CN109519212A CN201910054867.8A CN201910054867A CN109519212A CN 109519212 A CN109519212 A CN 109519212A CN 201910054867 A CN201910054867 A CN 201910054867A CN 109519212 A CN109519212 A CN 109519212A
Authority
CN
China
Prior art keywords
goaf
extraction
horizontal drilling
gas
major diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910054867.8A
Other languages
Chinese (zh)
Inventor
邹银辉
程波
陈殿赋
王振
罗伙根
张锋
王典国
李健威
孟范喻
程建圣
孙炳兴
向衍斌
李大勇
杜文波
黄光利
刘俊
冉庆雷
何云文
马智勇
廖文恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Research Institute Co Ltd filed Critical CCTEG Chongqing Research Institute Co Ltd
Priority to CN201910054867.8A priority Critical patent/CN109519212A/en
Publication of CN109519212A publication Critical patent/CN109519212A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Abstract

The present invention relates to a kind of device and methods of major diameter horizontal drilling bridge joint goaf mash gas extraction, belong to coal mine gas security technology area.The device includes casing, butterfly valve, threeway and extraction pipeline;Butterfly valve is mounted in described sleeve pipe, and described sleeve pipe is connect by threeway with extraction pipeline;Casing is placed to inside horizontal drilling;The horizontal drilling construction penetrates coal column on the coal column between the Belt transport crossheading of stope and the air intake duct of Adjacent Working Face;Flow, temperature, gas and carbon monoxide gas concentration measurement device are installed, for level monitoring drilling bridge joint goaf mash gas extraction situation on extraction pipeline.The present invention solves the problems, such as the high-intensitive stope Air return corner gas control under the conditions of inclined Y-shaped draft type, realize the multiple meeting points of goaf gas, continuous controllable extraction, while effectively control corner Gas, spontaneous combustion in goaf is monitored in real time.

Description

The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction
Technical field
The invention belongs to technical field of mine safety, are related to the device of major diameter horizontal drilling bridge joint goaf mash gas extraction And method.
Background technique
Adjustable, controllable and identification gas the real-time monitoring of goaf gas extraction amount is effective control Residual coal in goaf Spontaneous combustion, the important leverage for preventing underground coal mine stope gas at upper corner concentration from transfiniting.Currently, China's Ordos Basin The main mining coal seam of most of highly gassy mines of NORTHEAST MARGIN belongs to two class spontaneous progress, and the phase of being under fire is 4~6 months.And coal seam fully mechanized mining Caving coal mining working face intake is generally 2000m3/ min, return air air quantity are about 1600m3/ min, therefore, with regard to such mine well For lower coal stope, goaf air leaking brought by gas drainage most probably leads to spontaneous combustion in goaf, and And coal body spontaneous combustion becomes the ignition source of gas combustion and gas explosion again, not only seriously affects gas safety extraction, but also at For the great risk source of shaft production;In turn, in prevention and treatment spontaneous combustion process, the goaf taken and coal body are blocked, and are reduced It leaks out and loose coal perfusion fire extinguishing yellow mud colloid forms the measures such as isolation strip, be unfavorable for goaf gas extraction.Cause This fully considers control of the goaf gas extraction to face gas effusion intensity in taking preventing spontaneous combustion of coal measure, During gas drainage, goaf air leaking control prevention and treatment freely burning fire is taken into account, becomes and exists simultaneously gas and spontaneous combustion disaster mine Well realizes the crucial problem of safety in production.
In view of this, the present invention is under the conditions of two class spontaneous combustion high seam high tension coal mining of China's Eastern Margin of Ordos Basin Goaf gas administer problem, propose use major diameter horizontal drilling construction technology, by major diameter horizontal drilling bridge it is mined out Area's mash gas extraction technique is applied to the improvement of face upper corner angle gas, realize the multiple meeting points of fully mechanized coal face return side it is continuous, Controllable extraction.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of dresses of major diameter horizontal drilling bridge joint goaf mash gas extraction It sets and method, for solving the difficulty of the high-intensitive stope Air return corner gas control under the conditions of inclined Y-shaped draft type Topic realizes that the multiple meeting points of goaf gas, continuous controllable extraction can be to mined out while effectively control corner Gas Area's spontaneous combustion of remaining coal is monitored in real time, and effective prevention and control to the compound disaster of mine are realized.
In order to achieve the above objectives, the invention provides the following technical scheme:
A kind of device of major diameter horizontal drilling bridge joint goaf mash gas extraction, including casing, butterfly valve, threeway and drainage tube Road;
The butterfly valve is mounted in described sleeve pipe, and described sleeve pipe is connect by threeway with extraction pipeline;
Described sleeve pipe is placed to inside horizontal drilling;Belt transport crossheading of the horizontal drilling construction in stope On coal column between the air intake duct of Adjacent Working Face, and penetrate coal column;
Flow, temperature, gas and carbon monoxide gas concentration measurement device are installed, for supervising on the extraction pipeline It surveys horizontal drilling and bridges goaf mash gas extraction situation.
Further, the length of the coal column between the Belt transport crossheading of the stope and the air intake duct of Adjacent Working Face Degree is 150~200m, and the width of coal column is 20m, is the connection roadway of perforation between coal column.
Further, the horizontal drilling diameter is 113mm, and the spacing of drilling is 5~10m, construction 14 on each coal column~ 19 major diameter horizontal drillings.
Further, it is wound with cotton yarn in described sleeve pipe, there is a certain amount of polyurethane mixed solution on the cotton yarn, to poly- After the reaction of urethane mixed solution, solidification, horizontal drilling inner wall is sticky with casing, seal is formed, for completely cutting off air Intake.
Further, the method suitable for the major diameter horizontal drilling bridge joint goaf mash gas extraction of described device is specific to wrap Include following steps:
S1: on the coal column between the Belt transport crossheading of stope and the air inlet crossheading of Adjacent Working Face, construction The horizontal drilling of major diameter;
S2: the horizontal drilling of the major diameter of the construction penetrates coal column, after construction, enters casing to embedded in hole;
S3: winding cotton yarn in described sleeve pipe, and a certain amount of polyurethane mixed solution is poured on cotton yarn, mixed to polyurethane After closing solution reaction, solidification, effective closure to casing is realized;
S4: installing butterfly valve in described sleeve pipe, the extraction negative pressure to controlled level drilling;
S5: the casing for being equipped with butterfly valve is connected with threeway;
S6: the threeway connects extraction pipeline, and flow, temperature, gas and an oxidation are installed on the extraction pipeline Carbon gas concentration measuring device, for monitoring major diameter horizontal drilling bridge joint goaf mash gas extraction situation.
Further, the step S3 specifically includes the following steps:
S31: winding cotton yarn on casing, and then mixed polyurethane solutions are poured on cotton yarn, rapidly put casing Enter into drilling;
S32: after the polyurethane solutions after to be mixed sufficiently react, solidify, drill hole inner wall and casing being sticky, shape At seal, to completely cut off the intake of air, the reduction of mash gas extraction concentration is prevented.
Further, in the step S5, the control method of the butterfly valve are as follows:
(1) initial stage of extraction opens butterfly valve, and making the gas in goaf, inflow is horizontal under the action of negative pressure in extraction pipeline In drilling;Meanwhile the feelings of the gas by being set on extraction pipeline, carbon monoxide gas concentration sensor monitoring mash gas extraction Condition;
(2) if finding the opening and closing degree of CO gas, closing or regulating butterfly valve in extraction pipeline, goaf is reduced Interior leaks out, and prevents from losing coal generation spontaneous combustion.
The beneficial effects of the present invention are:
(1) gas at upper corner that the present invention can be used for implementing during underground coal mine coal stope promotes is administered, should Technique is the drilling constructed in coal column using major diameter horizontal drilling construction technology and bridge goaf, and suitable on standby mining face The extraction pipeline of the Large Diameter Pipeline laid in slot, and then ejectment goaf gas play the role of interfering flow field in goaf;
(2) present invention may replace connection lane, and realize completely isolated between crossheading on goaf and standby mining face, keep away Goaf high concentration gas is exempted from and has flowed directly into crossheading on standby mining face, has fundamentally solved what return air gas density transfinited Problem;Bridge line accesses the extraction negative pressure at goaf and is much larger than ventilation negative pressure in the place's of traversing under the conditions of inclined Y-shaped ventilating system, And extraction amount is big, can the more inclined Y-shaped ventilating system goaf deep return air side region high concentration gas that more effectively shuts off pour in Working face;
(3) present invention accesses goaf using multiple bridge lines, realizes the multiple meeting points of goaf return air side region and takes out It adopts and working face near zone and the continuous extraction simultaneously of goaf deep, reduces goaf gas effusion intensity;It accesses mined out The bridge line in area is accessed using multiple pipeline parallel connections, is effectively reduced the local resistance of extraction pipeline, is increased gas drainage Amount, strengthens the control to goaf gas flow field;
(4) present invention is compared with traditional High Position Drilling, and drilling construction project amount is small, and goaf mash gas extraction amount is big, It can be effectively controlled goaf gas flow field, prevent face upper corner angle gas exceeding limit;Each major diameter horizontal drilling and drainage tube Road is connected, and can real time on-line monitoring Residual coal in goaf spontaneous fire identification gas concentration, accomplish conscientiously to mine coal Effective pre-control of charcoal goaf in working faces coal spontaneous combustion;Major diameter horizontal drilling and extraction pipeline connection, are installed on tune Butterfly valve is controlled, to control hole pumping and mining gas negative pressure, so that hole pumping and mining gas amount is realized precisely, effectively controllably, is prevented because adopting Dead zone mash gas extraction amount is excessive, and the air intake caused causes spontaneous combustion of remaining coal.
Detailed description of the invention
In order to keep the purpose of the present invention, technical scheme and beneficial effects clearer, the present invention provides following attached drawing and carries out Illustrate:
Fig. 1 is the integral construction position view of device of the present invention;
Fig. 2 is the level schematic diagram of device of the present invention;
Fig. 3 is the A-A diagrammatic cross-section of Fig. 2;
Fig. 4 is the connection schematic diagram of pipeline and drainage tube.
Specific embodiment
Below in conjunction with attached drawing, a preferred embodiment of the present invention will be described in detail.
As shown in figures 1-4, a kind of device of major diameter horizontal drilling bridge joint goaf mash gas extraction, including casing, butterfly Valve, threeway and extraction pipeline;The butterfly valve is mounted in described sleeve pipe, and described sleeve pipe is connect by threeway with extraction pipeline;Institute Casing is stated to be placed to inside horizontal drilling;Belt transport crossheading and operated adjacent of the horizontal drilling construction in stope On coal column between the air intake duct in face, and penetrate coal column;Flow, temperature, gas and an oxygen are installed on the extraction pipeline Change carbon gas concentration measuring device, for level monitoring drilling bridge joint goaf mash gas extraction situation.
The length of coal column between the Belt transport crossheading of stope and the air intake duct of Adjacent Working Face be 150~ 200m, the width of coal column are 20m, are the connection roadway of perforation between coal column.Horizontal drilling diameter is 113mm, and the spacing of drilling is 5 ~10m, 14~19 major diameter horizontal drillings of constructing on each coal column.It is wound with cotton yarn on casing, has one on the cotton yarn Quantitative polyurethane mixed solution plays horizontal drilling inner wall and casing adhesion after the reaction of polyurethane mixed solution, solidification Come, seal is formed, for completely cutting off the intake of air.
The method that major diameter horizontal drilling bridges goaf mash gas extraction, specifically includes the following steps:
S1: on the coal column between the Belt transport crossheading of stope and the air inlet crossheading of Adjacent Working Face, construction The horizontal drilling of major diameter;
S2: the horizontal drilling of the major diameter of the construction penetrates coal column, after construction, enters casing to embedded in hole;
S3: winding cotton yarn in described sleeve pipe, and a certain amount of polyurethane mixed solution is poured on cotton yarn, mixed to polyurethane After closing solution reaction, solidification, effective closure to casing is realized;Specifically:
S31: winding cotton yarn on casing, and then mixed polyurethane solutions are poured on cotton yarn, rapidly put casing Enter into drilling;
S32: after the polyurethane solutions after to be mixed sufficiently react, solidify, drill hole inner wall and casing being sticky, shape At seal, to completely cut off the intake of air, the reduction of mash gas extraction concentration is prevented.
S4: installing butterfly valve in described sleeve pipe, the extraction negative pressure to controlled level drilling;
S5: the casing for being equipped with butterfly valve is connected with threeway;The wherein control method of butterfly valve are as follows:
(1) initial stage of extraction opens butterfly valve, and making the gas in goaf, inflow is horizontal under the action of negative pressure in extraction pipeline In drilling;Meanwhile the feelings of the gas by being set on extraction pipeline, carbon monoxide gas concentration sensor monitoring mash gas extraction Condition;
(2) if finding the opening and closing degree of CO gas, closing or regulating butterfly valve in extraction pipeline, goaf is reduced Interior leaks out, and prevents from losing coal generation spontaneous combustion.
S6: the threeway connects extraction pipeline, and flow, temperature, gas and an oxidation are installed on the extraction pipeline Carbon gas concentration measuring device, for monitoring major diameter horizontal drilling bridge joint goaf mash gas extraction situation.
Finally, it is stated that preferred embodiment above is only used to illustrate the technical scheme of the present invention and not to limit it, although logical It crosses above preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be Various changes are made to it in form and in details, without departing from claims of the present invention limited range.

Claims (7)

1. a kind of device of major diameter horizontal drilling bridge joint goaf mash gas extraction, which is characterized in that including casing, butterfly valve, three Logical and extraction pipeline;
The butterfly valve is mounted in described sleeve pipe, and described sleeve pipe is connect by threeway with extraction pipeline;
Described sleeve pipe is placed to inside horizontal drilling;Belt transport crossheading and phase of the horizontal drilling construction in stope On coal column between the air intake duct of adjacent working face, and penetrate coal column;
Flow, temperature, gas and carbon monoxide gas concentration measurement device are installed, for monitoring water on the extraction pipeline Flat drill hole bridges goaf mash gas extraction situation.
2. the device of major diameter horizontal drilling bridge joint goaf mash gas extraction according to claim 1, which is characterized in that institute The length for stating the coal column between the Belt transport crossheading of stope and the air intake duct of Adjacent Working Face is 150~200m, coal The width of column is 20m, is the connection roadway of perforation between coal column.
3. the device of major diameter horizontal drilling bridge joint goaf mash gas extraction according to claim 1, which is characterized in that institute Stating horizontal drilling diameter is 113mm, and the spacing of drilling is 5~10m, and 14~19 major diameter levels of construction are bored on each coal column Hole.
4. the device of major diameter horizontal drilling bridge joint goaf mash gas extraction according to claim 1, which is characterized in that institute It states and is wound with cotton yarn on casing, there is a certain amount of polyurethane mixed solution on the cotton yarn, reacted to polyurethane mixed solution, After solidification, horizontal drilling inner wall is sticky with casing, seal is formed, for completely cutting off the intake of air.
5. the major diameter horizontal drilling for being suitable for any one of Claims 1 to 4 described device bridges goaf mash gas extraction Method, which is characterized in that this method specifically includes the following steps:
S1: on the coal column between the Belt transport crossheading of stope and the air inlet crossheading of Adjacent Working Face, construction is big straight The horizontal drilling of diameter;
S2: the horizontal drilling of the major diameter of the construction penetrates coal column, after construction, enters casing to embedded in hole;
S3: winding cotton yarn in described sleeve pipe, and a certain amount of polyurethane mixed solution is poured on cotton yarn, mixes to polyurethane molten After liquid reaction, solidification, effective closure to casing is realized;
S4: installing butterfly valve in described sleeve pipe, the extraction negative pressure to controlled level drilling;
S5: the casing for being equipped with butterfly valve is connected with threeway;
S6: the threeway connects extraction pipeline, installs flow, temperature, gas and carbon monoxide gas on the extraction pipeline Bulk concentration measurement device, for monitoring major diameter horizontal drilling bridge joint goaf mash gas extraction situation.
6. the method for major diameter horizontal drilling bridge joint goaf mash gas extraction according to claim 5, which is characterized in that institute State step S3 specifically includes the following steps:
S31: winding cotton yarn on casing, and then mixed polyurethane solutions are poured on cotton yarn, are rapidly put into casing In drilling;
S32: after the polyurethane solutions after to be mixed sufficiently react, solidify, drill hole inner wall and casing being sticky, and formed close Feng Ti prevents the reduction of mash gas extraction concentration to completely cut off the intake of air.
7. the method for major diameter horizontal drilling bridge joint goaf mash gas extraction according to claim 5, which is characterized in that institute It states in step S5, the control method of the butterfly valve are as follows:
(1) initial stage of extraction opens butterfly valve, the gas in goaf is made to flow into horizontal drilling under the action of negative pressure in extraction pipeline It is interior;Meanwhile the case where gas by being set on extraction pipeline, carbon monoxide gas concentration sensor monitoring mash gas extraction;
(2) it if finding the opening and closing degree of CO gas, closing or regulating butterfly valve in extraction pipeline, reduces in goaf It leaks out, prevents from losing coal generation spontaneous combustion.
CN201910054867.8A 2019-01-21 2019-01-21 The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction Pending CN109519212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910054867.8A CN109519212A (en) 2019-01-21 2019-01-21 The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910054867.8A CN109519212A (en) 2019-01-21 2019-01-21 The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction

Publications (1)

Publication Number Publication Date
CN109519212A true CN109519212A (en) 2019-03-26

Family

ID=65799296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910054867.8A Pending CN109519212A (en) 2019-01-21 2019-01-21 The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction

Country Status (1)

Country Link
CN (1) CN109519212A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810221A (en) * 2019-04-11 2020-10-23 河南理工大学 Method for treating gas on mining face through pumping drainage of U-parallel U + upper corner
CN111946395A (en) * 2020-06-17 2020-11-17 华能庆阳煤电有限责任公司核桃峪煤矿 Pressure relief method for preventing air leakage and communicating accumulated water in goaf
CN112288589A (en) * 2020-10-29 2021-01-29 中煤科工集团重庆研究院有限公司 Method for measuring gas flow field of goaf by utilizing goaf closed wall extraction data
CN112415137A (en) * 2020-10-29 2021-02-26 中煤科工集团重庆研究院有限公司 Method for measuring gas concentration field of goaf by utilizing goaf closed wall extraction data
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113790084A (en) * 2021-09-09 2021-12-14 西安科技大学 Coal mine corner rapid plugging and monitoring system and method
CN114718517A (en) * 2022-03-24 2022-07-08 国能神东煤炭集团有限责任公司 Method for recycling butterfly valve on gas extraction pipe in coal mining operation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4978172A (en) * 1989-10-26 1990-12-18 Resource Enterprises, Inc. Gob methane drainage system
CN201723246U (en) * 2010-07-27 2011-01-26 山西焦煤集团有限责任公司 Ventilating structure for pumping and exhausting gas at coal face
RU2012129944A (en) * 2012-07-16 2014-01-27 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) METHOD OF GAS DISCHARGE MANAGEMENT WHEN EXHAUSTING A COLLECTIVE LAYER BENT TO SELF-IGNITION
CN106223996A (en) * 2016-09-14 2016-12-14 煤科集团沈阳研究院有限公司 Super-large diameter coal bed drilling intubates extraction goaf gas technique
CN107859530A (en) * 2017-11-07 2018-03-30 中国矿业大学(北京) A kind of ultra close distance coal seam exploitation gas controls method altogether with coal spontaneous combustion
CN108625893A (en) * 2018-05-29 2018-10-09 西安科技大学 A kind of coal mine High Position Drilling pressure relief gas pumping mining intelligent appraisement and regulator control system
CN209586428U (en) * 2019-01-21 2019-11-05 中煤科工集团重庆研究院有限公司 The device of major diameter horizontal drilling bridge joint goaf mash gas extraction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4978172A (en) * 1989-10-26 1990-12-18 Resource Enterprises, Inc. Gob methane drainage system
CN201723246U (en) * 2010-07-27 2011-01-26 山西焦煤集团有限责任公司 Ventilating structure for pumping and exhausting gas at coal face
RU2012129944A (en) * 2012-07-16 2014-01-27 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) METHOD OF GAS DISCHARGE MANAGEMENT WHEN EXHAUSTING A COLLECTIVE LAYER BENT TO SELF-IGNITION
CN106223996A (en) * 2016-09-14 2016-12-14 煤科集团沈阳研究院有限公司 Super-large diameter coal bed drilling intubates extraction goaf gas technique
CN107859530A (en) * 2017-11-07 2018-03-30 中国矿业大学(北京) A kind of ultra close distance coal seam exploitation gas controls method altogether with coal spontaneous combustion
CN108625893A (en) * 2018-05-29 2018-10-09 西安科技大学 A kind of coal mine High Position Drilling pressure relief gas pumping mining intelligent appraisement and regulator control system
CN209586428U (en) * 2019-01-21 2019-11-05 中煤科工集团重庆研究院有限公司 The device of major diameter horizontal drilling bridge joint goaf mash gas extraction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810221A (en) * 2019-04-11 2020-10-23 河南理工大学 Method for treating gas on mining face through pumping drainage of U-parallel U + upper corner
CN111810221B (en) * 2019-04-11 2022-05-24 河南理工大学 Method for treating gas on mining face through pumping drainage of U-parallel U + upper corner
CN111946395A (en) * 2020-06-17 2020-11-17 华能庆阳煤电有限责任公司核桃峪煤矿 Pressure relief method for preventing air leakage and communicating accumulated water in goaf
CN112288589A (en) * 2020-10-29 2021-01-29 中煤科工集团重庆研究院有限公司 Method for measuring gas flow field of goaf by utilizing goaf closed wall extraction data
CN112415137A (en) * 2020-10-29 2021-02-26 中煤科工集团重庆研究院有限公司 Method for measuring gas concentration field of goaf by utilizing goaf closed wall extraction data
CN112288589B (en) * 2020-10-29 2022-04-08 中煤科工集团重庆研究院有限公司 Method for measuring gas flow field of goaf by utilizing goaf closed wall extraction data
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113790084A (en) * 2021-09-09 2021-12-14 西安科技大学 Coal mine corner rapid plugging and monitoring system and method
CN114718517A (en) * 2022-03-24 2022-07-08 国能神东煤炭集团有限责任公司 Method for recycling butterfly valve on gas extraction pipe in coal mining operation

Similar Documents

Publication Publication Date Title
CN109519212A (en) The device and method of major diameter horizontal drilling bridge joint goaf mash gas extraction
CN105041374B (en) High methane Goaf of Close Distance Coal Seams gas cooperates with control method with coal fire
RU2341654C2 (en) Method and system of fluid medium recirculation in borehole system
CN106437632B (en) A kind of old goaf gas pumping method in colliery
CN110714797B (en) System and method for preventing and controlling fire in coal goaf
CN107387159A (en) To drilling intelligent drainage function dreg removing system and its application under a kind of coal mine gas drainage
CN108678798A (en) The control method of spontaneous combustion in goaf during being withdrawn for fully mechanized coal face
CN109236350A (en) High inclination-angle super high seam fire hazard treating method
CN112546487B (en) Treatment process for fire zone of coal seam around coal mine collapse column
CN109162751A (en) Coal seam group near interval fire hazard treating method
CN209586428U (en) The device of major diameter horizontal drilling bridge joint goaf mash gas extraction
CN103195470B (en) Drilling construction Gas gathering-device
CA1206411A (en) Oil recovery by in situ combustion
CN111594252B (en) Prevention and control system and prevention and control method for spontaneous combustion of coal in goaf during mining of extremely spontaneous combustion coal seam
CN108798565A (en) The fine pressure control drainage system of high pressured slatwater layer and pressure control water discharge method
CN113309557B (en) Fire prevention and extinguishing method for exploiting inflammable coal seam
CN116181398A (en) Goaf nitrogen blocking fine water mist fire prevention and extinguishing method
CN113107461B (en) Intelligent monitoring and control system for coal mine gas extraction and application method thereof
CN104819009B (en) Closed excavation roadway opening and high concentration hydrogen sulfide and gas treatment method
CN107143374A (en) The gas production method and system of belt pressing type drilling malleation mining
CN111794750A (en) Coal and oil shale combined mining safety withdrawal method
CN206636600U (en) A kind of stronger gas pumping device of stability
CN205805544U (en) Wear down existing shield tunnel pipe curtain construction settlement control system
RU2624838C1 (en) Method of operation of producing galleries of dip-working blocks at thermal development of oil fields
CN201310376Y (en) Safety protection system for drilling and spraying orifice

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination