CN109541359A - A kind of converter automatic test system and its application method - Google Patents

A kind of converter automatic test system and its application method Download PDF

Info

Publication number
CN109541359A
CN109541359A CN201811606698.6A CN201811606698A CN109541359A CN 109541359 A CN109541359 A CN 109541359A CN 201811606698 A CN201811606698 A CN 201811606698A CN 109541359 A CN109541359 A CN 109541359A
Authority
CN
China
Prior art keywords
power supply
module
control unit
energy accumulation
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811606698.6A
Other languages
Chinese (zh)
Other versions
CN109541359B (en
Inventor
陈卓
李宗原
李二海
冯瑾涛
曹元威
任高全
朱洋洋
贺春
韩聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang General Testing & Research Institute Ltd By Share Ltd
Original Assignee
Xuchang General Testing & Research Institute Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang General Testing & Research Institute Ltd By Share Ltd filed Critical Xuchang General Testing & Research Institute Ltd By Share Ltd
Priority to CN201811606698.6A priority Critical patent/CN109541359B/en
Publication of CN109541359A publication Critical patent/CN109541359A/en
Application granted granted Critical
Publication of CN109541359B publication Critical patent/CN109541359B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R23/00Arrangements for measuring frequencies; Arrangements for analysing frequency spectra
    • G01R23/16Spectrum analysis; Fourier analysis

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Inverter Devices (AREA)
  • Dc-Dc Converters (AREA)

Abstract

A kind of converter automatic test system, converter automatic test system of the invention, it is arranged for the power supply module for having tested device offer power supply, testing control module and data acquisition module, testing control module is connect with power supply module, the output end of data acquisition module and the input terminal of testing control module connect, examination control module is arranged according to the test-types of tested device and controls the output parameter of power supply module, power supply corresponding after adjusting is sent to tested device and provides power supply for the tested device by power supply module, data acquisition module collects the exchange end of tested device and the parameter of DC terminal and generates report, the parameter information at the exchange end of the tested device of collection and DC terminal is sent to testing control module by data acquisition module, the converter automatic test system when in use can be to adaptation Different testing requirements, while the cumbersome workflow for passing through manual operation and recording is avoided the need for, so that test is more succinct, reduce cost of labor, reduction operating error.

Description

A kind of converter automatic test system and its application method
Technical field
The present invention relates to the field of test technology of electric system, more particularly to a kind of converter automatic test system.
Background technique
When testing energy accumulation current converter and photovoltaic DC-to-AC converter (hereinafter referred to as equipment under test) efficiency stress_responsive genes, need individually to control Alternating current source processed and DC source, power analyzer.Manually adjusting direct current source power makes equipment under test reach specified power, then controls Power analysis carries out storing data, and after the completion of waiting storage, export data carry out the secondary treatment analysis of data manually.This process The very complicated waste of manpower time, and arrange in data procedures that data processing is cumbersome wastes time very much.
Therefore, in view of the shortcomings of the prior art, providing a kind of converter automatic test system to overcome the deficiencies of the prior art very For necessity.
Summary of the invention
A kind of converter automatic test system is provided it is an object of the invention to avoid the deficiencies in the prior art place, it should Converter automatic test system can directly generate efficiency test report, save manpower, reduce error.
Above-mentioned purpose of the invention is realized by following technological means.
A kind of converter automatic test system is provided, is provided with tested device, for providing the electricity of power supply to tested device Source power supply module, testing control module and data acquisition module, testing control module are connect with power supply module, and data are adopted The input terminal of the output end and testing control module that collect module connects.
Converter automatic test system specific work steps is;
S1: testing control module exports power supply parameter information to power supply module;
S2: power supply module provides power supply to tested device according to power supply parameter information;
S3: the parameter of data collecting module collected tested device exchange end and DC terminal simultaneously generates report;
S4:, collected tested device is exchanged the parameter information of end and DC terminal as feedback letter by data acquisition module Breath is delivered to testing control module;
S5: the testing control module judges the data acquisition module according to the feedback information of the data acquisition module It is omitted with the presence or absence of acquisition;It omits if it exists, then enters step S6, omit if it does not exist, then improve step S7;
S6: testing control module output requires supplementation with the power supply parameter information of test to the power supply module; Return step S2;
S7: test terminates.
Preferably, power supply module is provided with DC power supplier, AC power supply module;DC power supplier respectively with Testing control module, tested device connection, AC power supply module are connect with testing control module, tested device respectively.
Above-mentioned, corresponding parameter power supply is applied to data according to the control command of testing control module by DC power supplier Corresponding parameter power supply is applied to tested dress according to the control command of testing control module by acquisition module, AC power supply module It sets.
Preferably, testing control module is provided with energy accumulation current converter efficiency acquisition control unit and photovoltaic inversion acquisition control Unit processed;Energy accumulation current converter efficiency acquisition control unit respectively with DC power supplier, AC power supply module, tested device and Data acquisition module connection, photovoltaic inversion acquisition control unit respectively with DC power supplier, AC power supply module, tested device And data acquisition module connection;
Preferably, energy accumulation current converter efficiency acquisition control unit control respectively the out-put supply parameter of DC power supplier with The out-put supply parameter of AC power supply module;
Photovoltaic inversion acquisition control unit controls the out-put supply parameter and AC power supply module of DC power supplier respectively Out-put supply parameter, the collected information of institute feeds back to energy accumulation current converter efficiency acquisition control list by data acquisition module respectively Member and photovoltaic inversion acquisition control unit.
Preferably, DC power supplier is provided with CV mode dc power supply, PV mode dc power supply;
CV mode dc power supply is inverse with the tested device, energy accumulation current converter efficiency acquisition control unit and photovoltaic respectively Become acquisition control unit connection;
PV mode dc power supply is adopted with tested device, energy accumulation current converter efficiency acquisition control unit and photovoltaic inversion respectively Collect control unit connection;
CV mode dc power supply is according to energy accumulation current converter efficiency acquisition control unit and photovoltaic inversion acquisition control unit Control command provide power supply for tested device;
PV mode dc power supply is according to energy accumulation current converter efficiency acquisition control unit and photovoltaic inversion acquisition control unit Control command provide power supply for tested device.
Preferably, the specific rate-determining steps of energy accumulation current converter efficiency acquisition control unit are as follows:
It is CV mode that DC power supply, which is arranged, in step (1-1);
Step (1-2) sets gradually that the voltage of AC power source is V1, frequency F1, phase are Φ 1;
The voltage that DC power supply is arranged in step (1-3) is V(1-3)
The power supply X power that tested device is energy accumulation current converter is arranged in step (1-4);
Step (1-5) carries out delay and waits S1;
The data of T1 period are sent to data acquisition module by step (1-6) control;
Step (1-7) judges whether all power measuring points are completed, if not completing return step (1-4) circulate operation;
Step (1-8) judges whether all voltage measuring points are completed, if not completing return step (1-3) circulate operation;
Preferably, data acquisition module generates data report to step (1-9).
Preferably, energy accumulation current converter efficiency acquisition control unit is for the test of energy accumulation current converter rectification efficiency, energy storage unsteady flow The test of device inversion efficiency, energy accumulation current converter stress_responsive genes.
Preferably, photovoltaic inversion acquisition control unit specifically controls testing procedure are as follows:
It is PV mode that DC power supply, which is arranged, in step (2-1);
Step (2-2) sets gradually that the voltage in alternating current source is V2, frequency is F2 and phase is Φ 2;
Step (2-3) carries out film assembly static state MPPT test;
Step (2-4) carries out crystal silicon component static state MPPT test;
Step (2-5) generates A1Report;
Step (2-6) carries out dynamic MPPT test;
Preferably, data acquisition module generates data report to step (2-7).
Preferably, testing control module is additionally provided with film/crystal static state MPPT unit of testing and controlling;
Film/crystal static state MPPT unit of testing and controlling respectively with CV mode dc power supply, PV mode dc power supply, exchange Power module and the connection of photovoltaic inversion acquisition control unit;
Out-put supply parameter, the PV mode of film/crystal static state MPPT unit of testing and controlling control CV mode dc power supply Out-put supply parameter, the out-put supply parameter of AC power supply module of DC power supply, and it is sent to photovoltaic inversion acquisition control list Member executes the operation of step (2-1)-step (2-7).
Preferably, film/crystal static state MPPT unit of testing and controlling testing procedure is;
Step (3-1) be arranged DC power supply be UMPP (MPPT voltage), IMPP, UOC (overvoltage), ISC (short circuit current), It is tested after setting up, data report could be generated after test.
Step (3-2) carries out third delay and waits;
Step (3-3) is by T3The voltage of period, electric current, power, efficiency are sent to preferably, data acquisition module;
Step (3-4) judges whether all PMPP and UMPP measuring points are completed, if do not complete if return step (3-1) continue into Row test operation;
Step (3-5) enters step the operation of (2-1)-step (2-7);
Preferably, testing control module is additionally provided with photovoltaic DC-to-AC converter stress_responsive genes control unit;Photovoltaic inversion acquisition control Unit processed is connect with DC power supplier, AC power supply module and data acquisition module respectively;
Preferably, the power supply output parameter of photovoltaic DC-to-AC converter stress_responsive genes control unit control DC power supplier and friendship The output parameter of galvanic electricity source module is simultaneously sent to data acquisition module.
Preferably, the rate-determining steps of photovoltaic DC-to-AC converter stress_responsive genes control unit specifically:
DC power supply CV mode is arranged in step (4-1);
The voltage of step (4-2) setting AC power source is V4, frequency is F4 and phase is Φ 4;
Step (4-3) judges whether DC power supply is PV mode, is set if PV mode then enters step (4-3-1) It sets, if not it is that PV mode then enters step (4-3-2)
Step (4-3-1) setting setting DC power supply is UMPP, IMPP, UOC, ISC
It is V that direct current power source voltage, which is arranged, in step (4-3-2)(4-3-2)
Step (4-4) is arranged energy accumulation current converter and exchanges side power as P friendship;
Step (4-5) carries out S4 delay and waits;
Step (4-6) is by T4The voltage of period, electric current, power, efficiency are sent to data acquisition module;
Step (4-6) judges whether all power measuring points are completed, and enters step (4-4) if not completing;
Preferably, data acquisition module generates data report to step (4-7).
Preferably, when energy accumulation current converter efficiency acquisition control unit is tested for energy accumulation current converter rectification efficiency, step (1- 4) setting tested device is the DC side power of energy accumulation current converter.
Preferably, energy accumulation current converter efficiency acquisition control unit is for the test of energy accumulation current converter inversion efficiency, energy storage unsteady flow When device stress_responsive genes, the exchange side power that tested device is energy accumulation current converter is arranged in step (1-4).
Preferably, 0V≤V1≤300V;45Hz≤F1≤65Hz;0≤Φ1≤360°;0V≤V(4-3-2)≤360V;0V ≤V(1-3)≤360V。
Preferably, 0min≤S1≤5min.
Preferably, 3min≤T1≤10min.
Preferably, 0V≤V2≤300V;45Hz≤F2≤65Hz;0≤Φ2≤360°.
Preferably, 0≤third delay waiting≤5min.
Preferably, 3min≤T3≤10min。
Preferably, 0V≤V4≤300V;45Hz≤F4≤65Hz;0≤Φ4≤360°.
Preferably, 0min≤S4≤5min;3min≤T4≤10min.
Preferably, the A of step (2-5)1Report includes: static MPPT report, transfer efficiency report, weighting efficiency report one Kind is or a variety of.
Preferably, data acquisition module is set as WT3000.
Preferably, -1500kW≤P friendship≤1500kW.
Converter automatic test system of the invention is provided with for providing the power supply power supply mould of power supply to tested device Block, testing control module and data acquisition module, testing control module are connect with power supply module, data acquisition module Output end and the input terminal of testing control module connect.
Testing control module is arranged according to the test-types of tested device and controls the output parameter of power supply module, electricity Power supply corresponding after adjusting is applied to tested device and provides power supply, data acquisition module for the tested device by source power supply module Block collects the exchange end of tested device and the parameter of DC terminal simultaneously generates report, and data acquisition module is by the tested device of collection The parameter information of exchange end and DC terminal is sent to testing control module.Testing control module is according to the feedback of data acquisition module Whether infomation detection data acquisition module has acquisition to omit, and continues pair if having and omitting testing control module control power supply module Tested device applies corresponding power supply, and power supply module is provided with DC power supplier, AC power supply module;Testing and control mould Block is provided with energy accumulation current converter efficiency acquisition control unit, photovoltaic inversion acquisition control unit, film/crystal static state MPPT test Control unit and photovoltaic DC-to-AC converter stress_responsive genes control unit, controlling power supply module by different control units will be corresponding Power data export to tested device, data acquisition module be responsible for acquire tested device exchange end and DC terminal parameter simultaneously Generate report.The converter automatic test system can avoid the need for simultaneously when in use to different testing requirements is adapted to Pass through manual operation and the cumbersome workflow recorded reduces cost of labor so that test is more succinct, reduces operating error.
Detailed description of the invention
Using attached drawing, the present invention is further illustrated, but the content in attached drawing is not constituted to any limit of the invention System.
Fig. 1 is overall system attachment structure schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of the embodiment of the present invention 1.
Fig. 3 is the structural schematic diagram of the embodiment of the present invention 2.
Fig. 4 is the structural schematic diagram of the embodiment of the present invention 3.
In Fig. 1 to Fig. 4, comprising:
Tested device 100;
Power supply module 200, DC power supplier 201, CV mode dc power supply 2011, PV mode dc power supply 2012, AC power supply module 202;
Testing control module 300, energy accumulation current converter efficiency acquisition control unit 301, photovoltaic inversion acquisition control unit 302, film/crystal static state MPPT unit of testing and controlling 303, photovoltaic DC-to-AC converter stress_responsive genes control unit 304;
Data acquisition module 400.
Specific embodiment
The invention will be further described with the following Examples.
Embodiment 1.
A kind of converter automatic test system is provided with for providing power supply to tested device 100 as shown in Figure 1, 2 Power supply module 200, testing control module 300 and data acquisition module 400.
Testing control module 300 is connect with power supply module 200, and the output end of data acquisition module 400 and test are controlled The input terminal of molding block 300 connects.
Converter automatic test system specific work steps is;
S1: testing control module 300 exports power supply parameter information to power supply module 200;
S2: power supply module 200 provides power supply to tested device 100 according to power supply parameter information;
S3: data acquisition module 400 acquires tested device 100 and exchanges the parameter at end and DC terminal and generate report;
S4:, data acquisition module 400 using collected tested device 100 exchange the parameter information of end and DC terminal as Feedback information is delivered to testing control module 300;
S5: testing control module 300 judges that data acquisition module 400 is according to the feedback information of data acquisition module 400 It is no to there is acquisition omission;It omits if it exists, then enters step S6, omit if it does not exist, then improve step S7;
S6: testing control module 300, which exports, requires supplementation with the power supply parameter information of test to power supply module 200;It returns Return step S2;
S7: test terminates.
Tested device 100 is needed according to test for that can be divided into rectification efficiency test, inversion efficiency is tested, Chinese efficiency is surveyed Examination.
Data acquisition module 400 is set as WT3000.
Specifically, power supply module 200 is provided with DC power supplier 201, AC power supply module 202;DC power supply Module 201 is connect with testing control module 300, tested device 100 respectively, AC power supply module 202 respectively with testing and control mould Block 300, tested device 100 connect, and DC power supplier 201 will join accordingly according to the control command of testing control module 300 For number power delivery to tested device 100, AC power supply module 202 will be corresponding according to the control command of testing control module 300 Parameter power delivery is to tested device 100.
Specifically, testing control module 300 is provided with energy accumulation current converter efficiency acquisition control unit 301 and photovoltaic inversion Acquisition control unit 302, energy accumulation current converter efficiency acquisition control unit 301 respectively with DC power supplier 201, AC power source mould Block 202, tested device 100 and data acquisition module 400 connect, photovoltaic inversion acquisition control unit 302 respectively with direct current Source module 201, AC power supply module 202, tested device 100 and data acquisition module 400 connect, and energy accumulation current converter efficiency is adopted Collection control unit 301 controls the out-put supply parameter of DC power supplier 201 and the out-put supply of AC power supply module 202 respectively Parameter, photovoltaic inversion acquisition control unit 302 control the out-put supply parameter and AC power source mould of DC power supplier 201 respectively The collected information of institute is fed back to energy accumulation current converter efficiency respectively and adopted by the out-put supply parameter of block 202, data acquisition module 400 Collect control unit 301 and photovoltaic inversion acquisition control unit 302.
Specifically, DC power supplier 201 is provided with CV mode dc power supply 2011, PV mode dc power supply 2012, CV Mode dc power supply 2011 is adopted with tested device 100, energy accumulation current converter efficiency acquisition control unit 301 and photovoltaic inversion respectively Collect control unit 302 to connect;
PV mode dc power supply 2012 respectively with tested device 100, energy accumulation current converter efficiency acquisition control unit 301 and Photovoltaic inversion acquisition control unit 302 connects;
CV mode dc power supply 2011 is according to energy accumulation current converter efficiency acquisition control unit 301 and photovoltaic inversion acquisition control The control command of unit 302 processed is that tested device 100 provides power supply;
PV mode dc power supply 2012 is according to energy accumulation current converter efficiency acquisition control unit 301 and photovoltaic inversion acquisition control The control command of unit 302 processed is that tested device 100 provides power supply.
Specifically, the specific rate-determining steps of energy accumulation current converter efficiency acquisition control unit 301 are as follows:
It is CV mode that DC power supply, which is arranged, in step (1-1);
Step (1-2) sets gradually that the voltage of AC power source is V1, frequency F1, phase are Φ 1;
It is above-mentioned specifically, 0V≤V1≤300V;45Hz≤F1≤65Hz;0≤Φ1≤360°.
Practical operation and when V1, F1, Φ 1 is arranged, needs to be configured according to the model of the equipment under test of actual use.
The voltage that DC power supply is arranged in step (1-3) is V(1-3);;
The power supply X power that tested device 100 is energy accumulation current converter is arranged in step (1-4);
Step (1-5) carries out delay and waits S1;It is above-mentioned specifically, 0min≤S1≤5min.
Delay waits related with equipment under test, is that waiting equipment under test exports the stable time, such as when equipment under test is defeated It might have the regular hour when 50kW out for stablizing output, here it is delays to wait, and is 0~5min according to Standard General.
The data of T1 period are sent to specifically, data acquisition module 400 by step (1-6) control;It is above-mentioned specifically, 3min≤T1≤10min。
Step (1-7) judges whether all power measuring points are completed, if not completing return step (1-4) circulate operation;
Step (1-8) judges whether all voltage measuring points are completed, if not completing return step (1-3) circulate operation.
Data acquisition module 400 sends data to the energy accumulation current converter efficiency acquisition control list of testing control module 300 Member 301 carries out data acquisition feedback, in practical operation detection, such as when testing energy accumulation current converter efficiency test, according to Standard needs to test 3 voltage sections, and each voltage breaks as 10 power points 10%, and 20%, 30%~100%.The method of judgement It is exactly cyclic query, will continue to run test point if having chosen test point and not passed through circulation.If all test points are all Being circulated throughout will complete at all power measuring points at this time at report, are illustrated.The detection mode of all voltage measuring points with The judgment mode of all power points detections is consistent, the common knowledge based on one of ordinary skilled in the art, specific detection step Suddenly it just repeats no more.
Step (1-9) data acquisition module 400 generates data report.
Specifically, energy accumulation current converter efficiency acquisition control unit 301 becomes for the test of energy accumulation current converter rectification efficiency, energy storage Flow the test of device inversion efficiency, energy accumulation current converter stress_responsive genes.
Specifically, photovoltaic inversion acquisition control unit 302 specifically controls testing procedure are as follows:
It is PV mode that DC power supply, which is arranged, in step (2-1);
Step (2-2) sets gradually that the voltage in alternating current source is V2, frequency is F2 and phase is Φ 2.
Specifically, 0V≤V2≤300V;45Hz≤F2≤65Hz;0≤Φ2≤360°.
The voltage that alternating current source is arranged is V2, frequency is F2 and phase is Φ 2 in actual operation according to actual tested The concrete model of device 100 is set, and the mode of setting is just repeated no more based on the common knowledge of those of ordinary skill in the art.
Step (2-3) carries out film assembly static state MPPT test;
When carrying out film assembly static state MPPT test, the specific device parameter voltage according to photovoltaic DC-to-AC converter is from low to high It tests, then carries out power and from low to high tested,
Step (2-4) carries out crystal silicon component static state MPPT test;
Step (2-5) generates A1Report;
The A of the step (2-5)1Report includes: static MPPT report, transfer efficiency report, weighting efficiency report.
A1The generation step of report are as follows: 1. collect the data of dependence test, the data of 2. index dependence tests according to mark The formula that standard provides handled, the data after 3. index process, and addition addition is by the corresponding position, 4. raw into report template It is reported at word.
Step (2-6) carries out dynamic MPPT test;
Such as: according to " 0002-2014 photovoltaic combining inverter China efficiency techniques condition " standard setting pair in the art 17 curves answered.No. 1-17 is numbered to curve, successively tests and acquire data in order, post-processing data are completed in acquisition And generate report.
Step (2-7) is specifically, data acquisition module 400 generates data report.
Specifically, report can be automatically generated after the completion of test, by indexing the table filled in corresponding data into report It is interior.When energy accumulation current converter efficiency acquisition control unit 301 is tested for energy accumulation current converter rectification efficiency, quilt is arranged in step (1-4) Survey the DC side power that device 100 is energy accumulation current converter.
Specifically, energy accumulation current converter efficiency acquisition control unit 301 becomes for the test of energy accumulation current converter inversion efficiency, energy storage When flowing device stress_responsive genes, the exchange side power that tested device 100 is energy accumulation current converter is arranged in step (1-4).
Converter automatic test system of the invention is provided with for providing the power supply power supply mould of power supply to tested device Block, testing control module and data acquisition module, testing control module respectively with power supply module and data acquisition module Block connection, power supply module are connect with data acquisition module;Testing control module needs to be arranged according to the test of tested device And the output parameter of power supply module is controlled, power supply module exports voltage, current data to tested device, and data are adopted The exchange end of collection module acquisition tested device and the parameter of DC terminal simultaneously generate report,.
The converter automatic test system can carry out rectification efficiency test, energy storage unsteady flow to energy accumulation current converter when in use Device inversion efficiency and photovoltaic DC-to-AC converter China efficiency test, test avoid the need for the cumbersome work for passing through manual operation and recording Make process, so that test is more succinct, reduces cost of labor, reduce operating error.
Embodiment 2.
A kind of converter automatic test system, other structures are same as Example 1, the difference is that, the current transformer is certainly Dynamic test macro, specifically, testing control module 300 is additionally provided with film/crystal static state MPPT unit of testing and controlling 303;
Film/crystal static state MPPT unit of testing and controlling 303 respectively with CV mode dc power supply 2011, PV mode dc Power supply 2012, AC power supply module 202 and photovoltaic inversion acquisition control unit 302 connect;
The out-put supply parameter 2011 of the control CV mode dc power supply of film/crystal static state MPPT unit of testing and controlling 303, Out-put supply parameter, the out-put supply parameter of AC power supply module 202 of PV mode dc power supply 2012, and it is inverse to be sent to photovoltaic Become the operation that acquisition control unit 302 executes step (2-1)-step (2-7).
Specifically, 303 testing procedure of film/crystal static state MPPT unit of testing and controlling is;
It is UMPP (MPPT voltage), IMPP (MPPT electric current), UOC (overvoltage), ISC that DC power supply, which is arranged, in step (3-1) (short circuit current).
Step (3-2) carries out third delay and waits;
It is above-mentioned, specific 0≤third delay waiting≤5min
Step (3-3) is by T3The voltage of period, electric current, power, efficiency are sent to data acquisition module 400;
It is above-mentioned, 3min≤T3≤10min。
Step (3-4) judges whether all PMPP and UMPP measuring points are completed, if do not complete if return step (3-1) continue into Row test operation;
When judging whether all PMPP and UMPP measuring points are completed, data acquisition module 400 sends data to test control The film/crystal static state MPPT unit of testing and controlling 303 of molding block 300 is fed back, and is such as needed to carry out film/crystalline substance according to standard Body static state MPPT test test, when needing to test 3 voltage sections, each voltage breaks as 10 power points 10%, 20%, 30%~ 100%.The method of judgement is exactly cyclic query, will continue to run test point if having chosen test point and not passed through circulation.Such as All test points of fruit, which have all been circulated throughout, have been completed at all power measuring points at this time at report, are illustrated.All voltages The detection mode of measuring point is consistent with the judgment mode that all power points detect, based on known in one of ordinary skilled in the art Common sense, specific detecting step just repeat no more.
Step (3-5) enters step the operation of (2-1)-step (2-7).
By be arranged film/crystal static state MPPT unit of testing and controlling be able to carry out film crystal silicon static state MPPT test, into One step improves the range of test.
Embodiment 3.
A kind of converter automatic test system, other structures are identical as embodiment 1 or 2, the difference is that, testing and control Module 300 is additionally provided with photovoltaic DC-to-AC converter stress_responsive genes control unit 304;Photovoltaic inversion acquisition control unit 302 is respectively and directly Galvanic electricity source module 201, AC power supply module 202 and data acquisition module 400 connect;
Specifically, photovoltaic DC-to-AC converter stress_responsive genes control unit 304 controls the power supply output parameter of DC power supplier 201 And AC power supply module 202 output parameter and be sent to data acquisition module 400.
Specifically, the rate-determining steps of photovoltaic DC-to-AC converter stress_responsive genes control unit 304 specifically:
DC power supply CV mode is arranged in step (4-1);
The voltage of step (4-2) setting AC power source is V4, frequency is F4 and phase is Φ 4;
Specifically, above-mentioned, 0V≤V4≤300V;45Hz≤F4≤65Hz;0≤Φ4≤360°.
Step (4-3) judges whether DC power supply is PV mode, is set if PV mode then enters step (4-3-1) It sets, if not it is that PV mode then enters step (4-3-2)
Step (4-3-1) setting setting DC power supply is UMPP, IMPP, UOC, ISC
The voltage that DC power supply is arranged in step (4-3-2) is V(4-3-2)
When practical operation, the direct current power source voltage of setting is configured according to the operating parameter of practical tested device, tool Common knowledge of the body set-up mode based on those of ordinary skill in the art, particularly as repeating no more.
Step (4-4) is arranged energy accumulation current converter and exchanges side power as P friendship;
Step (4-5) carries out S4 delay and waits;Specifically, 0min≤S4≤5min.
Step (4-6) is by T4The voltage of period, electric current, power, efficiency are sent to specifically, data acquisition module 400; Specifically, 3min≤T4≤10min.
Step (4-6) judges whether all power measuring points are completed, and enters step (4-4) if not completing;
Step (4-7) is specifically, data acquisition module 400 generates data report.
- 1500kW≤P friendship≤1500kW.
The test that photovoltaic DC-to-AC converter harmonic wave is increased by the way that photovoltaic DC-to-AC converter stress_responsive genes control unit is arranged, further mentions The efficiency of high test reduces cost of labor, simplifies the cumbersome of test job.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention The limitation of range, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should be managed Solution, can with modification or equivalent replacement of the technical solution of the present invention are made, without departing from technical solution of the present invention essence and Range.

Claims (10)

1. a kind of converter automatic test system, it is characterised in that: be provided with testing control module, for providing to tested device The power supply module and data acquisition module of power supply,
The testing control module is connect with the power supply module, the output end of the data acquisition module and the test The input terminal of control module connects;
Converter automatic test system specific work steps is;
S1: the testing control module exports power supply parameter information to the power supply module;
S2: the power supply module provides power supply to tested device according to power supply parameter information;
S3: the parameter of the exchange end of tested device described in the data collecting module collected and DC terminal simultaneously generates report;
S4: collected tested device is exchanged the parameter information of end and DC terminal as feedback information by the data acquisition module It is delivered to the testing control module;
S5: whether the testing control module judges the data acquisition module according to the feedback information of the data acquisition module It is omitted in the presence of acquisition;It omits if it exists, then enters step S6, omit if it does not exist, then improve step S7;
S6: testing control module output requires supplementation with the power supply parameter information of test to the power supply module;It returns Step S2;
S7: test terminates.
2. converter automatic test system according to claim 1, it is characterised in that: the power supply module is provided with DC power supplier, AC power supply module;
The DC power supplier is connect with the testing control module, the tested device respectively, the AC power supply module It is connect respectively with the testing control module, the testing control module;
Corresponding power supply is applied to described tested by the DC power supplier according to the control command of the testing control module Corresponding power supply is applied to described tested by device, the AC power supply module according to the control command of the testing control module Device.
3. converter automatic test system according to claim 2, it is characterised in that:
The testing control module is provided with energy accumulation current converter efficiency acquisition control unit and photovoltaic inversion acquisition control unit;
The energy accumulation current converter efficiency acquisition control unit respectively with the DC power supplier, the AC power supply module, institute State tested device and the data acquisition module connection, the photovoltaic inversion acquisition control unit respectively with the DC power supply Module, the AC power supply module, the tested device and data acquisition module connection;
The energy accumulation current converter efficiency acquisition control unit controls out-put supply parameter and the institute of the DC power supplier respectively State the out-put supply parameter of AC power supply module;
The out-put supply parameter that the photovoltaic inversion acquisition control unit controls the DC power supplier respectively is exchanged with described The out-put supply parameter of power module;
The collected information of institute is fed back to the energy accumulation current converter efficiency acquisition control unit by the data acquisition module respectively And the photovoltaic inversion acquisition control unit.
4. converter automatic test system according to claim 3, it is characterised in that:
The DC power supplier is provided with CV mode dc power supply, PV mode dc power supply;
The CV mode dc power supply respectively with the tested device, the energy accumulation current converter efficiency acquisition control unit and institute State the connection of photovoltaic inversion acquisition control unit;
The PV mode dc power supply respectively with the tested device, the energy accumulation current converter efficiency acquisition control unit and institute State the connection of photovoltaic inversion acquisition control unit;
The CV mode dc power supply is acquired according to the energy accumulation current converter efficiency acquisition control unit and the photovoltaic inversion The control command of control unit provides power supply for the tested device;
The PV mode dc power supply is acquired according to the energy accumulation current converter efficiency acquisition control unit and the photovoltaic inversion The control command of control unit provides power supply for the tested device.
5. converter automatic test system according to claim 4, it is characterised in that:
The specific rate-determining steps of energy accumulation current converter efficiency acquisition control unit are;
It is CV mode that DC power supply, which is arranged, in step (1-1);
Step (1-2) sets gradually that the voltage of AC power source is V1, frequency F1, phase are Φ 1;
The voltage that DC power supply is arranged in step (1-3) is V(1-3)
The power supply X power that tested device is energy accumulation current converter is arranged in step (1-4);
Step (1-5) carries out delay and waits S1;
The data of T1 period are sent to the data acquisition module by step (1-6) control;
Step (1-7) judges whether all power measuring points are completed, if not completing return step (1-4) circulate operation;
Step (1-8) judges whether all voltage measuring points are completed, if not completing return step (1-3) circulate operation;
Step (1-9) data acquisition module generates data report.
6. converter automatic test system according to claim 5, it is characterised in that:
The energy accumulation current converter efficiency acquisition control unit is for the test of energy accumulation current converter rectification efficiency, energy accumulation current converter inversion effect Rate test, energy accumulation current converter stress_responsive genes.
7. converter automatic test system according to claim 6, it is characterised in that:
The photovoltaic inversion acquisition control unit specifically controls testing procedure;
It is PV mode that DC power supply, which is arranged, in step (2-1);
Step (2-2) sets gradually that the voltage in alternating current source is V2, frequency is F2 and phase is Φ 2;
Step (2-3) carries out film assembly static state MPPT test;
Step (2-4) carries out crystal silicon component static state MPPT test
Step (2-5) generates A1Report;
Step (2-6) carries out dynamic MPPT test;
Step (2-7) data acquisition module generates data report.
8. converter automatic test system according to claim 7, it is characterised in that:
The testing control module is additionally provided with film/crystal static state MPPT unit of testing and controlling;
The film/crystal static state MPPT unit of testing and controlling respectively with the CV mode dc power supply, the PV mode dc Power supply, the AC power supply module and photovoltaic inversion acquisition control unit connection;
The film/crystal static state MPPT unit of testing and controlling controls the out-put supply parameter of the CV mode dc power supply, institute The out-put supply parameter of PV mode dc power supply, the out-put supply parameter of the AC power supply module are stated, and is sent to the light Lie prostrate the operation that inversion acquisition control unit executes step (2-1)-step (2-7).
9. converter automatic test system according to claim 8, it is characterised in that:
The film/crystal static state MPPT unit of testing and controlling testing procedure is;
It is UMPP, IMPP, UOC, ISC that DC power supply, which is arranged, in step (3-1);
Step (3-2) carries out third delay and waits;
Step (3-3) is by T3The voltage of period, electric current, power, efficiency are sent to the data acquisition module;
Step (3-4) judges whether all PMPP and UMPP measuring points are completed, and return step (3-1) continues to survey if not completing Examination operation;
Step (3-5) enters step the operation of (2-1)-step (2-7);
The testing control module is additionally provided with photovoltaic DC-to-AC converter stress_responsive genes control unit;
The photovoltaic inversion acquisition control unit respectively with the DC power supplier, the AC power supply module and the number It is connected according to acquisition module;
The photovoltaic DC-to-AC converter stress_responsive genes control unit controls the power supply output parameter of the DC power supplier and described The output parameter of AC power supply module is simultaneously sent to the data acquisition module.
The rate-determining steps of the photovoltaic DC-to-AC converter stress_responsive genes control unit are specially;
DC power supply CV mode is arranged in step (4-1);
The voltage of step (4-2) setting AC power source is V4, frequency is F4 and phase is Φ 4;
Step (4-3) judges whether DC power supply is PV mode, is configured if PV mode then enters step (4-3-1), if Non- is that PV mode then enters step (4-3-2)
Step (4-3-1) setting setting DC power supply is UMPP, IMPP, UOC, ISC
The voltage that DC power supply is arranged in step (4-3-2) is V(4-3-2)
Step (4-4) is arranged energy accumulation current converter and exchanges the friendship of side power P;
Step (4-5) carries out S4 delay and waits;
Step (4-6) is by T4The voltage of period, electric current, power, efficiency are sent to the data acquisition module;
Step (4-6) judges whether all power measuring points are completed, and enters step (4-4) if not completing;
Step (4-7) data acquisition module generates data report.
10. converter automatic test system according to claim 9, it is characterised in that:
When the energy accumulation current converter efficiency acquisition control unit is tested for energy accumulation current converter rectification efficiency, the step (1-4) The DC side power that tested device is energy accumulation current converter is set;
The energy accumulation current converter efficiency acquisition control unit is surveyed for the test of energy accumulation current converter inversion efficiency, energy accumulation current converter harmonic wave When examination, step (1-4) the setting tested device is the exchange side power of energy accumulation current converter;
0V≤V1≤300V;45Hz≤F1≤65Hz;0≤Φ1≤360°;
0V≤V(4-3-2)≤360V;0V≤V(1-3)≤360V;
0min≤S1≤5min;3min≤T1≤10min;
0V≤V2≤300V;45Hz≤F2≤65Hz;0≤Φ2≤360°;
0≤third delay waiting≤5min;
3min≤T3≤10min;
0V≤V4≤300V;45Hz≤F4≤65Hz;0≤Φ4≤360°;
0min≤S4≤5min;3min≤T4≤10min;
The A of the step (2-5)1Report includes: static MPPT report, transfer efficiency report, weighting efficiency report one kind or or more Kind;
The data acquisition module is set as WT3000, -1500kW≤P friendship≤1500kW.
CN201811606698.6A 2018-12-27 2018-12-27 Converter automatic test system and use method thereof Active CN109541359B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811606698.6A CN109541359B (en) 2018-12-27 2018-12-27 Converter automatic test system and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811606698.6A CN109541359B (en) 2018-12-27 2018-12-27 Converter automatic test system and use method thereof

Publications (2)

Publication Number Publication Date
CN109541359A true CN109541359A (en) 2019-03-29
CN109541359B CN109541359B (en) 2021-01-08

Family

ID=65857069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811606698.6A Active CN109541359B (en) 2018-12-27 2018-12-27 Converter automatic test system and use method thereof

Country Status (1)

Country Link
CN (1) CN109541359B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111208365A (en) * 2020-01-06 2020-05-29 平高集团有限公司 PCS test system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201699430U (en) * 2010-06-30 2011-01-05 江西省电力科学研究院 Testing device of distributed type photovoltaic power supply parallel-grid inverter
CN202794483U (en) * 2012-09-13 2013-03-13 广州三晶电气有限公司 Photovoltaic inverter testing system
CN103063943A (en) * 2012-12-05 2013-04-24 中国电力科学研究院 System and method of detecting electric performance of photovoltaic inverter
CN104155616A (en) * 2014-08-12 2014-11-19 中国科学院电工研究所 Photovoltaic system current transformer test platform
CN203981788U (en) * 2014-05-21 2014-12-03 南京工程学院 A kind of photovoltaic combining inverter automatic detection device
CN104217108A (en) * 2014-08-29 2014-12-17 中国科学院电工研究所 Comprehensive evaluation method for transformation efficiency of grid-connected photovoltaic inverter
CN105610400A (en) * 2015-12-23 2016-05-25 广州三晶电气股份有限公司 Heterogeneous photovoltaic inverter testing system and testing method therefor
CN108459226A (en) * 2018-04-24 2018-08-28 合肥市艾特米信息技术有限公司 Photovoltaic DC-to-AC converter automatization test system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201699430U (en) * 2010-06-30 2011-01-05 江西省电力科学研究院 Testing device of distributed type photovoltaic power supply parallel-grid inverter
CN202794483U (en) * 2012-09-13 2013-03-13 广州三晶电气有限公司 Photovoltaic inverter testing system
CN103063943A (en) * 2012-12-05 2013-04-24 中国电力科学研究院 System and method of detecting electric performance of photovoltaic inverter
CN203981788U (en) * 2014-05-21 2014-12-03 南京工程学院 A kind of photovoltaic combining inverter automatic detection device
CN104155616A (en) * 2014-08-12 2014-11-19 中国科学院电工研究所 Photovoltaic system current transformer test platform
CN104217108A (en) * 2014-08-29 2014-12-17 中国科学院电工研究所 Comprehensive evaluation method for transformation efficiency of grid-connected photovoltaic inverter
CN105610400A (en) * 2015-12-23 2016-05-25 广州三晶电气股份有限公司 Heterogeneous photovoltaic inverter testing system and testing method therefor
CN108459226A (en) * 2018-04-24 2018-08-28 合肥市艾特米信息技术有限公司 Photovoltaic DC-to-AC converter automatization test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111208365A (en) * 2020-01-06 2020-05-29 平高集团有限公司 PCS test system

Also Published As

Publication number Publication date
CN109541359B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN101639514B (en) Detecting device for detecting IGBT
CN106998147B (en) Energy-saving multifunctional simulated electricity load device and control method thereof
CN207473070U (en) A kind of energy-saving direct-current power source aging experimental rig
CN102156227A (en) Detecting system and detecting method for non-vehicular charging machine
CN115825633B (en) Evaluation method and device of complete machine test system of photovoltaic inverter and upper computer
CN114397517A (en) Photovoltaic inverter test system
CN109541359A (en) A kind of converter automatic test system and its application method
CN107658902B (en) Photovoltaic grid-connected inverter with power quality monitoring function
CN209746043U (en) converter automatic test system
CN109581097A (en) A kind of charging pile test macro
CN110850294A (en) Battery pack testing system
CN110940851A (en) Power detection device and method for modular programmable photovoltaic system
CN202548234U (en) Testing equipment of photovoltaic inverter
CN203287467U (en) Transformation ratio and polarity testing apparatus for voltage transformer
CN107807334B (en) Test method and device
CN202102059U (en) Power unit testing apparatus
CN108693482A (en) A kind of multiple power supplies real-time monitoring system based on Internet of Things
CN206348400U (en) Multichannel small-sized household inverter efficiency detecting system
Langella et al. New comprehensive analytical model of single-phase ac/dc diode rectifiers in the presence of interharmonics in supply voltage
CN101477165B (en) Integrated test system for security and efficiency of washing machine
CN113466592A (en) Power unit's test system
CN201177647Y (en) Multiple waveform aging test apparatus of lightning arrester
CN206193161U (en) A polarization depolarization current monitoring devices for oily cardboard
CN105182068A (en) System and method for testing adaptability of photovoltaic inverter to grid harmonic
CN203786218U (en) Test system of photovoltaic inverter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant