CN109559016A - Six property of product design analysis software - Google Patents
Six property of product design analysis software Download PDFInfo
- Publication number
- CN109559016A CN109559016A CN201811268445.2A CN201811268445A CN109559016A CN 109559016 A CN109559016 A CN 109559016A CN 201811268445 A CN201811268445 A CN 201811268445A CN 109559016 A CN109559016 A CN 109559016A
- Authority
- CN
- China
- Prior art keywords
- product
- property
- defects
- measure
- design
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013461 design Methods 0.000 title claims abstract description 103
- 230000007547 defect Effects 0.000 claims abstract description 109
- 230000006872 improvement Effects 0.000 claims abstract description 81
- 238000007726 management method Methods 0.000 claims abstract description 63
- 238000004458 analytical method Methods 0.000 claims abstract description 38
- 238000012360 testing method Methods 0.000 claims abstract description 29
- 238000013439 planning Methods 0.000 claims abstract description 20
- 239000000203 mixture Substances 0.000 claims abstract description 12
- 238000012790 confirmation Methods 0.000 claims abstract description 11
- 238000009472 formulation Methods 0.000 claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 claims abstract description 8
- 230000000694 effects Effects 0.000 claims description 33
- 238000000034 method Methods 0.000 claims description 16
- 238000011161 development Methods 0.000 claims description 12
- 238000009826 distribution Methods 0.000 claims description 9
- 238000012356 Product development Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 235000013399 edible fruits Nutrition 0.000 claims description 2
- 230000007812 deficiency Effects 0.000 abstract description 2
- 238000011156 evaluation Methods 0.000 description 6
- 238000012795 verification Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 4
- 230000007115 recruitment Effects 0.000 description 4
- 238000012384 transportation and delivery Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000004132 cross linking Methods 0.000 description 2
- 230000002950 deficient Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000002459 sustained effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000003326 Quality management system Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/22—Design optimisation, verification or simulation using Petri net models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06314—Calendaring for a resource
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of six property of product to design analysis software, designs analysis module comprising six property: for analyzing product various defects present in design, manufacture link, formulating Defects improvements measure;Product testing and use fault information managing module: the various defects exposed in test, use for acquiring product formulate Defects improvements measure;Defects improvements measure management module: for confirming to the Defects improvements measure of formulation, the six sex work plans to be implemented are formed after confirming Defects improvements measure;Six property planning management modules: for according to six sex work planned assignment tasks;Object management module is delivered in six property plans: summarizing task performance for collecting.The present invention realizes the six sex works requirement of " six property design analysis-discovery design deficiency of product-formulation Defects improvements measure-implement corrective measure-collection product testing and use fault message-formulation Defects improvements measure-implements corrective measure-verifying confirmation corrective measure validity ".
Description
Technical field
The present invention relates to a kind of General Comput-er Softwares, for carrying out product six property (reliability, maintainability, testability, guarantor
Barrier property, safety and environmental suitability) design.
Background technique
Six property (reliability, maintainability, testability, protection, safety and environmental suitability) belong to the general matter of product
Flow characteristic requirement provides, product development tissue must be set up these characteristics according to GJB9001C quality management system 4.4.1.j item
The course of work, according to 8.1. operation planning and control g item) require, it should determine qualitative mass property, quantitative requirement and work
Make project demand, formulates universal qualities characteristic work plan;It is designed in conjunction with system, choosing comprehensively, decomposition universal qualities characteristic are fixed
Property quantitative requirement, carry out universal qualities specificity analysis, design, verifying, propose simultaneously implement prevention and corrective measure.8.3.2 design
It defines with exploitation planning p item " with the professions such as product optimization design and the design of universal qualities characteristic, human factor engineering design
Engineering technology carries out product design and exploitation;Tissue should determine the design criteria of products & services, including universal qualities characteristic
Related request.8.3.4 the h item for designing and developing control carries out the evaluation of universal qualities characteristic and computer software, verifying and really
Recognize activity.
Six property design activities are distributed in the life cycle management of product, including design, manufacture, are delivered for use the full stage, design
Activity is related to a variety of different professions, in order to guarantee work quality and effect, it should have the software assistance to carry out design analysis work.
The activity that six property should carry out includes four classes such as management activity, design analytic activity, verification experimental verification, sustained improvement.
Wherein management activity includes establishing job engineering, formulates work plan, is managed to supplier, establishes Trouble Report analysis system
System etc..Design analytic activity includes establishing model, determining qualitative or quantitative demand, establish model, carry out estimated distribution, carry out
Failure Mode Effective Analysis establishes design criteria, carries out failure tree analysis (FTA) etc., and verification experimental verification includes various l-G simulation tests, interior
Test and outdoor test etc., sustained improvement are improved and optimizated for the development of the activity after delivering.
The design activity of product includes determining functional requirement, performance requirement, interface requirements, power consumption demand etc., carries out scheme
Design, progress Preliminary design, detailed design, product manufacturing is realized, experimental test is verified, produces in batches, is delivered for use.
Under existing development process, six sexualities and the main design activity of the functional performance of product be it is parallel carry out, cause
Six property of product requires to be unable to get practicable, and the designing quality of product is low, Frequent Troubles after being delivered for use, and repairs difficult.
The problem of six sexualities should be embedded into the main design activity of product, find product design, and to asking
The influence size of topic is classified, and carries out grading design to product, and propose recommendation on improvement, and designer analyzes trade-off problem and builds
View, take corrective measure, and formulate corrective measure implement plan, six property design should tracking problem improvement implement effect.Continue
Carry out "-improvement assessment-criterion design review is implemented in criterion design review-problem discovery-Question Classification-recommendation on improvement-design improvement-improvement "
Circulation ".Thus, it could be seen that the realization of six property is needed management-design firmly being combined into one activity.
In order to guarantee that general six property requires to be implemented, needs design activity and management activity to combine, need
The design activity of product function performance and six property design analytic activity are combined, needed six property demands and design are real
Now verifying combines, and establishes six property and product integrated design process.Typical product design activity includes numerous steps.Ginseng
It is shown in Table 1:
Table 1
Summary of the invention
Goal of the invention of the invention is to provide a kind of six property of product design analysis software, and six property of product design analysis is soft
Part realize " six property design analysis-discovery design deficiency of product-formulation Defects improvements measure-implement corrective measure-collection product
The fault message-formulation Defects improvements measure-of exposure implements corrective measure-verifying confirmation corrective measure in test and use process
The six sex works requirement of validity " effectively combines six property design analysis, properties of product Functional Design and project management.
The phenomenon that opening skin present invention efficiently solves the design of six property of long-term existence and product design two solves existing various reliable
Property class design analysis software only focus on six property design analysis, be not concerned with formulate defect measure, implement Defects improvements measure, do not verify
The phenomenon that assessing corrective measure, six sexualities not being included in product development in the works.
Goal of the invention of the invention is achieved through the following technical solutions:
A kind of six property of product design analysis software includes six property planning management modules, six property design analysis module, product examination
Test and use fault information managing module, Defects improvements measure management module and six property plans to deliver object management module;
Six property design analysis module and are used to carry out the product in design, manufacture link for six property design analysis module
Analysis finds various defects existing for product, is generated according to the defect found out and is arranged for formulating Defects improvements to various defects
The first interface applied, and save the Defects improvements measure of formulation;
Product testing and using fault information managing module for provides acquisition product test, expose in use it is each
The second contact surface of kind defect generates third circle for various defects to be formulated with Defects improvements measure according to collected defect
Face, and save the Defects improvements measure of formulation;
Defects improvements measure management module is for providing to six property design analysis module and product testing and being believed using failure
The 4th interface that the Defects improvements measure formulated in breath management module is confirmed is formed real after confirming Defects improvements measure
The six sex work plans applied;
Six property planning management modules are used to generate the 5th interface for the task of distributing according to six sex work plans and check
6th interface of being assigned to for task, and save the distribution information of task;
Six property plans deliver object management module for providing the 7th interface of the task performance for summarizing distribution, and save
The task performance summarized.
It further, also include Defects improvements effect confirmation module, Defects improvements effect confirmation module is for providing to summarizing
The 8th interface that is checked of task situation, if the task performance of distribution not up to as defined in effect, by the task
Six property planning management modules are returned to, reformulate and issue six sex work plans.
It further, also include project development team member management module, project development team's management module is produced for storing
Product developer information, responsibility, post, affiliated function, contact method, person works measure statistics, process of work statistics, produce
The access privilege control of the comprising modules of six property of product design analysis software.
Further, management module also is set comprising product item exploitation attribute, product item develops attribute setting management mould
Block is used to store the essential information of product, provides foundation for analysis product defects, formulation Defects improvements measure.
The beneficial effects of the present invention are:
This software is by establishing six property planning management modules, product design and development Team Member management module, product development
Item attribute setup module, six property design analysis module, product testing and use fault information managing module, Defects improvements management
Module, plan deliver object management module, and Defects improvements confirmation module combines the design of six property and product design, hair
Existing weak link and product improvement require to combine, and product improvement requirement and improvement plan are combined, Bao Gaijin
Plan implements to specific personnel and improvement by project management, and Product design stream is thoroughly dissolved into six property design activities in this way
Cheng Zhong effectively changes the phenomenon that long-standing six property design opens skin with product design two, can increase substantially designing quality,
Ensure that product meets defined six property requirement.
Detailed description of the invention
Fig. 1 is the comprising modules schematic diagram of six property of product design analysis software.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
The design analysis software of six property of product shown in the present embodiment is made of 8 modules, is respectively: 1. six property planning management
Module, 2. six property design analysis module, 3. product testing and use fault information managing module, and 4. Defects improvements measure manages mould
Block, 5. object management module is delivered in six property plans, 6. product design and development Team Member management module, 7. Product Development Project attribute
Setup module, 8. Defects improvements effect confirmation module.
Wherein, shown in Figure 1, six property are designed analysis module and product testing and are used for using fault information managing module
It was found that the weak link of product.Defects improvements measure management module is for formulating Defects improvements measure.Six property planning management modules
For formulating and issuing the work plan of improvement defect and technique, improves and design and manufacture technique.Property management reason is delivered in six property plans
Module is used to save and inquire the evidence object of six sex works completion.
The comprising modules for designing analysis software to six property of product below are described in detail one by one.
One, six property design analysis module
Firstly, six property design analysis module analysis product various defects present in design, manufacture link.Analyze product
The various defects present in design, manufacture link can use various methods according to actual needs, and the present embodiment is to illustrate
Bright, the data for needing to be input to six property design analysis module include the estimated working environment section of product, the estimated full life of product
Order period profile, the six property requirement of product, the functional performance index of product, the working principle of product, the structure composition letter of product
Breath, product and the crosslinking relationship of other equipment etc..Analysis method includes establishing various models, carries out Distribution Indexes, carry out, it is expected that
Failure Mode Effective Analysis is carried out, failure tree analysis (FTA) is carried out, carries out thermal design, heat analysis is carried out, evaluation is designed to design
Deng.Defect is not improved, and product will be unable to meet defined six property requirement.It is needed in this module various scarce to what is analyzed
It is trapped into row exclusive number.Whole defect information and processing status can be shown in this module, including are not handled, in processing,
It has completed.
Secondly, generating the first interface for various defects to be formulated with Defects improvements measure according to the defect analyzed.It produces
Product designer, for defective effect degree, can formulate Defects improvements measure in the first interface.Defects improvements measure is main
It is the methods of to improve product design, such as take redundancy design, design of Reducing Rating.There are many measures for general Defects improvements, need comprehensive
Close the factors such as consideration progress, funds, complexity.Additionally need to assess the expected accessible effect of analysis corrective measure, it is proposed that
Personnel are implemented in corrective measure, improve design impact analysis, propose corrective measure recruitment evaluation verification method, propose to improve and arrange
Apply recruitment evaluation personnel.It needs to carry out exclusive number to Defects improvements measure in this module, and is built with specific defect
Vertical link.
Finally, after designer has formulated Defects improvements measure, six property design analysis module needs to save Defects improvements
Measure, and Defects improvements measure relevant information is sent in defect measure management module.
Two, product testing and use fault information managing module
First, product testing and acquisition product is provided in test, expose in use using fault information managing module
The second contact surface of various defects.In second contact surface, the information that designer can input include fault mode, date of occurrence,
The information such as position, failure influence, Trouble Report people, failure generation product number title occur for failure.It is needed in this module pair
Various fault messages carry out exclusive number.Whole fault message and processing status can be shown in this module, including are not located
It manages, in processing, has completed.
Secondly, the third interface for various defects to be formulated with Defects improvements measure is generated according to collected defect.If
Meter personnel can formulate Defects improvements and arrange at third interface for the defective effect degree that product exposes in test, use
It applies.The methods of Defects improvements measure mainly improves product design, such as take redundancy design, design of Reducing Rating.General defect changes
Into there are many measure, need to comprehensively consider the factors such as progress, funds, complexity.It is pre- additionally to need to assess analysis corrective measure
Phase accessible effect, it is proposed that personnel are implemented in corrective measure, improve design impact analysis, propose corrective measure recruitment evaluation
Verification method proposes corrective measure recruitment evaluation personnel.Need to carry out Defects improvements measure exclusive number in the module, and
And Defects improvements measure and specific defect are established the link.
Finally, after designer has formulated Defects improvements measure, product testing and use fault information managing module are needed
Defects improvements measure is saved, and Defects improvements measure relevant information is sent in defect measure management module.
Three, Defects improvements measure management module
Defects improvements measure management module houses six property design analysis module and tests and use fault information managing mould
The whole Defects improvements measures determined in block confirm Defects improvements measure according to the Defects improvements measure of storage offer
4th interface, designer can reaffirm whether need to implement Defects improvements measure in the 4th interface, can be to defect
Corrective measure is modified, and can be implemented the information such as people, target date to Defects improvements measure and be modified.
After final determining implementation corrective measure, it is formed the six sex work plans for having to implement, six new property works
Information of making a plan is automatically passed in six property planning management modules.The six sex work plans newly formed have exclusive number, work
Plan and Defects improvements measure and defect information establish the link.
Whole Defects improvements measure status can be shown in this module, including is not improved, and in improvement, completed
Deng.
Four, six property planning management module
Six property planning management modules are used to generate the 5th interface for the task of distributing according to six sex work plans, under task
Intelligent person can determine the task that needs issue in the 5th interface, and corresponding personnel is selected to assign task (personnel
The setting of information is realized in product design and development Team Member management module), task is issued, edit-modify has issued
Task plan (people is completed in change, and the target date completes to deliver object, cancel a plan) is, it is specified that work completes the time limit, it is specified that work
Finish adult, it is specified that work completion output, gives task to carry out exclusive number, show all has assigned and wait assign
Task current state information, wherein task current state information includes not issuing, has begun (Start Date), into
It (leaves in row and completes the date in time limit), completed (actual finish date).
Task assigns personnel when the 5th interface selects corresponding personnel to assign a task, it can be seen that the personnel currently undertook
Task has completed task dispatching information.
Task assigns personnel and can see that the executive condition all planned at the 5th interface.Executive condition includes plan
Title, plan number plan title, it is desirable that the target date plans current state information, delivers name and claims.
Six property planning management modules also provide the 6th interface for checking being assigned to for task.Plan operational staff on the 6th boundary
It can see that the projected conditions for being assigned to me, including plan title, plan number, plan completion date plan current shape in face
State.Plan operational staff after completing work, clicks delivery name and claim, and submit delivery object, projected state shows completion automatically
Information.
Six property planning management modules save the distribution information of task, and plan target and defect, Defects improvements are arranged in this module
(test uses failure) is applied to establish the link.
Five, object management module is delivered in six property plans
Six property plans deliver object management module for providing the 7th interface of report task performance, and save and summarize point
The task performance matched.It is that plan operational staff submits delivery object that all work plans, which complete criterion, and delivering object can be
File, designation of drawing or meeting summary are also possible to specific file.Six property plans are completed to deliver the storage of object management module
Deliver object.
It is every in this module to deliver object and plan, defect, Defects improvements measure (using testing failure information), plan execution
Personnel etc. establish the link.
Six, Defects improvements effect confirmation module
Defects improvements effect confirmation module is managed for providing the 8th interface checked the task performance of distribution
Reason personnel can check object is delivered whether six property Defects improvements measures of confirmation have reached defined effect at the 8th interface
Fruit.If being not carried out defined effect, administrative staff are set as the task to do over again in the 8th interface, and return to
In six property planning management modules, is reformulated in six property planning management modules and issue six new sex work plans.
The task of this module has exclusive number, and (uses examination with work plan, defect, Defects improvements measure
Test fault message), task completion personnel etc. establish the link.
Seven, project development team member management module
Project development team's management module is for storing product development personal information, responsibility, post, affiliated function, connection
Mode, person works measure the access authority that the comprising modules of software are analyzed in statistics, process of work statistics, the design of six property of product
Control.
Eight, management module is arranged in product item exploitation attribute,
Product item exploitation attribute setting management module is used to store the essential information of product, such as product is constituted, crosslinking
Relationship, project development time schedule requirement etc. provide foundation for analysis product defects, formulation Defects improvements measure.
Six property of this product design analysis software can be deployed in Intranet or internet, for different operating field
The more people of institute use simultaneously.Different access access rights can be set in the modules of six property of this product design analysis software, supplies
Different personnel use in team.
Six property of this product design analysis software can also be managed the work of complete unit.Six property design analysis mould
Block, product testing can collect the information of complete unit offer using fault message module, unite in six property planning management platforms
One carries out the work such as Defects improvements.
It, can according to the technique and scheme of the present invention and its hair it is understood that for those of ordinary skills
Bright design is subject to equivalent substitution or change, and all these changes or replacement all should belong to the guarantor of appended claims of the invention
Protect range.
Claims (4)
1. a kind of six property of product design analysis software, designs analysis module, product testing comprising six property planning management modules, six property
With use fault information managing module, Defects improvements measure management module and six property plans to deliver object management module, feature exists
In:
The six property design analysis module is used to analyze the product in design, manufacture link, finds existing for product
Various defects generate the first interface for various defects to be formulated with Defects improvements measure according to the defect found out, and save
The Defects improvements measure of formulation;
The product testing and using fault information managing module for provides acquisition product test, expose in use it is each
The second contact surface of kind defect generates third circle for various defects to be formulated with Defects improvements measure according to collected defect
Face, and save the Defects improvements measure of formulation;
The Defects improvements measure management module is for providing to six property design analysis module, product testing and using fault message
The 4th interface that the Defects improvements measure formulated in management module is confirmed, being formed after confirming Defects improvements measure will implement
Six sex work plans;
The six property planning management module is used to generate the 5th interface for the task of distributing according to six sex work plans, and checks
6th interface of being assigned to for task, and save the distribution information of task;
The six property plan delivers object management module for providing the 7th interface for summarizing distributed task performance, and saves
The task performance summarized.
2. six property of a kind of product design analysis software according to claim 1, it is characterised in that also imitated comprising Defects improvements
Fruit confirmation module, Defects improvements effect confirmation module is for providing the 8th boundary checked the task performance summarized
Face, if the not up to defined effect of the task performance of distribution, returns to six property planning management modules for the task, again
It formulates and issues six sex work plans.
3. six property of a kind of product design analysis software according to claim 1, it is characterised in that also include project development group
Team member management module, project development team's management module is for storing product development personal information, responsibility, post, affiliated portion
Door, contact method, person works measure statistics, process of work statistics, six property of product and design the comprising modules for analyzing software
Access privilege control.
4. six property of a kind of product design analysis software according to claim 1, it is characterised in that also opened comprising product item
It sends out attribute and management module is set, product item exploitation attribute setting management module is used to store the essential information of product, for analysis
Product defects formulate Defects improvements measure offer foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268445.2A CN109559016A (en) | 2018-10-29 | 2018-10-29 | Six property of product design analysis software |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268445.2A CN109559016A (en) | 2018-10-29 | 2018-10-29 | Six property of product design analysis software |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109559016A true CN109559016A (en) | 2019-04-02 |
Family
ID=65865594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811268445.2A Pending CN109559016A (en) | 2018-10-29 | 2018-10-29 | Six property of product design analysis software |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109559016A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210056473A1 (en) * | 2019-08-20 | 2021-02-25 | University Of Kentucky Research Foundation | Innovative manufacturing methods for next-generation products, processes, and systems |
CN114091967A (en) * | 2021-11-30 | 2022-02-25 | 重庆至信实业集团有限公司 | Monitoring system and monitoring method for problem solving measures |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337015A (en) * | 2013-07-11 | 2013-10-02 | 东信和平科技股份有限公司 | Product defect management system |
US20180173608A1 (en) * | 2016-12-19 | 2018-06-21 | Bank Of America Corporation | Software Defect Analysis Tool |
CN108304991A (en) * | 2017-12-28 | 2018-07-20 | 研祥智能科技股份有限公司 | Product defects management method, device, computer equipment and storage medium |
-
2018
- 2018-10-29 CN CN201811268445.2A patent/CN109559016A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337015A (en) * | 2013-07-11 | 2013-10-02 | 东信和平科技股份有限公司 | Product defect management system |
US20180173608A1 (en) * | 2016-12-19 | 2018-06-21 | Bank Of America Corporation | Software Defect Analysis Tool |
CN108304991A (en) * | 2017-12-28 | 2018-07-20 | 研祥智能科技股份有限公司 | Product defects management method, device, computer equipment and storage medium |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210056473A1 (en) * | 2019-08-20 | 2021-02-25 | University Of Kentucky Research Foundation | Innovative manufacturing methods for next-generation products, processes, and systems |
US11651319B2 (en) * | 2019-08-20 | 2023-05-16 | University Of Kentucky Research Foundation | Innovative manufacturing methods for next-generation products, processes, and systems |
CN114091967A (en) * | 2021-11-30 | 2022-02-25 | 重庆至信实业集团有限公司 | Monitoring system and monitoring method for problem solving measures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Van Thuyet et al. | Risk management in oil and gas construction projects in Vietnam | |
Simonsson et al. | Model-based IT governance maturity assessments with COBIT | |
CN108564347A (en) | Overhaul whole process management system and lean inspection base | |
Matta et al. | The information requirements of total quality management | |
GAlAr et al. | The need for aggregated indicators in performance asset management | |
CN106779577A (en) | The method for building up and system of Auditing Information System system | |
CN109559016A (en) | Six property of product design analysis software | |
Howick et al. | Delay and disruption in complex projects | |
CN110570109A (en) | Data center full life cycle integrated service test process supervision system | |
Lam et al. | A cooperative Internet-facilitated quality management environment for construction | |
Haase | Software process assessment concepts | |
Boloix | System evaluation and quality improvement | |
Prayitno et al. | Innovation in Aviation Education: Development of a Web-Based Flight Simulator Management System (FSMS) at Pilot Academy | |
CN109405185A (en) | Air-conditioning equipment Maintenance Management System | |
Yang et al. | Reliability Management | |
Pavych et al. | Formation of recommendations for quality assurance software | |
Lois et al. | Issues Associated with the Development of Nuclear Power Plant “Programm Effectiveness” Indicators for Regulatory Use | |
Jalham et al. | A Suggested Approach for Maintenance Performance Framework: An Aircraft Maintenance Organization as a case study | |
Piechowski et al. | Implementing BPMN in Maintenance Process Modeling | |
Action | High priority actions, overdue more than three months | |
Gupta | Software quality assurance | |
Li et al. | Research on integrated evaluation of military software supportability based on FAHP | |
CN116433012A (en) | Quality function development-based vendor risk evaluation method and evaluation system | |
Shi et al. | An integrated life cycle-based software reliability assurance approach for NASA projects | |
Harris | Relationship between Competitive Power Markets and Grid Reliability: The PJM RTO Experience |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190402 |