CN109555142A - A kind of constructing device for basement rock two-shot grouting - Google Patents

A kind of constructing device for basement rock two-shot grouting Download PDF

Info

Publication number
CN109555142A
CN109555142A CN201910042342.2A CN201910042342A CN109555142A CN 109555142 A CN109555142 A CN 109555142A CN 201910042342 A CN201910042342 A CN 201910042342A CN 109555142 A CN109555142 A CN 109555142A
Authority
CN
China
Prior art keywords
grouting
rock
grouting pipe
filler block
waterglass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910042342.2A
Other languages
Chinese (zh)
Inventor
崔浓辉
郭海轮
刘小斌
陈锐
张文
梁森
黄礼华
钟棋栊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Construction Quality And Safety Supervision Station
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
Shenzhen Construction Quality And Safety Supervision Station
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Construction Quality And Safety Supervision Station, China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical Shenzhen Construction Quality And Safety Supervision Station
Priority to CN201910042342.2A priority Critical patent/CN109555142A/en
Publication of CN109555142A publication Critical patent/CN109555142A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of constructing device for basement rock two-shot grouting, including filler block, waterglass Grouting Pipe and cement slurry Grouting Pipe, filler block is transferred to rock grouting section scar, slip casting section divides 5m mono- section, and it is sealed between filler block and rock grouting hole, one end of waterglass Grouting Pipe and cement slurry Grouting Pipe is each passed through filler block and extends in rock grouting hole, and one end of the waterglass Grouting Pipe extends at the 15m basement rock of lower part, one end of the cement slurry Grouting Pipe extends at the 15m basement rock of top, slip casting check valve is also respectively provided on one end of the waterglass Grouting Pipe and cement slurry Grouting Pipe.There are operating difficulties in basement rock two fluid grouting work progress to solve, and safety is poor, often has and occurs grout in filling process, it is difficult to the phenomenon that pressure maintaining, construct complex, it is at high cost, it is long in time limit the problems such as.Belong to geotechnical engineering construction security technology area.

Description

A kind of constructing device for basement rock two-shot grouting
Technical field
The present invention relates to a kind of constructing devices for basement rock two-shot grouting, belong to geotechnical engineering construction safe practice neck Domain.
Background technique
According to the mandatory code requirement of Shenzhen Metro, after common basement rock fills permeability rate require q≤0.5Lu (6.475 × 10-6/ cm/s) or q≤geological diagnostics permeability rate 1/10, for more complete light weathered granite, joint agensis, part is flower Hilllock rock microfissure, rock cement slurry plasma volume is few, and water-stagnating effect is difficult to control, it is difficult to meet the requirement of basement rock permeability rate after filling. In order to guarantee the rock slurries amount of pouring into, achieve the effect that rock sealing is passed through using cement slurry+silicate double solution grouting after filling Basement rock two-shot grouting constructing device carries out waterglass slip casting to lower part 15m basement rock, and top 15m basement rock carries out cement slurry slip casting, behaviour It is convenient, highly-safe to make, and the effect of rock sealing after filling has been effectively ensured, the safety of subway tunnel has been protected, however, in basement rock There are operating difficulties in two fluid grouting work progress, and safety is poor, often have and occur grout in filling process, it is difficult to which pressure maintaining shows As, it constructs complex, it is at high cost, it is long in time limit.
Summary of the invention
It is an object of the invention to: a kind of constructing device for basement rock two-shot grouting is provided, to solve in basement rock biliquid There are operating difficulties during mortar depositing construction, and safety is poor, often has and occurs grout in filling process, it is difficult to the phenomenon that pressure maintaining, Construct complex, it is at high cost, it is long in time limit the problems such as.
To solve the above problems, such a constructing device for basement rock two-shot grouting of proposed adoption, including filler block, water Glass Grouting Pipe and cement injection pipe are put in rock grouting section scar under filler block, and slip casting section divides 5m mono- section, and filler block and base It is sealed between rock injected hole, one end of waterglass Grouting Pipe and cement slurry Grouting Pipe is each passed through filler block and extends to rock grouting In hole, and one end of the waterglass Grouting Pipe extends at the 15m basement rock of lower part, and one end of the cement injection pipe extends to top At 15m basement rock, slip casting check valve, rock grouting are also respectively provided on one end of the waterglass Grouting Pipe and cement injection pipe When outward washed open by grouting pressure, check valve is in closed state when no pressure acts on.
In aforementioned constructing device, it is additionally provided with pressure maintaining mouth on the filler block, is used for filler block pressurized expansion, grouting pressure It adjusts and pressure maintaining is carried out to slip casting process, guarantee that entire grouting environment is in air-tight state, it is complete under Grouting Design pressure value At rock stratum grouting construction;
In aforementioned constructing device, the pressure maintaining mouth is the access for penetrating through filler block upper and lower ends, and is arranged on the access high Pressure valve, when lower part air pressure is more than setting pressure, by high pressure valve to external pressure release.
Compared with prior art, the present invention is terminated using double Grouting Pipe slip castings, movable filler block in waterglass perfusion The grouting of cement slurry, and the position of the depth adjustment filler block according to grouting liquid level are and then carried out afterwards, have been effectively ensured entire Continuing for filling process is uninterrupted, shortens grouting duration, in addition, present invention employs controllable pressure maintaining mouth high pressure valve, it is whole A filling process adjusts grouting pressure by pressure maintaining mouth, has accomplished pressure controllable, stablizes, the effect of grouting to waterproof has been effectively ensured Fruit.Entire provisions for grouting is easy to operate, highly-safe, and effectively shortens the construction period, at low cost.
Detailed description of the invention
Fig. 1 is constructing structure schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with attached drawing The detailed description of step.
Embodiment:
Referring to attached drawing 1, the present embodiment provides a kind of constructing devices for basement rock two-shot grouting, including filler block 1, water glass Glass Grouting Pipe 2 and cement injection pipe 3, the plug of filler block 1 are set to rock grouting section scar, and slip casting section divides 5m mono- section, and filler block 1 with It is sealed between rock grouting hole 4, filler block 1 blocks slurries to prevent grout, one end of waterglass Grouting Pipe 2 and cement injection pipe 3 It is each passed through filler block 1 and extends in rock grouting hole 4, and one end of the waterglass Grouting Pipe 2 extends to lower part 15m basement rock Place, one end of the cement injection pipe 3 extend at the 15m basement rock of top, and the one of the waterglass Grouting Pipe 2 and cement injection pipe 3 It is also respectively provided with the slip casting check valve 5 opened outward on end, when rock grouting is outward washed open by grouting pressure, no pressure Masterpiece used time check valve 5 is in closed state.Pressure maintaining mouth 6 is additionally provided on filler block 1, the pressure maintaining mouth 6 is perforation filler block 1 The access of upper and lower ends, and high pressure valve is set on the access, when lower part air pressure is more than setting pressure, by high pressure valve to outside Pressure release carries out filler block pressurized expansion by pressure maintaining mouth 6 when rock grouting, grouting pressure is adjusted and is protected to slip casting process Pressure guarantees that entire grouting environment is in air-tight state, rock stratum grouting construction is completed under Grouting Design pressure value.
The concrete construction method of above-mentioned two-shot grouting device is as follows:
The device first passes through waterglass Grouting Pipe 2 and carries out 7 slip casting of waterglass, when slip casting, water to lower part 15m basement rock when constructing Slip casting check valve 5 in glass Grouting Pipe 2 is washed open outward by grouting pressure, while another 5 no pressure of slip casting check valve acts on In closed state, 8 slip casting of cement slurry is carried out to top 15m basement rock followed by cement injection pipe 3 after having filled, when slip casting, Slip casting check valve 5 on cement injection pipe 3 is washed open by grouting pressure, and at the slip casting contact surface of cement slurry 8 and waterglass 7 Formation length is the rock two fluid grouting section 9 of 6m or so, ensure that the grouting to waterproof effect at slip casting interface, entire slip casting process are adopted Continue pressure maintaining 30 minutes by pressure maintaining mouth 6 with 3Mpa grouting pressure, grout compartment divides 5m mono- section, one section of basement rock grouting to waterproof of every completion Plug position is adjusted to grout compartment scar, and the construction of entire injected hole is completed with this, and entire filling process continues uninterruptedly, is effectively protected Grouting effect is demonstrate,proved.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (3)

1. a kind of constructing device for basement rock two-shot grouting, it is characterised in that: including filler block (1), waterglass Grouting Pipe (2) With cement injection pipe (3), rock grouting section scar is put under filler block (1), slip casting section divides 5m mono- section, and filler block (1) and base Rock injected hole seals between (4), and one end of waterglass Grouting Pipe (2) and cement slurry Grouting Pipe (3) is each passed through filler block (1) simultaneously It extends in rock grouting hole (4), and one end of the waterglass Grouting Pipe (2) extends at the 15m basement rock of lower part, the cement injection One end of pipe (3) extends at the 15m basement rock of top, also divides on one end of the waterglass Grouting Pipe (2) and cement slurry Grouting Pipe (3) It is not provided with the slip casting check valve (5) opened outward.
2. a kind of constructing device for basement rock two-shot grouting according to claim 1, it is characterised in that: the filler block (1) pressure maintaining mouth (6) are additionally provided on.
3. a kind of constructing device for basement rock two-shot grouting according to claim 2, it is characterised in that: the pressure maintaining mouth (6) it is the access of perforation filler block (1) upper and lower ends, and high pressure valve is set on the access.
CN201910042342.2A 2019-01-17 2019-01-17 A kind of constructing device for basement rock two-shot grouting Pending CN109555142A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910042342.2A CN109555142A (en) 2019-01-17 2019-01-17 A kind of constructing device for basement rock two-shot grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910042342.2A CN109555142A (en) 2019-01-17 2019-01-17 A kind of constructing device for basement rock two-shot grouting

Publications (1)

Publication Number Publication Date
CN109555142A true CN109555142A (en) 2019-04-02

Family

ID=65873121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910042342.2A Pending CN109555142A (en) 2019-01-17 2019-01-17 A kind of constructing device for basement rock two-shot grouting

Country Status (1)

Country Link
CN (1) CN109555142A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1884790A (en) * 2006-07-06 2006-12-27 宋彦波 Grouting sealing method and apparatus for borehole and conductor pipe for water prospection of mine
CN204590023U (en) * 2015-03-16 2015-08-26 中国水电基础局有限公司 A kind of deep covering layer two-shot grouting plug
CN205152954U (en) * 2015-11-11 2016-04-13 中铁第一勘察设计院集团有限公司 Grout three -way tube structure that renovation shallow layer cover type karst ground sinks
CN207159727U (en) * 2017-09-11 2018-03-30 广西交通规划勘察设计研究院有限公司 A kind of roadbed Grouting Pipe
CN108756898A (en) * 2018-06-06 2018-11-06 中铁六局集团有限公司 Using the front pre-grouting construction method of HSC grouting materials
CN109098687A (en) * 2018-10-11 2018-12-28 中国石油大学(华东) Single stop grouting plug retrusive sublevel grouting device and method suitable for crack rock
CN209538205U (en) * 2019-01-17 2019-10-25 中建四局第一建筑工程有限公司 A kind of constructing device for basement rock two-shot grouting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1884790A (en) * 2006-07-06 2006-12-27 宋彦波 Grouting sealing method and apparatus for borehole and conductor pipe for water prospection of mine
CN204590023U (en) * 2015-03-16 2015-08-26 中国水电基础局有限公司 A kind of deep covering layer two-shot grouting plug
CN205152954U (en) * 2015-11-11 2016-04-13 中铁第一勘察设计院集团有限公司 Grout three -way tube structure that renovation shallow layer cover type karst ground sinks
CN207159727U (en) * 2017-09-11 2018-03-30 广西交通规划勘察设计研究院有限公司 A kind of roadbed Grouting Pipe
CN108756898A (en) * 2018-06-06 2018-11-06 中铁六局集团有限公司 Using the front pre-grouting construction method of HSC grouting materials
CN109098687A (en) * 2018-10-11 2018-12-28 中国石油大学(华东) Single stop grouting plug retrusive sublevel grouting device and method suitable for crack rock
CN209538205U (en) * 2019-01-17 2019-10-25 中建四局第一建筑工程有限公司 A kind of constructing device for basement rock two-shot grouting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁超鹏;王胜;吴秋红;: "水泥-水玻璃注浆在围堰防渗漏浆处理中的应用", 探矿工程(岩土钻掘工程), no. 10 *

Similar Documents

Publication Publication Date Title
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN103898873B (en) To Construction of Silo seam infiltration leak-blocking construction method under high water head
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN106246188B (en) The system and method that the prevention coal mine shaft lining shaft deformation of stratum settlement compatibility of deformation is destroyed
CN104141314B (en) The method of complete seepage proof curtain is formed in rock, native two media
CN102838325B (en) Hole sealing grout stop material and grouting hole sealing process
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN202809665U (en) Blocking device for relief well of micro artesian water in foundation pit
CN108278096A (en) A kind of seat earth layer-through drilling dynamic self-adapting hole sealing device and method
CN102660952B (en) Controllable clay paste slurry grouting technique
CN108166535A (en) A kind of construction method of bellows leak stopping
CN105731978B (en) A kind of grouting serous fluid and grouting method for fine sand layer jacking culvert solidifying of the working face
CN209538205U (en) A kind of constructing device for basement rock two-shot grouting
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN110469338A (en) A kind of artesian water stratum shield method of reseptance
CN102168433A (en) Grouting repairing method of water stopping curtain
CN104674817B (en) The method of the sealing of falling pressure type slip casting closure reserving hole
CN109555142A (en) A kind of constructing device for basement rock two-shot grouting
CN206328766U (en) A kind of pipe well well-sealing device
CN208280189U (en) Pier nose formula anti-float anchor rod waterproofing node
CN104929565A (en) Double-layered grouting guide pipe
CN209603062U (en) Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190402

RJ01 Rejection of invention patent application after publication