CN109538926A - A kind of LNG supercharging equipment - Google Patents

A kind of LNG supercharging equipment Download PDF

Info

Publication number
CN109538926A
CN109538926A CN201811251047.XA CN201811251047A CN109538926A CN 109538926 A CN109538926 A CN 109538926A CN 201811251047 A CN201811251047 A CN 201811251047A CN 109538926 A CN109538926 A CN 109538926A
Authority
CN
China
Prior art keywords
work box
side wall
floating ball
lng
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811251047.XA
Other languages
Chinese (zh)
Inventor
赵卫东
林辉
张光明
郭俊鑫
王冠凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lian Heng Environmental Science And Technology Co Ltd
Original Assignee
Shandong Lian Heng Environmental Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Lian Heng Environmental Science And Technology Co Ltd filed Critical Shandong Lian Heng Environmental Science And Technology Co Ltd
Priority to CN201811251047.XA priority Critical patent/CN109538926A/en
Publication of CN109538926A publication Critical patent/CN109538926A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • F17C7/04Discharging liquefied gases with change of state, e.g. vaporisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/06Closures, e.g. cap, breakable member
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/10Arrangements for preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • F17C2225/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0316Water heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0323Heat exchange with the fluid by heating using another fluid in a closed loop
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0367Localisation of heat exchange
    • F17C2227/0388Localisation of heat exchange separate
    • F17C2227/0393Localisation of heat exchange separate using a vaporiser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/03Dealing with losses
    • F17C2260/031Dealing with losses due to heat transfer
    • F17C2260/032Avoiding freezing or defrosting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/033Treating the boil-off by recovery with cooling
    • F17C2265/034Treating the boil-off by recovery with cooling with condensing the gas phase

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to the technical fields of LNG memory attaching device to reduce pipeline strenuous vibration possibility more particularly to a kind of LNG supercharging equipment;A possibility that reducing pipeline frostbite;Including four groups of supporting legs and steam vaporizer, steam vaporizer is internally provided with heat exchanging chamber, steam vaporizer left side wall bottom end and right side wall top are provided with and respectively communicated with steam outlet pipe and steam inlet tube, steam vaporizer left side wall lower half region and right side wall upper half area are respectively arranged with left installing port and right installing port, and steam vaporizer is internally provided with coil pipe;It further include the first work box, the first floating ball, fixed pin, swingle, first movement bar, first connecting rod, support plate and rubber pad;It further include the second floating ball, third floating ball, spring, the second work box, the second mobile bar, the second connecting rod and chock plug, coil pipe output end lateral wall bottom end is provided with fluid hole, and the second work box is internally provided with the second working chamber.

Description

A kind of LNG supercharging equipment
Technical field
The present invention relates to the technical fields of LNG memory attaching device, more particularly to a kind of LNG supercharging equipment.
Background technique
It is well known that LNG supercharging equipment is a kind of for carrying out the dress of supplement pressure in LNG storing process to LNG storage tank It sets, is widely used in a variety of applications in the field of LNG storage;Existing LNG supercharging equipment includes four groups of supporting legs and steam vapour Change device, four groups of supporting leg tops are connect with steam vaporizer downside wall front left side, left rear side, forward right side and right lateral side respectively, steam Vaporizer is internally provided with heat exchanging chamber, and steam vaporizer left side wall top and right side wall bottom end are provided with and respectively communicated with steam outlet pipe And steam inlet tube, steam vaporizer left side wall lower half region and right side wall upper half area are respectively arranged with left installing port and right installation Mouthful, steam vaporizer is internally provided with coil pipe, coil pipe input terminal and the output end difference left installing port of hermetically passing and right installing port; Existing LNG supercharging equipment is in use, LNG storage tank stores a large amount of LNG, when LNG discharges, with continuously outflowing for LNG, LNG Liquid level constantly declines in storage tank, and gas-phase space constantly becomes larger, and four groups of supporting legs support steam vaporizer, steam inlet tube and outer Vapour source connection in boundary's is flowed out with the LNG heat exchange hand from LNG storage tank along steam outlet pipe, and LNG is flowed into along coil pipe input terminal and edge The outflow of coil pipe output end, LNG carry out heat exchange with steam during coil pipe internal flow, and LNG, which absorbs steam heat, becomes gas State NG, gaseous state NG return to LNG storage tank, so that LNG storage tank internal pressure increases, to reach required pressure;Existing LNG pressurization is set Found in standby use, steam, which carries out most of steam after heat exchange, becomes liquid water, but there are a small amount of steam, a small amount of steam with Liquid water, which flows out to steam outlet pipe, may result in pipeline strenuous vibration, and use reliability is lower;LNG gasification is incomplete, on a small quantity LNG liquid is flowed out with gaseous state NG, causes pipeline frostbite, thus make line clogging, it is higher using limitation.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of reduction pipeline strenuous vibration possibility, improve using reliable Property;A possibility that reducing pipeline frostbite, improve the LNG supercharging equipment of use reliability.
A kind of LNG supercharging equipment of the invention, including four groups of supporting legs and steam vaporizer, four groups of supporting leg tops respectively with steaming Vapour vaporizer downside wall front left side, left rear side, forward right side are connected with right lateral side, and steam vaporizer is internally provided with heat exchanging chamber, are steamed Vapour vaporizer left side wall bottom end and right side wall top are provided with and respectively communicated with steam outlet pipe and steam inlet tube, steam vaporizer left side Wall lower half region and right side wall upper half area are respectively arranged with left installing port and right installing port, and steam vaporizer is internally provided with disk Pipe, coil pipe input terminal and the output end difference left installing port of hermetically passing and right installing port;It further include the first work box, first floating Ball, fixed pin, swingle, first movement bar, first connecting rod, support plate and rubber pad, the first work box inside setting There is the first working chamber, the first work box side wall left area and downside wall middle section are provided with and respectively communicated with mobile mouth and upper Exhaust outlet, the steam vaporizer side wall left area are provided with and communicated with lower exhaust outlet, and lower exhaust outlet and upper exhaust ports are set It is equipped with exhaust pipe, exhaust pipe top and bottom end are sealingly mounted at exhaust outlet and lower exhaust ports respectively, before the first working chamber is interior Side wall and interior rear wall are respectively arranged with preceding placing groove and rear placing groove, and the first connecting rod left area is provided with the first rotation Turn hole, the fixed pin rear end pass through the first rotating hole, and fixed pin front-end and back-end be inserted into respectively preceding placing groove and after put It sets inside slot, first connecting rod right end is connect with first floating ball left end, and the first floating ball is internally provided with the first cavity, described Support plate right end is connect with the first work box right side wall lower half region, and the rubber pad bottom end is connect with support plate top, and first Floating ball top is contacted with rubber pad top left area, and first connecting rod left area is provided with the second rotating hole, and described first Mobile bar lower half region is provided with third rotating hole, and the rotation rod rear end passes through the second rotating hole and third rotating hole, mobile It is provided with annular groove on mouthful inner sidewall, is provided with O-ring on annular groove inner sidewall, first movement bar top passes through O-ring, and first Mobile bar lateral wall upper half area and O-ring inner sidewall are in close contact, and first movement bar is internally provided with discharge chamber, first movement Bar right side wall upper half area and middle section are provided with and respectively communicated with pressure stabilizing mouth and lower pressure stabilizing mouth, and upper pressure stabilizing mouth is located at the Outside one work box, lower pressure stabilizing mouth is located inside the first work box;It further include the second floating ball, third floating ball, spring, the second work Case, the second mobile bar, the second connecting rod and chock plug, the coil pipe output end lateral wall bottom end are provided with fluid hole, and described second Work box is internally provided with the second working chamber, and the second work box side wall and downside wall middle section are provided with and respectively communicated with out Liquid mouth and lower liquid outlet, the second work box end sealing are mounted at fluid hole, and the spring top and bottom end are respectively with second Downside wall middle section connects in connecting rod downside wall middle section and the second working chamber, and second mobile bar is located in spring Portion, and the second mobile bar top is connect with the second connecting rod downside wall, and the second connecting rod bottom end is connect with the chock plug top, Chock plug lateral wall lower half region is contacted with lower liquid outlet inner sidewall, and the second connection left end and right end are left with second floating ball respectively End is connected with third floating ball right end, is respectively arranged with the second cavity and third cavity inside the second floating ball and third floating ball.
A kind of LNG supercharging equipment of the invention, further includes first support bar, second support bar, fixed disk and three groups of flabellums, The first support bar bottom end is connect with the first work box side wall left area, the second support bar right side wall and first The connection of strut left side wall upper half area, the fixed disk right side wall middle section are provided with card holding trough, rolling are provided at card holding trough Pearl bearing, second support bar left end are inserted into inside ball bearing and are keyed with ball bearing, and three groups of flabellums are respectively mounted In fixed disk.
A kind of LNG supercharging equipment of the invention, further includes multiple groups ball, is provided with ring on the first rotating hole inner sidewall Most of region of shape slot, the multiple groups ball is respectively positioned in annular groove, and fixed pin lateral wall is contacted with multiple groups ball, the One connecting rod bottom end is provided with discharge orifice, and discharge orifice is connected to annular groove.
A kind of LNG supercharging equipment of the invention further includes front limit plate and rear position margining plate, the swingle front-end and back-end It is connect respectively with front limit plate rear wall and rear position margining plate front side wall middle section.
A kind of LNG supercharging equipment of the invention, the lower liquid outlet and chock plug longitudinal direction interface shape are isosceles trapezoid.
A kind of LNG supercharging equipment of the invention, further includes third work box, and the third work box is internally provided with third Working chamber, third work box side wall and downside wall are provided with and respectively communicated with fixing port and refluxing opening, third work box sealing peace At fluid hole, and the second work box is located inside third work box, and return pipe, return pipe are provided at the refluxing opening Input terminal is sealingly mounted at lower liquid outlet.
A kind of LNG supercharging equipment of the invention further includes multiple groups deflector, and multiple groups deflector top is and in coil pipe Top connection.
A kind of LNG supercharging equipment of the invention is provided with sealing shroud outside the chock plug.
A kind of LNG supercharging equipment of the invention further includes four groups of rubber blocks, four groups of rubber block tops with four groups of branch The connection of leg bottom end.
Compared with prior art the invention has the benefit that the first work box has been connected to by exhaust pipe with steam vaporizer Come, since vapour density is less than the density of water, so that steam swims in the top of steam vaporizer, the water edge in steam vaporizer Lower exhaust pipe enters inside the first work box, when anhydrous inside the first work box, the first floating ball bottom end and rubber pad tip contact, Support plate supports rubber pad and the first floating ball, it is hindered to move down, and fixed pin passes through first connecting rod and fixation Pin front-end and back-end are inserted into respectively inside preceding placing groove and rear placing groove, so that first connecting rod can turn by axis of fixed pin Dynamic, swingle passes through first connecting rod and first movement bar, and first movement bar and first connecting rod can be using swingles as axis Rotation, first movement bar top passes through mobile mouth and first movement bar lateral wall and O-ring are in close contact, and prevents the first work Leaked water inside case, upper pressure stabilizing mouth and lower pressure stabilizing mouth are located at the first work box outwardly and inwardly, and external environment passes through at this time Be connected to inside upper pressure stabilizing mouth and lower pressure stabilizing mouth and the first work box, when water and steam enter inside the first work box, first is floated When the upward power that ball is subject to is greater than the downward power being subject to, the first floating ball is moved up, after rising to certain position, upper pressure stabilizing Mouth and lower pressure stabilizing mouth are in inside the first work box, and the first work box is more difficult at this time is in communication with the outside, when in the first work box When the pressure that top is subject to is sufficiently large, water does not enter back into the first work box, and steam can also enter in the first work box along exhaust pipe Top, and air is filled with inside the first floating ball, so that the first floating ball swims in water surface always, steam is in the first work box Internal constantly accumulation, declines water level constantly, so that the first float position declines, when upper pressure stabilizing mouth is located at outside the first work box When, it is connected to outside external environment and the first work box again, so that the first work box steam inside is along lower pressure stabilizing mouth and upper pressure stabilizing Mouth is expelled to outdoor, and after the first work box internal pressure reduces, water level rises again, and the first floating ball is driven to rise, and makes the again One work box and extraneous disconnection, repeat the above process, and the steam in water is expelled to outdoor, and reducing pipeline strenuous vibration may Property, improve use reliability;It is filled with air inside second floating ball and third floating ball, the second connecting rod is by the second floating ball and the Three floating balls connect, and a small amount of LNG of coil pipe output end is flowed into inside the second work box along fluid hole, and in the second work box Internal constantly accumulation, if LNG amount is less, when not touching the second floating ball and third floating ball enough, LNG, which can voluntarily volatilize, becomes gas State NG, when LNG liquid level touches the second floating ball and third floating ball and constantly rises, inside the second floating ball and third floating ball A possibility that filled with air, spring force coefficient is larger, reduces lower liquid outlet leakage goes out down when spring moves up Liquid mouth is opened, so that LNG stream goes out outside the second work box, and due to the barrier action of LNG, gaseous state NG is more difficult along lower liquid out Mouth is detached from the second work box, when the second work box LNG liquid level declines, thus the second floating ball and the decline of third floating ball, final chock plug A possibility that lower liquid outlet is blocked, is repeated the above process, pipeline frostbite is reduced improves use reliability.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the partial enlarged view in the portion A in Fig. 1;
Fig. 3 is the partial enlarged view in the portion B in Fig. 1;
Fig. 4 is the partial enlarged view in the portion C in Fig. 1;
It is attached marked in the figure: 1, supporting leg;2, steam vaporizer;3, steam outlet pipe;4, steam inlet tube;5, coil pipe;6, the first work Make case;7, the first floating ball;8, fixed pin;9, swingle;10, first movement bar;11, first connecting rod;12, support plate;13, rubber Rubber mat;14, exhaust pipe;15, O-ring;16, the second floating ball;17, third floating ball;18, spring;19, the second work box;20, second Mobile bar;21, the second connecting rod;22, chock plug;23, first support bar;24, second support bar;25, fixed disk;26, flabellum; 27, ball;28, front limit plate;29, third work box;30, return pipe;31, deflector;32, sealing shroud;33, rubber block;34, Ball bearing.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
As shown in Figures 1 to 4, a kind of LNG supercharging equipment of the invention, including four groups of supporting legs 1 and steam vaporizer 2, four Group 1 top of supporting leg is connect with 2 downside wall front left side of steam vaporizer, left rear side, forward right side and right lateral side respectively, steam vaporizer 2 are internally provided with heat exchanging chamber, and 2 left side wall bottom end of steam vaporizer and right side wall top are provided with and respectively communicated with 3 He of steam outlet pipe Steam inlet tube 4,2 left side wall lower half region of steam vaporizer and right side wall upper half area are respectively arranged with left installing port and right installation Mouthful, steam vaporizer 2 is internally provided with coil pipe 5,5 input terminal of coil pipe and the output end difference left installing port of hermetically passing and right installation Mouthful;It further include the first work box 6, the first floating ball 7, fixed pin 8, swingle 9, first movement bar 10, first connecting rod 11, support Plate 12 and rubber pad 13, the first work box 6 are internally provided with the first working chamber, 6 side wall left area of the first work box and bottom Side wall centers region is provided with and respectively communicated with mobile mouth and upper exhaust outlet, the connection setting of 2 side wall left area of steam vaporizer There is lower exhaust outlet, lower exhaust outlet and upper exhaust ports are provided with exhaust pipe 14, and 14 top of exhaust pipe and bottom end seal installation respectively Front side wall and interior rear wall are respectively arranged with preceding placing groove and rear placement in upper exhaust outlet and lower exhaust ports, the first working chamber Slot, 11 left area of first connecting rod are provided with the first rotating hole, and 8 rear end of fixed pin passes through the first rotating hole, and fixed pin 8 Front-end and back-end are inserted into respectively inside preceding placing groove and rear placing groove, and 11 right end of first connecting rod is connect with 7 left end of the first floating ball, First floating ball 7 is internally provided with the first cavity, and 12 right end of support plate is connect with 6 right side wall lower half region of the first work box, rubber It pads 13 bottom ends to connect with 12 top of support plate, 7 top of the first floating ball is contacted with 13 top left area of rubber pad, first connecting rod 11 left area are provided with the second rotating hole, and 10 lower half region of first movement bar is provided with third rotating hole, and 9 rear end of swingle is worn The second rotating hole and third rotating hole are crossed, annular groove is provided on mobile mouth inner sidewall, is provided with O-ring on annular groove inner sidewall 15,10 top of first movement bar passes through O-ring 15, and 10 lateral wall upper half area of first movement bar and 15 inner sidewall of O-ring are close Contact, first movement bar 10 are internally provided with discharge chamber, and 10 right side wall upper half area of first movement bar and middle section connect respectively It is logical to be provided with pressure stabilizing mouth and lower pressure stabilizing mouth, and upper pressure stabilizing mouth is located at outside the first work box 6, and lower pressure stabilizing mouth is located at the first work Make inside case 6;It further include the second floating ball 16, third floating ball 17, spring 18, the second work box 19, the second mobile bar 20, second company Extension bar 21 and chock plug 22,5 output end lateral wall bottom end of coil pipe are provided with fluid hole, and the second work box 19 is internally provided with the second work Make chamber, 19 side wall of the second work box and downside wall middle section are provided with and respectively communicated with upper liquid outlet and lower liquid outlet, and second 19 end sealing of work box is mounted at fluid hole, 18 top of spring and bottom end respectively with 21 downside wall central area of the second connecting rod Domain is connected with downside wall middle section in the second working chamber, and the second mobile bar 20 is located inside spring 18, and the second mobile bar 20 tops are connect with 21 downside wall of the second connecting rod, and 21 bottom end of the second connecting rod is connect with 22 top of chock plug, 22 lateral wall of chock plug Lower half region is contacted with lower liquid outlet inner sidewall, second connection left end and right end respectively with 16 left end of the second floating ball and third floating ball 17 right ends connect, and are respectively arranged with the second cavity and third cavity inside the second floating ball 16 and third floating ball 17;Exhaust pipe is by One work box is connected to steam vaporizer, since vapour density is less than the density of water, so that steam swims in steam vaporization The top of device, the water in steam vaporizer enters inside the first work box along lower exhaust pipe, when anhydrous inside the first work box, the One floating ball bottom end and rubber pad tip contact, support plate support rubber pad and the first floating ball, it is hindered to move down, Gu Rationed marketing passes through first connecting rod and fixed pin front-end and back-end are inserted into respectively inside preceding placing groove and rear placing groove, thus first Connecting rod can be rotated by axis of fixed pin, and swingle passes through first connecting rod and first movement bar, first movement bar and first Connecting rod can be rotated by axis of swingle, and first movement bar top is across mobile mouth and first movement bar lateral wall and O Shape circle is in close contact, and prevents leaked water inside the first work box, upper pressure stabilizing mouth and lower pressure stabilizing mouth are located at outside the first work box Portion and inside, external environment is inside upper pressure stabilizing mouth and lower pressure stabilizing mouth and the first work box by being connected at this time, when water and steam into When entering inside the first work box, when the upward power that the first floating ball is subject to is greater than the downward power being subject to, the first floating ball is to moving up Dynamic, after rising to certain position, upper pressure stabilizing mouth and lower pressure stabilizing mouth are in inside the first work box, and the first work box is more difficult at this time It is in communication with the outside, when the pressure that the first work box inner top is subject to is sufficiently large, water does not enter back into the first work box, and steam can also Enter top in the first work box along exhaust pipe, and be filled with air inside the first floating ball, so that the first floating ball floats always In water surface, steam is constantly accumulated inside the first work box, declines water level constantly, so that the first float position declines, when When upper pressure stabilizing mouth is located at outside the first work box, it is connected to again outside external environment and the first work box, thus the first work box Steam inside is expelled to outdoor along lower pressure stabilizing mouth and upper pressure stabilizing mouth, and after the first work box internal pressure reduces, water level rises again, It drives the first floating ball to rise, makes the first work box and extraneous disconnection again, repeat the above process, the steam in water is expelled to room Outside, pipeline strenuous vibration possibility is reduced, use reliability is improved;Air is filled with inside second floating ball and third floating ball, Second connecting rod connects the second floating ball and third floating ball, and a small amount of LNG of coil pipe output end flows into the second work along fluid hole Make inside case, and constantly accumulated inside the second work box, if LNG amount is less, does not touch the second floating ball and third enough When floating ball, LNG, which can voluntarily volatilize, becomes gaseous state NG, when LNG liquid level touches the second floating ball and third floating ball and constantly rises, Due to inside the second floating ball and third floating ball be filled with air, spring force coefficient is larger, reduce lower liquid outlet leakage can Energy property, when spring moves up, lower liquid outlet is opened, so that LNG stream goes out outside the second work box, and due to LNG's Barrier action, gaseous state NG is more difficult to be detached from the second work box along lower liquid outlet, when the second work box LNG liquid level declines, thus second A possibility that floating ball and decline of third floating ball, lower liquid outlet is blocked, repeated the above process, reduces pipeline frostbite by final chock plug, Improve use reliability.
A kind of LNG supercharging equipment of the invention further includes first support bar 23, second support bar 24, fixed disk 25 and three Group flabellum 26,23 bottom end of first support bar connect with 6 side wall left area of the first work box, 24 right side wall of second support bar and The connection of 23 left side wall upper half area of first support bar, 25 right side wall middle section of fixed disk are provided with card holding trough, set at card holding trough It is equipped with ball bearing 34,24 left end of second support bar is inserted into 34 inside of ball bearing and is keyed with ball bearing 34, three groups Flabellum 26 is installed in fixed disk 25;Three groups of flabellums are respectively positioned on the right side of pressure stabilizing mouth, and three groups of flabellums tilt installation, the One support rod supports second support bar, and second support bar is inserted into inside ball bearing, thus fixed disk and three groups of flabellums It can be rotated by axis of second support bar, steam drives three groups of flabellum flowings after the outflow of upper pressure stabilizing mouth, and user observes Three groups of flabellum rotations, to be user-friendly for adjusting.
A kind of LNG supercharging equipment of the invention further includes multiple groups ball 27, is provided with annular on the first rotating hole inner sidewall Most of region of slot, multiple groups ball 27 is respectively positioned in annular groove, and 8 lateral wall of fixed pin is contacted with multiple groups ball 27, the One connecting rod, 11 bottom end is provided with discharge orifice, and discharge orifice is connected to annular groove;Multiple groups ball improves the steady of first connecting rod rotation Qualitative, when having water on multiple groups ball lateral wall, water is detached from multiple groups ball along discharge orifice.
A kind of LNG supercharging equipment of the invention further includes front limit plate 28 and rear position margining plate, 9 front-end and back-end of swingle It is connect respectively with 28 rear wall of front limit plate and rear position margining plate front side wall middle section;Front limit plate and rear position margining plate hinder rotation Bar is detached from first movement bar and first connecting rod.
A kind of LNG supercharging equipment of the invention, lower liquid outlet and the longitudinal interface shape of chock plug 22 are isosceles trapezoid;Go out down Liquid mouth and chock plug longitudinal direction interface shape are isosceles trapezoid, convenient to carry out flow control to lower liquid outlet.
A kind of LNG supercharging equipment of the invention, further includes third work box 29, and third work box 29 is internally provided with third Working chamber, 29 side wall of third work box and downside wall are provided with and respectively communicated with fixing port and refluxing opening, and third work box 29 is close Envelope is mounted at fluid hole, and the second work box 19 is located inside third work box 29, and return pipe 30 is provided at refluxing opening, 30 input terminal of return pipe is sealingly mounted at lower liquid outlet;Cooling device is provided with outside third work box and outside return pipe And Cold-keeping Layer, return pipe output end are connected to LNG storage tank, LNG stream flow to LNG storage tank after going out, and reduces the loss of LNG.
A kind of LNG supercharging equipment of the invention, further includes multiple groups deflector 31,31 top of multiple groups deflector with coil pipe 5 Interior top connection;Multiple groups deflector increases less turbulence of the LNG in coil pipe internal flow, improves the heat exchange efficiency with steam.
A kind of LNG supercharging equipment of the invention is provided with sealing shroud 32 outside chock plug 22;Sealing shroud improve chock plug and it is lower go out The tightness of liquid mouth reduces a possibility that LNG is revealed when chock plug is not switched on.
A kind of LNG supercharging equipment of the invention, further includes four groups of rubber blocks 33, four groups of 33 tops of rubber block with four groups of branch The connection of 1 bottom end of leg;Rubber block has certain elasticity, improves the damping effect of steam vaporizer.
A kind of LNG supercharging equipment of the invention, LNG storage tank store a large amount of LNG, continuous with LNG when LNG discharges It flows out, liquid level constantly declines in LNG storage tank, and gas-phase space constantly becomes larger, and four groups of supporting legs support steam vaporizer, steam Inlet pipe is connected to extraneous vapour source, is flowed out with the LNG heat exchange hand from LNG storage tank along steam outlet pipe, LNG is along coil pipe input terminal stream Enter and flowed out along coil pipe output end, LNG carries out heat exchange during coil pipe internal flow with steam, and LNG absorbs steam heat Quantitative change is gaseous state NG, and gaseous state NG returns to LNG storage tank, so that LNG storage tank internal pressure increases, to reach required pressure, exhaust pipe First work box is connected to steam vaporizer, since vapour density is less than the density of water, so that steam swims in steam The top of vaporizer, the water in steam vaporizer enters inside the first work box along lower exhaust pipe, anhydrous inside the first work box When, the first floating ball bottom end and rubber pad tip contact, support plate support rubber pad and the first floating ball, hinder it to moving down Dynamic, fixed pin passes through first connecting rod and fixed pin front-end and back-end are inserted into respectively inside preceding placing groove and rear placing groove, from And first connecting rod can be rotated using fixed pin as axis, multiple groups ball improves the stability of first connecting rod rotation, when multiple groups are rolled When having water on pearl lateral wall, water along discharge orifice be detached from multiple groups ball, swingle pass through first connecting rod and first movement bar, first Mobile bar and first connecting rod can be rotated by axis of swingle, and front limit plate and rear position margining plate hinder swingle to be detached from first Mobile bar and first connecting rod, first movement bar top passes through mobile mouth and first movement bar lateral wall closely connects with O-ring Touching prevents leaked water inside the first work box, and upper pressure stabilizing mouth and lower pressure stabilizing mouth are located at the first work box outwardly and inwardly, this When external environment by be connected to inside upper pressure stabilizing mouth and lower pressure stabilizing mouth and the first work box, when water and steam are into the first work box When internal, when the upward power that the first floating ball is subject to is greater than the downward power being subject to, the first floating ball is moved up, and is risen to certain Behind position, upper pressure stabilizing mouth and lower pressure stabilizing mouth are in inside the first work box, and the first work box is more difficult at this time is in communication with the outside, when When the pressure that first work box inner top is subject to is sufficiently large, water does not enter back into the first work box, and steam can also enter along exhaust pipe Top in first work box, and air is filled with inside the first floating ball, so that the first floating ball swims in water surface, steam always It is constantly accumulated inside the first work box, declines water level constantly, so that the first float position declines, when upper pressure stabilizing mouth is located at the It when outside one work box, is connected to again outside external environment and the first work box, so that the first work box steam inside is along lower steady Pressure mouth and upper pressure stabilizing mouth are expelled to outdoor, and three groups of flabellums are respectively positioned on the right side of pressure stabilizing mouth, and three groups of flabellums tilt installation, the One support rod supports second support bar, and second support bar is inserted into inside ball bearing, thus fixed disk and three groups of flabellums It can be rotated by axis of second support bar, steam drives three groups of flabellum flowings after the outflow of upper pressure stabilizing mouth, and user observes Three groups of flabellum rotations, to be user-friendly for adjusting, after the first work box internal pressure reduces, water level rises again, band Dynamic first floating ball rises, and makes the first work box and extraneous disconnection again, repeats the above process, the steam in water is expelled to room Outside, it being filled with air inside the second floating ball and third floating ball, the second connecting rod connects the second floating ball and third floating ball, The a small amount of LNG of coil pipe output end is flowed into inside the second work box along fluid hole, and is constantly accumulated inside the second work box, if LNG amount is less, and when not touching the second floating ball and third floating ball enough, LNG, which can voluntarily volatilize, becomes gaseous state NG, when LNG liquid level When touching the second floating ball and third floating ball and constantly rising, due to being filled with air inside the second floating ball and third floating ball, A possibility that spring force coefficient is larger, reduces lower liquid outlet leakage, when spring moves up, lower liquid outlet is opened, from And LNG stream goes out outside the second work box, and due to the barrier action of LNG, gaseous state NG is more difficult to be detached from the second work along lower liquid outlet Make case, when the second work box LNG liquid level declines, so that the second floating ball and the decline of third floating ball, final chock plug block up lower liquid outlet Firmly, lower liquid outlet and chock plug longitudinal direction interface shape are isosceles trapezoid, convenient to carry out flow control, third work to lower liquid outlet It is provided with cooling device and Cold-keeping Layer outside case and outside return pipe, return pipe output end is connected to LNG storage tank, and LNG stream goes out After flow to LNG storage tank, reduce the loss of LNG, multiple groups deflector increases less turbulence of the LNG in coil pipe internal flow, improves With the heat exchange efficiency of steam, sealing shroud improves the tightness of chock plug and lower liquid outlet, and LNG leakage can when reduction chock plug is not switched on Energy property, rubber block have certain elasticity, improve the damping effect of steam vaporizer.
Term as used herein "vertical", "horizontal", "left" and "right" and similar statement simply to illustrate that Purpose.Heretofore described " first ", " second ", " third " and similar statement do not represent specific quantity and sequence, It is only used for the differentiation of title.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvements and modifications, these improvements and modifications can also be made Also it should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of LNG supercharging equipment, including four groups of supporting legs (1) and steam vaporizer (2), four groups of supporting leg (1) tops respectively with steaming Vapour vaporizer (2) downside wall front left side, left rear side, forward right side are connected with right lateral side, and steam vaporizer (2) is internally provided with heat exchange Chamber, steam vaporizer (2) left side wall bottom end and right side wall top are provided with and respectively communicated with steam outlet pipe (3) and steam inlet tube (4), Steam vaporizer (2) left side wall lower half region and right side wall upper half area are respectively arranged with left installing port and right installing port, steam Vaporizer (2) is internally provided with coil pipe (5), and coil pipe (5) input terminal and output end distinguish the left installing port of hermetically passing and right installation Mouthful;It is characterized in that, further including the first work box (6), the first floating ball (7), fixed pin (8), swingle (9), first movement bar (10), first connecting rod (11), support plate (12) and rubber pad (13), first work box (6) are internally provided with the first work Make chamber, the first work box (6) side wall left area and downside wall middle section are provided with and respectively communicated with mobile mouth and upper exhaust Mouthful, steam vaporizer (2) the side wall left area is provided with and communicated with lower exhaust outlet, lower exhaust outlet and the setting of upper exhaust ports Have exhaust pipe (14), exhaust pipe (14) top and bottom end are sealingly mounted at exhaust outlet and lower exhaust ports, the first work respectively Intracavitary front side wall and interior rear wall are respectively arranged with preceding placing groove and rear placing groove, and first connecting rod (11) left area is set It is equipped with the first rotating hole, fixed pin (8) rear end passes through the first rotating hole, and fixed pin (8) front-end and back-end are inserted respectively Enter inside preceding placing groove and rear placing groove, first connecting rod (11) right end is connect with the first floating ball (7) left end, the first floating ball (7) it is internally provided with the first cavity, support plate (12) right end is connect with the first work box (6) right side wall lower half region, institute It states rubber pad (13) bottom end to connect with support plate (12) top, the first floating ball (7) top and rubber pad (13) top left area Contact, first connecting rod (11) left area are provided with the second rotating hole, and first movement bar (10) the lower half region is provided with Third rotating hole, swingle (9) rear end pass through the second rotating hole and third rotating hole, are provided with ring on mobile mouth inner sidewall Shape slot is provided with O-ring (15) on annular groove inner sidewall, and first movement bar (10) top passes through O-ring (15), first movement bar (10) lateral wall upper half area and O-ring (15) inner sidewall are in close contact, and first movement bar (10) is internally provided with discharge chamber, the One mobile bar (10) right side wall upper half area and middle section are provided with and respectively communicated with pressure stabilizing mouth and lower pressure stabilizing mouth, and upper steady Pressure mouth is located at the first work box (6) outside, and it is internal that lower pressure stabilizing mouth is located at the first work box (6);It further include the second floating ball (16), Three floating balls (17), spring (18), the second work box (19), the second mobile bar (20), the second connecting rod (21) and chock plug (22), institute It states coil pipe (5) output end lateral wall bottom end and is provided with fluid hole, second work box (19) is internally provided with the second working chamber, Second work box (19) side wall and downside wall middle section are provided with and respectively communicated with upper liquid outlet and lower liquid outlet, the second work Case (19) end sealing is mounted at fluid hole, spring (18) top and bottom end respectively with the second connecting rod (21) downside wall Downside wall middle section connects in middle section and the second working chamber, and second mobile bar (20) is located at spring (18) inside, And the second mobile bar (20) top is connect with the second connecting rod (21) downside wall, the second connecting rod (21) bottom end and the chock plug (22) top connects, and chock plug (22) lateral wall lower half region is contacted with lower liquid outlet inner sidewall, the second connection left end and right end point It is not connect with the second floating ball (16) left end and third floating ball (17) right end, the second floating ball (16) and third floating ball (17) are internal It is respectively arranged with the second cavity and third cavity.
2. a kind of LNG supercharging equipment as described in claim 1, which is characterized in that further include first support bar (23), second Strut (24), fixed disk (25) and three groups of flabellums (26), first support bar (23) bottom end and the first work box (6) side wall Left area connection, second support bar (24) right side wall is connect with first support bar (23) left side wall upper half area, described Fixed disk (25) right side wall middle section is provided with card holding trough, and ball bearing (34), second support bar are provided at card holding trough (24) left end insertion ball bearing (34) is internal and is keyed with ball bearing (34), and three groups of flabellums (26) are installed in In fixed disk (25).
3. a kind of LNG supercharging equipment as claimed in claim 2, which is characterized in that it further include multiple groups ball (27), described first Annular groove is provided on rotating hole inner sidewall, most of region of the multiple groups ball (27) is respectively positioned in annular groove, and solid Rationed marketing (8) lateral wall is contacted with multiple groups ball (27), and first connecting rod (11) bottom end is provided with discharge orifice, discharge orifice and annular groove Connection.
4. a kind of LNG supercharging equipment as claimed in claim 3, which is characterized in that further include front limit plate (28) and rear limit Plate, swingle (9) front-end and back-end connect with front limit plate (28) rear wall and rear position margining plate front side wall middle section respectively It connects.
5. a kind of LNG supercharging equipment as claimed in claim 4, which is characterized in that the lower liquid outlet and chock plug (22) are longitudinal Interface shape is isosceles trapezoid.
6. a kind of LNG supercharging equipment as claimed in claim 5, which is characterized in that it further include third work box (29), described the Three work boxs (29) are internally provided with third working chamber, and third work box (29) side wall and downside wall are provided with and respectively communicated with solid Determine mouth and refluxing opening, third work box (29) is sealingly mounted at fluid hole, and the second work box (19) is located at third work Case (29) is internal, is provided with return pipe (30) at the refluxing opening, return pipe (30) input terminal is sealingly mounted at lower liquid outlet.
7. a kind of LNG supercharging equipment as claimed in claim 6, which is characterized in that it further include multiple groups deflector (31), it is described more Group deflector (31) top is connect with coil pipe (5) interior top.
8. a kind of LNG supercharging equipment as claimed in claim 7, which is characterized in that be provided with sealing outside the chock plug (22) It covers (32).
9. a kind of LNG supercharging equipment as claimed in claim 8, which is characterized in that it further include four groups of rubber blocks (33), described four Group rubber block (33) top is connect with four groups of supporting leg (1) bottom ends.
CN201811251047.XA 2018-10-25 2018-10-25 A kind of LNG supercharging equipment Pending CN109538926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811251047.XA CN109538926A (en) 2018-10-25 2018-10-25 A kind of LNG supercharging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811251047.XA CN109538926A (en) 2018-10-25 2018-10-25 A kind of LNG supercharging equipment

Publications (1)

Publication Number Publication Date
CN109538926A true CN109538926A (en) 2019-03-29

Family

ID=65845501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811251047.XA Pending CN109538926A (en) 2018-10-25 2018-10-25 A kind of LNG supercharging equipment

Country Status (1)

Country Link
CN (1) CN109538926A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2713282Y (en) * 2004-07-13 2005-07-27 洪有福 Cylindrical ball float drain valve
JP2014134266A (en) * 2013-01-11 2014-07-24 Tlv Co Ltd Float type drain trap
CN204629074U (en) * 2015-03-27 2015-09-09 张家港市骏马钢帘线有限公司 A kind of steam condensate recovering device
CN205477910U (en) * 2016-02-04 2016-08-17 潍柴动力股份有限公司 Intercooler comdenstion water hydrophobic means
US20160319994A1 (en) * 2015-04-30 2016-11-03 Eastern Machine, Inc. Tee-tube pressure vessel
CN205877372U (en) * 2016-06-21 2017-01-11 九通集团有限公司 Combined type exhaust valve
CN205877319U (en) * 2016-06-21 2017-01-11 九通集团有限公司 Combined type exhaust valve
CN106382451A (en) * 2016-10-27 2017-02-08 中国能源建设集团广东省电力设计研究院有限公司 Floating ball type automatic drainer with improved structure
CN206369489U (en) * 2016-12-30 2017-08-01 江苏中伟机械制造有限公司 The heat exchanger of indirect steam
CN207196065U (en) * 2017-09-30 2018-04-06 孙悄愿 A kind of draining apparatus for steam conduit
CN207514354U (en) * 2017-10-26 2018-06-19 良名阀门科技有限公司 A kind of NEW TYPE OF COMPOSITE lever automatic exhaust steam valve
CN207880443U (en) * 2018-02-08 2018-09-18 天津昱丞高科工程设计有限公司 Horizontal steam heat-exchanging LNG gasification device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2713282Y (en) * 2004-07-13 2005-07-27 洪有福 Cylindrical ball float drain valve
JP2014134266A (en) * 2013-01-11 2014-07-24 Tlv Co Ltd Float type drain trap
CN204629074U (en) * 2015-03-27 2015-09-09 张家港市骏马钢帘线有限公司 A kind of steam condensate recovering device
US20160319994A1 (en) * 2015-04-30 2016-11-03 Eastern Machine, Inc. Tee-tube pressure vessel
CN205477910U (en) * 2016-02-04 2016-08-17 潍柴动力股份有限公司 Intercooler comdenstion water hydrophobic means
CN205877372U (en) * 2016-06-21 2017-01-11 九通集团有限公司 Combined type exhaust valve
CN205877319U (en) * 2016-06-21 2017-01-11 九通集团有限公司 Combined type exhaust valve
CN106382451A (en) * 2016-10-27 2017-02-08 中国能源建设集团广东省电力设计研究院有限公司 Floating ball type automatic drainer with improved structure
CN206369489U (en) * 2016-12-30 2017-08-01 江苏中伟机械制造有限公司 The heat exchanger of indirect steam
CN207196065U (en) * 2017-09-30 2018-04-06 孙悄愿 A kind of draining apparatus for steam conduit
CN207514354U (en) * 2017-10-26 2018-06-19 良名阀门科技有限公司 A kind of NEW TYPE OF COMPOSITE lever automatic exhaust steam valve
CN207880443U (en) * 2018-02-08 2018-09-18 天津昱丞高科工程设计有限公司 Horizontal steam heat-exchanging LNG gasification device

Similar Documents

Publication Publication Date Title
CN101646877B (en) Level compensator having vacuum pump therein
CN108125634A (en) Sweeping robot automatic watering drainage arrangement
CN106481867B (en) A kind of automatic water-feeding device and upper water-adding humidifier
CN201440018U (en) Flash evaporator and enthalpy spraying system adopting same
CN109538926A (en) A kind of LNG supercharging equipment
CN109114724A (en) A kind of upper plus water humidifier water-level control apparatus
CN208968105U (en) Two-way liquid storage device and heat pump system
CN2495889Y (en) Diluted oil sealing and dry type coal gas chamber
CN208435504U (en) Sweeping robot automatically adds water drainage arrangement
CN209667706U (en) Device for storing liquid and flavoring machine with it
CN205686911U (en) A kind of opposite opened basin
CN110301817A (en) A kind of water bottle connector
CN209509070U (en) A kind of expansible multipurpose water tank
CN209668748U (en) A kind of vacuum pumping device
CN208475604U (en) A kind of annular microchannel dehumidifying heat pipe
CN208604689U (en) A kind of non-negative pressure method of water supply device with energy storage vacuum compensation function
CN106037475A (en) Pipeline machine
CN211779267U (en) High-low pressure bypass regulating valve with high leakage-proof performance
CN103127784B (en) Filter of carbon dioxide heat pump system
CN206404943U (en) A kind of spray equipment of numerical control cutting liquid
CN208860443U (en) A kind of non-contact liquid level monitoring liquid gas cylinder
CN209041192U (en) It is a kind of to facilitate the siphon pipe for adjusting bending angle
CN216976775U (en) Linear planar mounting structure for water replenishing pump of gas steam boiler
CN216703799U (en) Dust device for building engineering
CN209519147U (en) A kind of medical treatment department of general surgery hepatobiliary drainage device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329

RJ01 Rejection of invention patent application after publication