CN109526590A - A kind of laying method on planarization lawn - Google Patents
A kind of laying method on planarization lawn Download PDFInfo
- Publication number
- CN109526590A CN109526590A CN201811575758.2A CN201811575758A CN109526590A CN 109526590 A CN109526590 A CN 109526590A CN 201811575758 A CN201811575758 A CN 201811575758A CN 109526590 A CN109526590 A CN 109526590A
- Authority
- CN
- China
- Prior art keywords
- grass planting
- planting block
- horizontal concrete
- locating rack
- partition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
- A01G20/10—Pre-cultivated sod or turf; Apparatus therefor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
- A01G20/10—Pre-cultivated sod or turf; Apparatus therefor
- A01G20/18—Apparatus for laying sods or turfs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/02—Internal fittings
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses a kind of laying method on planarization lawn, including site clearing, Soil tillage, land smoothing, cover river sand, grass planting block prepares, is laid with grass planting block, backfill gap soil;Including locating rack, locating rack is in " field " font sets there are four reticle, and locating rack is made of four common partitions and eight external partitions, and the bottom of each reticle is equipped with support construction;Support construction includes being disposed therein the horizontal concrete chute being set in parallel in a common partition and wherein an external partition, and longitudinal chute vertical with horizontal concrete chute in another common partition is set, longitudinal chute bottom and horizontal concrete chute connection, support construction further includes multiple slide bars, multiple slide bars are arranged in parallel and are slidably connected in horizontal concrete chute and longitudinal chute, and the side wall at slide bar both ends is equipped with connecting rope and connect with adjacent slide bar.The integrity degree of grass planting block can be improved and fitly grass planting block is laid with, so that it is more smooth to be laid with the lawn completed.
Description
Technical field
The present invention relates to ecological afforestation construction fields, more particularly, to a kind of laying method on planarization lawn.
Background technique
In construction of city afforestation, lawn is important component part, lawn plant extensively in park, square, residential quarter,
The public activities occasion such as hospital.The ecology and ornamental value value that lawn has concurrently largely improve people's lives quality
And improve the ecological environment in city.
Currently, the grass planting block that lawn mainly uses artificial growth good is mated formation, construction party transports the grass planting block bought
Construction site is transported to, then is mated formation by worker to grass planting block.In order to guarantee the planarization on be laid with lawn, grass planting block it is complete
Whole degree and the construction technique of worker are key factors.But since grass planting block is not that scene is cultivated, in transportational process usually
Because jolt, stack it is irregular, overload etc. reasons cause grass planting block bottom cultivate soil matrix there is situations such as being crushed, falling, make
It obtains grass planting block and there is the phenomenon that damage, along with the problems such as construction personnel of existing profession is less, and worker's skill is not up to standard causes
There is the problem of out-of-flatness in be laid with lawn.
Summary of the invention
The object of the present invention is to provide a kind of laying method on planarization lawn, the integrity degree of grass planting block and whole can be improved
Grass planting block is laid with together, so that it is more smooth to be laid with the lawn completed.
Above-mentioned purpose of the invention has the technical scheme that
A kind of laying method on planarization lawn, including,
Site clearing;The sundries such as various stone, metals for interfering construction in place are removed before being laid with lawn;
Soil tillage;Soil tillage depth is not less than 30cm, and the sundries such as chad, grass roots, tile are removed during turning over;It turns over
Soil block is smashed when ploughing, soil block diameter should be less than 1cm;
Organic fertilizer;Sufficient fertilizer is applied while Soil tillage, per acre 2.5-3 kilograms of dosage;
Land smoothing;Place rolling, finishing are carried out after Soil tillage cleaning;And flood is poured, it allows soil layer sufficiently to settle, rolls again
Leveling;
Cover river sand;Place after leveling covers 3-5cm river sand and rolls leveling;
Grass planting block prepares;Including locating rack, the locating rack is in " field " font sets there are four for placing the reticle of grass planting block,
The length and width of reticle are 30cm*30cm;The locating rack is made of four common partitions and eight external partitions, the common partition
Thickness with external partition is 2cm, and each reticle is made of two common partitions and two external partitions;The bottom of each reticle
Portion is equipped with support construction;The support construction includes being disposed therein in a common partition and wherein an external partition in flat
The horizontal concrete chute of row setting, and longitudinal chute vertical with horizontal concrete chute in another common partition, the longitudinal direction are set
Sliding slot bottom and horizontal concrete chute connection, the support construction further includes multiple slide bars, and multiple slide bars are arranged in parallel and are slidably connected
In horizontal concrete chute and longitudinal chute, the side wall at slide bar both ends is equipped with connecting rope and connect with adjacent slide bar, has in multiple slide bars
One is greater than the head rod of longitudinal chute opening width, the upside opening edge edge conflict of head rod and longitudinal chute for diameter;In slide bar
On be lined with rice paper, grass planting block is placed on rice paper, and is transported together together with locating rack to being laid with place;
It is laid with grass planting block;Locating rack is placed directly in pre- paving location, pulls head rod that multiple slide bars is driven to be away from horizontal cunning
Slot, grass planting block are put in place under Gravitative Loads;Locating rack is lifted after four grass planting blocks in locating rack are put in place
It takes out, places next locating rack then against the grass planting block for having been placed in position, the grass planting block needed for place is placed
In place;
Backfill gap soil;Soil is backfilled in the gap of adjacent grass planting block and is compacted grass planting block with roller;Watering, second day again
It is rolled one time with roller, completes the laying on lawn.
By using above-mentioned technical proposal, before being laid with grass planting block, place has carried out impurity cleaning, Soil tillage, soil
Leveling, watering sedimentation, the operation such as cover river sand, so that place is more smooth, are not likely to produce local sedimentation.In addition, being risen in grass planting block
It is just placed in locating rack after grass, so that during transportation, grass planting block can keep completely, being hardly damaged.When being laid with,
Without re-laying the taking-up of grass planting block, the damage of grass planting block is avoided;But locating rack is directly placed in pre- paving location, in head
When bar pull-up, head rod drags other slide bars away from horizontal concrete chute by connecting rope, in this process, due to being also lined with a surname on slide bar
Paper, so that will not destroy the culture soil matrix of grass planting block in slide bar moving process, grass planting block, which falls within to overlay under Gravitative Loads, sets position
It sets;After locating rack is taken out, four grass planting blocks are put in place.Next locating rack close to the grass planting block being put in place into
Row is placed, and the thickness of common partition and external partition is 2cm, also allows for forming 2cm's between the grass planting block being put in place
Gap after the gap is backfilled by soil, provides growing space to careless strain.Rice paper water imbibition is preferable, also has centainly
Water retention.
It is laid with using this programme, due to that grass planting block can be effectively protected in transport and process of deployment, and
Place flattens with improving, and is laid with using the program that grass planting block is simpler, conveniently, without especially professional skill,
So as to easily lay out the higher lawn of flatness.
The present invention is further arranged to: being further included checking grass planting block before laying grass planting block, is observed the culture of grass planting block
Whether the upper surface of soil matrix is in same plane, high for being higher by setting for not being marked in conplane grass planting block
The grass planting block of degree is low by the soil layer chisel of riding position when placing;Grass planting block lower than setting height will be placed when placing
The soil layer raising of position, so that the laying height of grass planting block is identical.
By using above-mentioned technical proposal, locating rack can once place four grass planting blocks, and be located in locating rack
Four grass planting blocks are placed together, this is compared quite convenient for height of the construction personnel to four grass planting blocks, thus
It is easier to filter out underproof grass planting block, and is performed in accordance with chisel soil or bankets, this is also to help to improve from other side
The planarization on be laid with lawn or the laying difficulty for alleviating planarization lawn.
The present invention is further arranged to: external partition, the common partition for being provided with horizontal concrete chute are separate longitudinal in horizontal concrete chute
The side of sliding slot is equipped with traction cable, traction cable include the fixed link for being installed on corresponding external partition or corresponding common partition,
Clockwork spring and drag-line;Clockwork spring inner end is connect with fixed link, and outer end is connect with drag-line, and drag-line is wound in clockwork spring
In fixed link;The end of drag-line is connect with slide bar.
By using above-mentioned technical proposal, when pulling head rod, head rod pulls out drag-line with moving slide-bar together, due to
Clockwork spring is connected in fixed link, when unclamping head rod, clockwork spring resets immediately, and drag-line is wound, thus by slide bar
Again original position is slided go back to, it is convenient that grass planting block is placed next time.
The present invention is further arranged to: the connection position of the horizontal concrete chute and longitudinal chute carries out chamfered.
By using above-mentioned technical proposal, so that sliding bar is more smooth.
The present invention is further arranged to: the distance of the horizontal concrete chute to locating rack bottom is 2cm.
By using above-mentioned technical proposal, although smooth processing is passed through in place, not representing is horizontality, still may be used
Can have the case where some fluctuatings, be arranged using above-mentioned 2cm, can to avoid slide bar and ground face contact, when avoiding sliding bar by
To the obstruction of rolling ground, while the distance is arranged, and when grass planting block is fallen by Gravitative Loads, will not generate damage.
The present invention is further arranged to: the external partition of not set horizontal concrete chute is movably connected on positioning in each reticle
Frame.
By using above-mentioned technical proposal, facilitates and grass planting block is placed in reticle.
The present invention is further arranged to: being provided with the side of external partition and common partition far from longitudinal chute of horizontal concrete chute
Equipped with fixing axle, the external partition of not set horizontal concrete chute is rotationally connected with fixing axle.
By using above-mentioned technical proposal, the external partition of not set horizontal concrete chute can be rotated around fixing axle, convenient for that will plant
Grass block is placed in reticle.
The present invention is further arranged to: the common partition and the material of external partition are timber.
By using above-mentioned technical proposal, the main material of locating rack is timber, and timber more lightweight facilitates construction personnel
It is carried.
In conclusion advantageous effects of the invention are as follows:
It 1, can be with effective protection grass planting block, so that being hardly damaged in grass planting block transportational process;
2, laying is more convenient, is laid with high-efficient;
3, place is effectively flattened, the comprehensive planarization for improving be laid with lawn.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment locating rack (slide bar is not installed);
Fig. 2 is the structural schematic diagram of the single reticle of the present embodiment;
Fig. 3 is the schematic diagram that the present embodiment highlights slide bar mounting structure.
Description of symbols: 1, locating rack;2, reticle;3, common partition;4, external partition;5, horizontal concrete chute;6, longitudinal
Sliding slot;7, slide bar;8, connecting rope;9, head rod;10, traction cable;11, fixed link;12, drag-line;13, fixing axle;14, screw thread
Hole;15, connecting hole.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment:
A kind of laying method on planarization lawn, including a kind of locating rack 1 is used, as shown in Figure 1, the locating rack 1 is in " field " word
Shape is set there are four the reticle 2 for placing grass planting block, and the length and width of reticle 2 are 30cm*30cm;Locating rack 1 is shared by four
Partition 3 and eight external partitions 4 form, and the material of common partition 3 and external partition 4 is timber, the thickness of common partition 3 and external partition 4
Degree is 2cm, and each reticle 2 is made of two common partitions 3 and two external partitions 4;
As Figure 2-3, wherein a common partition 3 and wherein an external partition 4 are equipped with the horizontal concrete chute being set in parallel
5, the longitudinal chute 6 vertical with horizontal concrete chute 5,6 bottom of longitudinal chute and horizontal concrete chute 5 are equipped in another common partition 3
The connection position of connection, horizontal concrete chute 5 and longitudinal chute 6 carries out chamfered.Multiple slide bars disposed in parallel 7 are slidably connected to water
In smooth slot 5 and longitudinal chute 6, the side wall at 7 both ends of slide bar is equipped with connecting rope 8 and connect with adjacent slide bar 7, in multiple slide bars 7
There are the head rod 9 for being greater than 6 opening width of longitudinal chute for diameter, the upside opening edge edge conflict of head rod 9 and longitudinal chute 6.
When several slide bars 7 are slid into head rod 9 and 6 opening edge of longitudinal chute along conflict to separate 6 side of longitudinal chute, multiple slide bars 7
Almost the bottom of reticle 2 is uniformly spread out, forms the support construction for being used to support grass planting block.
As shown in Figure 3, it is preferable that external partition 4, the common partition 3 for being provided with horizontal concrete chute 5 are separate vertical in horizontal concrete chute 5
It is also equipped with traction cable 10 to the side of sliding slot 6, traction cable 10 includes being installed on corresponding external partition 4 or corresponding common partition
3 fixed link 11, clockwork spring and drag-line 12, clockwork spring inner end are connect with fixed link 11, and outer end is connect with drag-line 12, are drawn
Rope 12 and clockwork spring are wound in fixed link 11;The end of drag-line 12 is connect with slide bar 7.The traction cable 10 is existing skill
Art, principle are identical as storage wire box, tape measure etc.;It is not repeated them here in the present embodiment.When pulling head rod 9, head rod 9 is with moving slide-bar 7
To pull out drag-line 12 together, due to being connected with clockwork spring in fixed link 11, when unclamping head rod 9, clockwork spring is immediately
It resets, and drag-line 12 is wound, so that slide bar 7 is slided back to original position again, it is convenient that grass planting block is pacified next time
It puts.
As shown in figure 3, being provided with the external partition 4 of horizontal concrete chute 5 and common partition 3 is equipped with far from the side of longitudinal chute 6
Fixing axle 13 is rotationally connected with fixing axle 13 on the downside of the external partition 4 of not set horizontal concrete chute 5 and the upside of the external partition 4 is equipped with
Threaded hole 14 is provided on the external partition 4 and common partition 3 of horizontal concrete chute 5 and corresponds to threaded hole 14 equipped with connecting hole 15, connecting hole
It is bolted between 15 and threaded hole 14.When placing grass planting block, the external partition 4 for being connected to fixing axle 13 can be turned up,
The external partition 4 is resetted and is bolted again after placing grass planting block.
As shown in figure 3, the connection position of horizontal concrete chute 5 and longitudinal chute 6 carries out chamfered, horizontal concrete chute 5 to locating rack 1
The distance of bottom is 2cm.Using above-mentioned 2cm be arranged, can to avoid slide bar 7 and ground face contact, avoid slide bar 7 slide when by rise
It throws oneself on the ground the obstruction in face, while the distance is arranged, and when grass planting block is fallen by Gravitative Loads, will not generate damage.
Steps are as follows for the laying of the present embodiment:
One, site clearing;The sundries such as various stone, metals for interfering construction in place are removed before being laid with lawn;
Two, Soil tillage;Soil tillage depth is not less than 30cm, and removing chad, grass roots, tile etc. are miscellaneous during turning over
Object;Soil block is smashed when turning over, soil block diameter should be less than 1cm;
Three, organic fertilizer;Sufficient fertilizer is applied while Soil tillage, per acre 2.5-3 kilograms of dosage;
Four, land smoothing;Place rolling, finishing are carried out after Soil tillage cleaning;And flood is poured, allow soil layer sufficiently to settle, again
Rolling leveling;
Five, river sand is covered;Place after leveling covers 3-5cm river sand and rolls leveling;
Six, grass planting block prepares;Using above-mentioned locating rack 1, and upper rice paper is padded on the slide bar 7 of 2 bottom of reticle, grass planting block is placed
In on rice paper, and transport together together with locating rack 1 to being laid with place;
Seven, whether the upper surface of grass planting block inspection, observation grass planting block culture soil matrix is in same plane, for not in same plane
Grass planting block be marked, it is when placing that the soil layer chisel of riding position is low for being higher by the grass planting block of setting height;For low
By the soil layer raising of riding position when the grass planting block of setting height is in placement, so that the laying height of grass planting block is identical;
Eight, it is laid with grass planting block;Locating rack 1 is placed directly in pre- paving location, pulls head rod 9 that multiple slide bars 7 is driven to be away from
Horizontal concrete chute 5, grass planting block are put in place under Gravitative Loads;It will determine after four grass planting blocks in locating rack 1 are put in place
Position frame 1 is lifted out, and places next locating rack 1, the plant needed for place then against the grass planting block for having been placed in position
Grass block is put in place;
Nine, backfill gap soil;Soil is backfilled in the gap of adjacent grass planting block and is compacted grass planting block with roller;Watering, second
It is rolled one time with roller again, completes the laying on lawn.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of laying method on planarization lawn, it is characterised in that: including,
Site clearing;The sundries such as various stone, metals for interfering construction in place are removed before being laid with lawn;
Soil tillage;Soil tillage depth is not less than 30cm, and the sundries such as chad, grass roots, tile are removed during turning over;It turns over
Soil block is smashed when ploughing, soil block diameter should be less than 1cm;
Organic fertilizer;Sufficient fertilizer is applied while Soil tillage, per acre 2.5-3 kilograms of dosage;
Land smoothing;Place rolling, finishing are carried out after Soil tillage cleaning;And flood is poured, it allows soil layer sufficiently to settle, rolls again
Leveling;
Cover river sand;Place after leveling covers 3-5cm river sand and rolls leveling;
Grass planting block prepares;Including locating rack (1), the locating rack (1) is in " field " font sets that there are four for placing grass planting block
Reticle (2), the length and width of reticle (2) are 30cm*30cm;The locating rack (1) by four common partitions (3) and eight it is outer every
The thickness of plate (4) composition, the common partition (3) and external partition (4) is 2cm, and each reticle (2) is by two common partitions
(3) it is formed with two external partitions (4);The bottom of each reticle (2) is equipped with support construction;The support construction includes setting
A common partition (3) and the horizontal concrete chute (5) being wherein set in parallel on an external partition (4) wherein, and setting exist
The longitudinal chute (6) vertical with horizontal concrete chute (5) on another common partition (3), longitudinal chute (6) bottom and level are sliding
Slot (5) connection, the support construction further include multiple slide bars (7), and multiple slide bars (7) are arranged in parallel and are slidably connected to horizontal cunning
In slot (5) and longitudinal chute (6), the side wall at slide bar (7) both ends is equipped with connecting rope (8) and connect with adjacent slide bar (7), multiple cunnings
There is the head rod (9) for being greater than longitudinal chute (6) opening width for diameter in bar (7), head rod (9) is upper with longitudinal chute (6)
Side opening edge contradicts;Rice paper is lined on slide bar (7), grass planting block is placed on rice paper, and is transported together together with locating rack (1)
To laying place;
It is laid with grass planting block;Locating rack (1) is placed directly in pre- paving location, pull head rod (9) drive multiple slide bars (7) from
Horizontal concrete chute (5) are opened, grass planting block is put in place under Gravitative Loads;Four grass planting blocks in locating rack (1) are put in place
Locating rack (1) is lifted out afterwards, next locating rack (1) is placed then against the grass planting block for having been placed in position, until field
Grass planting block needed for ground is put in place;
Backfill gap soil;Soil is backfilled in the gap of adjacent grass planting block and is compacted grass planting block with roller;Watering, second day again
It is rolled one time with roller, completes the laying on lawn.
2. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: also wrapped before being laid with grass planting block
It includes and grass planting block is checked, whether the upper surface of observation grass planting block culture soil matrix is in same plane, for not same flat
The grass planting block in face is marked, when placing that the soil layer chisel of riding position is low for the grass planting block for being higher by setting height;For
Lower than setting height grass planting block when placing by the soil layer raising of riding position so that the laying height of grass planting block is identical.
3. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: be provided with horizontal concrete chute
(5) external partition (4), common partition (3) are equipped with traction cable far from the side of longitudinal chute (6) in horizontal concrete chute (5)
(10), traction cable (10) includes the fixed link (11) for being installed on corresponding external partition (4) or corresponding common partition (3), clockwork spring bullet
Spring and drag-line (12);Clockwork spring inner end is connect with fixed link (11), and outer end is connect with drag-line (12), drag-line (12) and clockwork spring
Spring wrap is on fixed link (11);The end of drag-line (12) is connect with slide bar (7).
4. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: the horizontal concrete chute (5)
Chamfered is carried out with the connection position of longitudinal chute (6).
5. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: the horizontal concrete chute (5)
Distance to locating rack (1) bottom is 2cm.
6. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: in each reticle (2)
The external partition (4) of not set horizontal concrete chute (5) is movably connected on locating rack (1).
7. a kind of laying method on planarization lawn according to claim 6, it is characterised in that: be provided with horizontal concrete chute
(5) the side of external partition (4) and common partition (3) far from longitudinal chute (6) is equipped with fixing axle (13), not set horizontal concrete chute
(5) external partition (4) is rotationally connected with fixing axle (13).
8. a kind of laying method on planarization lawn according to claim 1, it is characterised in that: the common partition (3)
Material with external partition (4) is timber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811575758.2A CN109526590B (en) | 2018-12-22 | 2018-12-22 | Method for laying smooth lawn |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811575758.2A CN109526590B (en) | 2018-12-22 | 2018-12-22 | Method for laying smooth lawn |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109526590A true CN109526590A (en) | 2019-03-29 |
CN109526590B CN109526590B (en) | 2020-12-01 |
Family
ID=65856736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811575758.2A Active CN109526590B (en) | 2018-12-22 | 2018-12-22 | Method for laying smooth lawn |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109526590B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113179867A (en) * | 2021-05-18 | 2021-07-30 | 宋鹏 | Municipal garden turf laying equipment and method |
CN113678694A (en) * | 2021-08-30 | 2021-11-23 | 上海园林(集团)有限公司 | Assembled degradable flower bed planting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4309811A1 (en) * | 1993-03-11 | 1994-09-15 | H F Wiebe Gmbh & Co Kg | Wagon for bulk material |
CN203698895U (en) * | 2013-12-19 | 2014-07-09 | 郑州煤机综机设备有限公司 | Material container |
CN107804609A (en) * | 2017-11-23 | 2018-03-16 | 四川良品集科技有限公司 | A kind of intelligent sorting classified rubbish dustbin |
CN108668725A (en) * | 2018-03-20 | 2018-10-19 | 东营国科生态环境工程有限公司 | A kind of method that vetiver is cold-proof in Winter in North China |
CN108954816A (en) * | 2018-07-20 | 2018-12-07 | 芜湖新农夫机械有限公司 | A kind of hot-blast stove |
-
2018
- 2018-12-22 CN CN201811575758.2A patent/CN109526590B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4309811A1 (en) * | 1993-03-11 | 1994-09-15 | H F Wiebe Gmbh & Co Kg | Wagon for bulk material |
CN203698895U (en) * | 2013-12-19 | 2014-07-09 | 郑州煤机综机设备有限公司 | Material container |
CN107804609A (en) * | 2017-11-23 | 2018-03-16 | 四川良品集科技有限公司 | A kind of intelligent sorting classified rubbish dustbin |
CN108668725A (en) * | 2018-03-20 | 2018-10-19 | 东营国科生态环境工程有限公司 | A kind of method that vetiver is cold-proof in Winter in North China |
CN108954816A (en) * | 2018-07-20 | 2018-12-07 | 芜湖新农夫机械有限公司 | A kind of hot-blast stove |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113179867A (en) * | 2021-05-18 | 2021-07-30 | 宋鹏 | Municipal garden turf laying equipment and method |
CN113678694A (en) * | 2021-08-30 | 2021-11-23 | 上海园林(集团)有限公司 | Assembled degradable flower bed planting method |
Also Published As
Publication number | Publication date |
---|---|
CN109526590B (en) | 2020-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105325226B (en) | Ribbon living plant fence type sand-protecting barrier protection system planting and establishing method | |
Nyssen et al. | Removal of rock fragments and its effect on soil loss and crop yield, Tigray, Ethiopia | |
CN109526590A (en) | A kind of laying method on planarization lawn | |
CN105075792B (en) | A kind of low method for disturbing artificial afforestration site preparation in native Mountainous Area | |
CN102409686A (en) | Garbage hill ecological slope protection method and garbage hill greening slope adopting same | |
CN108222026A (en) | The restorative procedure of coal mine small-sized hillock | |
CN113216223A (en) | Ecological restoration method for mine side slope | |
Milner et al. | Chert hoes as digging tools | |
Almond et al. | Agricultural land rehabilitation following 2010 Darfield (Canterbury) earthquake: a preliminary report | |
CN1296735A (en) | Method for transplanting old and noble trees | |
CN104350831A (en) | Vineyard ditching method comprehensively utilizing surface layer mellow soil | |
CN212506107U (en) | Wave dissipation slope protection structure for water ecological restoration | |
CN112195956B (en) | Construction method for power transmission line in desert area | |
CN108684370B (en) | Ancient tree ex-situ rejuvenation method | |
CN105900791A (en) | Semi-arid hilly area low-disturbance soil preparation rainwater harvesting vegetation recovery method | |
CN110761304A (en) | Assembled anchor rod frame slope protection structure and construction method thereof | |
CN211421166U (en) | Ecological slag blocking facility | |
KR102261997B1 (en) | Eco-Friendly Earth Pouch Steel Net Kit and its Manufacturing Method | |
Mortimer et al. | Investigation of the archaeological landscape at Broom, Bedfordshire: phase 4 | |
CN211312556U (en) | Assembled stock frame slope protection structure | |
CN115943848B (en) | Slope turf protection method and turf storage mechanism | |
DE680477C (en) | Storage area for storing potatoes | |
Siyag et al. | Fencing Work | |
Bruijnzeel et al. | Runoff and soil loss from bench terraces in upland West Java, Indonesia and implications for process modelling | |
CN205794539U (en) | Ecological drought Testudinis culturing pool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |