CN109534175A - Precast beam lifts center rest and its method - Google Patents

Precast beam lifts center rest and its method Download PDF

Info

Publication number
CN109534175A
CN109534175A CN201811586707.XA CN201811586707A CN109534175A CN 109534175 A CN109534175 A CN 109534175A CN 201811586707 A CN201811586707 A CN 201811586707A CN 109534175 A CN109534175 A CN 109534175A
Authority
CN
China
Prior art keywords
steel pipe
pillar
precast beam
vertical steel
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811586707.XA
Other languages
Chinese (zh)
Inventor
吴赟栋
毛子成
熊玎玮
施智亮
张丽骏
马文浩
唐健
唐天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201811586707.XA priority Critical patent/CN109534175A/en
Publication of CN109534175A publication Critical patent/CN109534175A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear

Abstract

The present invention provides a kind of precast beam lifting center rest and its method, for the present invention by the steel tube frame being erected on around each pillar, the steel tube frame includes the more vertical steel pipe being connected supports and lateral steel pipe support;Two vertical steel pipe supports are equipped on girder on the pillar;The both ends of secondary beam on the pillar and middle position are equipped with vertical steel pipe support;It is connected with horizontal oblique pull steel pipe between adjacent two vertical steel pipes support, to guarantee the stability of girder and secondary beam.The factors such as construction safety, economic cost, stress-bearing capability need to be considered in the selection of this precast beam lifting, and how node bent-frame bracing guarantees that firm stable is the emphasis of precast beam lifting.The present invention can ensure construction safety when precast beam lifting operation.

Description

Precast beam lifts center rest and its method
Technical field
The present invention relates to a kind of precast beam lifting center rest and its methods.
Background technique
The selection of precast beam lifting need to consider the factors such as construction safety, economic cost, stress-bearing capability, node bent-frame bracing How to guarantee that firm stable is the emphasis of precast beam lifting.
Summary of the invention
The purpose of the present invention is to provide a kind of precast beam lifting center rest and its methods, can ensure precast beam Construction safety when lifting operation.
To solve the above problems, the present invention provides a kind of precast beam lifting center rest, comprising:
The steel tube frame being erected on around each pillar, the steel tube frame include the more vertical steel pipes being connected Support and lateral steel pipe support;
Two vertical steel pipe supports are equipped on girder on the pillar;
The both ends of secondary beam on the pillar and middle position are equipped with vertical steel pipe support;
Horizontal oblique pull steel pipe is connected between adjacent two vertical steel pipes support.
Further, in above-mentioned bracket, the size of the steel tube frame is 1.5 meters long * 1.5 meters wide.
Further, in above-mentioned bracket, the one end on the vertical steel pipe support contact ground is equipped with 150*150 millimeters Template or the 40*90 millimeters of elongated lumps of wood.
Further, in above-mentioned bracket, the one end on the vertical steel pipe support contact ground is connected with can brake caster.
Further, in above-mentioned bracket, ladder is additionally provided on the steel tube frame.
Further, in above-mentioned bracket, bridging is also connected on the steel tube frame.
Another side according to the present invention provides a kind of precast beam lifting antihunt means, comprising:
Steel tube frame is set up around each pillar, the steel tube frame includes the more vertical steel pipe branch being connected Support and lateral steel pipe support;
Two vertical steel pipe supports are added on the girder on the pillar;
The both ends of secondary beam on the pillar and middle position add vertical steel pipe support;
Horizontal oblique pull steel pipe is connected between adjacent two vertical steel pipes support.
Further, in the above-mentioned methods, the both ends of the secondary beam on the pillar and middle position add vertical steel After pipe support, further includes:
One end pad on contact ground is supported to set 150*150 millimeters of templates or 40*90 millimeters of elongated sides in the vertical steel pipe Wood.
Further, in the above-mentioned methods, the both ends of the secondary beam on the pillar and middle position add vertical steel After pipe support, further includes:
Support one end connection on contact ground can brake caster in the vertical steel pipe.
Further, in the above-mentioned methods, after setting up steel tube frame around each pillar, further includes:
Bridging is also connected on the steel tube frame.
Compared with prior art, the present invention passes through the steel tube frame that is erected on around each pillar, the steel pipe support Frame includes the more vertical steel pipe being connected supports and lateral steel pipe support;Two are equipped on girder on the pillar vertically Steel pipe support;The both ends of secondary beam on the pillar and middle position are equipped with vertical steel pipe support;Adjacent two are vertical Horizontal oblique pull steel pipe is connected between steel pipe support, to guarantee the stability of girder and secondary beam.In the selection of this precast beam lifting It need to consider the factors such as construction safety, economic cost, stress-bearing capability, how node bent-frame bracing guarantees that firm stable is precast beam The emphasis of lifting.The present invention can ensure construction safety when lifting operation.
Detailed description of the invention
Fig. 1 is the structure chart of the precast beam lifting center rest of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides a kind of precast beam lifting center rest, comprising:
The steel tube frame 1 being erected on around each pillar, the steel tube frame include the more vertical steels being connected Pipe support and lateral steel pipe support;
Two vertical steel pipe supports are equipped on girder on the pillar;
The both ends of secondary beam on the pillar and middle position are equipped with vertical steel pipe support;
It is connected with horizontal oblique pull steel pipe between adjacent two vertical steel pipes support, to guarantee the stabilization of girder and secondary beam Property.
The factors such as construction safety, economic cost, stress-bearing capability, node framed bent need to be considered in the selection of this precast beam lifting How support guarantees that firm stable is the emphasis of precast beam lifting.The present invention can ensure construction safety when lifting operation.
In precast beam lifting one embodiment of center rest of the invention, the size of the steel tube frame is 1.5 meters of long * It is 1.5 meters wide, to guarantee support strength.
In precast beam lifting one embodiment of center rest of the invention, one end pad on the vertical steel pipe support contact ground 150*150 millimeters of templates or the 40*90 millimeters of elongated lumps of wood are equipped with, to prevent the steel pipe support from destroying ground.
In precast beam lifting one embodiment of center rest of the invention, the one end on the vertical steel pipe support contact ground connects Be connected to can brake caster 2, to facilitate steel pipe support mobile.
As shown in Figure 1, being also set up on the steel tube frame in precast beam lifting one embodiment of center rest of the invention There is ladder 3, work is facilitated to climb.
As shown in Figure 1, also connecting on the steel tube frame 1 in precast beam lifting one embodiment of center rest of the invention It is connected to bridging 4, to improve the stability of steel tube frame.
Another side according to the present invention also provides a kind of precast beam lifting antihunt means, comprising:
Steel tube frame is set up around each pillar, the steel tube frame includes the more vertical steel pipe branch being connected Support and lateral steel pipe support;
Two vertical steel pipe supports are added on the girder on the pillar;
The both ends of secondary beam on the pillar and middle position add vertical steel pipe support;
Horizontal oblique pull steel pipe is connected between adjacent two vertical steel pipes support.
In precast beam lifting one embodiment of antihunt means of the invention, the both ends of the secondary beam on the pillar and interposition The place of setting adds after vertical steel pipe support, further includes:
One end pad on contact ground is supported to set 150*150 millimeters of templates or 40*90 millimeters of elongated sides in the vertical steel pipe Wood.
In precast beam lifting one embodiment of antihunt means of the invention, the both ends of the secondary beam on the pillar and interposition The place of setting adds after vertical steel pipe support, further includes:
Support one end connection on contact ground can brake caster in the vertical steel pipe.
In precast beam lifting one embodiment of antihunt means of the invention, set up around each pillar steel tube frame it Afterwards, further includes:
Bridging is also connected on the steel tube frame.
The detailed content of each method embodiment of the invention, for details, reference can be made to each precast beam lifting center rest embodiments Corresponding part, here, repeating no more.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (10)

1. a kind of precast beam lifts center rest characterized by comprising
The steel tube frame being erected on around each pillar, the steel tube frame include the more vertical steel pipe being connected supports With lateral steel pipe support;
Two vertical steel pipe supports are equipped on girder on the pillar;
The both ends of secondary beam on the pillar and middle position are equipped with vertical steel pipe support;
Horizontal oblique pull steel pipe is connected between adjacent two vertical steel pipes support.
2. precast beam as described in claim 1 lifts center rest, which is characterized in that the size of the steel tube frame is It is 1.5 meters long * 1.5 meters wide.
3. precast beam as described in claim 1 lifts center rest, which is characterized in that the vertical steel pipe support contact ground One end be equipped with 150*150 millimeters of templates or the 40*90 millimeters of elongated lumps of wood.
4. precast beam as described in claim 1 lifts center rest, which is characterized in that the vertical steel pipe support contact ground Be connected with can brake caster for one end.
5. precast beam as described in claim 1 lifts center rest, which is characterized in that be additionally provided on the steel tube frame Ladder.
6. precast beam as described in claim 1 lifts center rest, which is characterized in that be also connected on the steel tube frame Bridging.
7. a kind of precast beam lifts antihunt means characterized by comprising
Set up steel tube frame around each pillar, the steel tube frame include the more vertical steel pipes being connected supports and Lateral steel pipe support;
Two vertical steel pipe supports are added on the girder on the pillar;
The both ends of secondary beam on the pillar and middle position add vertical steel pipe support;
Horizontal oblique pull steel pipe is connected between adjacent two vertical steel pipes support.
8. precast beam as claimed in claim 7 lifts antihunt means, which is characterized in that the both ends of the secondary beam on the pillar And middle position add vertical steel pipe support after, further includes:
One end pad on contact ground is supported to set 150*150 millimeters of templates or the 40*90 millimeters of elongated lumps of wood in the vertical steel pipe.
9. precast beam as claimed in claim 7 lifts antihunt means, which is characterized in that the both ends of the secondary beam on the pillar And middle position add vertical steel pipe support after, further includes:
Support one end connection on contact ground can brake caster in the vertical steel pipe.
10. precast beam as claimed in claim 7 lifts antihunt means, which is characterized in that set up steel pipe around each pillar After support frame, further includes:
Bridging is also connected on the steel tube frame.
CN201811586707.XA 2018-12-25 2018-12-25 Precast beam lifts center rest and its method Pending CN109534175A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811586707.XA CN109534175A (en) 2018-12-25 2018-12-25 Precast beam lifts center rest and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811586707.XA CN109534175A (en) 2018-12-25 2018-12-25 Precast beam lifts center rest and its method

Publications (1)

Publication Number Publication Date
CN109534175A true CN109534175A (en) 2019-03-29

Family

ID=65857332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811586707.XA Pending CN109534175A (en) 2018-12-25 2018-12-25 Precast beam lifts center rest and its method

Country Status (1)

Country Link
CN (1) CN109534175A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010276192A (en) * 2009-06-01 2010-12-09 Denro Corp Support frame and construction method of the same
CN106760571A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 Precast beam unit is quick in place and frock and method of adjustment
CN207268089U (en) * 2017-08-15 2018-04-24 上海建工七建集团有限公司 Tool-type hoisting bracket device
CN108002244A (en) * 2017-11-30 2018-05-08 中国冶集团有限公司 Lift-on/Lift-off System and its method for high pier stud steel bar template
CN209536813U (en) * 2018-12-25 2019-10-25 上海建工五建集团有限公司 Precast beam lifts center rest

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010276192A (en) * 2009-06-01 2010-12-09 Denro Corp Support frame and construction method of the same
CN106760571A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 Precast beam unit is quick in place and frock and method of adjustment
CN207268089U (en) * 2017-08-15 2018-04-24 上海建工七建集团有限公司 Tool-type hoisting bracket device
CN108002244A (en) * 2017-11-30 2018-05-08 中国冶集团有限公司 Lift-on/Lift-off System and its method for high pier stud steel bar template
CN209536813U (en) * 2018-12-25 2019-10-25 上海建工五建集团有限公司 Precast beam lifts center rest

Similar Documents

Publication Publication Date Title
CN207633222U (en) Bridge pier binder Coping Construction platform
CN103572708B (en) Large-span concrete continuous girder bridge side span folding device and method
CN103264968B (en) The construction method of plug-in tower crane support beam structure in Super High Core Walls Structure
CN205711776U (en) A kind of supporting bracket of bridge construction
CN107142832B (en) A kind of construction method of arc steel box-girder
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN202430994U (en) Template limiting clamp
CN209536813U (en) Precast beam lifts center rest
CN109534175A (en) Precast beam lifts center rest and its method
CN204940861U (en) Adjustable case beam side steel bracket
CN107476573A (en) A kind of formwork reinforcement support system of inverted tubaeform arc shear wall
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
CN106641461A (en) Bracket provided with three petroleum pipelines capable of being laid thereon
CN206987351U (en) A kind of special workbench of I-beam
CN203359856U (en) Support beam structure for external tower crane in high-rise core tube
CN105544402B (en) A kind of hanging gang form support frame and construction method for pier capping beam high
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN104963410B (en) Beam column of steel structure is slidably connected node
CN205367459U (en) Sharing of many hoisting points of bridge truss steel construction promotes hoist
CN103243924A (en) Method for improving slippage resistance of cable clamp
CN103741857A (en) Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates
CN203782619U (en) Construction trolley
CN105060087A (en) Rectangular tube truss without support
CN204252315U (en) For realizing the damping mechanism of energy-dissipating and shock-absorbing between longitudinal framing levels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination