CN109547870A - The dispatching method and system of optical cable cleft grafting task - Google Patents

The dispatching method and system of optical cable cleft grafting task Download PDF

Info

Publication number
CN109547870A
CN109547870A CN201710858517.8A CN201710858517A CN109547870A CN 109547870 A CN109547870 A CN 109547870A CN 201710858517 A CN201710858517 A CN 201710858517A CN 109547870 A CN109547870 A CN 109547870A
Authority
CN
China
Prior art keywords
optical cable
cutover
task
bearer service
institute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710858517.8A
Other languages
Chinese (zh)
Other versions
CN109547870B (en
Inventor
荆瑞泉
尹立云
赵国永
汪海强
霍晓莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Telecom Corp Ltd
Original Assignee
China Telecom Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Telecom Corp Ltd filed Critical China Telecom Corp Ltd
Priority to CN201710858517.8A priority Critical patent/CN109547870B/en
Publication of CN109547870A publication Critical patent/CN109547870A/en
Application granted granted Critical
Publication of CN109547870B publication Critical patent/CN109547870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/22Alternate routing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0064Arbitration, scheduling or medium access control aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects
    • H04Q2011/0081Fault tolerance; Redundancy; Recovery; Reconfigurability

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Optical Communication System (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses the dispatching methods and system of a kind of optical cable cleft grafting task, are related to transmission net maintenance technology field.Method therein includes: to obtain cutover cable link circuit mapping table;Using the routing information of each optical cable institute bearer service in cutover cable link circuit mapping table, judge whether the backup path of cutover task optical cable institute bearer service includes cutover task optical cable;If determining the backup path for not including cutover task optical cable for cutover task optical cable institute's bearer service comprising cutover task optical cable;When executing optical cable cleft grafting task, cutover task optical cable institute bearer service is migrated to the backup path not comprising cutover task optical cable.The present invention passes through the scheduling system of leading in cable cutover task, it realizes and migrates institute's bearer service to backup path before optical cable cleft grafting, to provide the dispatching method of more optimal optical cable cleft grafting task, service disconnection caused by optical cable cleft grafting is avoided, customer experience is improved.

Description

The dispatching method and system of optical cable cleft grafting task
Technical field
The present invention relates to transmission net maintenance technology field, in particular to the dispatching method of a kind of optical cable cleft grafting task and it is System.
Background technique
Due to municipal construction and relocation equipment etc., optical cable cleft grafting is one of telecom operators' optical-fiber network daily maintenance Important process.
The schedule of optical cable cleft grafting task relies primarily on manual type, optical cable cleft grafting simulation/assessment system and net at present Network resource management system is as auxiliary tool.
According to investigation, existing optical cable cleft grafting simulation or assessment system can analyze optical cable cleft grafting to the wind of service impact Engineering construction decision is convenient in danger.But cannot distinguish between the business for handling different protection types, it can not be before cutover to impacted Business migrated.
Summary of the invention
Inventor the study found that it is existing rely primarily on operation maintenance personnel carry out optical cable cleft grafting task schedule mode there are following Problem: not only manual dispatching mode low efficiency is easy error;And service disconnection can be caused when executing optical cable cleft grafting task, Customer experience is poor.
Present invention solves the technical problem that being how to realize the dispatching method of the optical cable cleft grafting task more automated, subtract It is few to cause service disconnection when executing optical cable cleft grafting task, promote customer experience.
According to an aspect of an embodiment of the present invention, a kind of dispatching method of optical cable cleft grafting task is provided, comprising: obtain Cutover cable link circuit mapping table;Believed using the path of each optical cable institute bearer service in cutover cable link circuit mapping table Breath, judges whether the backup path of cutover task optical cable institute bearer service includes cutover task optical cable;If including cutover task light Cable determines the backup path for not including cutover task optical cable then for cutover task optical cable institute's bearer service;Executing optical cable cleft grafting When task, cutover task optical cable institute bearer service is migrated to the backup path for not including cutover task optical cable.
In one embodiment, it if comprising cutover task optical cable, is not wrapped for the determination of cutover task optical cable institute's bearer service If the backup path of the optical cable of task containing cutover include: cutover task optical cable institute's bearer service be it is non-protected switch business, to cut It takes over business optical cable institute bearer service and resets the backup path not comprising cutover task optical cable.
In one embodiment, it if comprising cutover task optical cable, is not wrapped for the determination of cutover task optical cable institute's bearer service If the backup path of the optical cable of task containing cutover includes: that cutover task optical cable institute's bearer service is pretection switch business, by cutover Optical cable cleft grafting task on the backup path of task optical cable institute bearer service is postponed.
In one embodiment, dispatching method further include: from transmission net managing and control system read failure list of link;It is holding Before row optical cable cleft grafting task, failure whether there is according to the backup path that faulty link list judgement does not include cutover task optical cable Link;Faulty link if it exists, then reset not comprising cutover task optical cable for cutover task optical cable institute bearer service and not There are the backup paths of faulty link.
In one embodiment, dispatching method further include: from transmission net managing and control system read failure list of link;It is holding Before row optical cable cleft grafting task, failure whether there is according to the backup path that faulty link list judgement does not include cutover task optical cable Link;Faulty link if it exists then postpones the optical cable cleft grafting task of cutover task optical cable.
Other side according to an embodiment of the present invention provides a kind of scheduling system of optical cable cleft grafting task, comprising: cut It connects prediction scheme and formulates unit, be used for: obtaining cutover cable link circuit mapping table;Using each in cutover cable link circuit mapping table The routing information of optical cable institute bearer service judges whether the backup path of cutover task optical cable institute bearer service includes cutover task Optical cable;If being determined for cutover task optical cable institute's bearer service comprising cutover task optical cable and not including the standby of cutover task optical cable Use path;Cutover prediction scheme execution unit, is used for: when executing optical cable cleft grafting task, cutover task optical cable institute bearer service being moved Move to the backup path not comprising cutover task optical cable.
In one embodiment, cutover prediction scheme is formulated unit and is used for: if cutover task optical cable institute's bearer service is non-protected Business is switched, then resets the backup path not comprising cutover task optical cable for cutover task optical cable institute bearer service.
In one embodiment, cutover prediction scheme is formulated unit and is used for: if cutover task optical cable institute's bearer service is fallen for protection Business is changed, then is postponed the optical cable cleft grafting task on the backup path of cutover task optical cable institute bearer service.
In one embodiment, which further includes the first cutover prediction scheme verification unit, is used for: being managed from transmission net System read failure list of link;Before executing optical cable cleft grafting task, cutover task is not included according to faulty link list judgement The backup path of optical cable whether there is faulty link;Faulty link if it exists, then again for cutover task optical cable institute bearer service It is arranged not comprising cutover task optical cable and is not present the backup path of faulty link.
In one embodiment, scheduling system further includes the second cutover prediction scheme verification unit, is used for: managing system from transmission net System read failure list of link;Before executing optical cable cleft grafting task, cutover task light is not included according to faulty link list judgement The backup path of cable whether there is faulty link;Faulty link if it exists then pushes away the optical cable cleft grafting task of cutover task optical cable Late.
The present invention can be realized the dispatching method of more optimal optical cable cleft grafting task, promote customer experience.
By referring to the drawings to the detailed description of exemplary embodiment of the present invention, other feature of the invention and its Advantage will become apparent.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of one embodiment of the invention.
Fig. 2 shows the flow diagrams of the dispatching method of the optical cable cleft grafting task of one embodiment of the invention.
Fig. 3 shows the flow diagram of the dispatching method of the optical cable cleft grafting task of another embodiment of the present invention.
Fig. 4 A shows the work flow diagram that cutover prediction scheme formulates unit and same day cutover prediction scheme verification unit.
Fig. 4 B shows the work flow diagram of cutover prediction scheme execution unit.
Fig. 4 C shows the work flow diagram that cutover prediction scheme formulates one week cutover task allocating module of unit.
Fig. 4 D shows the work flow diagram for the cutover prediction scheme computing module that cutover prediction scheme is formulated in unit.
Fig. 4 E shows the work flow diagram for the interim cutover task correction verification module that cutover prediction scheme is formulated in unit.
Fig. 4 F shows the work flow diagram of the cutover prediction scheme correction verification module in same day cutover prediction scheme verification unit.
Fig. 5 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of another embodiment of the present invention.
Fig. 6 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of another embodiment of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Below Description only actually at least one exemplary embodiment be it is illustrative, never as to the present invention and its application or make Any restrictions.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under all other embodiment obtained, shall fall within the protection scope of the present invention.
The present invention existing optical cable cleft grafting task schedule mode there are aiming at the problem that, propose a kind of optical cable cleft grafting task Dispatching method and system.Pass through the resource management system and managing and control system (network management system or SDN controller) in existing transmission net On the basis of leading in cable cutover dispatch system, be responsible for complete optical cable cleft grafting prediction scheme formulation, verification and execution, target is in light Impacted business migration is gone out before cable cutover, so as to avoid service disconnection caused by optical cable cleft grafting, improves client's body It tests.
Fig. 1 is combined to introduce the scheduling system of the optical cable cleft grafting task of one embodiment of the invention first.
Fig. 1 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of one embodiment of the invention.Such as Fig. 1 institute Show, the scheduling system of the optical cable cleft grafting task in the present embodiment includes: that cutover prediction scheme formulates unit, same day cutover prediction scheme verification list Member and cutover prediction scheme execution unit.
Wherein, it is to receive cutover task from cutover task WorkForm System that cutover prediction scheme, which formulates the main function of unit, then According to the optical cable-link-circuit mapping relation information obtained from resource management system, carries out the distribution of cutover task and formulate cutover Prediction scheme.
Unit, which is formulated, from cutover prediction scheme when the main function of same day cutover prediction scheme verification unit is daily T1 receives the same day Cutover prediction scheme carries out cutover prediction scheme then according to the current network state and fault message obtained from transmission net managing and control system Verification.For verifying unsanctioned cutover task, it is fed back to cutover prediction scheme formulation unit and carries out delaying to redistribute.
The same day is received from the same day cutover prediction scheme verification unit when main function of cutover prediction scheme execution unit is daily T2 Then cutover prediction scheme sends business migration instruction finishing service migration to transmission net managing and control system.Optical cable cleft grafting is appointed when next day T0 After the completion of business, cutover state is exited in request, and the business that is migrated determines whether to return to initialization path according to preset rules.
The dispatching method of the optical cable cleft grafting task of one embodiment of the invention is introduced below with reference to Fig. 2.
Fig. 2 shows the flow diagrams of the dispatching method of the optical cable cleft grafting task of one embodiment of the invention.Such as Fig. 2 institute Show, the dispatching method of the optical cable cleft grafting task in the present embodiment includes:
Step S202 obtains cutover cable link circuit mapping table from fiber optic resource management system system.
In cutover cable link circuit mapping table, every optical cable corresponds to a plurality of optical fiber, wherein the corresponding chain of every optical fiber Road;Each of the links correspond to multiple circuits, wherein each circuit corresponds to a business, can inquire in cable link circuit mapping table There is the protection attribute of corresponding business to each circuit.
Step S204 utilizes the routing information of each optical cable institute bearer service in cutover cable link circuit mapping table, judgement Whether the backup path of cutover task optical cable institute bearer service includes cutover task optical cable.
If not including cutover task optical cable, do not needed when executing cutover task to cutover task optical cable institute bearer service It is migrated.
If thening follow the steps S206 comprising cutover task optical cable, do not include for the determination of cutover task optical cable institute's bearer service The backup path of cutover task optical cable.
Wherein, it if cutover task optical cable institute's bearer service switches business to be non-protected, is carried by cutover task optical cable Business resets the backup path not comprising cutover task optical cable.
Wherein, if cutover task optical cable institute's bearer service is pretection switch business, by the carried industry of cutover task optical cable Optical cable cleft grafting task on the backup path of business is postponed.
Step S208, when executing optical cable cleft grafting task, by cutover task optical cable institute bearer service migrate to do not include cut Take over the backup path of business optical cable.
In above-described embodiment, according to different service protection types, optical cable cleft grafting task scheduling system can be formulated automatically Optical cable cleft grafting prediction scheme, and automatically process cutover task.Meanwhile above-described embodiment is supported to ask conventional cutover request and urgent cutover The processing asked, support migrates impacted business before cutover, to avoid cutover influence caused by business, promotes visitor Family experience, while promoting efficiency of operation, can reduce network operation cost.
The dispatching method of the optical cable cleft grafting task of another embodiment of the present invention is introduced below with reference to Fig. 3.
Fig. 3 shows the flow diagram of the dispatching method of the optical cable cleft grafting task of another embodiment of the present invention.Such as Fig. 3 It is shown, on the basis of embodiment shown in Fig. 2, after step S206, the dispatching party of the optical cable cleft grafting task in the present embodiment Method further include:
Step S3071, from transmission net managing and control system read failure list of link.
Step S3072 does not include cutover task optical cable according to faulty link list judgement before executing optical cable cleft grafting task Backup path whether there is faulty link.
Faulty link if it exists, and cutover task optical cable institute's bearer service switches business to be non-protected, thens follow the steps S3073 resets not comprising cutover task optical cable for cutover task optical cable institute bearer service and there is no the standby of faulty link Use path.
Faulty link if it exists, and cutover task optical cable institute's bearer service is pretection switch business, is thened follow the steps S3074 postpones the optical cable cleft grafting task of cutover task optical cable.
In above-described embodiment, according to different service protection types, take different scheduling strategies to avoid faulty link The scheduling bring of optical cable cleft grafting task is influenced, further promotes customer experience, and further promoting efficiency of operation Meanwhile further decreasing network operation cost.
4A~4F introduces the application examples of the dispatching method of optical cable cutover task with reference to the accompanying drawing.
Fig. 4 A shows the work flow diagram that cutover prediction scheme formulates unit and same day cutover prediction scheme verification unit.
Cutover prediction scheme formulates unit, and from the acquisition of cutover task WorkForm System, cutover task, X are positive integer after x days.Then, net Network topology and service information database are from transmission net managing and control system acquisition network topology and business information, from fiber optic resource management system system System obtains optical cable information, and You Yizhou cutover task allocating module progress task, which distributes to be formed one week, reports to control after cutover prediction scheme Platform, while the reallocation of cutover prediction scheme is carried out after cutover task groups to be processed unappropriated in one week cutover prediction scheme are postponed one day. For interim cutover task, the cutover prediction scheme in X days is regenerated after being verified by interim cutover task authentication module, and on It reports to console.Console sends cutover prediction scheme notice in X days to cutover task WorkForm System.
According to faulty link list, cutover prediction scheme correction verification module can be verified cutover prediction scheme, and be after verifying Same day cutover prediction scheme lock resource.1+1 protection business will be unable to locate if verification obtains cutover prediction scheme and needs to adjust The cutover task of reason is distributed to cutover task groups to be processed;For unprotect business, if can not be corrected to cutover prediction scheme, Then early warning can be interrupted with transmitting line.
Fig. 4 B shows the work flow diagram of cutover prediction scheme execution unit.
For example, the daily T2 moment starts to execute cutover prediction scheme, pretection switch business (or 1+1 protection is handled one by one first Business).Business switch after the completion of enter cutover state, handled one by one if switching successfully it is non-protected switch business (or be nothing Protection business);Or switch it is unsuccessful, by the circuit by cutover optical cable be put into cutover task groups to be processed after, notice control Platform terminates related optical cable cleft grafting.Handle one by one it is non-protected carry out soft heavy-route when switching business, if the success cutover of soft heavy-route is moved It moves and completes, interrupt early warning to console transmitting line if the failure of soft heavy-route.
In addition, the daily T0 moment, which can start to execute, exits cutover operation, still according to pretection switch business and non-guarantor The sequence that protective switching business is handled one by one carries out.
Fig. 4 C shows the work flow diagram that cutover prediction scheme formulates one week cutover task allocating module of unit.
Cutover prediction scheme computing module generates interim cutover prediction scheme and interim cutover task groups to be processed.It is pre- for interim cutover Case, judges whether cutover optical cable quantity is greater than daily maximum cutover amount Gmax.If being not more than, this week last time cutover is generated Prediction scheme;If more than then random removal is more than the cutover optical cable of Gmax, and the part of removal is distributed to interim cutover to be processed and is appointed Business group, then judges whether this week last time cutover prediction scheme has formed.If having been formed, cutover task groups to be processed are generated; If not formed, cutover prediction scheme computing module reallocates to interim cutover task groups to be processed.
Fig. 4 D shows the work flow diagram for the cutover prediction scheme computing module that cutover prediction scheme is formulated in unit.
After cutover prediction scheme formulation unit filters out pretection switch circuit according to cutover cable link circuit mapping table, sentence one by one Whether disconnected active-standby path all includes cutover optical cable.If so, the cutover optical cable that the circuit primary path passes through is put into be processed Cutover task groups, and update cutover cable link circuit mapping table;If it is not, being scheduled to cutover task, until being met The cutover cable link circuit mapping table of pretection switch circuit requirements.
After cutover prediction scheme formulation unit filters out non-protected negater circuit according to cutover cable link circuit mapping table, one by one Judge whether preset backup path includes cutover optical cable.If so, recalculating backup path for the circuit, and in backup path Backup path resource is determined in normal situation, and transmitting line interrupts early warning in the improper situation of backup path.
Fig. 4 E shows the work flow diagram for the interim cutover task correction verification module that cutover prediction scheme is formulated in unit.
Interim cutover task, specific date cutover prediction scheme, same day cutover prediction scheme all have respective priority.Wherein, face When cutover task have low priority, specific date cutover prediction scheme, same day cutover prediction scheme all have high priority.
The process and cutover prediction scheme calculating process of interim cutover task verification are more close.Wherein primary difference is that, by Whether item judges active-standby path all comprising during cutover optical cable, the active-standby path of pretection switch business all includes cutover optical cable In the case of, need further to judge the interim cutover task whether specified specific date.If so, refusing interim cutover task;If It is no, then it further determines whether to complete to handle day by day.If completion is handled day by day, refuse interim cutover task;If do not complete by Day processing, then reallocate to interim cutover task.
Fig. 4 F shows the work flow diagram of the cutover prediction scheme correction verification module in same day cutover prediction scheme verification unit.
The process of same day cutover prediction scheme verification and cutover prediction scheme formulation process are more close.Wherein primary difference is that, obtain After taking faulty link list and cutover prediction scheme, judge faulty link whether by carrying to cutover optical cable one by one.If it is not, then into one Step judges whether faulty link is related to the pretection switch circuit carried to all circles' optical cable: if so, this is waited for that cutover optical cable is put Enter cutover task groups to be processed.
In conjunction with the figures above it is found that the design rule of the scheduling system of optical cable cleft grafting task is, industry is switched for non-protected It is engaged in for (including such as unprotect business or Dynamic- Recovery business), is pre-configured with backup path and does not do resource reservation.It is cutting Need to migrate business (i.e. soft heavy-route, and retain the resource of initial path) before connecing task execution, to permit in resource Perhaps ensure that non-protected to switch business unaffected in the case where.For pretection switch business, cannot simultaneously cutover protection fall The active and standby path for changing business needs to be switched in advance before cutover.For example, daily T2 (such as 23 points) starts to carry out in advance business It first switches, and sets cutover state for business, business is set normal condition by second day T0 (such as 6 points).Also, cutover The echo plex mode of state is irrevocable formula;During T2 to T0, in work at present path fails, it should attempt to be protected It switches.
It in terms of for conventional cutover task processing, needs to lock the cutover prediction scheme in X days, i.e., need to shift to an earlier date submission in X days and cut Connect task requests.Optical cable cleft grafting scheduling system calculates the cutover prediction scheme in one week risen after x days daily.It is based on current network simultaneously State (failure, link circuit resource variation etc.) verifies the cutover prediction scheme on the same day, and the cutover on the same day is updated according to check results Prediction scheme.
In terms of the processing of urgent cutover task, cutover apply by urgent cutover request (in X days) with original X days in cut It connects prediction scheme to be recalculated together, conflict if had with the cutover prediction scheme in X days, refuse the urgent cutover request.
In terms of the processing of faulty link, after the completion of cutover task arrangement on the day of to before starting to execute cutover prediction scheme In case of Cable's Fault, need to judge whether to clash with the cutover prediction scheme on the same day, if there is conflict then notify stop by The cutover task of influence.
The scheduling system of the optical cable cleft grafting task of one embodiment of the invention is introduced below with reference to Fig. 5.
Fig. 5 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of another embodiment of the present invention.Such as Fig. 5 Shown, the scheduling system 50 of the optical cable cleft grafting task in the present embodiment includes:
Cutover prediction scheme formulates unit 502, is used for:
Obtain cutover cable link circuit mapping table;
Using the routing information of each optical cable institute bearer service in cutover cable link circuit mapping table, cutover task light is judged Whether the backup path of cable institute bearer service includes cutover task optical cable;
If being determined for cutover task optical cable institute's bearer service comprising cutover task optical cable and not including cutover task optical cable Backup path;
Cutover prediction scheme execution unit 504, is used for:
When executing optical cable cleft grafting task, cutover task optical cable institute bearer service is migrated to not comprising cutover task optical cable Backup path.
In one embodiment, cutover prediction scheme is formulated unit 502 and is used for:
If cutover task optical cable institute's bearer service switches business to be non-protected, for cutover task optical cable institute bearer service weight New setting does not include the backup path of cutover task optical cable.
In one embodiment, cutover prediction scheme is formulated unit 502 and is used for:
If cutover task optical cable institute's bearer service is pretection switch business, by the standby of cutover task optical cable institute bearer service It is postponed with the optical cable cleft grafting task on path.
In above-described embodiment, according to different service protection types, optical cable cleft grafting task scheduling system can be formulated automatically Optical cable cleft grafting prediction scheme, and automatically process cutover task.Meanwhile above-described embodiment is supported to ask conventional cutover request and urgent cutover The processing asked, support migrates impacted business before cutover, to avoid cutover influence caused by business, promotes visitor Family experience, while promoting efficiency of operation, can reduce network operation cost.
The scheduling system of the optical cable cleft grafting task of another embodiment of the present invention is introduced below with reference to Fig. 6.
Fig. 6 shows the structural schematic diagram of the scheduling system of the optical cable cleft grafting task of another embodiment of the invention.Such as Fig. 6 It is shown, on the basis of embodiment shown in Fig. 5, the scheduling system 60 of the optical cable cleft grafting task in the present embodiment further include:
First cutover prediction scheme verification unit 603A, is used for:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, the backup path of cutover task optical cable is not included according to faulty link list judgement With the presence or absence of faulty link;
Faulty link if it exists, then reset not comprising cutover task optical cable for cutover task optical cable institute bearer service and There is no the backup paths of faulty link.
In one embodiment, the scheduling system 60 of optical cable cleft grafting task further includes the second cutover prediction scheme verification unit 603B is used for:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, the backup path of cutover task optical cable is not included according to faulty link list judgement With the presence or absence of faulty link;
Faulty link if it exists then postpones the optical cable cleft grafting task of cutover task optical cable.
In above-described embodiment, according to different service protection types, take different scheduling strategies to avoid faulty link The scheduling bring of optical cable cleft grafting task is influenced, further promotes customer experience, and further promoting efficiency of operation Meanwhile further decreasing network operation cost.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The calculating implemented in non-transient storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) can be used The form of machine program product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The foregoing is merely a prefered embodiment of the invention, is not intended to limit the invention, all in the spirit and principles in the present invention Within, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of dispatching method of optical cable cleft grafting task characterized by comprising
Obtain cutover cable link circuit mapping table;
Using the routing information of each optical cable institute bearer service in cutover cable link circuit mapping table, cutover task optical cable institute is judged Whether the backup path of bearer service includes cutover task optical cable;
If being determined for cutover task optical cable institute's bearer service comprising cutover task optical cable and not including cutover task optical cable Backup path;
When executing optical cable cleft grafting task, cutover task optical cable institute bearer service is migrated to described and does not include cutover task The backup path of optical cable.
2. dispatching method as described in claim 1, which is characterized in that if described comprising cutover task optical cable, cut to be described It takes over business optical cable institute's bearer service and determines that the backup path for not including cutover task optical cable includes:
If cutover task optical cable institute's bearer service switches business to be non-protected, industry is carried by the cutover task optical cable Business resets the backup path not comprising cutover task optical cable.
3. dispatching method as described in claim 1, which is characterized in that if described comprising cutover task optical cable, cut to be described It takes over business optical cable institute's bearer service and determines that the backup path for not including cutover task optical cable includes:
If cutover task optical cable institute's bearer service is pretection switch business, by cutover task optical cable institute bearer service Backup path on optical cable cleft grafting task postpone.
4. dispatching method as claimed in claim 2, which is characterized in that the dispatching method further include:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, according to the faulty link list judgement backup path for not including cutover task optical cable With the presence or absence of faulty link;
Faulty link if it exists, then reset not comprising cutover task optical cable for cutover task optical cable institute bearer service and There is no the backup paths of faulty link.
5. dispatching method as claimed in claim 3, which is characterized in that the dispatching method further include:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, according to the faulty link list judgement backup path for not including cutover task optical cable With the presence or absence of faulty link;
Faulty link if it exists then postpones the optical cable cleft grafting task of the cutover task optical cable.
6. a kind of scheduling system of optical cable cleft grafting task characterized by comprising
Cutover prediction scheme formulates unit, is used for:
Obtain cutover cable link circuit mapping table;
Using the routing information of each optical cable institute bearer service in cutover cable link circuit mapping table, cutover task optical cable institute is judged Whether the backup path of bearer service includes cutover task optical cable;
If being determined for cutover task optical cable institute's bearer service comprising cutover task optical cable and not including cutover task optical cable Backup path;
Cutover prediction scheme execution unit, is used for:
When executing optical cable cleft grafting task, cutover task optical cable institute bearer service is migrated to described and does not include cutover task The backup path of optical cable.
7. scheduling system as claimed in claim 6, which is characterized in that the cutover prediction scheme is formulated unit and is used for:
If cutover task optical cable institute's bearer service switches business to be non-protected, industry is carried by the cutover task optical cable Business resets the backup path not comprising cutover task optical cable.
8. scheduling system as claimed in claim 6, which is characterized in that the cutover prediction scheme is formulated unit and is used for:
If cutover task optical cable institute's bearer service is pretection switch business, by cutover task optical cable institute bearer service Backup path on optical cable cleft grafting task postpone.
9. scheduling system as claimed in claim 7, which is characterized in that the scheduling system further includes the verification of the first cutover prediction scheme Unit is used for:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, according to the faulty link list judgement backup path for not including cutover task optical cable With the presence or absence of faulty link;
Faulty link if it exists, then reset not comprising cutover task optical cable for cutover task optical cable institute bearer service and There is no the backup paths of faulty link.
10. scheduling system as claimed in claim 8, which is characterized in that the scheduling system further includes the second cutover prediction scheme school Verification certificate member, is used for:
From transmission net managing and control system read failure list of link;
Before executing optical cable cleft grafting task, according to the faulty link list judgement backup path for not including cutover task optical cable With the presence or absence of faulty link;
Faulty link if it exists then postpones the optical cable cleft grafting task of the cutover task optical cable.
CN201710858517.8A 2017-09-21 2017-09-21 Method and system for scheduling optical cable cutting task Active CN109547870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710858517.8A CN109547870B (en) 2017-09-21 2017-09-21 Method and system for scheduling optical cable cutting task

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710858517.8A CN109547870B (en) 2017-09-21 2017-09-21 Method and system for scheduling optical cable cutting task

Publications (2)

Publication Number Publication Date
CN109547870A true CN109547870A (en) 2019-03-29
CN109547870B CN109547870B (en) 2022-01-18

Family

ID=65828106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710858517.8A Active CN109547870B (en) 2017-09-21 2017-09-21 Method and system for scheduling optical cable cutting task

Country Status (1)

Country Link
CN (1) CN109547870B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113055118A (en) * 2021-03-18 2021-06-29 烽火通信科技股份有限公司 Method and system for repairing optical hybrid circuit bearing IP protocol
CN114050885A (en) * 2021-08-30 2022-02-15 国网山东省电力公司信息通信公司 POS optical port-based rapid cut-over method for convergence service channel
CN115913985A (en) * 2022-10-14 2023-04-04 烽火通信科技股份有限公司 Link cutover simulation method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040128201A1 (en) * 2003-06-12 2004-07-01 Datawire Communication Networks, Inc. Versatile terminal adapter and network for transaction processing
CN103518381A (en) * 2011-05-17 2014-01-15 瑞典爱立信有限公司 Protection for fibre optic access networks
CN203984428U (en) * 2014-05-28 2014-12-03 上海共联通信信息发展有限公司 A kind of without interrupting optical cable cleft grafting device
CN104753585A (en) * 2015-04-13 2015-07-01 国家电网公司 Intelligent optical fiber distribution device
US20170054629A1 (en) * 2013-04-05 2017-02-23 International Business Machines Corporation Set up of direct mapped routers located across independently managed compute and storage networks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040128201A1 (en) * 2003-06-12 2004-07-01 Datawire Communication Networks, Inc. Versatile terminal adapter and network for transaction processing
CN103518381A (en) * 2011-05-17 2014-01-15 瑞典爱立信有限公司 Protection for fibre optic access networks
US20170054629A1 (en) * 2013-04-05 2017-02-23 International Business Machines Corporation Set up of direct mapped routers located across independently managed compute and storage networks
CN203984428U (en) * 2014-05-28 2014-12-03 上海共联通信信息发展有限公司 A kind of without interrupting optical cable cleft grafting device
CN104753585A (en) * 2015-04-13 2015-07-01 国家电网公司 Intelligent optical fiber distribution device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王柏军: "光缆割接串纤引起网元告警特殊案例解析", 《中小企业管理与科学》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113055118A (en) * 2021-03-18 2021-06-29 烽火通信科技股份有限公司 Method and system for repairing optical hybrid circuit bearing IP protocol
CN114050885A (en) * 2021-08-30 2022-02-15 国网山东省电力公司信息通信公司 POS optical port-based rapid cut-over method for convergence service channel
CN114050885B (en) * 2021-08-30 2023-06-09 国网山东省电力公司信息通信公司 Convergence service channel cutting-over method based on POS optical port
CN115913985A (en) * 2022-10-14 2023-04-04 烽火通信科技股份有限公司 Link cutover simulation method and system

Also Published As

Publication number Publication date
CN109547870B (en) 2022-01-18

Similar Documents

Publication Publication Date Title
CN103870334A (en) Method and device for assigning large-scale vulnerability scanning task
CN106803790B (en) A kind of upgrade control method and device of group system
CN109547870A (en) The dispatching method and system of optical cable cleft grafting task
CN106302074A (en) A kind of moving method virtualizing network function VNF and device
CN106817306B (en) Method and device for determining target route
CN108965014A (en) The service chaining backup method and system of QoS perception
US20100293549A1 (en) System to Improve Cluster Machine Processing and Associated Methods
CN110493670B (en) Optical cable interruption judgment method and device
US7184541B2 (en) Method and apparatus for selecting an agent to handle a call
CN107689879A (en) The management method and device of Virtual NE
CN107168777A (en) The dispatching method and device of resource in distributed system
CN107463357A (en) Task scheduling system, dispatching method, Simulation of Brake system and emulation mode
CN110147273A (en) A kind of task executing method and device
CN107135192A (en) Dispose VNF resource authorization method, VNFM and NFVO
CN104615486A (en) Multi-task scheduling and executing method, device and system for search promotion platform
CN112804092A (en) Modeling and simulation method and system for OTN optical transmission network for power communication
CN110659108B (en) Cloud system virtual machine task migration method and device and server
CN103685084B (en) A kind of method generating Frame and device
CN109729086B (en) Policy management method, system, device, and medium
CN104616197A (en) Separable query transaction data scheduling method and apparatus
CN104090797A (en) Halftone upgrading method and network equipment
Olumolade Reactive scheduling system for cellular manufacturing with failure-prone machines
CN113419829B (en) Job scheduling method, device, scheduling platform and storage medium
CN102868594B (en) Method and device for message processing
CN105634792A (en) Configuration information transmission method and apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant