CN109538517A - A kind of fan of the dual control storage equipment during power down of shutting down surely controls method and device - Google Patents

A kind of fan of the dual control storage equipment during power down of shutting down surely controls method and device Download PDF

Info

Publication number
CN109538517A
CN109538517A CN201811383893.7A CN201811383893A CN109538517A CN 109538517 A CN109538517 A CN 109538517A CN 201811383893 A CN201811383893 A CN 201811383893A CN 109538517 A CN109538517 A CN 109538517A
Authority
CN
China
Prior art keywords
control
fan
power down
control mainboard
driving signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811383893.7A
Other languages
Chinese (zh)
Other versions
CN109538517B (en
Inventor
刘帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201811383893.7A priority Critical patent/CN109538517B/en
Publication of CN109538517A publication Critical patent/CN109538517A/en
Application granted granted Critical
Publication of CN109538517B publication Critical patent/CN109538517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/004Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids by varying driving speed
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/20Cooling means
    • G06F1/206Cooling means comprising thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

This application discloses a kind of fan of dual control storage equipment during power down of shutting down surely to control method, apparatus, device and computer readable storage medium, it include: the motherboard power supply status signal and the first fan driving signal for receiving the hardware monitoring chip in the first control mainboard and sending, the first fan driving signal is generated by hardware monitoring chip according to the fan speed-regulating signal that BMC is sent;Judge whether the first control mainboard shuts down power down;The power down if so, whether the second control mainboard of detection shuts down;The power down if the second control mainboard is not shut down, intercepts the first fan driving signal, generates and exports the second fan driving signal of overall height level to line and logical device, to control fan running by the BMC of the second control mainboard.The application is directed to the control mainboard of shutdown power down, replaces BMC to supervise the control to rotation speed of the fan using the control device of shutdown not power down, avoids the unstability for causing fan control because of BMC shutdown power down, improves user experience.

Description

A kind of fan of the dual control storage equipment during power down of shutting down surely controls method and device
Technical field
This application involves storage technical field of heat dissipation, in particular to wind of a kind of dual control storage equipment during power down of shutting down The steady control method, apparatus of fan, device and computer readable storage medium.
Background technique
The proper heat reduction of storage equipment is the essential condition that safeguards system operates normally.It is set especially for dual control storage It is standby, that is, have for the storage equipment there are two control mainboard, since its power dissipation ratio single control storage equipment is high, heat dissipation problem It is even more most important.In the prior art, as shown in Figure 1, being usually by the BMC (Baseboard in control mainboard Management Controller, baseboard management controller) fan fortune is controlled by hardware monitoring chip (HW monitor) Turn.The fan speed-regulating signal that hardware monitoring chip can be exported according to BMC by I2C bus generates corresponding driving signal to drive Dynamic fan running.But since during storage equipment shutdown power down, the unstable state before power down is led to wind by BMC The control unstability for fanning revolving speed, enables the revolving speed of fan fluctuated, reduces the comprehensive performance of system, bring to user bad User experience.It can be seen that providing a kind of solution to the problems described above is that those skilled in the art need concern.
Summary of the invention
The application's is designed to provide fan steady prosecutor method and dress of a kind of dual control storage equipment during power down of shutting down It sets, to ensure the stable operation of fan during equipment shuts down power down, improves system radiating performance and avoid fan unstable Noise jamming when running surely.Its concrete scheme is as follows:
In a first aspect, the steady prosecutor method of fan this application provides a kind of dual control storage equipment during power down of shutting down, institute Stating dual control storage equipment includes two control mainboards, includes the hardware monitoring chip and controller of connection in each control mainboard Part, the control device are shutdown not power down device, and the output end of two control devices is connect by line with logical device To the driving end of the fan of dual control storage equipment, the steady prosecutor method of fan is applied to the control in the first control mainboard Device processed, comprising:
Receive the motherboard power supply status signal and first that the hardware monitoring chip in first control mainboard is sent Fan driving signal, the fan speed-regulating signal that first fan driving signal is sent by the hardware monitoring chip according to BMC It generates;
Judge whether first control mainboard shuts down power down;
The power down if so, whether the second control mainboard of detection shuts down;
The power down if second control mainboard is not shut down, intercepts first fan driving signal, generates and export Second fan driving signal of overall height level is to the line and logical device, to be controlled by the BMC of second control mainboard The fan running.
Optionally, judge whether first control mainboard shuts down after power down described, further includes:
If it is not, then first fan driving signal is exported to the line and logical device, to be controlled by described first The BMC of mainboard processed controls the fan running.
Optionally, after whether the second control mainboard of the detection shuts down power down, further includes:
The power down if second control mainboard is shut down judges whether first control mainboard is default master control borad;
If so, intercepting the first fan driving signal, generates the second fan that PWM duty cycle is default value and drive letter Number, and export to the line and logical device, it is operated to control the fan with preset rotation speed.
Optionally, the default value is 20%.
Optionally, it is described judge whether first control mainboard is default master control borad after, further includes:
If it is not, then intercept the first fan driving signal, generates and export the second fan driving signal of overall height level to institute Line and logical device are stated, to control the fan running by the control device of second control mainboard.
Optionally, the control device is CPLD or FPGA.
Second aspect, this application discloses a kind of fan stability control device of dual control storage equipment during power down of shutting down, institutes Stating dual control storage equipment includes two control mainboards, includes the hardware monitoring chip and controller of connection in each control mainboard Part, the control device are shutdown not power down device, and the output end of two control devices is connect by line with logical device To the driving end of the fan of dual control storage equipment, the fan stability control device is applied to the control in the first control mainboard Device processed, comprising:
Receiving module, for receiving the motherboard power supply shape of the transmission of the hardware monitoring chip in first control mainboard State signal and the first fan driving signal, first fan driving signal are sent by the hardware monitoring chip according to BMC Fan speed-regulating signal generates;
First judgment module, for judging whether first control mainboard shuts down power down;If so, the second control of detection Whether mainboard shuts down power down;
Generation module, for intercepting first fan and driving after judgement second control mainboard does not shut down power down Dynamic signal generates and exports the second fan driving signal of overall height level to the line and logical device, so as to by described second The BMC of control mainboard controls the fan running.
It optionally, further include the second judgment module, for judging institute after determining the second control mainboard shutdown power down State whether the first control mainboard is default master control borad;
The generation module is also used to: after determining that first control mainboard is default master control borad, intercepting described first Fan driving signal generates the second fan driving signal that PWM duty cycle is default value, and exports to the line and logic device Part operates to control the fan with preset rotation speed.
The third aspect, this application discloses a kind of fan stability controller part of dual control storage equipment during power down of shutting down, packets It includes:
Memory, for storing computer program;
Processor realizes that any dual control storage equipment as described above is being shut down for executing the computer program The step of fan during power down steady prosecutor method.
Fourth aspect, this application discloses a kind of computer readable storage medium, in the computer readable storage medium It is stored with computer program, to realize any dual control storage as described above when the computer program is executed by processor The step of fan of the equipment during power down of shutting down steady prosecutor method.
The motherboard power supply state that the application is sent by the hardware monitoring chip received in first control mainboard Signal and the first fan driving signal, the wind that first fan driving signal is sent by the hardware monitoring chip according to BMC Speed-regulating signal is fanned to generate;Judge whether first control mainboard shuts down power down;If so, whether the second control mainboard of detection closes Machine power down;The power down if second control mainboard is not shut down, intercepts first fan driving signal, generates and exports complete Second fan driving signal of high level is to the line and logical device, to control institute by the BMC of second control mainboard State fan running.As it can be seen that the application is directed to the control mainboard of dual control storage equipment shutdown power down, the control of shutdown not power down is utilized Device processed replaces BMC to supervise the control to rotation speed of the fan, avoids the unstability that fan control is caused because of BMC shutdown power down, both The proper heat reduction for having ensured storage equipment, also avoids noise jamming when fan irregular operation, improves user experience.
Detailed description of the invention
In order to illustrate more clearly of the technical solution in the prior art and the embodiment of the present application, below will to the prior art and Attached drawing to be used is needed to make brief introduction in the embodiment of the present application description.Certainly, in relation to the attached drawing of the embodiment of the present application below A part of the embodiment in only the application of description is not paying creativeness to those skilled in the art Under the premise of labour, other attached drawings can also be obtained according to the attached drawing of offer, other accompanying drawings obtained also belong to the application Protection scope.
Fig. 1 is the schematic diagram of a scenario that dual control stores fan steady prosecutor method of the equipment during power down of shutting down in the prior art;
Fig. 2 is the scene signal that dual control disclosed in the present application stores fan steady prosecutor method of the equipment during power down of shutting down Figure;
Fig. 3 is that dual control disclosed in the present application stores a kind of equipment specific reality in the steady prosecutor method of fan during power down of shutting down Apply the flow chart of example;
Fig. 4 is that dual control disclosed in the present application storage equipment is another specific in the steady prosecutor method of fan during power down of shutting down The flow chart of embodiment;
Fig. 5 is a kind of structural frames that dual control disclosed in the present application stores fan stability control device of the equipment during power down of shutting down Figure.
Specific embodiment
The core of the application is to provide the steady prosecutor method of fan and dress of a kind of dual control storage equipment during power down of shutting down It sets, to ensure the stable operation of fan during equipment shuts down power down, improves system radiating performance and avoid fan unstable Noise jamming when running surely.
In order to which technical solutions in the embodiments of the present application is more clearly and completely described, below in conjunction with this Shen Please attached drawing in embodiment, technical solutions in the embodiments of the present application is introduced.Obviously, described embodiment is only Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
It is the storage equipment having there are two control mainboard that dual control, which stores equipment,.Generally, the electricity in two control mainboards Road, device etc. are just the same, only when actually playing a role, one be as main control mainboard, and another be then used as from Control mainboard.Fig. 1 is the schematic diagram of a scenario that dual control stores fan steady prosecutor method of the equipment during power down of shutting down in the prior art. In each control mainboard, the hardware monitoring chip being connected with BMC is instructed according to BMC by the fan speed-regulating that I2C bus is sent And corresponding driving signal is generated, the driving signal warp in two control mainboards and logical device carry out at line and logic After reason, output to the driving end of fan is operated with driving fan.As it can be seen that in the prior art, either in the normal of storage equipment Operation state, or be all to control wind by main control mainboard or from the BMC in control mainboard in the shutdown power down stage The operating of fan.
Since BMC belongs to the shutdown power down device on storage equipment mainboard, in the prior art in storage equipment mainboard Shut down during power down, BMC also can power down, therefore the fan speed-regulating command signal and unstable of its output, and then also cannot achieve To the stability contorting of fan.To solve this problem, the wind this application discloses a kind of dual control storage equipment during power down of shutting down Steady prosecutor method is fanned, Fig. 2 is the applied field that dual control disclosed in the present application stores fan steady prosecutor method of the equipment during booting powers on Scape schematic diagram.
As shown in Fig. 2, the steady prosecutor method of fan provided herein is specifically to apply connecting with hardware monitoring chip In control device, the output end of the control device in two control mainboards is connect by line with logic chip with fan.With BMC Difference, the control device are specially the not power down device that shuts down, that is, after the main board system for storing equipment shuts down power down, the control Device is still charged and can be worked normally, and therefore, during system closedown power down, which is always to be in stable operation shape State, it thus can realize the stability contorting to fan.
Wherein, described control device concretely CPLD or FPGA.
Specifically, CPLD (Complex Programmable Logic Device, Complex Programmable Logic Devices) be The device come out from PAL and GAL device development is a kind of user according to respective the need and voluntarily set of digits of constitutive logic function At circuit, have that flexible in programming, integrated level are high, design and develop that the period is short, the scope of application is wide, developing instrument is advanced, price is public The features such as change.
FPGA (Field-Programmable Gate Array, field programmable gate array) based on concurrent operation, with Hardware description language is realized, is the product further developed on the basis of the programming devices such as PAL, GAL, CPLD.It is Occur as one of field specific integrated circuit (ASIC) semi-custom circuit, both solved the deficiency of custom circuit, The limited disadvantage of original programming device gate circuit number is overcome again.
Certainly, those skilled in the art can also be using other shutdown not power down devices as control described in the application Device, the application are not limited thereto.
Referring to Fig. 3, a kind of fan steady prosecutor method of the dual control storage equipment provided by the present application during power down of shut down is applied In the control device in the first control mainboard, this method is mainly comprised the steps that
S1: the motherboard power supply status signal and the drive of the first fan that the hardware monitoring chip in the first control mainboard is sent are received Dynamic signal, the first fan driving signal are generated by hardware monitoring chip according to the fan speed-regulating signal that BMC is sent.
Wherein, the first described control mainboard is not some refered in particular in dual control storage two control mainboards of equipment, only For the control mainboard where control device to be distinguished with another control mainboard.Equipment two controls are stored for dual control For any one of device processed, where control mainboard be the first described control mainboard, and another controller Control mainboard where part is the second control mainboard.
It, can be with as shown in Fig. 2, the hardware monitoring chip of control device provided herein and dual control storage equipment is connect Receive motherboard power supply status signal and the first fan driving signal that hardware monitoring chip is sent.The first described fan drives letter Number be specifically from hardware monitoring chip after BMC connected to it has sent fan speed-regulating signal to hardware monitoring chip, root It is generated according to fan speed-regulating signal.It is as previously mentioned, I2C bus communication is generally used between BMC and hardware monitoring chip.
Generally, what the driving of fan utilized is PWM wave speed regulating control principle, the first fan of hardware monitoring chip output Driving signal is a kind of PWM wave signal.Fan running speed: duty ratio can be changed in duty ratio size by adjusting PWM wave Higher, the running speed of fan is faster;Duty ratio is smaller, and the running speed of fan is smaller.When duty ratio is 100%, fan By full-speed operation.Generally, the revolving speed of the fan of full-speed operation may be up to 20000r/min, and noise may be up to 90dB.Certainly, no The concrete condition for storing equipment and fan with model can slightly have difference.
It is easily understood that the motherboard power supply status signal and first that the hardware monitoring chip in the first control mainboard is sent Fan driving signal is from the first control mainboard, and correspondingly, another control mainboard (installs situation in place Under) i.e. motherboard power supply status signal and the first fan driving signal can be also generated in the second control mainboard.
Two control mainboards output the second fan driving signal warp and logical device carry out line and processing after export to Fan drives end.In Digital Logical Circuits, only high level and high level line just export high level with after, participate in line and appoint Signal of anticipating can all export low level when being low level.Therefore, the biggish driving signal of PWM duty cycle and PWM duty cycle compared with After small driving signal warp and logical process, output is still the lesser driving signal of PWM duty cycle, i.e. PWM duty cycle Lesser driving signal plays the role of master control.As a result, generally, the lesser driving of PWM duty cycle can be exported by main control mainboard Signal, and by exporting the biggish driving signal of PWM duty cycle from control mainboard.
S2: judge whether the first control mainboard shuts down power down;If so, into S3.
It, can be according to mainboard electricity after the control device in the first control mainboard receives motherboard power supply status signal Source status signal judges whether the first control mainboard of dual control storage equipment shuts down power down.
S3: whether the second control mainboard of detection shuts down power down;If it is not, then entering S4.
The power down if the first control mainboard is shut down, BMC will also shut down power down in the present embodiment at this time just will not benefit The first fan driving signal for being generated under the BMC control action of the first control mainboard and driving fan.Similarly, for double Another control mainboard i.e. the second control mainboard of control storage equipment, also needs to judge its power down of whether shutting down, so as to clear Whether the BMC of the second control mainboard will also shut down power down.
S4: intercepting the first fan driving signal, generate and export the second fan driving signal of overall height level to line with patrol Device is collected, to control fan running by the BMC of the second control mainboard.
The power down if the second control mainboard is not shut down, the BMC of the second control mainboard is in stable operation shape at this time State, therefore, in the present embodiment, fan can be controlled by the BMC of the second control mainboard.First control master as a result, Second fan driving signal of the exportable overall height level of the control device of plate is come from by the control device output of the second control mainboard First fan driving signal of hardware monitoring chip, line with export later to fan still for the second control mainboard output first Fan driving signal, that is, fan running is regulated and controled by the BMC of the second control mainboard.
The motherboard power supply status signal and that the application is sent by the hardware monitoring chip received in the first control mainboard One fan driving signal, the first fan driving signal are generated by hardware monitoring chip according to the fan speed-regulating signal that BMC is sent;Sentence Whether disconnected first control mainboard shuts down power down;The power down if so, whether the second control mainboard of detection shuts down;If the second control mainboard It does not shut down power down, then intercepts the first fan driving signal, generate and export the second fan driving signal of overall height level to line With logical device, so as to by the BMC of the second control mainboard control fan running.As it can be seen that the application is directed to dual control storage equipment The control mainboard of shutdown power down replaces BMC to supervise the control to rotation speed of the fan, avoids using the control device of shutdown not power down The unstability that fan control is caused because of BMC shutdown power down, has both ensured the proper heat reduction of storage equipment, has also avoided fan shakiness Noise jamming when running surely, improves user experience.
Equipment is stored during power down of shutting down to dual control provided herein below by another specific embodiment The steady prosecutor method of fan is further elaborated, and relative to a upper embodiment, the present embodiment has made further technical solution Bright and optimization.Referring to Fig. 2, which includes:
S41: motherboard power supply status signal and the first fan that the hardware monitoring chip in the first control mainboard is sent are received Driving signal, the first fan driving signal are generated by hardware monitoring chip according to the fan speed-regulating signal that BMC is sent.
S42: judge whether the first control mainboard shuts down power down;If so, into S43;If it is not, then entering S48.
S43: whether the second control mainboard of detection shuts down power down;If it is not, then entering S44;If so, into S45.
S44: intercepting the first fan driving signal, generate and export the second fan driving signal of overall height level to line with patrol Device is collected, to control fan running by the BMC of the second control mainboard.
S45: judge whether the first control mainboard is default master control borad;If so, into S46;If it is not, then entering S47.
The power down if the second control mainboard is similarly shut down illustrates that the BMC of the second control mainboard and the first control mainboard is equal It is unstable, then the control device in two control mainboards is needed to supervise the operating of fan.Specifically, as previously mentioned, two controls There are master-slaves between mainboard processed, are used to export the PWM wave driving signal of overall height level from control plate, and master control borad is accounted for for exporting Empty relatively low PWM drive signal.Therefore, need to determine whether the first control mainboard is default master control borad at this time.
S46: intercepting the first fan driving signal, generates the second fan driving signal that PWM duty cycle is default value, and Output is operated to line and logical device to control fan with preset rotation speed.
If the first control mainboard is default master control borad, the control device of the first control mainboard can export and preset rotation speed Second fan driving signal of corresponding duty ratio.Certainly, the second control mainboard is default from control plate, then the second control at this time The control device of mainboard can then export the second fan driving signal of overall height level.Fan is input to later by line as a result, Driving signal be still by the first control mainboard export driving signal, thus by the first control mainboard control device control wind Fan is operated according to preset rotation speed.
Wherein, as a preferred embodiment, default value 20%, corresponding preset rotation speed can both meet centainly at this time Radiating requirements, and not will lead to larger power consumption, while also avoiding high noisy when fan runs at high speed.It requires supplementation with It is, since the power consumption of dual control storage equipment is higher, even if still being needed after dual control storage equipment completes shutdown power down Fan is wanted to radiate with certain speed operating, control device can drive fan to operate with preset rotation speed always as a result,.
It should also be noted that, control device preferably uses closed-loop control to the control of rotation speed of the fan, it can real-time sampling The actual speed of fan, compared with carrying out making difference with preset rotation speed by actual speed, by feedback control by the output of fan Rotational speed regulation is preset rotation speed.
S47: intercepting the first fan driving signal, generate and export the second fan driving signal of overall height level to line with patrol Device is collected, to control fan running by the control device of the second control mainboard.
Specifically, if the first control mainboard is not default master control borad, the control device output of the first control mainboard at this time Second fan driving signal of overall height level.Meanwhile second control mainboard be default master control borad, the then control of the second control mainboard The exportable duty ratio of device processed is the second fan driving signal of default value.Pass through line as a result, and is exported later to fan For the driving signal of the second control mainboard output, that is, control fan running by the control device of the second control mainboard at this time.
S48: the first fan driving signal is exported to line and logical device, to be controlled by the BMC of the first control mainboard Fan running.
Specifically, in the present embodiment, when the first control mainboard is in normal operating conditions there is no shutdown power down, BMC is also stable operation, thus can then be controlled as a result, as being regulated and controled in the prior art by revolving speed of the BMC to fan The first fan driving signal that device can send hardware monitoring chip is forwarded to fan, according to the fan speed-regulating instruction pair of BMC Fan is regulated and controled.
The fan stability control device of dual control storage equipment provided herein during power down of shutting down is introduced below. Referring to Fig. 5, Fig. 5 is the knot that a kind of dual control provided herein stores fan stability control device of the equipment during power down of shutting down Structure block diagram;The dual control storage equipment includes two control mainboards, includes the hardware monitoring core of connection in each control mainboard Piece and control device, the control device are shutdown not power down device, and the output end of two control devices passes through line and patrols The driving end that device is connected to the fan of the dual control storage equipment is collected, the fan stability control device is applied to the first control mainboard On the control device, comprising:
Receiving module 1, for receiving the motherboard power supply status signal of the transmission of the hardware monitoring chip in the first control mainboard The fan speed-regulating signal life sent by hardware monitoring chip according to BMC with the first fan driving signal, the first fan driving signal At;
First judgment module 2, for judging whether the first control mainboard shuts down power down;If so, detection the second control master Whether plate shuts down power down;
Generation module 3, for intercepting the first fan driving signal after the second control mainboard of judgement does not shut down power down, It generates and exports the second fan driving signal of overall height level to line and logical device, to be controlled by the BMC of the second control mainboard Fan running processed.
The motherboard power supply status signal and that the application is sent by the hardware monitoring chip received in the first control mainboard One fan driving signal, the first fan driving signal are generated by hardware monitoring chip according to the fan speed-regulating signal that BMC is sent;Sentence Whether disconnected first control mainboard shuts down power down;The power down if so, whether the second control mainboard of detection shuts down;If the second control mainboard It does not shut down power down, then intercepts the first fan driving signal, generate and export the second fan driving signal of overall height level to line With logical device, so as to by the BMC of the second control mainboard control fan running.As it can be seen that the application is directed to dual control storage equipment The control mainboard of shutdown power down replaces BMC to supervise the control to rotation speed of the fan, avoids using the control device of shutdown not power down The unstability that fan control is caused because of BMC shutdown power down, has both ensured the proper heat reduction of storage equipment, has also avoided fan shakiness Noise jamming when running surely, improves user experience.
On the basis of above content, as a kind of preferred embodiment, dual control storage equipment provided herein is being shut down Fan stability control device during power down further includes the second judgment module, for sentencing after determining the shutdown power down of the second control mainboard Whether disconnected first control mainboard is default master control borad;
Generation module 3 is also used to: after determining that the first control mainboard is default master control borad, intercepting the first fan driving letter Number, the second fan driving signal that PWM duty cycle is default value is generated, and export to line and logical device, to control wind Fan is operated with preset rotation speed.
Preferably, the default value is 20%.
On the basis of above content, as a kind of preferred embodiment, dual control storage equipment provided herein is being shut down Fan stability control device during power down further includes sending module, for determining that the first control mainboard do not shut down after power down, First fan driving signal is exported to line and logical device, to control fan running by the BMC of the first control mainboard.
On the basis of above content, as a kind of preferred embodiment, dual control storage equipment provided herein is being shut down In fan stability control device during power down, generation module 3 is also used to: determine the first control mainboard and be not default master control borad it Afterwards, the first fan driving signal is intercepted, generate and exports the second fan driving signal of overall height level to line and logical device, with Just fan running is controlled by the control device of the second control mainboard.
On the basis of above content, it is preferable that the control device is CPLD or FPGA.
Further, the fan stability controller part disclosed herein as well is a kind of dual control storage equipment during power down of shutting down, Include:
Memory, for storing computer program;
Processor realizes that any dual control storage equipment as described above is being shut down for executing the computer program The step of fan during power down steady prosecutor method.
Further, disclosed herein as well is a kind of computer readable storage medium, the computer readable storage mediums In be stored with computer program, to realize that any dual control as described above is deposited when the computer program is executed by processor The step of storing up fan of the equipment during power down of shutting down steady prosecutor method.
Fan stability control device, device and the computer of dual control storage equipment provided herein during power down of shutting down can Read the steady prosecutor of fan of the specific embodiment and dual control as described above storage equipment of storage medium during power down of shutting down Method can correspond to each other reference, just repeat no more here.
Each embodiment is described in a progressive manner in the application, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.
It should be noted that in present specification, the relational terms of such as " first " and " second " etc are used merely to One entity or operation and another entity or operate is distinguished, without necessarily requiring or implying these entities or There are any actual relationship or orders between person's operation.In addition, the terms "include", "comprise" or its any other Variant is intended to non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only It including those elements, but also including other elements that are not explicitly listed, or further include for this process, method, object Product or the intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", It is not precluded in the process, method, article or apparatus that includes the element that there is also other identical elements.
Technical solution provided herein is described in detail above.Specific case used herein is to this Shen Principle and embodiment please is expounded, the present processes that the above embodiments are only used to help understand and its Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the application principle Under, can also to the application, some improvement and modification can also be carried out, these improvement and modification are also fallen into the protection scope of the application.

Claims (10)

1. a kind of fan steady prosecutor method of dual control storage equipment during power down of shutting down, which is characterized in that the dual control storage is set Standby includes two control mainboards, includes the hardware monitoring chip and control device of connection, the control in each control mainboard Device is shutdown not power down device, and the output end of two control devices is connected to the dual control with logical device by line and deposits The driving end of the fan of equipment is stored up, the steady prosecutor method of fan is applied to the control device in the first control mainboard, comprising:
Receive motherboard power supply status signal and the first fan that the hardware monitoring chip in first control mainboard is sent Driving signal, first fan driving signal are generated by the hardware monitoring chip according to the fan speed-regulating signal that BMC is sent;
Judge whether first control mainboard shuts down power down;
The power down if so, whether the second control mainboard of detection shuts down;
The power down if second control mainboard is not shut down, intercepts first fan driving signal, generates and export overall height Second fan driving signal of level is to the line and logical device, so as to as described in the BMC of second control mainboard control Fan running.
2. the steady prosecutor method of fan according to claim 1, which is characterized in that be in judgement first control mainboard After no shutdown power down, further includes:
If it is not, then first fan driving signal is exported to the line and logical device, to be led by first control The BMC of plate controls the fan running.
3. the steady prosecutor method of fan according to claim 2, which is characterized in that whether closed in the second control mainboard of the detection After machine power down, further includes:
The power down if second control mainboard is shut down judges whether first control mainboard is default master control borad;
If so, intercepting the first fan driving signal, the second fan driving signal that PWM duty cycle is default value is generated, and Output is operated to the line and logical device to control the fan with preset rotation speed.
4. the steady prosecutor method of fan according to claim 3, which is characterized in that the default value is 20%.
5. the steady prosecutor method of fan according to claim 3, which is characterized in that be in judgement first control mainboard No is after presetting master control borad, further includes:
If it is not, then intercept the first fan driving signal, generates and export the second fan driving signal of overall height level to the line With logical device, to control the fan running by the control device of second control mainboard.
6. the steady prosecutor method of fan according to any one of claims 1 to 5, which is characterized in that the control device is CPLD Or FPGA.
7. a kind of fan stability control device of dual control storage equipment during power down of shutting down, which is characterized in that the dual control storage is set Standby includes two control mainboards, includes the hardware monitoring chip and control device of connection, the control in each control mainboard Device is shutdown not power down device, and the output end of two control devices is connected to the dual control with logical device by line and deposits The driving end of the fan of equipment is stored up, the fan stability control device is applied to the control device in the first control mainboard, comprising:
Receiving module, for receiving the motherboard power supply state letter of the transmission of the hardware monitoring chip in first control mainboard Number and the first fan driving signal, the fan that first fan driving signal is sent by the hardware monitoring chip according to BMC Speed-regulating signal generates;
First judgment module, for judging whether first control mainboard shuts down power down;If so, the second control mainboard of detection Whether shut down power down;
Generation module, for intercepting the first fan driving letter after judgement second control mainboard does not shut down power down Number, it generates and exports the second fan driving signal of overall height level to the line and logical device, to be controlled by described second The BMC of mainboard controls the fan running.
8. fan stability control device according to claim 7, which is characterized in that further include:
Second judgment module, for judging that first control mainboard is after determining the second control mainboard shutdown power down No is default master control borad;
The generation module is also used to: after determining that first control mainboard is default master control borad, intercepting first fan Driving signal generates the second fan driving signal that PWM duty cycle is default value, and exports to the line and logical device, It is operated to control the fan with preset rotation speed.
9. a kind of fan stability controller part of dual control storage equipment during power down of shutting down characterized by comprising
Memory, for storing computer program;
Processor, for executing the computer program to realize that dual control as claimed in any one of claims 1 to 6 such as stores equipment The step of fan during power down of shutting down steady prosecutor method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer in the computer readable storage medium Program, to realize that dual control storage as claimed in any one of claims 1 to 6 such as is set when the computer program is executed by processor The step of standby fan during power down of shutting down steady prosecutor method.
CN201811383893.7A 2018-11-20 2018-11-20 Fan stability control method and device of double-control storage device during shutdown power-down period Active CN109538517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811383893.7A CN109538517B (en) 2018-11-20 2018-11-20 Fan stability control method and device of double-control storage device during shutdown power-down period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811383893.7A CN109538517B (en) 2018-11-20 2018-11-20 Fan stability control method and device of double-control storage device during shutdown power-down period

Publications (2)

Publication Number Publication Date
CN109538517A true CN109538517A (en) 2019-03-29
CN109538517B CN109538517B (en) 2020-11-20

Family

ID=65848539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811383893.7A Active CN109538517B (en) 2018-11-20 2018-11-20 Fan stability control method and device of double-control storage device during shutdown power-down period

Country Status (1)

Country Link
CN (1) CN109538517B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989935A (en) * 2019-04-11 2019-07-09 苏州浪潮智能科技有限公司 A kind of control method for fan based on dual control storage server, device and equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104182017A (en) * 2014-08-21 2014-12-03 刘文君 Intelligent heat radiation control system and method for server
US20150147155A1 (en) * 2012-08-29 2015-05-28 Huawei Technologies Co., Ltd. Fan control method, apparatus, and sytem
CN104963882A (en) * 2015-07-07 2015-10-07 浙江宇视科技有限公司 Fan module control method and system in dual-control storage system
CN107203455A (en) * 2017-05-31 2017-09-26 郑州云海信息技术有限公司 Prevent that standby electric module crosses the method and system put when storage system power down fan from hanging dead
CN206894335U (en) * 2017-04-21 2018-01-16 深圳市同泰怡信息技术有限公司 A kind of dual control storage product of BBU redundancies
CN107967195A (en) * 2017-12-07 2018-04-27 郑州云海信息技术有限公司 A kind of fault repairing method and system based on dual control storage
CN108799176A (en) * 2018-05-25 2018-11-13 环胜电子(深圳)有限公司 fan control system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150147155A1 (en) * 2012-08-29 2015-05-28 Huawei Technologies Co., Ltd. Fan control method, apparatus, and sytem
CN104182017A (en) * 2014-08-21 2014-12-03 刘文君 Intelligent heat radiation control system and method for server
CN104963882A (en) * 2015-07-07 2015-10-07 浙江宇视科技有限公司 Fan module control method and system in dual-control storage system
CN206894335U (en) * 2017-04-21 2018-01-16 深圳市同泰怡信息技术有限公司 A kind of dual control storage product of BBU redundancies
CN107203455A (en) * 2017-05-31 2017-09-26 郑州云海信息技术有限公司 Prevent that standby electric module crosses the method and system put when storage system power down fan from hanging dead
CN107967195A (en) * 2017-12-07 2018-04-27 郑州云海信息技术有限公司 A kind of fault repairing method and system based on dual control storage
CN108799176A (en) * 2018-05-25 2018-11-13 环胜电子(深圳)有限公司 fan control system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989935A (en) * 2019-04-11 2019-07-09 苏州浪潮智能科技有限公司 A kind of control method for fan based on dual control storage server, device and equipment
CN109989935B (en) * 2019-04-11 2021-06-25 苏州浪潮智能科技有限公司 Fan control method, device and equipment based on double-control storage server

Also Published As

Publication number Publication date
CN109538517B (en) 2020-11-20

Similar Documents

Publication Publication Date Title
CN109581911A (en) A kind of fan of the dual control storage equipment during booting powers on surely controls method and device
CN103092138B (en) Control method of equipment cabinet system
US8607080B2 (en) Optimizing voltage on a power plane using a host control unit to control a networked voltage regulation module array
US20120017074A1 (en) Dynamic system mode switching
CN101477403A (en) Automatic control method for system power consumption
US9727108B2 (en) Supply of power from one device to another device
CN101957787A (en) Method for debugging blade server by using BMC module
CN102799248B (en) A kind of network wake-up device, cyber-net awakening method
CN105045701A (en) Server system with high-precision PCIE equipment power consumption monitoring function
CN106774763A (en) A kind of method for controlling the upper electricity of multi-node server system start
CN114996096A (en) Server, and fan speed regulation method and circuit of server
CN109538517A (en) A kind of fan of the dual control storage equipment during power down of shutting down surely controls method and device
CN109491237A (en) A kind of fan of the single control storage equipment during booting powers on surely controls method and device
CN104597983A (en) Regulation method of revolving speed of computer and mainboard system
CN204961152U (en) Pumped storage unit control program off -line test system
CN109992170A (en) A kind of control method for fan and control device
CN100451979C (en) Method for decreasing immediate current of boot-strap
CN103135728B (en) Power supply start-up control method and system thereof
US20120017100A1 (en) Power System Optimization and Verification for Embedded System Design
CN109595192A (en) A kind of fan of the single control storage equipment during power down of shutting down surely controls method and device
CN113048090B (en) Fan rotating speed control method and system
Geng Design of Energy‐Efficient IT Equipment
CN1261846C (en) Real time power managing method and its system
CN100437474C (en) System and method for regulating CPU frequency
CN116820897B (en) Cluster computer operation scheduling control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201102

Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province

Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601

Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant