CN109531922A - A kind of self-propelled interlayer injection moulding method - Google Patents

A kind of self-propelled interlayer injection moulding method Download PDF

Info

Publication number
CN109531922A
CN109531922A CN201811325162.7A CN201811325162A CN109531922A CN 109531922 A CN109531922 A CN 109531922A CN 201811325162 A CN201811325162 A CN 201811325162A CN 109531922 A CN109531922 A CN 109531922A
Authority
CN
China
Prior art keywords
platform
seconds
pair
temperature
penetrating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811325162.7A
Other languages
Chinese (zh)
Inventor
贺宗贵
顾武炳
朱亮
邹鹏飞
何志深
敖国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO SUNNY MOULD CO Ltd
Original Assignee
NINGBO SUNNY MOULD CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO SUNNY MOULD CO Ltd filed Critical NINGBO SUNNY MOULD CO Ltd
Priority to CN201811325162.7A priority Critical patent/CN109531922A/en
Publication of CN109531922A publication Critical patent/CN109531922A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/16Making multilayered or multicoloured articles
    • B29C45/1642Making multilayered or multicoloured articles having a "sandwich" structure
    • B29C45/1643Making multilayered or multicoloured articles having a "sandwich" structure from at least three different materials or with at least four layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/78Measuring, controlling or regulating of temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76531Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76551Time
    • B29C2945/76561Time duration

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

A kind of self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 55 DEG C ~ 70 DEG C, and main platform temperature of penetrating is 220 DEG C ~ 240 DEG C, and it is 200 DEG C ~ 220 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 200 DEG C ~ 220 DEG C;B. reach in step A after range after temperature, pair penetrates platform and first injects TPE in die cavity, and then main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates platform and works, and continues for some time;C. pair penetrates platform and first stops being fed, and after a period of time, main platform of penetrating stops feed, simultaneity factor pressure maintaining several seconds;D. system is cooling, die sinking, pickup.The present invention passes through the control and optimization to material injecting glue temperature, time, ratio, pressure, make to pad appearance TPE flexible glue in prepared glove box, shock-absorbing silencing function is strong, inner sandwich layer is PP ebonite, and rigid structure is strong, and overall structure is unlikely to deform, long service life, the setting of mixed transition layer simultaneously makes material molding be evenly distributed from during pushing away, and product quality is high, and integrated artistic is simple.

Description

A kind of self-propelled interlayer injection moulding method
Technical field
The invention belongs to auto-parts injection molding arts, and in particular to a kind of self-propelled folder for padding in automobile glove box Layer injection moulding process.
Background technique
With the raising of Living consumption and the development of automobile industry, family car is more more and more universal, this also drives The fast development of the enterprises such as automobile industry upstream and downstream, automobile parts.In automobile parts, automobile glove box is one kind of standard configuration, mesh Before, the structure of the automobile glove box of medium-to-high grade vehicle generally comprises the interior pad on openable outer housing and attachment on the inner wall of the housing Layer, the setting one of inner cushion layer make glove box aesthetic interior, and two can play the purpose of damping and silencing.
In the prior art, in order to achieve the purpose that good damping and silencing, the inner cushion layer of glove box is generally by very flexible Material is made, and such as TPE class flexible glue, but this kind of material price is higher, leads to increased costs, while excessively soft, easy to damage.If interior Bed course is made of hard material, then is easy to generate noise in collision process, brings bad usage experience.In some of the above On the basis of problem, now also the paid method for using interlayer to be molded produces inner cushion layer in the industry, but production technology is different, Easily occur that interlayer is uneven, flexible outer is damaged, hard internal layer thickness is different, ectonexine separation etc. one in production process simultaneously A little problems, this undoubtedly reduces the yields of product, increases entreprise cost.
Therefore, enterprising based on some problems, the interlayer injection moulding method that the present invention pads in automobile glove box present on Further research is gone.
Summary of the invention
For the above deficiency in the prior art, the present invention provides a kind of self-propelled interlayer injection moulding method, simple processes Easy to operate, pad in the automobile glove box for producing sandwich that can be stable, yields is high, has saved entreprise cost.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals.
A kind of self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 55 DEG C ~ 70 DEG C, main Penetrating platform temperature is 220 DEG C ~ 240 DEG C, and it is 200 DEG C ~ 220 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 200 DEG C ~ 220 DEG C;B. to temperature Degree reaches in step A after range, and pair penetrates platform and first injects TPE in die cavity, and then main platform of penetrating injects PP in die cavity, and pair is penetrated at this time Platform and master penetrate platform and work, and continue for some time;C. pair penetrates platform and first stops being fed, and after a period of time, main platform of penetrating stops feed, together When the system pressure maintaining several seconds;D. system is cooling, die sinking, pickup.
In the prior art, pad is usually that pure flexible glue is made or pure ebonite is made in glove box, if using pure flexible glue Material is soft, and shock-proof effect is good, while also having good defencive function to the article being placed in glove box, but interior pad over time It is easily deformed, and flexible glue is at high cost.It is at low cost if using pure ebonite, long service life, but since its material is harder, with Peripheral appendix member is hard contact, and periphery is easy to loosen and collide with over time, generates noise, influences passenger experience.In the prior art, There is interior pad made of epoxy glue, inherit the advantage of the two kinds of materials in part, has taken into account surface softness, integral rigidity, also eliminated Local collision noise, but this is also a kind of compromise, do not embody the optimal performance of respective material.
Pad in prepared glove box in the application, outer layer are TPE flexible glue, and inner sandwich layer is PP ebonite, and surface has completely There is the softness of TPE flexible glue, while PP inner sandwich layer deform overall structure will not, long service life as skeletal support.
In injection moulding process in the application, after temperature is suitable, first by TPE flexible glue injection type chamber, the TPE flexible glue is by shape At the surface layer padded in glove box, TPE flexible glue and PP ebonite are then injected simultaneously, forms transition zone, are increased between unlike material layer Bonding force, prevent from disengaging, at the same should during, the transition zones of the mixed materials is by TPE flexible glue layer to the vacant place in type chamber periphery It pushes, is formed from the effect pushed away.Finally, forming the interior hard inner core layer padded, during being somebody's turn to do, note being separately injected into PP ebonite layer The PP material entered enters in type chamber from coupler, while pushing original TPE and mixture to periphery, until being full of entire type Chamber, formed product after cooling.
Applicant has done the best the trials of distinct methods many times in R&D process, the techniques such as selects from temperature, material On the optimum choice that does.In the cut-and-try process of early period, TPE flexible glue is first injected into type chamber by applicant, then PP glue is injected into In type chamber, the not no transition state of simultaneous implantation between the two, the interior pad of this technique preparation, wherein PP material is due to cooling solid Change very fast, it is difficult to it is uniformly distributed in type chamber, product periphery TPE material is more, and the PP material near inlet is more and thicker, Product is uniformly poor, influences using while neighboring is excessively soft easily-deformable, after a period of time use, also will appear two kinds of materials Between matter the phenomenon that delamination.After applicant continuously attempts to and optimizes to technique, TPE and PP are increased during injecting glue while being infused The stage entered, this phenomenon of very good solution make integral material be evenly distributed, and contact is good between material, improve production The product service life.
Preferably, in step B: reach in step A after range after temperature, pair penetrates platform and first injects TPE in die cavity, and 1.8 Second ~ after 2.2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates platform and works, and continues 0.7 second ~ 1.3 seconds.
Preferably, in step C: pair penetrates platform and first stops being fed, and after 1.8 seconds ~ 2.2 seconds, main platform of penetrating stops feed, is simultaneously Blanket insurance is pressed 1 second ~ 3 seconds.
Preferably, in step B: reach in step A after range after temperature, pair penetrates platform and first injects TPE in die cavity, and 2 seconds Afterwards, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates platform and works, for 1 seconds;In step C: pair is penetrated platform and is first stopped Feed, after 2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 2 seconds.
Preferably, in step A: the mould temperature that injection molding machine is arranged is 60 DEG C, and main platform temperature of penetrating is 230 DEG C, and pair penetrates platform temperature It is 210 DEG C, hot-fluid channel temp is 210 DEG C.
Preferably, the weight ratio of the secondary TPE for penetrating platform injection and the main PP for penetrating platform injection are 7:3 ~ 5:5, preferably 6:4.
Preferably, the main pressure for penetrating platform is set as 85/20bar, the pressure that pair penetrates platform is set as 145/95bar.
Preferably, in step D, 10 seconds board storing time, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.
Compared with prior art, the invention has the following advantages: providing a kind of self-propelled interlayer injection moulding method, By the control and optimization to material injecting glue temperature, time, ratio, pressure, keep pad appearance TPE in prepared glove box soft Glue, shock-absorbing silencing function is strong, and inner sandwich layer is PP ebonite, and rigid structure is strong, and overall structure is unlikely to deform, long service life, simultaneously The setting of mixed transition layer makes material molding be evenly distributed from during pushing away, and product quality is high.Integrated artistic is simple, high-efficient.
Detailed description of the invention
Fig. 1 is the side view for the injection molding machine that the injection moulding process in the present invention is related to.
Fig. 2 is the top view for the injection molding machine that the injection moulding process in the present invention is related to.
Fig. 3 is the cross-sectional view one for the injection molding machine that the injection moulding process in the present invention is related to.
Fig. 4 is the cross-sectional view two for the injection molding machine that the injection moulding process in the present invention is related to.
Fig. 5 is the diagrammatic cross-section of pad in the glove box of the injection moulding process preparation in the present invention.
Fig. 6 is the enlarged diagram of a-quadrant in Fig. 5.
Specific embodiment
Present invention is further described in detail with specific embodiment with reference to the accompanying drawing.
A kind of self-propelled interlayer injection moulding method being related to referring to figs. 1 to Fig. 6, in the present invention, comprising the following steps: A. is set The mould temperature for setting injection molding machine is 55 DEG C ~ 70 DEG C, and main platform temperature of penetrating is 220 DEG C ~ 240 DEG C, and it is 200 DEG C ~ 220 DEG C that pair, which penetrates platform temperature, heat Runner temperature is 200 DEG C ~ 220 DEG C;B. reach in step A after range after temperature, pair penetrates platform and first injects TPE in die cavity, then Main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates platform and works, and continues for some time;C. pair penetrates platform and first stops supplying Material, after a period of time, main platform of penetrating stops feed, simultaneity factor pressure maintaining several seconds;D. system is cooling, die sinking, pickup.
In above step, specifically, in step A: the mould temperature that injection molding machine is arranged is 60 DEG C, and main platform temperature of penetrating is 230 DEG C, secondary Penetrating platform temperature is 210 DEG C, and hot-fluid channel temp is 210 DEG C.In step B: reaching in step A after range after temperature, pair is penetrated platform and first incited somebody to action TPE is injected in die cavity, and after 1.8 seconds ~ 2.2 seconds, after preferably 2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates platform It works, continues 0.7 second ~ 1.3 seconds, preferably 1 second.In step C: pair penetrates platform and first stops being fed, after 1.8 seconds ~ 2.2 seconds, preferably 2 seconds Afterwards, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 1 second ~ 3 seconds, preferably 2 seconds.In step D, 10 seconds board storing time, mold is cold But time 25 seconds, die sinking and 8 seconds cooling times.
In addition, the weight ratio that pair penetrates the TPE and the main PP for penetrating platform injection of platform injection is 7:3 ~ 5:5, preferably in the application 6:4.The main pressure for penetrating platform is set as 85/20bar, and the pressure that pair penetrates platform is set as 145/95bar.
Fig. 1 to Fig. 4 is the schematic diagram of the injection molding machine designed in the present invention, and it is specially straight to can be seen that the injection molding machine in figure Angle-style double coloured plastic injection machine, as can be seen that the structure of the injection molding machine from top to bottom is followed successively by upper mounted plate 2, first from cross-sectional view Hot runner manifold 3, the second hot runner manifold 4, third hot runner manifold 6, cope plate 7, upper cores 71, lower mode 81, lower template 8, support block 10, face needle plate 11, bottom needle plate 12, bottom plate 13 are formed with type chamber, the group of the above structure between upper cores 71 and lower mode 81 Dress relationship is the prior art.Wherein, the top of the injection molding machine is equipped with master and penetrates platform glue-feeder 1, and the side of injection molding machine is penetrated equipped with pair Platform glue-feeder 5, master penetrates platform glue-feeder 1 and pair penetrates platform glue-feeder 5 for corresponding material to be driven into type by type chamber glue-feeder 9 In chamber.The method that the injection molding of the interlayer in the application may be implemented in above injection molding machine.
The following are the specific embodiments of self-propelled interlayer injection moulding method under the different technology conditions in the application, implement below In example and comparative example, TPE(Thermoplastic Elastomer) it is a kind of thermoplastic elastic material, it is commercially available commercially available, it is excellent Being selected as polyvinyl chloride-base TPE or polyurethanes TPE, PP is polypropylene, commercially available commercially available, and both of which is common former in industry Material.The main pressure for penetrating platform is set as 85/20bar, and the pressure that pair penetrates platform is set as 145/95bar.
Embodiment 1: a kind of self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 55 DEG C DEG C, main platform temperature of penetrating is 240 DEG C, and it is 200 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 200 DEG C;B. reach in step A to temperature After range, pair penetrates platform and first injects TPE in die cavity, and after 1.8 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates Platform works, and continues 1.3 seconds;C. pair penetrates platform and first stops being fed, and after 1.8 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 3 seconds; D. board storing time 10 seconds, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.During integral molded plastic, pair is penetrated platform and is penetrated The weight ratio of TPE and the main PP for penetrating platform injection out are 7:3.
A kind of embodiment 2: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 70 DEG C, Main platform temperature of penetrating is 220 DEG C, and it is 220 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 220 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 2.2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and main to penetrate platform equal Work, continues 0.7 second;C. pair penetrates platform and first stops being fed, and after 2.2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 1 second;D. 10 seconds board storing time, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.During integral molded plastic, pair penetrates platform injection TPE and the weight ratio of the main PP for penetrating platform injection be 1:1.
A kind of embodiment 3: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 60 DEG C, Main platform temperature of penetrating is 230 DEG C, and it is 210 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 210 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates the equal work of platform Make, it is for 1 seconds;C. pair penetrates platform and first stops being fed, and after 2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 2 seconds;D. board storing Time 10 seconds, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.During integral molded plastic, pair penetrate platform injection TPE with The weight ratio of the main PP for penetrating platform injection is 6:4.
A kind of embodiment 4: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 65 DEG C, Main platform temperature of penetrating is 235 DEG C, and it is 205 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 220 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 2.1 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and main to penetrate platform equal Work, continues 0.9 second;C. pair penetrates platform and first stops being fed, and after 1.9 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 1.5 seconds;D. 10 seconds board storing time, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.
A kind of comparative example 1: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 60 DEG C, Main platform temperature of penetrating is 230 DEG C, and it is 210 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 210 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 3 seconds, pair penetrates platform and stops feed, and and then main platform of penetrating injects PP in die cavity, and 3 After second, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 2 seconds;C. board storing time 10 seconds, mold cooling time 25 seconds, die sinking And 8 seconds cooling times.During integral molded plastic, the weight ratio that pair penetrates the TPE and the main PP for penetrating platform injection of platform injection is 6:4.
A kind of comparative example 2: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 65 DEG C, Main platform temperature of penetrating is 210 DEG C, and it is 200 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 190 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates the equal work of platform Make, it is for 1 seconds;C. pair penetrates platform and first stops being fed, and after 2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 2 seconds;D. board storing Time 10 seconds, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.During integral molded plastic, pair penetrate platform injection TPE with The weight ratio of the main PP for penetrating platform injection is 6:4.
A kind of comparative example 3: self-propelled interlayer injection moulding method, comprising the following steps: the mould temperature that injection molding machine is arranged in A. is 70 DEG C, Main platform temperature of penetrating is 250 DEG C, and it is 230 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 230 DEG C;B. reach range in step A to temperature Afterwards, pair penetrates platform and first injects TPE in die cavity, and after 2 seconds, main platform of penetrating injects PP in die cavity, and pair penetrates platform at this time and master penetrates the equal work of platform Make, it is for 1 seconds;C. pair penetrates platform and first stops being fed, and after 2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 2 seconds;D. board storing Time 10 seconds, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.During integral molded plastic, pair penetrate platform injection TPE with The weight ratio of the main PP for penetrating platform injection is 6:4.
It is padded in prepared glove box in above embodiments 1 to 4, surface is TPE flexible glue layer, and matter is soft, good hand touch, shock-absorbing Effect is good, will not generate the noise that collides with;Inner sandwich layer is PP material layers simultaneously, and matter is hard, ensure that the integrally-built stabilization of interior pad Property and robustness, improve the service life of product.Meanwhile there is mixing injection stage in the injection moulding process in the application, it should Stage, directly master penetrated platform and pair penetrates platform material feeding simultaneously not by the way of mixture injection, improved efficiency;What the step was formed The mixing bed of material is between TPE flexible glue layer and PP material layers, and mixture can be pushed into type cavity edge under high pressure when injection molding, if directly It connects and comparatively fast is difficult to be pushed at type cavity edge since it solidifies using PP material, later product does not conform to rate height;Depositing for the bed of material is mixed simultaneously Bond properties on improving product between unlike material, will not delamination.
It is padded in prepared glove box in the above comparative example 1 to 3, wherein due to having lacked mixing material feeding in comparative example 1 In the stage, so that PP material is difficult to be pulled to glove box edge, overall distribution is uneven, in the product produced, marginal portion TPE material Material distribution is more, so that marginal portion is excessively soft.In comparative example 2, internal temperature is lower than the temperature range optimized, so that PP Material pushes difficulty open, and PP material is also difficult to be pulled to glove box edge, and overall distribution is uneven, in the product produced, edge part Divide TPE material distribution more, so that marginal portion is excessively soft.In comparative example 3, internal temperature is higher than the temperature model optimized It encloses, this makes on some marginal positions, and PP material is excessively pushed open, and the TPE flexible glue on these positions is excessively thin, in use process It is easy breakage, life of product is not grown.
In attached drawing, attached drawing 5 to 6 show the schematic diagram padded in glove box prepared by the injection moulding process in the present invention, should Pad 9 is placed in the glove box of automobile in glove box, as can be seen that the surface layer of pad 9 is TPE flexible glue layer 92 in the glove box in Fig. 6, Inside is PP inner sandwich layer 91, is the mixing bed of material 93 between TPE flexible glue layer 92 and PP inner sandwich layer 91.
In the prior art, pad is usually that pure flexible glue is made or pure ebonite is made in glove box, if using pure flexible glue Material is soft, and shock-proof effect is good, while also having good defencive function to the article being placed in glove box, but interior pad over time It is easily deformed, and flexible glue is at high cost.It is at low cost if using pure ebonite, long service life, but since its material is harder, with Peripheral appendix member is hard contact, and periphery is easy to loosen and collide with over time, generates noise, influences passenger experience.In the prior art, There is interior pad made of epoxy glue, inherit the advantage of the two kinds of materials in part, has taken into account surface softness, integral rigidity, also eliminated Local collision noise, but this is also a kind of compromise, do not embody the optimal performance of respective material.
Pad in prepared glove box in the application, outer layer are TPE flexible glue, and inner sandwich layer is PP ebonite, and surface has completely There is the softness of TPE flexible glue, while PP inner sandwich layer deform overall structure will not, long service life as skeletal support. Meanwhile also there is the mixing bed of material, as transition zone, increases the bonding force between unlike material layer, prevent from disengaging.
The above, present invention tool provide a kind of self-propelled interlayer injection moulding method, by material injecting glue temperature, when Between, the control and optimization of ratio, pressure, make to pad appearance TPE flexible glue in prepared glove box, shock-absorbing silencing function is strong, interior Sandwich layer is PP ebonite, and rigid structure is strong, and overall structure is unlikely to deform, long service life, while the setting of mixed transition layer makes material Material molding is evenly distributed from during pushing away, and product quality is high.Integrated artistic is simple, high-efficient.
Protection scope of the present invention includes but is not limited to embodiment of above, and protection scope of the present invention is with claims Subject to, replacement, deformation, the improvement that those skilled in the art that any pair of this technology is made is readily apparent that each fall within of the invention Protection scope.

Claims (8)

1. a kind of self-propelled interlayer injection moulding method, which comprises the following steps:
A. the mould temperature that injection molding machine is arranged is 55 DEG C ~ 70 DEG C, and main platform temperature of penetrating is 220 DEG C ~ 240 DEG C, pair penetrate platform temperature be 200 DEG C ~ 220 DEG C, hot-fluid channel temp is 200 DEG C ~ 220 DEG C;
B. reach in step A after range after temperature, pair penetrates platform and first injects TPE in die cavity, and then master penetrates platform and PP is injected die cavity In, pair penetrates platform at this time and master penetrates platform and works, and continues for some time;
C. pair penetrates platform and first stops being fed, and after a period of time, main platform of penetrating stops feed, simultaneity factor pressure maintaining several seconds;
D. system is cooling, die sinking, pickup.
2. a kind of self-propelled interlayer injection moulding method according to claim 1, which is characterized in that in step B: reaching to temperature In step A after range, pair penetrates platform and first injects TPE in die cavity, and after 1.8 seconds ~ 2.2 seconds, main platform of penetrating injects PP in die cavity, at this time Pair penetrates platform and master penetrates platform and works, and continues 0.7 second ~ 1.3 seconds.
3. a kind of self-propelled interlayer injection moulding method according to claim 2, which is characterized in that in step C: pair is penetrated platform and first stopped Only it is fed, after 1.8 seconds ~ 2.2 seconds, main platform of penetrating stops being fed, and simultaneity factor pressure maintaining 1 second ~ 3 seconds.
4. a kind of self-propelled interlayer injection moulding method according to claim 3, which is characterized in that in step B: reaching to temperature In step A after range, pair penetrates platform and first injects TPE in die cavity, and after 2 seconds, main platform of penetrating injects PP in die cavity, at this time pair penetrate platform and Master penetrates platform and works, for 1 seconds;In step C: pair penetrates platform and first stops being fed, and after 2 seconds, main platform of penetrating stops feed, and simultaneity factor is protected Pressure 2 seconds.
5. a kind of self-propelled interlayer injection moulding method according to claim 4, which is characterized in that in step A: setting injection molding machine Mould temperature be 60 DEG C, main platform temperature of penetrating is 230 DEG C, and it is 210 DEG C that pair, which penetrates platform temperature, and hot-fluid channel temp is 210 DEG C.
6. a kind of self-propelled interlayer injection moulding method according to any one of claims 1 to 5, which is characterized in that pair is penetrated platform and penetrated The weight ratio of TPE and the main PP for penetrating platform injection out are 7:3 ~ 5:5.
7. a kind of self-propelled interlayer injection moulding method according to any one of claims 1 to 5, which is characterized in that master penetrates platform Pressure is set as 85/20bar, and the pressure that pair penetrates platform is set as 145/95bar.
8. a kind of self-propelled interlayer injection moulding method according to any one of claims 1 to 5, which is characterized in that in step D, 10 seconds board storing time, mold cooling time 25 seconds, die sinking and 8 seconds cooling times.
CN201811325162.7A 2018-11-08 2018-11-08 A kind of self-propelled interlayer injection moulding method Pending CN109531922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811325162.7A CN109531922A (en) 2018-11-08 2018-11-08 A kind of self-propelled interlayer injection moulding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811325162.7A CN109531922A (en) 2018-11-08 2018-11-08 A kind of self-propelled interlayer injection moulding method

Publications (1)

Publication Number Publication Date
CN109531922A true CN109531922A (en) 2019-03-29

Family

ID=65844660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811325162.7A Pending CN109531922A (en) 2018-11-08 2018-11-08 A kind of self-propelled interlayer injection moulding method

Country Status (1)

Country Link
CN (1) CN109531922A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102398342A (en) * 2011-10-28 2012-04-04 宁波帅特龙车辆部件有限公司 Interlayer injection moulding method
WO2014103655A1 (en) * 2012-12-25 2014-07-03 宇部興産機械株式会社 Method for producing sandwich molded article, injection molding machine, and sandwich molded article
CN104191568A (en) * 2014-08-13 2014-12-10 东莞市旭通达模具塑胶有限公司 Double-color injection molding method and mold of complicated automobile parts
CN205167720U (en) * 2015-10-17 2016-04-20 湖南元拓实业集团有限公司 Take metal material of alloy layer
CN107471535A (en) * 2017-07-25 2017-12-15 常熟德柯塑料制品有限公司 A kind of processing technology of interlayer injecting products
CN207345197U (en) * 2017-10-24 2018-05-11 秦力环保建材科技(东莞)有限公司 A kind of rubber and plastic composite environmental-friendly rubber floor covering of improvement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102398342A (en) * 2011-10-28 2012-04-04 宁波帅特龙车辆部件有限公司 Interlayer injection moulding method
WO2014103655A1 (en) * 2012-12-25 2014-07-03 宇部興産機械株式会社 Method for producing sandwich molded article, injection molding machine, and sandwich molded article
CN104191568A (en) * 2014-08-13 2014-12-10 东莞市旭通达模具塑胶有限公司 Double-color injection molding method and mold of complicated automobile parts
CN205167720U (en) * 2015-10-17 2016-04-20 湖南元拓实业集团有限公司 Take metal material of alloy layer
CN107471535A (en) * 2017-07-25 2017-12-15 常熟德柯塑料制品有限公司 A kind of processing technology of interlayer injecting products
CN207345197U (en) * 2017-10-24 2018-05-11 秦力环保建材科技(东莞)有限公司 A kind of rubber and plastic composite environmental-friendly rubber floor covering of improvement

Similar Documents

Publication Publication Date Title
CN101150973A (en) Foam seat element, mold for the production thereof and method to manufacture the mold
KR101172211B1 (en) Method for munufacturing crash pad for vehicle and crash pad for vehicle by the same
US20180290347A1 (en) Dual firmness head restraint
CN203819078U (en) Seat used for vehicle
CN100496940C (en) Process for making integral elastic supports and support obtainable by said process
CN101347992A (en) In-mold decorative injection molding mould and moulding method
CN104622235A (en) Self-skinning anti-fatigue floor mat and production process thereof
CN101380797A (en) Dough cover and loaming material indirect shaping method
TWI364375B (en)
CN103958147B (en) The manufacture method of mould, forming machine and expanded moldings
CN109531922A (en) A kind of self-propelled interlayer injection moulding method
JP2004231030A (en) Interior parts for automobile manufacturing method thereof, and molding die for the same
CN105034972A (en) Injection molded automotive sound insulation pad and manufacturing method thereof
EP1597055B1 (en) Methods of manufacturing hook plates
CN101892789A (en) Molded composite product and production method thereof
CN205131026U (en) Back seat is saucer for center armrest
CN102785330A (en) Method for manufacturing sheet element made of polymer materials and related apparatus
CN210283004U (en) Interlayer injection molding soft rubber cushion
CN1200323A (en) mfg. method of mould casting products made of polyurethane
KR101843886B1 (en) Apparatus and method for manufacturing car interior
CN201856422U (en) Molded composite product
CN113954293B (en) Production method of multi-layer gel pillow
CN220314430U (en) Soft touch chair back plate
CN101433442A (en) Composite bathtub
CN109080186A (en) It is integrally formed out the moulding process of two layers of different hardness polyurethane shoe-sole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 315400, No. 518, Shun Shun Road, Yuyao, Zhejiang, Ningbo

Applicant after: Ningbo sunny Precision Industry Co.,Ltd.

Address before: 315400, No. 518, Shun Shun Road, Yuyao, Zhejiang, Ningbo

Applicant before: NINGBO SUNNY MOULD Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329