CN109570459B - Continuous casting crystallizer for continuous casting copper pipe - Google Patents

Continuous casting crystallizer for continuous casting copper pipe Download PDF

Info

Publication number
CN109570459B
CN109570459B CN201910113164.8A CN201910113164A CN109570459B CN 109570459 B CN109570459 B CN 109570459B CN 201910113164 A CN201910113164 A CN 201910113164A CN 109570459 B CN109570459 B CN 109570459B
Authority
CN
China
Prior art keywords
water
cavity
stage
pipe
tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910113164.8A
Other languages
Chinese (zh)
Other versions
CN109570459A (en
Inventor
李文敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Eastern Crystallizer Co ltd
Original Assignee
Jinan Eastern Crystallizer Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Eastern Crystallizer Co ltd filed Critical Jinan Eastern Crystallizer Co ltd
Priority to CN201910113164.8A priority Critical patent/CN109570459B/en
Publication of CN109570459A publication Critical patent/CN109570459A/en
Application granted granted Critical
Publication of CN109570459B publication Critical patent/CN109570459B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/0403Multiple moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/001Continuous casting of metals, i.e. casting in indefinite lengths of specific alloys
    • B22D11/004Copper alloys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/006Continuous casting of metals, i.e. casting in indefinite lengths of tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

The invention provides a continuous casting crystallizer for continuous casting copper pipes, wherein cooling water enters a first-stage interlayer cavity from a first-stage water inlet pipe, then enters a second-stage interlayer cavity from a second-stage water inlet through hole on an inner water jacket, then part of cooling water in the second-stage interlayer cavity is sprayed downwards from a water distribution plate, the other part of cooling water upwards enters a central cavity from a third-stage water inlet through hole, and then cooling water in the central cavity is sprayed from a water outlet inclined through hole; cooling the copper melt in the tubular billet cavity by cooling water in the central cavity and the secondary interlayer cavity for one time to generate a billet shell containing the copper melt; water flowing out of the secondary interlayer cavity is flushed towards the outer wall surface of the tubular casting blank, so that water flowing out of the central cavity is flushed towards the inner wall surface of the tubular casting blank, and the primary cold blank shell is subjected to secondary cooling; the inner sleeve and the outer sleeve are of an inner sleeve structure, the inner sleeve and the outer sleeve are connected and formed through bolts, the cooling capacity is high, and the inner sleeve and the outer sleeve have the characteristics of simple and compact structure, easiness in manufacturing and convenience in disassembly and assembly.

Description

Continuous casting crystallizer for continuous casting copper pipe
Technical Field
The invention relates to the technical field of metallurgical equipment, in particular to a continuous casting crystallizer for continuous casting copper pipes.
Background
The mold is a very important component of a continuous casting machine, and is a forcedly water-cooled bottomless copper tube mold, called the "heart" of the continuous casting machine. The crystallizer is continuous copper casting equipment for receiving molten copper injected from a tundish and solidifying the molten copper into a firm blank shell according to a specified cross-sectional shape, is the most critical component in a continuous casting machine, and the structure, the material and the performance parameters of the crystallizer play a decisive role in the quality of a casting blank and the production capacity of the casting machine. When casting is started, the head of the dummy bar is the movable inner bottom of the crystallizer, the molten copper is poured into the crystallizer to be gradually condensed into a blank shell with a certain thickness and is continuously pulled out, at the moment, the inner wall of the crystallizer bears the combined action of mechanical stress and thermal stress generated by the static pressure of high-temperature molten copper, the friction force of relative motion between the inner wall of the crystallizer and the blank shell, and the like, and the working condition of the dummy bar is extremely bad. In order to obtain acceptable billets, the basic conditions that the crystallizer should fulfil are: (1) The copper alloy has good heat conductivity so as to enable the copper to be rapidly condensed and formed; (2) The wear resistance is good, so that the service life of the crystallizer is prolonged, the maintenance workload and the time for replacing the crystallizer are reduced, and the operation rate of the continuous casting machine is improved; (3) Has enough rigidity, and particularly needs small deformation under the condition of large chilling shock heat and temperature gradient; (4) The structure is simple and compact, the manufacture is easy, the disassembly and the assembly are convenient, the adjustment is easy, and the cooling waterway can be automatically communicated so as to be convenient for quick replacement; the self weight is small, so that the inertia force of the crystallizer during vibration is reduced, the driving power of the vibration device is reduced, and the vibration of the crystallizer is stable.
For the basic conditions to be met, most continuous casting crystallizers in the prior art always have one or a plurality of basic conditions which are not ideal to be met, so that short plates are caused, and the comprehensive performance is poor.
Disclosure of Invention
The invention aims to provide a continuous casting crystallizer for continuously casting copper pipes, which has the characteristics of more excellent structure, simplicity and compactness, easiness in manufacturing and convenience in disassembly and assembly.
In order to solve the technical problems, the technical scheme provided by the invention is as follows:
a continuous casting crystallizer for continuous casting copper pipes comprises a crystallizer copper pipe, an inner water jacket, a water distribution disc, an outer shell, a first sealing ring and a second sealing ring;
the crystallizer copper pipe is used for pulling out a tubular casting blank from the crystallizer copper pipe, a hollow pipe cavity of the crystallizer copper pipe forms a central cavity for storing and circulating cooling water, the top end of the central cavity is open, the top end opening of the central cavity is in threaded connection with a sealing cover by a sealing cover, and a plurality of water outlet inclined through holes which are inclined towards the axial center line of the crystallizer copper pipe from bottom to top and are used for spraying cooling water onto the inner wall surface of the tubular casting blank are arranged at the connecting position between the bottom wall and the side wall of the central cavity;
a tubular billet cavity for containing copper melt and pulling out a tubular casting billet is formed in the pipe wall of the crystallizer copper pipe, the bottom opening of the tubular billet cavity is totally open, a plurality of melt inlet holes for allowing the copper melt to flow into the tubular billet cavity are formed in the top wall of the tubular billet cavity, three-stage water inlet through holes for allowing cooling water to flow into the tubular billet cavity are formed in the outer wall of the tubular billet cavity, and the three-stage water inlet through holes sequentially penetrate through the solid hole wall between two adjacent melt inlet holes and the inner wall of the tubular billet cavity from outside to inside to form three-stage water inlet through holes for allowing the cooling water to flow into the central cavity;
the inner water jacket is tubular, the crystallizer copper tube is sleeved in a tube hollow cavity of the inner water jacket, and a secondary interlayer cavity for water gap cooling is reserved between the outer wall surface of the outer wall of the tubular blank cavity and the inner wall surface of the inner water jacket;
the top end of the crystallizer copper pipe is provided with a circle of annular boss which protrudes outwards and is used for blocking the secondary interlayer cavity from the upper part, and the annular boss on the crystallizer copper pipe is provided with a bolt through hole for bolt connection;
the top end of the inner water jacket is provided with a circle of annular boss which protrudes outwards and is used for bolting, the annular boss on the inner water jacket is provided with a bolt blind hole positioned at the inner ring and a bolt through hole positioned at the outer ring, the bottom end surface of the inner water jacket is provided with a first sealing ring groove, and a first sealing ring is arranged in the first sealing ring groove;
the annular boss, the rubber asbestos plate and the annular boss on the inner water jacket are sequentially overlapped from top to bottom, and bolts penetrate through bolt through holes on the annular boss on the crystallizer copper pipe and the rubber asbestos plate from top to bottom and are finally inserted into bolt blind holes on the annular boss on the inner water jacket to form bolt connection;
the bottom outlet of the secondary interlayer cavity is blocked by the water diversion disc, the water diversion disc is annular, the inner diameter of the water diversion disc is large and small, and a plurality of water diversion water outlet tanks which are inclined from top to bottom towards the axial central line of the water diversion disc and are used for spraying cooling water to the outer wall surface of the tubular casting blank are arranged on the inner diameter wall surface of the water diversion disc;
the inner water sleeve is sleeved in the shell hollow cavity of the outer shell, and a first-stage interlayer cavity for pre-storing, stabilizing and stabilizing cooling water is reserved between the outer wall surface of the inner water sleeve and the inner wall surface of the outer shell;
the top end of the outer shell is provided with a flange plate for blocking the primary interlayer cavity from the upper part, the inner ring of the flange plate is provided with a second sealing ring groove, the outer ring of the flange plate is provided with a bolt through hole, the annular boss on the inner water jacket is overlapped with the flange plate from top to bottom, the bolt penetrates through the bolt through hole on the annular boss on the inner water jacket from top to bottom to form bolt connection with the bolt through hole on the flange plate, a second sealing ring is arranged in the second sealing ring groove, and the annular boss on the inner water jacket and the flange plate form sealing connection through the second sealing ring so as to seal the upper opening of the primary interlayer cavity;
the bottom end of the outer shell is provided with a blocking annular plate for blocking the primary interlayer cavity from below, the diameter of a central through hole of the blocking annular plate is larger than the inner diameter of the water distributing disc, and the bottom end surface of the inner water jacket and the upper plate surface of the blocking annular plate form sealing connection through a first sealing ring so as to seal the lower opening of the primary interlayer cavity;
a first-stage water inlet pipe for water inflow into the first-stage interlayer cavity is arranged on the outer wall surface of the outer shell, a plurality of second-stage water inflow through holes for water inflow from the first-stage interlayer cavity into the second-stage interlayer cavity are arranged at the upper part of the inner water jacket, and the plurality of second-stage water inflow through holes are uniformly distributed on the pipe wall of the inner water jacket along a circle of circumferential interval;
the cooling water circulation channel is formed by the connection of the first-stage water inlet pipe, the first-stage interlayer cavity, the second-stage interlayer cavity, the tubular blank cavity and the central cavity, so that cooling water enters the first-stage interlayer cavity from the first-stage water inlet pipe, then enters the second-stage interlayer cavity from the second-stage water inlet through hole on the inner water jacket, then part of cooling water in the second-stage interlayer cavity is sprayed downwards from the water diversion water outlet groove in the water diversion disc, and the other part of cooling water upwards enters the central cavity from the third-stage water inlet through hole, and then cooling water in the central cavity is sprayed from the water outlet inclined through hole.
Preferably, an internal thread is arranged on the inner wall surface of the bottom of the inner water jacket, an external thread is arranged on the outer diameter wall surface of the water distributing disc, and the water distributing disc is fixed in a bottom pipe orifice of the inner water jacket through threaded connection so as to block a bottom outlet of the secondary interlayer cavity.
Preferably, the outer shell comprises a flange plate, a metal pipe and a plugging annular plate;
the flange plate is welded at the top end of the metal pipe, the plugging annular plate is welded at the bottom end of the metal pipe, and a primary water inlet pipe is arranged on the outer wall surface of the metal pipe.
Preferably, the crystallizer copper pipe is made of phosphorus deoxidized copper.
Preferably, the inner water jacket is made of stainless steel.
Preferably, the water distributing disc is made of stainless steel.
Preferably, the outer shell is made of stainless steel.
The invention provides a continuous casting crystallizer for continuous casting copper pipes, which comprises a crystallizer copper pipe, an inner water jacket, a water distribution disc, an outer shell, a first sealing ring and a second sealing ring, wherein the crystallizer copper pipe is used for pulling out a tubular casting blank from the inner water jacket;
in the continuous casting crystallizer, the first-stage water inlet pipe, the first-stage interlayer cavity, the second-stage interlayer cavity, the tubular blank cavity and the central cavity are communicated to form a cooling water circulation channel for cooling water to enter the first-stage interlayer cavity from the first-stage water inlet pipe, then enter the second-stage interlayer cavity from the second-stage water inlet through hole on the inner water jacket, then part of cooling water in the second-stage interlayer cavity is sprayed downwards from the water distributing disc, and the other part of cooling water is sprayed upwards from the third-stage water inlet through hole to enter the central cavity, and then cooling water in the central cavity is sprayed from the water outlet inclined through hole;
primary cooling the copper melt in the tubular billet cavity by flowing cooling water in the central cavity and the secondary interlayer cavity to generate a billet shell containing the copper melt;
then, as the water diversion outlet groove is gradually inclined towards the axial center line of the water diversion disc from top to bottom and the water diversion outlet through hole is gradually inclined towards the axial center line of the copper pipe of the crystallizer from bottom to top, water flowing out of the secondary interlayer cavity can be flushed towards the outer wall surface of the tubular casting blank just pulled out of the crystallizer, so that water flowing out of the central cavity can be flushed towards the inner wall surface of the tubular casting blank just pulled out of the crystallizer, the primary cooling blank shell is subjected to secondary cooling, and the cooling of the casting blank is enhanced;
in conclusion, the continuous casting crystallizer provided by the application is of an inner sleeve and outer sleeve structure, the inner sleeve and the outer sleeve are formed through bolt connection, the cooling capacity of a cooling water flowing path is high, and the continuous casting crystallizer has the advantages of being simple and compact in structure, easy to manufacture and convenient to assemble and disassemble.
Drawings
FIG. 1 is a schematic view of an axial center plane cross-sectional structure of a continuous casting mold according to an embodiment of the present invention;
fig. 2 is a schematic perspective view of the copper tube of the crystallizer in fig. 1;
FIG. 3 is a schematic view of the axial center plane cross-sectional structure of the inner water jacket in FIG. 1;
FIG. 4 is a schematic view of the axial center plane cross-sectional structure of the water distribution tray of FIG. 1;
FIG. 5 is a schematic top view of the water distribution tray of FIG. 4;
fig. 6 is a schematic view of the cross-sectional structure of the axial center plane of the outer case in fig. 1.
In the figure: 1, sealing a cover;
2 a crystallizer copper pipe, a central cavity, a tubular billet cavity 202, an outer wall of the tubular billet cavity 203, an inner wall of the tubular billet cavity 204, an annular boss on the crystallizer copper pipe 205, a water outlet inclined through hole 206, a melt inlet hole 207 and a three-stage water inlet through hole 208;
3 an inner water jacket, a ring-shaped boss on the inner water jacket 301, a secondary water inlet through hole 302 and a first sealing ring 303;
4, a water distribution disc, a 401 water distribution water outlet groove and 402 external threads;
5 outer shell, 501 flange, 502 metal pipe, 503 shutoff annular plate, 504 first-stage water inlet pipe, 505 second sealing ring;
a second-level interlayer cavity, a first-level interlayer cavity and an 8 rubber asbestos plate.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be understood that the terms "center," "axial," "radial," "longitudinal," "transverse," "length," "width," "upper," "lower," "front," "rear," "left," "right," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "vertical," "horizontal," etc. indicate or are based on the orientation or positional relationship shown in the drawings, merely for convenience of description and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the invention.
In the description of the present invention, it should be understood that the azimuth or positional relationship indicated by the terms "inner", "outer", "vertical", "horizontal", etc. are based on the azimuth or positional relationship in practical use of the continuous casting mold, which is "inner" at the axial center line thereof, and "outer" at the outer shell thereof, are merely for convenience of description of the present invention and for simplification of description, and do not indicate or imply that the apparatus or elements referred to must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present invention.
In the present invention, unless expressly stated or limited otherwise, a first feature being "above" or "below" a second feature may include both the first and second features being in direct contact, as well as the first and second features not being in direct contact but being in contact with each other through additional features therebetween. Moreover, a first feature being "above," "over" and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is level higher than the second feature. The first feature being "under", "below" and "beneath" the second feature includes the first feature being directly beneath and obliquely beneath the second feature, or simply indicating that the first feature is less level than the second feature.
Referring to fig. 1 to 6, fig. 1 is a schematic view showing a cross-sectional structure of an axial center plane of a continuous casting mold according to an embodiment of the present invention; fig. 2 is a schematic perspective view of the copper tube of the crystallizer in fig. 1; FIG. 3 is a schematic view of the axial center plane cross-sectional structure of the inner water jacket in FIG. 1; FIG. 4 is a schematic view of the axial center plane cross-sectional structure of the water distribution tray of FIG. 1; FIG. 5 is a schematic top view of the water distribution tray of FIG. 4; fig. 6 is a schematic view of the cross-sectional structure of the axial center plane of the outer case in fig. 1.
The application provides a continuous casting crystallizer for continuous casting of copper pipes, which comprises a crystallizer copper pipe 2, an inner water jacket 3, a water diversion disk 4, an outer shell 5, a first sealing ring 303 and a second sealing ring 505;
the crystallizer copper pipe 2 is used for pulling out a tubular casting blank from the crystallizer copper pipe 2, a hollow pipe cavity of the crystallizer copper pipe 2 forms a central cavity 201 for storing and circulating cooling water, the top end of the central cavity 201 is open, the top end of the central cavity 201 is in threaded connection with a sealing cover by a sealing cover 1, and a plurality of water outlet inclined through holes 206 which are inclined towards the axial center line of the crystallizer copper pipe from bottom to top and are used for spraying cooling water onto the inner wall surface of the tubular casting blank are arranged at the connecting position of the bottom wall and the side wall of the central cavity 201;
a tubular billet cavity 202 for containing copper melt and pulling out a tubular casting blank is formed in the pipe wall of the crystallizer copper pipe 2, the bottom opening of the tubular billet cavity 202 is totally open, a plurality of melt inlet holes 207 for allowing the copper melt to flow into the tubular billet cavity 202 are formed in the top wall of the tubular billet cavity 202, three-stage water inlet through holes for allowing cooling water to flow into are formed in the outer wall 203 of the tubular billet cavity 202, and the three-stage water inlet through holes sequentially penetrate through the solid hole wall between two adjacent melt inlet holes 207 and the inner wall 204 of the tubular billet cavity 202 from outside to inside to form three-stage water inlet through holes 208 for allowing the cooling water to flow into the central cavity 201;
the inner water sleeve 3 is tubular, the crystallizer copper pipe 2 is sleeved in a pipe hollow cavity of the inner water sleeve 3, and a secondary interlayer cavity 6 for water gap cooling is reserved between the outer wall surface of the outer wall 203 of the tubular blank cavity 202 and the inner wall surface of the inner water sleeve 3;
the top end of the crystallizer copper pipe 2 is provided with a circle of annular boss which protrudes outwards and is used for blocking the secondary interlayer cavity 6 from the upper side, and a bolt through hole for bolt connection is formed in the annular boss 205 on the crystallizer copper pipe 2;
the top end of the inner water sleeve 3 is provided with a circle of annular boss which protrudes outwards and is used for bolting, the annular boss 301 on the inner water sleeve 3 is provided with a bolt blind hole positioned at the inner ring and a bolt through hole positioned at the outer ring, the bottom end surface of the inner water sleeve 3 is provided with a first sealing ring groove, and a first sealing ring 303 is arranged in the first sealing ring groove;
the annular boss 205, the rubber asbestos plate 8 and the annular boss 301 on the inner water jacket 3 on the crystallizer copper pipe 2 are sequentially overlapped from top to bottom, and bolts penetrate through bolt through holes on the annular boss 205 on the crystallizer copper pipe 2 and the rubber asbestos plate 8 from top to bottom and are finally inserted into bolt blind holes on the annular boss 301 on the inner water jacket 3 to form bolt connection;
the bottom outlet of the secondary interlayer cavity 6 is blocked by the water diversion disc 4, the water diversion disc 4 is annular, the inner diameter of the water diversion disc 4 is big-end-up, and a water diversion water outlet groove 401 which is inclined from top to bottom towards the axial center line of the water diversion disc 4 and is used for spraying cooling water onto the outer wall surface of the tubular casting blank is arranged on the inner diameter wall surface of the water diversion disc 4;
the inner water sleeve 3 is sleeved in a shell hollow cavity of the outer shell 5, and a first-stage interlayer hollow cavity 7 for pre-storing, stabilizing and stabilizing cooling water is reserved between the outer wall surface of the inner water sleeve 3 and the inner wall surface of the outer shell 5;
the top end of the outer shell 5 is provided with a flange plate 501 for blocking the primary interlayer cavity 7 from above, a second sealing ring groove is arranged at the inner ring of the flange plate 501, a bolt through hole is arranged at the outer ring of the flange plate 501, an annular boss 301 on the inner water jacket 3 is overlapped with the flange plate 501 from top to bottom, bolts penetrate through the bolt through hole on the annular boss 301 on the inner water jacket 3 from top to bottom to form bolt connection with the bolt through hole on the flange plate 501, a second sealing ring 505 is arranged in the second sealing ring groove, and the annular boss 301 on the inner water jacket 3 and the flange plate 501 form sealing connection through the second sealing ring 505 so as to seal the upper opening of the primary interlayer cavity 7;
the bottom end of the outer shell 5 is provided with a blocking annular plate 503 for blocking the primary interlayer cavity 7 from below, the diameter of a central through hole of the blocking annular plate 503 is larger than the inner diameter of the water distribution disc 4, and the bottom end surface of the inner water jacket 3 and the upper plate surface of the blocking annular plate 503 form sealing connection through a first sealing ring 303 so as to seal the lower opening of the primary interlayer cavity 7;
a first-stage water inlet pipe 504 for feeding water into the first-stage interlayer cavity 7 is arranged on the outer wall surface of the outer shell 5, a plurality of second-stage water inlet through holes 302 for feeding water from the first-stage interlayer cavity 7 into the second-stage interlayer cavity 6 are arranged at the upper part of the inner water jacket 3, and the plurality of second-stage water inlet through holes 302 are uniformly arranged on the pipe wall of the inner water jacket 3 along a circle of circumferential intervals;
the first-stage water inlet pipe 504, the first-stage interlayer cavity 7, the second-stage interlayer cavity 6, the tubular blank cavity 202 and the central cavity 201 are communicated to form a cooling water circulation channel for cooling water to enter the first-stage interlayer cavity 7 from the first-stage water inlet pipe 504, then enter the second-stage interlayer cavity 6 from the second-stage water inlet through hole 302 on the inner water jacket 3, then, a part of cooling water in the secondary interlayer cavity 6 is sprayed downwards from the water distribution disc 4, and the other part of cooling water upwards enters the central cavity 201 from the tertiary water inlet through holes 208, and then the cooling water in the central cavity 201 is sprayed from the water outlet inclined through holes 206.
In one embodiment of the present application, an internal thread is disposed on the bottom inner wall surface of the inner water jacket 3, an external thread 402 is disposed on the outer diameter wall surface of the water diversion disc 4, and the water diversion disc 4 is fixed in the bottom pipe orifice of the inner water jacket 3 through threaded connection to block the bottom outlet of the secondary interlayer cavity 6.
In one embodiment of the present application, the outer housing 5 includes a flange 501, a metal tube 502, and a plugging ring plate 503;
the flange plate 501 is welded at the top end of the metal pipe 502, the plugging annular plate 503 is welded at the bottom end of the metal pipe 502, and a primary water inlet pipe 504 is arranged on the outer wall surface of the metal pipe 502.
In one embodiment of the present application, the crystallizer copper tube 2 is made of phosphorus deoxidized copper.
In one embodiment of the present application, the inner water jacket 3 is made of stainless steel.
In one embodiment of the present application, the water distribution tray 4 is made of stainless steel.
In one embodiment of the present application, the outer housing 5 is made of stainless steel.
The invention provides a continuous casting crystallizer for continuous casting copper pipes, which comprises a crystallizer copper pipe 2, an inner water jacket 3, a water distribution disc 4, an outer shell 5, a first sealing ring 303 and a second sealing ring 505, wherein the crystallizer copper pipe 2 is used for pulling out a tubular casting blank from the inner shell, a central cavity 201 for storing and circulating cooling water is formed by a hollow pipe cavity of the crystallizer copper pipe 2, a tubular blank cavity 202 for containing copper melt and pulling out the tubular casting blank is formed in the pipe wall of the crystallizer copper pipe 2, the crystallizer copper pipe 2 is sleeved in a pipe hollow cavity of the inner water jacket 3, a secondary interlayer cavity 6 for water gap cooling is reserved between the outer wall surface of the outer wall 203 of the tubular blank cavity 202 and the inner wall surface of the inner water jacket 3, the inner water jacket 3 is sleeved in the shell hollow cavity of the outer shell 5, a primary interlayer cavity 7 for pre-storing and circulating cooling water is reserved between the outer wall surface of the inner water jacket 3 and the inner wall surface of the outer shell 5, the top end of the crystallizer copper pipe 2 and the top end of the inner water jacket 3 are connected with the secondary interlayer cavity 6 through a sealing bolt, the top end of the water distribution disc is connected with the secondary interlayer cavity 6 and the top end of the sealing disc 4 is connected with the top end of the sealing plate of the sealing ring-shaped interlayer cavity 6;
in the continuous casting crystallizer, the first-stage water inlet pipe 504, the first-stage interlayer cavity 7, the second-stage interlayer cavity 6, the tubular blank cavity 202 and the central cavity 201 are communicated to form a cooling water circulation channel for cooling water to enter the first-stage interlayer cavity 7 from the first-stage water inlet pipe 504, then enter the second-stage interlayer cavity 6 from the second-stage water inlet through hole 302 on the inner water jacket 3, then part of cooling water in the second-stage interlayer cavity 6 is sprayed downwards from the water distribution disc 4 and the other part of cooling water is sprayed upwards from the third-stage water inlet through hole 208 into the central cavity 201, and then cooling water in the central cavity 201 is sprayed from the water outlet inclined through hole;
primary cooling of the copper melt in the tubular billet cavity 202 by the flowing cooling water in the central cavity 201 and the secondary interlayer cavity 6 to generate a billet shell containing the copper melt;
next, as the water diversion outlet groove 401 gradually inclines from top to bottom to the axial center line of the water diversion disc 4 and the water outlet inclined through hole 206 gradually inclines from bottom to top to the axial center line of the crystallizer copper pipe 2, water flowing out of the secondary interlayer cavity 6 can be flushed to the outer wall surface of the tubular casting blank just pulled out of the crystallizer, so that water flowing out of the central cavity 201 can be flushed to the inner wall surface of the tubular casting blank just pulled out of the crystallizer, thereby performing secondary cooling on the primary cooling shell and strengthening cooling of the casting blank;
in conclusion, the continuous casting crystallizer provided by the application is of an inner sleeve and outer sleeve structure, the inner sleeve and the outer sleeve are formed through bolt connection, the cooling capacity of a cooling water flowing path is high, and the continuous casting crystallizer has the advantages of being simple and compact in structure, easy to manufacture and convenient to assemble and disassemble.
The method and the device which are not described in detail in the invention are all the prior art and are not described in detail.
The principles and embodiments of the present invention have been described herein with reference to specific examples, which are intended to be merely illustrative of the methods of the present invention and their core ideas. It should be noted that it will be apparent to those skilled in the art that various modifications and adaptations of the invention can be made without departing from the principles of the invention and these modifications and adaptations are intended to be within the scope of the invention as defined in the following claims.

Claims (5)

1. The continuous casting crystallizer for continuous casting of the copper pipe is characterized by comprising a crystallizer copper pipe, an inner water jacket, a water distribution disc, an outer shell, a first sealing ring and a second sealing ring;
the crystallizer copper pipe is used for pulling out a tubular casting blank from the crystallizer copper pipe, a hollow pipe cavity of the crystallizer copper pipe forms a central cavity for storing and circulating cooling water, the top end of the central cavity is open, the top end opening of the central cavity is in threaded connection with a sealing cover by a sealing cover, and a plurality of water outlet inclined through holes which are inclined towards the axial center line of the crystallizer copper pipe from bottom to top and are used for spraying cooling water onto the inner wall surface of the tubular casting blank are arranged at the connecting position between the bottom wall and the side wall of the central cavity;
a tubular billet cavity for containing copper melt and pulling out a tubular casting billet is formed in the pipe wall of the crystallizer copper pipe, the bottom opening of the tubular billet cavity is totally open, a plurality of melt inlet holes for allowing the copper melt to flow into the tubular billet cavity are formed in the top wall of the tubular billet cavity, three-stage water inlet through holes for allowing cooling water to flow into the tubular billet cavity are formed in the outer wall of the tubular billet cavity, and the three-stage water inlet through holes sequentially penetrate through the solid hole wall between two adjacent melt inlet holes and the inner wall of the tubular billet cavity from outside to inside to form three-stage water inlet through holes for allowing the cooling water to flow into the central cavity;
the inner water jacket is tubular, the crystallizer copper tube is sleeved in a tube hollow cavity of the inner water jacket, and a secondary interlayer cavity for water gap cooling is reserved between the outer wall surface of the outer wall of the tubular blank cavity and the inner wall surface of the inner water jacket;
the top end of the crystallizer copper pipe is provided with a circle of annular boss which protrudes outwards and is used for blocking the secondary interlayer cavity from the upper part, and the annular boss on the crystallizer copper pipe is provided with a bolt through hole for bolt connection;
the top end of the inner water jacket is provided with a circle of annular boss which protrudes outwards and is used for bolting, the annular boss on the inner water jacket is provided with a bolt blind hole positioned at the inner ring and a bolt through hole positioned at the outer ring, the bottom end surface of the inner water jacket is provided with a first sealing ring groove, and a first sealing ring is arranged in the first sealing ring groove;
the annular boss, the rubber asbestos plate and the annular boss on the inner water jacket are sequentially overlapped from top to bottom, and bolts penetrate through bolt through holes on the annular boss on the crystallizer copper pipe and the rubber asbestos plate from top to bottom and are finally inserted into bolt blind holes on the annular boss on the inner water jacket to form bolt connection;
the bottom outlet of the secondary interlayer cavity is blocked by the water diversion disc, the water diversion disc is annular, the inner diameter of the water diversion disc is large and small, and a plurality of water diversion water outlet tanks which are inclined from top to bottom towards the axial central line of the water diversion disc and are used for spraying cooling water to the outer wall surface of the tubular casting blank are arranged on the inner diameter wall surface of the water diversion disc;
the inner water sleeve is sleeved in the shell hollow cavity of the outer shell, and a first-stage interlayer cavity for pre-storing, stabilizing and stabilizing cooling water is reserved between the outer wall surface of the inner water sleeve and the inner wall surface of the outer shell;
the top end of the outer shell is provided with a flange plate for blocking the primary interlayer cavity from the upper part, the inner ring of the flange plate is provided with a second sealing ring groove, the outer ring of the flange plate is provided with a bolt through hole, the annular boss on the inner water jacket is overlapped with the flange plate from top to bottom, the bolt penetrates through the bolt through hole on the annular boss on the inner water jacket from top to bottom to form bolt connection with the bolt through hole on the flange plate, a second sealing ring is arranged in the second sealing ring groove, and the annular boss on the inner water jacket and the flange plate form sealing connection through the second sealing ring so as to seal the upper opening of the primary interlayer cavity;
the bottom end of the outer shell is provided with a blocking annular plate for blocking the primary interlayer cavity from below, the diameter of a central through hole of the blocking annular plate is larger than the inner diameter of the water distributing disc, and the bottom end surface of the inner water jacket and the upper plate surface of the blocking annular plate form sealing connection through a first sealing ring so as to seal the lower opening of the primary interlayer cavity;
a first-stage water inlet pipe for water inflow into the first-stage interlayer cavity is arranged on the outer wall surface of the outer shell, a plurality of second-stage water inflow through holes for water inflow from the first-stage interlayer cavity into the second-stage interlayer cavity are arranged at the upper part of the inner water jacket, and the plurality of second-stage water inflow through holes are uniformly distributed on the pipe wall of the inner water jacket along a circle of circumferential interval;
the first-stage water inlet pipe, the first-stage interlayer cavity, the second-stage interlayer cavity, the tubular blank cavity and the central cavity are communicated to form a cooling water circulation channel for cooling water to enter the first-stage interlayer cavity from the first-stage water inlet pipe, then enter the second-stage interlayer cavity from the second-stage water inlet through hole on the inner water jacket, then one part of cooling water in the second-stage interlayer cavity is sprayed downwards from the water diversion water outlet groove in the water diversion disc, and the other part of cooling water is sprayed upwards from the third-stage water inlet through hole to enter the central cavity, and then cooling water in the central cavity is sprayed from the water outlet inclined through hole;
an inner thread is arranged on the inner wall surface of the bottom of the inner water jacket, an outer thread is arranged on the outer diameter wall surface of the water distribution disc, and the water distribution disc is fixedly connected in a bottom pipe orifice of the inner water jacket through threads to block a bottom outlet of the secondary interlayer cavity;
the outer shell comprises a flange plate, a metal pipe and a plugging annular plate;
the flange plate is welded at the top end of the metal pipe, the plugging annular plate is welded at the bottom end of the metal pipe, and a primary water inlet pipe is arranged on the outer wall surface of the metal pipe.
2. The continuous casting mold according to claim 1, wherein the mold copper tube is made of phosphorus deoxidized copper.
3. The continuous casting mold according to claim 1, wherein the inner water jacket is made of stainless steel.
4. The continuous casting mold according to claim 1, wherein the water distribution tray is made of stainless steel.
5. The continuous casting mold according to claim 1, wherein the outer shell is made of stainless steel.
CN201910113164.8A 2019-02-13 2019-02-13 Continuous casting crystallizer for continuous casting copper pipe Active CN109570459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910113164.8A CN109570459B (en) 2019-02-13 2019-02-13 Continuous casting crystallizer for continuous casting copper pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910113164.8A CN109570459B (en) 2019-02-13 2019-02-13 Continuous casting crystallizer for continuous casting copper pipe

Publications (2)

Publication Number Publication Date
CN109570459A CN109570459A (en) 2019-04-05
CN109570459B true CN109570459B (en) 2024-04-09

Family

ID=65918882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910113164.8A Active CN109570459B (en) 2019-02-13 2019-02-13 Continuous casting crystallizer for continuous casting copper pipe

Country Status (1)

Country Link
CN (1) CN109570459B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114769538B (en) * 2022-04-28 2023-06-23 贵溪华泰铜业有限公司 High-efficient continuous casting device is used in environment-friendly processing of red copper bar

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2394738Y (en) * 1999-10-29 2000-09-06 冶金工业部马鞍山钢铁设计研究院 Cooler for crystallizer copper tube
CN201906804U (en) * 2010-12-13 2011-07-27 圣力(福州)重工有限公司 Continuous-casting tube type crystallizer
CN102909324A (en) * 2012-11-21 2013-02-06 安陆火凤凰铝材有限责任公司 Short crystallizer for casting hollow aluminum ingots
CN105033202A (en) * 2015-07-13 2015-11-11 江苏联峰能源装备有限公司 Crystallizer copper pipe water seam width positioning device, crystallizer and crystallizer assembling method
CN209632080U (en) * 2019-02-13 2019-11-15 济南东方结晶器有限公司 A kind of continuous cast mold for continuous casting copper pipes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2394738Y (en) * 1999-10-29 2000-09-06 冶金工业部马鞍山钢铁设计研究院 Cooler for crystallizer copper tube
CN201906804U (en) * 2010-12-13 2011-07-27 圣力(福州)重工有限公司 Continuous-casting tube type crystallizer
CN102909324A (en) * 2012-11-21 2013-02-06 安陆火凤凰铝材有限责任公司 Short crystallizer for casting hollow aluminum ingots
CN105033202A (en) * 2015-07-13 2015-11-11 江苏联峰能源装备有限公司 Crystallizer copper pipe water seam width positioning device, crystallizer and crystallizer assembling method
CN209632080U (en) * 2019-02-13 2019-11-15 济南东方结晶器有限公司 A kind of continuous cast mold for continuous casting copper pipes

Also Published As

Publication number Publication date
CN109570459A (en) 2019-04-05

Similar Documents

Publication Publication Date Title
US10576534B2 (en) Mold for improving solidification speed of aluminum alloy cast hot section
CN100566883C (en) The method of cooling cast hollow core clava blank with endoporus water as well and device thereof
CN109570459B (en) Continuous casting crystallizer for continuous casting copper pipe
CN117259728A (en) Casting mold and casting method of aluminum-iron composite brake disc
CN201720405U (en) Mold for casting copper and round copper-alloy ingots
CN111054896A (en) Water-cooling dummy bar head device for casting
US3710840A (en) Method for continuous casting of hollow bar
CN209632080U (en) A kind of continuous cast mold for continuous casting copper pipes
CN201889403U (en) Molten steel continuous casting rivet type water jacket crystallizer
CN207272114U (en) A kind of water cooling pours into a mould ingot mould
CN216325039U (en) Cooling system for nodular iron castings
CN213256986U (en) Water-cooling mold for hub casting
CN108580818B (en) Crystallizer suitable for producing thin-wall annular blank
CN202877498U (en) Continuous casting device of copper pipe for crystallizer
CN203109200U (en) Sprinkling-type cooling device of water-cooling metal centrifugal pipe casting machine
RU60408U1 (en) CRYSTALIZER FOR SEMI-CONTINUOUS VERTICAL CASTING OF ROUND INGOTS
CN211679909U (en) Water-cooling dummy bar head device for casting
CN217512824U (en) Cooling device for continuous casting mold
CN215467954U (en) Novel crystallization device for pipe blank continuous casting
CN215902691U (en) Casting device for preparing aluminum alloy round cast ingot
CN210702430U (en) Multi-stage cooling crystallizer for zinc white copper horizontal continuous casting unit
CN107570673A (en) A kind of water cooling pours into a mould ingot mould
CN201783632U (en) Billet connecting piece of steelmaking and continuous casting billet heat exchanger
CN213671737U (en) Spray strip for cooling casting blank
CN219378916U (en) Round billet continuous casting connecting piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant