support device including the lower part of concrete panel is arranged in is embedded in the concrete panel and presents the perpendicular of lower extension To Grouting Pipe, the upper and lower ends of vertical Grouting Pipe are open, and the base expanding and base expanding support device includes the water being embedded in concrete panel It put down slurry pipe, several horizontal cylinder bodies being embedded in concrete panel, be slidably arranged in the intracorporal piston of horizontal cylinder and and piston It mutually hangs down the side of the horizontally-supported column being connected, the horizontal axis and the concrete panel where vertical tongue-and-groove for crossing slurry pipe Directly, horizontal one end for crossing slurry pipe is connected with vertical Grouting Pipe, and level crosses the other end closing of slurry pipe, the axis of the horizontal cylinder body Line and the horizontal axis perpendicular for crossing slurry pipe, the first end of horizontal cylinder body is crossed between slurry pipe with level to be connected by connecting pipe Logical, the second end of horizontal cylinder body is connected with the lateral surface of concrete panel, close to the horizontal cylinder body of the second end of horizontal cylinder body Medial surface be equipped with piston limit block, horizontally-supported column and piston limit block are located at the same side of piston, and when piston supports In the first end of horizontal cylinder body, horizontally-supported column is located in horizontal cylinder body.
9. canal formula soil cement interpolation assembled underground according to claim 8 connects wall prestressing force wallboard, characterized in that institute The lateral surface for stating horizontally-supported column is equipped with several grooves.
10. canal formula soil cement interpolation assembled underground according to claim 1 or 2 or 3 connects wall prestressing force wallboard, special Sign is that the wallboard through-hole through the upper and lower end face of concrete panel is equipped in the concrete panel.
CN201811398918.0A 2018-11-22 2018-11-22 Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard Pending CN109577314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811398918.0A CN109577314A (en) 2018-11-22 2018-11-22 Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811398918.0A CN109577314A (en) 2018-11-22 2018-11-22 Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard

Publications (1)

Publication Number Publication Date
CN109577314A true CN109577314A (en) 2019-04-05

Family

ID=65923762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811398918.0A Pending CN109577314A (en) 2018-11-22 2018-11-22 Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard

Country Status (1)

Country Link
CN (1) CN109577314A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172968A (en) * 2020-01-09 2020-05-19 浙江理工大学 Waterproof construction method of channel type cutting assembly type underground continuous wall
CN114075830A (en) * 2020-08-17 2022-02-22 南京瑞平环境科技有限公司 Precast concrete's hasp spare and strut subassembly

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007231570A (en) * 2006-02-28 2007-09-13 Oriental Construction Co Ltd Reinforcing structure of pc wall body member
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN105369799A (en) * 2015-11-12 2016-03-02 天津建城基业集团有限公司 Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN206477327U (en) * 2017-02-22 2017-09-08 王雪君 One kind building stake
CN206928281U (en) * 2017-06-10 2018-01-26 福建省闽工科技发展有限公司 Pretensioning prestressed concrete porous hollow ecology stake
CN207934022U (en) * 2018-02-12 2018-10-02 中国铁路设计集团有限公司 A kind of assembled underground continuous wall
CN209482296U (en) * 2018-11-22 2019-10-11 浙江吉通地空建筑科技有限公司 A kind of canal formula soil cement interpolation assembled underground continuous wall prestressing force wallboard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007231570A (en) * 2006-02-28 2007-09-13 Oriental Construction Co Ltd Reinforcing structure of pc wall body member
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN105369799A (en) * 2015-11-12 2016-03-02 天津建城基业集团有限公司 Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN206477327U (en) * 2017-02-22 2017-09-08 王雪君 One kind building stake
CN206928281U (en) * 2017-06-10 2018-01-26 福建省闽工科技发展有限公司 Pretensioning prestressed concrete porous hollow ecology stake
CN207934022U (en) * 2018-02-12 2018-10-02 中国铁路设计集团有限公司 A kind of assembled underground continuous wall
CN209482296U (en) * 2018-11-22 2019-10-11 浙江吉通地空建筑科技有限公司 A kind of canal formula soil cement interpolation assembled underground continuous wall prestressing force wallboard

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172968A (en) * 2020-01-09 2020-05-19 浙江理工大学 Waterproof construction method of channel type cutting assembly type underground continuous wall
CN111172968B (en) * 2020-01-09 2021-09-21 浙江理工大学 Waterproof construction method of channel type cutting assembly type underground continuous wall
CN114075830A (en) * 2020-08-17 2022-02-22 南京瑞平环境科技有限公司 Precast concrete's hasp spare and strut subassembly

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN108331026B (en) Prefabricated reinforced concrete inspection well and construction method thereof
CN107338801B (en) Prestressing force assembled Complex retaining wall structure and construction method
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN109518696A (en) Assembled manomelia diaphram wall
CN109577314A (en) Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard
CN113373950A (en) Chemically improved curtain and well point dewatering foundation pit water stop structure and construction method
CN109024721A (en) A kind of underpinning and improve the method that ability is cut in the bending resistance of existing building rigid foundation
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN102220764B (en) Construction method of deep foundation pit bracing system
CN106245655A (en) Utilize the deep foundation pit supporting construction method of miniature steel pipe pile
CN209482296U (en) A kind of canal formula soil cement interpolation assembled underground continuous wall prestressing force wallboard
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
JP2003147782A (en) Foundation structure for constructing new building on existing basement and its construction method
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN108086302B (en) A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
JP3481508B2 (en) Stone masonry retaining wall reinforcement method
CN110258526A (en) The method of prefabricated diaphram wall and construct outer wall of basement and floor
CN109083128A (en) Fashioned iron column assembled underground continuous wall with high-bearing capacity
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN107675700A (en) The construction method of diaphram wall
CN209508979U (en) Slip-crack surface bracing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405

RJ01 Rejection of invention patent application after publication