CN109559037A - A kind of excavation calling system - Google Patents

A kind of excavation calling system Download PDF

Info

Publication number
CN109559037A
CN109559037A CN201811442035.5A CN201811442035A CN109559037A CN 109559037 A CN109559037 A CN 109559037A CN 201811442035 A CN201811442035 A CN 201811442035A CN 109559037 A CN109559037 A CN 109559037A
Authority
CN
China
Prior art keywords
excavation
pipeline
ownership
data
call
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811442035.5A
Other languages
Chinese (zh)
Inventor
陈洪杰
赵红蕊
檀亚楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811442035.5A priority Critical patent/CN109559037A/en
Publication of CN109559037A publication Critical patent/CN109559037A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Abstract

The invention discloses a kind of excavation calling systems, including web server, it acquires using the geodetic coordinates that measuring tool carries out pipeline after pipeline construction and puts up one along the line and call through Sign Board, the coordinate of acquisition is encrypted to upload to after open coordinate system coordinate and is excavated in web server, data center saves complete pipeline information data at this time, excavation calls through Sign Board to searching one nearby is excavated, the two dimensional code opening one in Sign Board, which is called through, with wechat scanning one calls through small routine, and excavation side needs mark in the map for calling through small routine one " excavating route " and fills in excavation contact information, click reports button to be reported to excavation call platform for track data is excavated, excavation call platform receives after data, it is analyzed by geographical position coordinates, it will notify the ownership unit of occurred pipeline, pipeline ownership unit receives After notice, reply will be made, the hand-held computer containing RTK is opened WEBGIS system, instruct engineering construction on the spot by pipeline ownership working unit personnel.

Description

A kind of excavation calling system
Technical field
The present invention relates to a kind of calling system, specifically a kind of excavation calling system.
Background technique
Urban Buried Pipeline Network is an extremely complex huge system, be first conduit types complexity, such as have water supply, Substantially seven seed type such as draining, coal gas, electric power, heating power, telecommunications and industrial pipeline, in addition the buried depth of underground pipe network is different, material Material is different, and the age is different, and ownership is different;Construction and excavation frequently refers to more ownership units, and ownership unit only understands oneself The line conditions of unit, and the case where do not know about other unit, cause job schedule and workflow to be difficult to carry out substance Communication.
What present construction and excavation connection was mainly completed by way of Advise By Wire, it such as dials in combustion gas identification pile Telephone number is contacted, and goes forward side by side construction location time etc. carrying out word picture, existing technical deficiency place:
(1) oral account may cause the unclear problem of situation explanation;
(2) information can not accurately be passed to pipeline ownership unit;
(3) more pipeline units cannot be notified simultaneously.
Accomplish that excavation side can directly relate to all ownership units to allow pipeline to excavate this part thing, ownership unit can It most will accurately excavate data and be supplied to excavation side, and can will excavate the near minimum quantity of safety accident, can assist in ownership list The problems such as position is accurate to manage pipeline data, can provide issuable safety accident reliably card is it is proposed that a kind of excavation Calling system.
Summary of the invention
The purpose of the present invention is to provide a kind of excavation calling systems, to solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of excavation calling system, including web server, wechat, one call through small routine, one exhale two dimensional code lead to Sign Board, Excavate the tablet computer and coordinate measure tool of call platform, WEBGIS system, the function containing RTK, which is characterized in that including following Step:
Step 1: it is acquired after pipeline construction using the geodetic coordinates that the measuring tool carries out pipeline and is opened along the line Patch one calls through Sign Board;
Step 2: the coordinate of acquisition being encrypted to upload to after open coordinate system coordinate and is excavated in the web server, this When data center save complete pipeline information data;
Step 3: excavation side calls through Sign Board to searching one nearby is excavated, and " sweeps and sweeps " functionality scan one with wechat and call through Two dimensional code in Sign Board opens described one and calls through small routine, and excavation side needs to mark in the map for calling through small routine one " excavating route " simultaneously fills in excavation contact information, and then click reports button that excavation track data is reported to the excavation and exhales It is platform;
Step 4: after the excavation call platform receives the data excavated and reported, being analyzed by geographical position coordinates, will The ownership unit of occurred pipeline within radius N kilometers of notice;
Step 5: after pipeline ownership unit is notified, reply will be made;
Step 6: the hand-held tablet computer containing RTK is opened the WEBGIS system by pipeline ownership working unit personnel System, instructs engineering construction on the spot.
As a further solution of the present invention: the wechat small routine excavates call platform, all data of WEBGIS system All rely on web server.
As a further solution of the present invention: the content of announcement for excavating call platform includes but is not limited to excavate route And excavate contact information.
As a further solution of the present invention: the pipeline ownership unit reply content includes but is not limited to simple buried pipe Net figure, job order.
As a further solution of the present invention: excavation can in minutes offer the route that will be excavated all Ownership unit.
As a further solution of the present invention: the ownership unit for excavating all pipelines near route can receive excavation immediately It reports request and handles.
As a further solution of the present invention: ownership unit can check real-time pipeline data at the scene, and guide excavation side.
As a further solution of the present invention: the staff being related in pipeline ownership unit job order will be according to group The specified in more detail of work order is met for excavation side and is instructed.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention, which excavates, can in minutes offer the route that will be excavated all ownership units, excavation line The ownership unit of all pipelines can receive excavation immediately and report request and handle near road, while ownership unit can be looked at the scene It sees real-time pipeline data, excavation side is and guided to work.
2, operation efficiency of the invention improves, reduces energy consumption, yield improves, precision improves, process is simplified, easy to control, And appearance of useful properties etc. reflects.
3, it will be minimum that the present invention, which can will be unfamiliar with the excavation safety accident probability that subsurface picture may result in, once go out Safety accident is now excavated, excavation side and ownership unit can be using platform datas as responsibility planning basis.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for excavating calling system and its application method.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of excavation calling system, including web server, wechat, one call through it is small Program, the tablet computer and measurement of coordinates for exhaling two dimensional code to lead to Sign Board, excavate call platform, WEBGIS system, the function containing RTK Tool, which comprises the following steps:
Step 1: it is acquired after pipeline construction using the geodetic coordinates that the measuring tool carries out pipeline and is opened along the line Patch one calls through Sign Board;
Step 2: the coordinate of acquisition being encrypted to upload to after open coordinate system coordinate and is excavated in the web server, this When data center save complete pipeline information data;
Step 3: excavation side calls through Sign Board to searching one nearby is excavated, and " sweeps and sweeps " functionality scan one with wechat and call through Two dimensional code in Sign Board opens described one and calls through small routine, and excavation side needs to mark in the map for calling through small routine one " excavating route " simultaneously fills in excavation contact information, and then click reports button that excavation track data is reported to the excavation and exhales It is platform;
Step 4: after the excavation call platform receives the data excavated and reported, being analyzed by geographical position coordinates, will The ownership unit of occurred pipeline within radius N kilometers of notice;
Step 5: after pipeline ownership unit is notified, reply will be made;
Step 6: the hand-held tablet computer containing RTK is opened the WEBGIS system by pipeline ownership working unit personnel System, instructs engineering construction on the spot.
The wechat small routine, excavation call platform, all data of WEBGIS system all rely on web server.
The content of announcement for excavating call platform includes but is not limited to excavate route and excavate contact information, is excavated The ownership unit of all pipelines can receive excavation immediately and report request and handle near route.
The pipeline ownership unit reply content includes but is not limited to simple underground pipe network figure, job order, pipeline ownership list The staff being related in the job order of position will meet for excavation side and instruct according to the specified in more detail of job order.
The route that will be excavated can be offered all ownership units, ownership unit platform packet by excavation in minutes Water supply company, draining company, gas company, power supply company, light current company etc. are included, ownership unit can check real-time pipe at the scene Line number evidence, and guides excavation side.
By excavating calling system, allows pipeline to excavate this part thing and accomplish that excavation side can directly relate to all ownership lists Position, ownership unit most can will accurately excavate data and be supplied to excavation side, while ownership unit can be assisted accurately to manage Pipeline data, it is possible to create safety accident reliable card is provided can will be unfamiliar with the safe thing of excavation that subsurface picture may result in Therefore probability will be minimum, once occurring excavating safety accident, excavation side and ownership unit can be advised platform data as responsibility Draw foundation.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (8)

1. a kind of excavation calling system, including web server, wechat, one calls through small routine, one two dimensional code exhaled to lead to Sign Board, open Dig the tablet computer and coordinate measure tool of call platform, WEBGIS system, the function containing RTK, which is characterized in that including following step It is rapid:
Step 1: the geodetic coordinates acquisition of pipeline is carried out using the measuring tool after pipeline construction and puts up one along the line Call through Sign Board;
Step 2: the coordinate of acquisition is encrypted to upload to after open coordinate system coordinate and is excavated in the web server, is counted at this time Complete pipeline information data are saved according to center;
Step 3: excavation side calls through Sign Board to searching one nearby is excavated, and " sweeps and sweeps " functionality scan one with wechat and call through mark Two dimensional code in board opens described one and calls through small routine, and marks " excavation in the excavations side map that needs to call through small routine one Route " simultaneously fills in excavation contact information, and then click reports button that excavation track data is reported to the excavation calling and puts down Platform;
Step 4: it after the excavation call platform receives the data excavated and reported, is analyzed, will be notified by geographical position coordinates The ownership unit of occurred pipeline within N kilometers of radius;
Step 5: after pipeline ownership unit is notified, reply will be made;
Step 6: the hand-held tablet computer containing RTK is opened the WEBGIS system by pipeline ownership working unit personnel, Engineering construction is instructed on the spot.
2. a kind of excavation calling system according to claim 1, which is characterized in that the wechat small routine excavates calling Platform, all data of WEBGIS system all rely on web server.
3. a kind of excavation calling system according to claim 1, which is characterized in that in the notice for excavating call platform Hold includes but is not limited to excavate route and excavation contact information.
4. a kind of excavation calling system according to claim 1, which is characterized in that the pipeline ownership unit reply content Including but not limited to simple underground pipe network figure, job order.
5. a kind of excavation calling system according to claim 1, which is characterized in that excavating will be in minutes The route of excavation is offered to all ownership units.
6. a kind of excavation calling system according to claim 1, which is characterized in that excavate the power of all pipelines near route Category unit can receive excavation immediately and report request and handle.
7. a kind of excavation calling system according to claim 1, which is characterized in that ownership unit can check in real time at the scene Pipeline data, and guide excavation side.
8. a kind of excavation calling system according to claim 1, which is characterized in that involved in pipeline ownership unit job order The staff arrived will meet for excavation side and instruct according to the specified in more detail of job order.
CN201811442035.5A 2018-11-29 2018-11-29 A kind of excavation calling system Pending CN109559037A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811442035.5A CN109559037A (en) 2018-11-29 2018-11-29 A kind of excavation calling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811442035.5A CN109559037A (en) 2018-11-29 2018-11-29 A kind of excavation calling system

Publications (1)

Publication Number Publication Date
CN109559037A true CN109559037A (en) 2019-04-02

Family

ID=65867901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811442035.5A Pending CN109559037A (en) 2018-11-29 2018-11-29 A kind of excavation calling system

Country Status (1)

Country Link
CN (1) CN109559037A (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040181443A1 (en) * 2003-03-10 2004-09-16 Horton Carl A. Method and apparatus for the management of infrastructure assets, work orders,service requests, and work flows, utilizing an integrated call center, database, GIS system, and wireless handheld device
WO2005122540A1 (en) * 2004-05-11 2005-12-22 France Telecom System and method for assisting in the setting up of a telecommunication link in a telecommunication network
WO2010039243A2 (en) * 2008-10-02 2010-04-08 Certusview Technologies, Llc Methods and apparatus for analyzing locate and marking operations with respect to facilities maps
US7773095B1 (en) * 2003-04-08 2010-08-10 At&T Intellectual Property Ii, L.P. Method and system for provisioning facility-based maps and related information to field personnel
US20100228588A1 (en) * 2009-02-11 2010-09-09 Certusview Technologies, Llc Management system, and associated methods and apparatus, for providing improved visibility, quality control and audit capability for underground facility locate and/or marking operations
CN102750618A (en) * 2012-06-27 2012-10-24 西安理工大学 {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof
CN103064123A (en) * 2012-12-21 2013-04-24 杭州德豪环保材料有限公司 Underground pipeline locating method and device
US20160042010A1 (en) * 2014-08-11 2016-02-11 Cox Communications, Inc. Systems and Methods of Facilities Location
US20160048783A1 (en) * 2014-06-17 2016-02-18 One Call Concepts, Inc. System and Method for Locate Request Entry Configured for Defining Multiple Excavation Sites as Part of a Single Locate Request
CN205176896U (en) * 2015-11-05 2016-04-20 成都千嘉科技有限公司 Pipe fitting information management system and gas pipeline pipe fitting based on RFID
WO2017045425A1 (en) * 2015-09-18 2017-03-23 南京联众建设工程技术有限公司 Steel-concrete composite tunnel lining support structure and manufacturing and construction method thereof
CN106651074A (en) * 2015-11-03 2017-05-10 璧典凯 Intelligent underground pipeline management system
CN106759625A (en) * 2016-12-20 2017-05-31 清华大学合肥公共安全研究院 Excavate pipeline real-time early warning terminal and its fixed structure in a kind of city
CN206224595U (en) * 2016-10-31 2017-06-06 成都慧途科技有限公司 Comprehensive underground pipenet information management system based on GIS three-dimensional visualizations
CN106898964A (en) * 2015-12-21 2017-06-27 浙江科畅电子有限公司 A kind of patrolling transmission line wire examination method based on wechat platform
CN107392266A (en) * 2017-07-12 2017-11-24 广州宇洪科技股份有限公司 It is a kind of that cloud platform is transmitted for the wisdom of mark by Quick Response Code
CN107679836A (en) * 2017-10-19 2018-02-09 湖南优图信息技术有限公司 A kind of underground utilities safeguard approval system and method
CN107818535A (en) * 2017-11-17 2018-03-20 湖南优图信息技术有限公司 A kind of Underground Pipeline Data management method, apparatus and system
CN108194764A (en) * 2017-12-30 2018-06-22 南京华博供用电工程有限公司 The means of defence of underground piping during a kind of excavation pipe trench

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040181443A1 (en) * 2003-03-10 2004-09-16 Horton Carl A. Method and apparatus for the management of infrastructure assets, work orders,service requests, and work flows, utilizing an integrated call center, database, GIS system, and wireless handheld device
US7773095B1 (en) * 2003-04-08 2010-08-10 At&T Intellectual Property Ii, L.P. Method and system for provisioning facility-based maps and related information to field personnel
WO2005122540A1 (en) * 2004-05-11 2005-12-22 France Telecom System and method for assisting in the setting up of a telecommunication link in a telecommunication network
WO2010039243A2 (en) * 2008-10-02 2010-04-08 Certusview Technologies, Llc Methods and apparatus for analyzing locate and marking operations with respect to facilities maps
US20100228588A1 (en) * 2009-02-11 2010-09-09 Certusview Technologies, Llc Management system, and associated methods and apparatus, for providing improved visibility, quality control and audit capability for underground facility locate and/or marking operations
CN102750618A (en) * 2012-06-27 2012-10-24 西安理工大学 {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof
CN103064123A (en) * 2012-12-21 2013-04-24 杭州德豪环保材料有限公司 Underground pipeline locating method and device
US20160048783A1 (en) * 2014-06-17 2016-02-18 One Call Concepts, Inc. System and Method for Locate Request Entry Configured for Defining Multiple Excavation Sites as Part of a Single Locate Request
US20160042010A1 (en) * 2014-08-11 2016-02-11 Cox Communications, Inc. Systems and Methods of Facilities Location
WO2017045425A1 (en) * 2015-09-18 2017-03-23 南京联众建设工程技术有限公司 Steel-concrete composite tunnel lining support structure and manufacturing and construction method thereof
CN106651074A (en) * 2015-11-03 2017-05-10 璧典凯 Intelligent underground pipeline management system
CN205176896U (en) * 2015-11-05 2016-04-20 成都千嘉科技有限公司 Pipe fitting information management system and gas pipeline pipe fitting based on RFID
CN106898964A (en) * 2015-12-21 2017-06-27 浙江科畅电子有限公司 A kind of patrolling transmission line wire examination method based on wechat platform
CN206224595U (en) * 2016-10-31 2017-06-06 成都慧途科技有限公司 Comprehensive underground pipenet information management system based on GIS three-dimensional visualizations
CN106759625A (en) * 2016-12-20 2017-05-31 清华大学合肥公共安全研究院 Excavate pipeline real-time early warning terminal and its fixed structure in a kind of city
CN107392266A (en) * 2017-07-12 2017-11-24 广州宇洪科技股份有限公司 It is a kind of that cloud platform is transmitted for the wisdom of mark by Quick Response Code
CN107679836A (en) * 2017-10-19 2018-02-09 湖南优图信息技术有限公司 A kind of underground utilities safeguard approval system and method
CN107818535A (en) * 2017-11-17 2018-03-20 湖南优图信息技术有限公司 A kind of Underground Pipeline Data management method, apparatus and system
CN108194764A (en) * 2017-12-30 2018-06-22 南京华博供用电工程有限公司 The means of defence of underground piping during a kind of excavation pipe trench

Similar Documents

Publication Publication Date Title
CN103064123B (en) A kind of underground utilities localization method and device
US8300895B2 (en) Virtual white lines for delimiting planned excavation sites
US9471835B2 (en) Electronic manifest of underground facility locate marks
CA2691780C (en) Management system, and associated methods and apparatus, for providing automatic assesment of a locate operation
US20120330849A1 (en) Methods, apparatus, and systems for performing installations of engineered systems and generating site visit manifests for same
US20160071059A1 (en) Infrastructure management, model, and deliverable creation system and method of use
CA2885962A1 (en) Methods and apparatus for assessing locate request tickets
CN102147886A (en) Geographic-information system (GIS) and general packet radio service (GPRS) technology-based remote metro construction inspection and management system
US9280269B2 (en) Electronic manifest of underground facility locate marks
CN110929363B (en) Communication line investigation design method and system
CN112989532A (en) BIM-based construction method for changing municipal pipeline of subway station
CN109559037A (en) A kind of excavation calling system
CN103020327B (en) Land use intensively investigation real-time data acquisition terminal system and acquisition method thereof
CN110186436A (en) Bathymetric surveying drawing formation system and method based on architecture information model
CN110610244A (en) Water supply pipeline hidden danger troubleshooting integrated operation method, computer readable storage medium and terminal
CN114419123A (en) Cable protection zone determining method and system based on true color point cloud
CN111473771A (en) Method for measuring mine topographic map by RTK (real-time kinematic) linear lofting measurement
CN116090768A (en) Underground cable linkage management system and management method
Uysal A GPS/GIS based line of balance method for planning and control of construction projects
Hamzah et al. TECHNICAL REVIEW OF THE CURRENT EARTHWORK SMART TECHNOLOGIES IN AUSTRALIA
Johnson et al. Dam Failure Inundation Map Project
CN116205399A (en) Cable channel resource management system
CN117873315A (en) Augmented reality equipment for power cable inspection
Peterson et al. Water Quality Sampling Locations Along the Shoreline of the Columbia River, Hanford Site, Washington
McDonnell et al. Pipeline Pig Tracking Through the Internet: A New Use for Existing Technology in the Pipeline Pigging Industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190402

WD01 Invention patent application deemed withdrawn after publication