CN109518586A - It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method - Google Patents

It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method Download PDF

Info

Publication number
CN109518586A
CN109518586A CN201910034160.0A CN201910034160A CN109518586A CN 109518586 A CN109518586 A CN 109518586A CN 201910034160 A CN201910034160 A CN 201910034160A CN 109518586 A CN109518586 A CN 109518586A
Authority
CN
China
Prior art keywords
assembly portion
girder
plate
web
cutting line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910034160.0A
Other languages
Chinese (zh)
Inventor
徐昕宇
曾永平
陈克坚
陈星宇
陶奇
郑晓龙
杨国静
苏延文
董俊
庞林
周川江
颜永逸
刘力维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201910034160.0A priority Critical patent/CN109518586A/en
Publication of CN109518586A publication Critical patent/CN109518586A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

Novel increase plate girder, steel-concrete connecting beam and its processing method the invention discloses a kind of, increasing plate girder includes the first assembly portion, the second assembly portion and third assembly portion, first assembly portion includes the flange plate one and web one of whole roll forming, second assembly portion includes the flange plate two and web two of whole roll forming, third assembly portion includes steel plate, and both ends are connected with web one and web two by butt weld respectively;Steel-concrete connecting beam include any one kind it is novel increase plate girder, and in the novel concrete slab being equipped on plate girder that increases, novel increasing is connected with connector between plate girder and concrete slab;Processing method is to obtain whole rolled steel plate-girder by whole roll;The web of whole rolled steel plate-girder is cut according to cutting line, forms the first assembly portion and the second assembly portion;First assembly portion and third assembly portion are subjected to butt welding, the second assembly portion and third assembly portion are subjected to butt welding, obtain increasing plate girder.

Description

It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method
Technical field
The present invention relates to technical field of bridge engineering, in particular to it is a kind of it is novel increase plate girder, steel-concrete connecting beam and Its processing method.
Background technique
Steel-concrete connecting beam can give full play to that steel tensile strength is high, ductility is good and concrete crushing strength height, rigidity are big Material sexual clorminance, in science of bridge building using more and more extensive.It is using I-shaped steel plate mostly in steel-concrete connecting beam Beam, especially for the bridge of middle large span, rigidity and bending resistance to girder require very high, the design of main depth of beam, that is, girder steel The case where height can reach greater than 2m;But under existing processing technology, only 1.2m deck-molding plate girder below can be by whole Body is rolling.As Figure 1-Figure 2, plate girder more than 1.2m deck-molding is all by the way that two flange plates 2 are respectively welded at Molding on web 1, such a plate girder just includes 4 fillet welding crack structures, although the mode of welding can satisfy deck-molding It is required that but a fairly large number of fillet weld 3 not only weld strength is big, but also the deformation extent of welding quality and plate girder is difficult to Guarantee, fillet weld 3 becomes the weakness zone of structure stress, and the processing method of this plate girder has seriously affected the peace of bridge structure Entirely.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, provides and a kind of novel increase steel plate Beam, steel-concrete connecting beam and its processing method.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
It is a kind of it is novel increase plate girder, including the first assembly portion, the second assembly portion and third assembly portion, described first spells Dress portion includes the flange plate one and web one of whole roll forming, and second assembly portion includes the flange plate of whole roll forming Two and web two, the cross section in first assembly portion and the second assembly portion is T shape, and third assembly portion includes steel plate, and The both ends in third assembly portion are connected with the web one and web two by butt weld respectively.
The novel spelling increased plate girder and pass through the first assembly portion, the second assembly portion and third assembly portion of the present invention Dress, can not only greatly improve steel plate depth of beam, can be more than the plate girder of 2m with machine-shaping deck-molding.Further, only lead to Cross the deck-molding for increasing third assembly portion, so that it may significantly improve the deck-molding for entirely increasing plate girder, be highly convenient for processing;And first spells By roll forming, web is closely connect with flange plate for dress portion and the second assembly portion, and no fillet weld exists, and solves fillet welding seam weld Quality problems are connect, transmission force property is excellent;Finally, the first assembly portion, the second assembly portion and third assembly portion pass through butt weld phase Connection, processing and fabricating is convenient, is readily transported, the welding quality of butt weld is easy to ensure.
Particularly, the first assembly of the present invention portion and the second assembly portion can be cut again by the whole I-steel that rolls It cuts to obtain, or whole rolled h-section steel beam cuts to obtain again, or the various ways such as whole rolling T-steel obtain, as long as can roll simultaneously Produce flange plate and web.And the width and thickness of flange plate one of the present invention and flange plate two can be identical, it can also It is not identical, depending on Structural Design Requirement.Preferably, it when steel plate girder construction is applied in steel-concrete connecting beam, can use mixed The compressive property for coagulating soil suitably reduces the width and thickness of top flange plate.
Preferably, third assembly portion further includes the ribbed stiffener being equipped in steel plate, to increase plate girder described in enhancing Rigidity.
Preferably, several cavitys are additionally provided on the web one, third assembly portion and web two, the presence of cavity is not only It can reduce steel using amount, reduce cost, and be substantially shorter fusion length, reduce welding workload.
Preferably, the cavity is located on the web one or third assembly portion or web two or the cavity is located at institute State the join domain of web one, third assembly portion and web two.
Preferably, the shape of the cavity includes polygon, circle and similar round, is not limited to above-mentioned shape, is also possible to Other various unusual shapes, but, in order to guarantee the integral strength of structure, it is preferred that the cavity is axially symmetric structure.
Preferably, first assembly portion is identical with size, the shape in the second assembly portion, convenient for assembled processing, certainly, institute Stating the size in the first assembly portion and the second assembly portion, shape identical can also be different.
Preferably, first assembly portion and the second assembly portion are that whole rolled steel plate-girder is formed along cutting wire cutting. Preferably, the cutting line is straight line.
Preferably, the cutting line is broken line, and the cutting line includes several cutter units interconnected, Mei Gesuo Stating cutter unit includes eminence cutting line, and the connection of lower cutting line and the connection eminence cutting line and lower cutting line is cut Secant, the eminence cutting line and lower cutting line are horizontal line, and the length of the eminence cutting line and lower cutting line It is equal.It is after obtaining the first assembly portion and the second assembly portion, two assembly portion dislocation are assembled, and docked respectively with third assembly portion Postwelding, so that it may increase plate girder described in obtaining.
It is cut according to above-mentioned broken line cutting line, taking full advantage of whole rolled plate (can be I-steel or H Fashioned iron etc.) processed edge, not only process it is extremely convenient, and by simply dislocation assembly can effectively increase plate girder Height, increase deck-molding after plate girder web naturally occurring cavity, steel using amount is greatly reduced, reduces costs.Certainly, First assembly portion and the second assembly portion can also obtain by other means, be not limited to above-mentioned integral cutting mode, and such as two Assembled portion is to be respectively cut in two pieces of different whole rolled plates, or distinguish rolling two assembly portions etc..It is empty The acquisition of chamber is also not necessarily limited to above-mentioned integral cutting self-assembling formation, can also specially make cavity to mitigate the weight of web.
Preferably, each connection cutting line is straight line or curve, described straight for the ease of processing, preferably straight line Line includes vertical line and oblique line, in order to further increase the area of cavity, reduction steel using amount, preferably oblique line.
Preferably, two of each cutter unit connection cutting lines are relative to the eminence cutting line axial symmetry Setting, at this point, the girder steel plate that increases completed the process is symmetrical structure, performance is more preferably.
Preferably, the butt weld is full penetration butt weld, further increases bonding strength, meets bridge steel beam slab Intensity requirement.
Preferably, first assembly portion, the second assembly portion and third assembly portion are all made of weathering steel, are not necessarily to coating, side Just it constructs.
The invention also discloses it is a kind of it is novel increase steel-concrete connecting beam, increase including any described one kind is novel Plate girder, and in the novel concrete slab for increasing pouring molding on plate girder, it is described it is novel increase plate girder and Several connectors are connected between the concrete slab, to form the overall structure of common stress.The connector can be with It is WELDING STUDS etc..At this point, the deck-molding for not only increasing plate girder greatly improves, meet construction requirement, and solves the matter of fillet weld Amount problem, then in oversite concrete plate above, then give full play to that steel tensile strength is high, ductility is good and concrete crushing strength Material sexual clorminance high, rigidity is big, is highly suitable for science of bridge building field.
The invention also discloses a kind of novel processing methods for increasing plate girder, comprising the following steps:
Step 1: whole rolled steel plate-girder is obtained by whole roll;
Step 2: the web of the whole rolled steel plate-girder is cut according to cutting line, formed the first assembly portion with Second assembly portion;
Step 3: first assembly portion and third assembly portion are subjected to butt welding, by second assembly portion and third Assembled portion carries out butt welding, obtains increasing plate girder.
What processing obtained through the invention increases plate girder, is integrally rolled using batch production, web closely connects with flange plate It connects, no fillet weld exists, and transmission force property is excellent;And processing and fabricating is convenient, is readily transported, the welding quality of butt weld is easy to protect Barrier, further, can greatly improve steel plate depth of beam, can be more than the girder steel plate of 2m with machine-shaping deck-molding, or even remote super Cross the plate girder of 2m.
Particularly, whole rolled steel plate-girder of the present invention can be I-steel or H profile steel, and I-steel or H-type The width and thickness of two blocks of flange plates up and down of steel may be the same or different.The cutting line can be straight line and be also possible to roll over The partial region of line, the broken line can be curve.
Preferably, the distance of top flange plate of the cutting line apart from the whole rolled steel plate-girder is equal to the cutting line The distance of bottom wing listrium apart from the whole rolled steel plate-girder, at this point, size, the shape one of the two module unit plates that cutting is formed It causes, convenient for assembled processing.
Compared with prior art, it is of the present invention increase plate girder the utility model has the advantages that
The novel spelling increased plate girder and pass through the first assembly portion, the second assembly portion and third assembly portion of the present invention Dress, can not only greatly improve steel plate depth of beam, can be more than the plate girder of 2m with machine-shaping deck-molding.Further, only lead to Cross the deck-molding for increasing third assembly portion, so that it may significantly improve the deck-molding for entirely increasing plate girder, be highly convenient for processing;And first spells By roll forming, web is closely connect with flange plate for dress portion and the second assembly portion, and no fillet weld exists, and solves fillet welding seam weld Quality problems are connect, transmission force property is excellent;Finally, the first assembly portion, the second assembly portion and third assembly portion pass through butt weld phase Connection, processing and fabricating is convenient, is readily transported, the welding quality of butt weld is easy to ensure.
Compared with prior art, it is of the present invention increase steel-concrete connecting beam the utility model has the advantages that
Of the present invention to increase in steel-concrete connecting beam, the deck-molding for not only increasing plate girder greatly improves, and meets construction and wants It asks, and solves the quality problems of fillet weld, then in oversite concrete plate above, then give full play to steel tensile strength height, prolong The material sexual clorminance that malleability is good and concrete crushing strength is high, rigidity is big, is highly suitable for science of bridge building field.
Compared with prior art, the processing method of the present invention for increasing plate girder the utility model has the advantages that
What processing obtained through the invention increases plate girder, is integrally rolled using batch production, web closely connects with flange plate It connects, no fillet weld exists, and transmission force property is excellent;And processing and fabricating is convenient, is readily transported, the welding quality of butt weld is easy to protect Barrier, further, can greatly improve steel plate depth of beam, can be more than the girder steel plate of 2m with machine-shaping deck-molding, or even remote super Cross the plate girder of 2m.
Detailed description of the invention:
Fig. 1 is the front view of the existing plate girder being welded described in background technology.
Fig. 2 is the side view of the existing plate girder being welded described in background technology.
It is marked in Fig. 1-Fig. 2: 1- web, 2- flange plate, 3- fillet weld.
Fig. 3 is the front view for increasing plate girder novel described in the embodiment of the present invention 1.
Fig. 4 is the side view for increasing plate girder novel described in the embodiment of the present invention 1.
Fig. 5 is the side view for increasing plate girder novel described in the embodiment of the present invention 2.
Fig. 6 is the front view of whole rolled steel plate-girder cutting described in the embodiment of the present invention 1.
Fig. 7 is the side view of whole rolled steel plate-girder cutting described in the embodiment of the present invention 1.
Fig. 8 is the front view for increasing plate girder novel described in the embodiment of the present invention 3.
Fig. 9 is the side view for increasing plate girder novel described in the embodiment of the present invention 3.
Figure 10 is the front view of whole rolled steel plate-girder cutting described in the embodiment of the present invention 3.
Figure 11 is the schematic diagram of cutting line described in the embodiment of the present invention 3.
Figure 12 is the front view for increasing steel-concrete connecting beam novel described in the embodiment of the present invention 4.
Figure 13 is the side view for increasing steel-concrete connecting beam novel described in the embodiment of the present invention 4.
It is marked in Fig. 3-Figure 13: 0- entirety rolled steel plate-girder, the first assembly of 1- portion, 11- flange plate one, 12- web one, 2- Second assembly portion, 21- flange plate two, 22- web two, 3- third assembly portion, 31- ribbed stiffener, 4- butt weld, 5- cutting line, 51- cutter unit, 52- eminence cutting line, 53- lower cutting line, 54- connection cutting line, 6- concrete slab, 7- connector.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
As Figure 3-Figure 4, a kind of novel to increase plate girder, including the first assembly portion 1, the second assembly portion 2 and third Assembled portion 3, first assembly portion 1 include the flange plate 1 and web 1 of whole roll forming, second assembly portion 2 The cross section in flange plate 2 21 and web 2 22 including whole roll forming, first assembly portion 1 and the second assembly portion 2 is T shape, third assembly portion 3 includes steel plate, and the web 1 is connected with third assembly portion 3 by butt weld 4 It connects, the web 2 22 is connected with third assembly portion 3 by butt weld 4.
Particularly, the first assembly of the present invention portion 1 and the second assembly portion 2 can roll I-steel again by whole Cutting obtains, or whole rolled h-section steel beam cuts to obtain again, or the various ways such as whole rolling T-steel obtain, as long as can be simultaneously Roll out flange plate and web.And the width and thickness of flange plate 1 of the present invention and flange plate 2 12 can phase Together, can not also be identical, depending on Structural Design Requirement.
In the present embodiment, as Figure 6-Figure 7, first assembly portion 1 and the second assembly portion 2 are by cutting whole roll Plate girder 0 processed obtains, specifically, whole rolled steel plate-girder 0 is divided into two along straight cuts line 5, then spells described first Butt welding third assembly portion 3 between dress portion 1 and the second assembly portion 2, to increase deck-molding, to obtain increasing plate girder.
Embodiment 2
As shown in figure 5, the present embodiment the difference from embodiment 1 is that, also according to setting on the steel plate in third assembly portion 3 Meter, which needs to design, vertical or lateral ribbed stiffener 31, to enhance the rigidity of plate girder.The ribbed stiffener 31 can with it is described Steel plate is welded to connect, and can also be integrally formed with the steel plate.The ribbed stiffener 31 can be laterally arranged along the steel plate, or It is vertically arranged, or laterally/vertical arranged in a crossed manner.And above-mentioned add can also be equipped in first assembly portion 1 and the second assembly portion 2 Strength rib 31.
Embodiment 3
As illustrated in figs. 8-9, the present embodiment the difference from embodiment 1 is that, it is described increase be additionally provided on plate girder it is several A cavity, specifically, in the present embodiment, the cavity is located at the company of the web 1, third assembly portion 3 and web 2 22 Region is connect, certain cavity can also individually be located on one 12/ third assembly portion of web, 3/ web 2 22, and cavity can pass through digging Hole obtains, and can also can spelled in assembled integral preceding acquisition by the assembled self-assembling formation between assembled portion, cavity Self-assembling formation when dressing up entirety can also obtain again after assembly is integral.
As shown in figs. 10-11, process it is above-mentioned when increasing plate girder, can be along cutting line 5 by whole rolled plate Beam 0 is divided into two, and obtains the first assembly portion 1 and the second assembly portion 2, and the cutting line 5 is broken line, if the cutting line 5 includes A dry cutter unit 51 interconnected, each cutter unit 51 include eminence cutting line 52, lower cutting line 53 and Connect the connection cutting line 54 of the eminence cutting line 52 and lower cutting line 53, the eminence cutting line 52 and lower cutting line 53 be horizontal line, and the equal length of the eminence cutting line 52 and lower cutting line 53, i.e. L1=L2.Each connection Cutting line 54 can be straight line or curve, and the straight line includes vertical line and oblique line.Specifically, in the present embodiment, Mei Gesuo Stating connection cutting line 54 is oblique line, and the connection cutting line 54 of two of each cutter unit 51 is cut relative to the eminence The setting of 52 axial symmetry of secant, and the distance of flange plate of the eminence cutting line 52 apart from the whole rolled steel plate-girder 0 is equal to The distance of flange plate of the lower cutting line 53 apart from the whole rolled steel plate-girder 0, i.e. D1=D2.
In the present embodiment, it is cut and is misplaced by the cutting line of broken line type 5 assembly, it can be natural on plate girder Cavity is formed, rolled steel dosage can not only be further reduced, reduce cost, and can be reduced the length of butt weld 4, reduces Welder It measures.
Embodiment 4
As shown in Figure 12-Figure 13, it is a kind of it is novel increase steel-concrete connecting beam, including the novel increasing of any described one kind High plate girder, and it is described it is novel increase the concrete slab 6 being equipped on plate girder, it is described novel to increase plate girder and institute It states and is connected with connector 7 between concrete slab 6, to form the overall structure of common stress.The connector 7 can be shearing Nail etc..At this point, not only the novel deck-molding for increasing plate girder greatly improves, meet construction requirement, and solves the matter of fillet weld Amount problem, then in oversite concrete plate above, then give full play to that steel tensile strength is high, ductility is good and concrete crushing strength Material sexual clorminance high, rigidity is big, is highly suitable for science of bridge building field.
The width and thickness of flange plate 1 and flange plate 2 21 of the present invention can be identical, can not also be identical, depending on knot Depending on structure design requirement.When steel plate girder construction is applied in steel-concrete connecting beam, the compressive property that can use concrete is appropriate Reduce the width and thickness of top flange plate.
Embodiment 5
A kind of novel processing method for increasing plate girder, comprising the following steps:
Step 1: whole rolled steel plate-girder 0 is obtained by whole roll, at this point, the web and the wing of whole rolled steel plate-girder 0 Without fillet weld between listrium, reduce the weak link of structure stress;
Step 2: the web of the whole rolled steel plate-girder 0 is cut according to cutting line 5, forms the first assembly portion 1 With the second assembly portion 2, while in the third assembly portion 3 of factory process steel plate form.Cutting line 5 can be described in embodiment 1 Linear cutting line, be also possible to the cutting line of broken line type described in embodiment 3, it is preferred that 5 distance of cutting line The distance of the top flange plate of the entirety rolled steel plate-girder 0 is equal to the cutting line 5 under the whole rolled steel plate-girder 0 The distance of flange plate, i.e. D1=D2, at this point, the size shape in the two assembly portions formed is consistent, convenient for assembled processing.
Step 3: the web 1 in first assembly portion 1 and third assembly portion 3 are subjected to butt welding, by described second The web 2 22 in assembled portion 2 and third assembly portion 3 carry out butt welding, obtain increasing plate girder.When the cutting line 5 is broken line type When, can misplace assembly, so that self-assembling formation cavity reduces steel using amount on the basis of meeting Structural strength calls, reduce Construction cost.
In the case that the deck-molding of whole rolled steel plate-girder 0 is 1.2m, not only may be used using processing method of the present invention To process the plate girder that deck-molding is greater than 1.2m, it might even be possible to process the plate girder that deck-molding is far longer than 2m.In the present embodiment In, the cutting line 5 as described according to Figure 10 is cut, and the deck-molding of whole rolled steel plate-girder 0 is 1.2m, third assembly portion steel plate Height be 0.3m, the D1=D2=0.15m of cutter unit 51, at this point, the deck-molding for the plate girder that assembled welding processing goes out is 2.4m。
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (10)

  1. Novel increase plate girder 1. a kind of, which is characterized in that including the spelling of the first assembly portion (1), the second assembly portion (2) and third Dress portion (3), first assembly portion (1) include the flange plate one (11) and web one (12) of whole roll forming, and described second Assembled portion (2) includes the flange plate two (21) and web two (22) of whole roll forming, and first assembly portion (1) and second are spelled The cross section in dress portion (2) is T shape, and third assembly portion (3) includes steel plate, and the both ends in third assembly portion (3) are distinguished It is connected with the web one (12) and web two (22) by butt weld (4).
  2. 2. one kind according to claim 1 it is novel increase plate girder, which is characterized in that third assembly portion (3) also Including the ribbed stiffener (31) being equipped on the steel plate.
  3. 3. one kind according to claim 1 it is novel increase plate girder, which is characterized in that the web one (12), third Several cavitys are additionally provided on assembled portion (3) and web two (22).
  4. 4. one kind according to claim 3 it is novel increase plate girder, which is characterized in that the cavity is located at the web On one (12) or third assembly portion (3) or web two (22) or the cavity is located at the web one (12), third assembly portion (3) and the join domain of web two (22).
  5. 5. one kind according to claim 1 to 4 it is novel increase plate girder, which is characterized in that first assembly portion (1) and the second assembly portion (2) is that whole rolled steel plate-girder (0) is cut along cutting line (5).
  6. 6. one kind according to claim 5 it is novel increase plate girder, which is characterized in that the cutting line (5) be broken line, The cutting line (5) includes several cutter units (51) interconnected, and each cutter unit (51) includes that eminence is cut The connection cutting line of secant (52), lower cutting line (53) and connection the eminence cutting line (52) and lower cutting line (53) (54), the eminence cutting line (52) and lower cutting line (53) are horizontal line, and the eminence cutting line (52) and lower The equal length of cutting line (53);Or the cutting line (5) is straight line.
  7. 7. one kind according to claim 6 it is novel increase plate girder, which is characterized in that each connection cutting line It (54) is straight line or curve, the straight line includes vertical line and oblique line.
  8. Novel increase steel-concrete connecting beam 8. a kind of, which is characterized in that including as claimed in claim 1 a kind of new Type increases plate girder, and in the novel concrete slab (6) for increasing pouring molding on plate girder, the novel increasing Several connectors (7) are connected between high plate girder and the concrete slab (6).
  9. 9. a kind of novel processing method for increasing plate girder, which is characterized in that processing as claimed in claim 1 one Kind novel increases plate girder, comprising the following steps:
    Step 1: whole rolled steel plate-girder (0) is obtained by whole roll;
    Step 2: the web of the whole rolled steel plate-girder (0) is cut according to cutting line (5), forms the first assembly portion (1) and the second assembly portion (2);
    Step 3: carrying out butt welding for first assembly portion (1) and third assembly portion (3), by second assembly portion (2) and Third assembly portion (3) carries out butt welding, obtains increasing plate girder.
  10. 10. the novel processing method for increasing plate girder of one kind according to claim 9, which is characterized in that the cutting The distance of top flange plate of the line (5) apart from the whole rolled steel plate-girder (0) is equal to the cutting line (5) and rolls apart from the entirety The distance of the bottom wing listrium of plate girder (0) processed.
CN201910034160.0A 2019-01-14 2019-01-14 It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method Pending CN109518586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910034160.0A CN109518586A (en) 2019-01-14 2019-01-14 It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910034160.0A CN109518586A (en) 2019-01-14 2019-01-14 It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method

Publications (1)

Publication Number Publication Date
CN109518586A true CN109518586A (en) 2019-03-26

Family

ID=65798936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910034160.0A Pending CN109518586A (en) 2019-01-14 2019-01-14 It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method

Country Status (1)

Country Link
CN (1) CN109518586A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900742A (en) * 2021-01-15 2021-06-04 西南交通大学 I-shaped beam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060085145A (en) * 2005-01-21 2006-07-26 현대제철 주식회사 Hybrid beam
KR20090090904A (en) * 2008-02-22 2009-08-26 연세대학교 산학협력단 Method for introducing pre-stress into the steel girder
CN201411823Y (en) * 2009-05-27 2010-02-24 北京京诚华宇建筑设计研究院有限公司 Novel steel-concrete cellular composite beam
CN102704620A (en) * 2012-06-28 2012-10-03 山东大学 Solid-web H-shaped honeycomb steel beam for polygonal hole
CN103276849A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Castellated beam, concrete flitch beam and design method
CN209482114U (en) * 2019-01-14 2019-10-11 中铁二院工程集团有限责任公司 It is a kind of novel to increase plate girder and steel-concrete connecting beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060085145A (en) * 2005-01-21 2006-07-26 현대제철 주식회사 Hybrid beam
KR20090090904A (en) * 2008-02-22 2009-08-26 연세대학교 산학협력단 Method for introducing pre-stress into the steel girder
CN201411823Y (en) * 2009-05-27 2010-02-24 北京京诚华宇建筑设计研究院有限公司 Novel steel-concrete cellular composite beam
CN102704620A (en) * 2012-06-28 2012-10-03 山东大学 Solid-web H-shaped honeycomb steel beam for polygonal hole
CN103276849A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Castellated beam, concrete flitch beam and design method
CN209482114U (en) * 2019-01-14 2019-10-11 中铁二院工程集团有限责任公司 It is a kind of novel to increase plate girder and steel-concrete connecting beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900742A (en) * 2021-01-15 2021-06-04 西南交通大学 I-shaped beam

Similar Documents

Publication Publication Date Title
CN201671229U (en) Shear connector
CN204530475U (en) Little width bridge deck wet seam syndeton
CN103388376B (en) A kind of Wavelike steel webplate girder construction improving fatigue resistance
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN209482114U (en) It is a kind of novel to increase plate girder and steel-concrete connecting beam
CN103741584A (en) Lower flange anti-pulling composite box girder with corrugated steel webs and construction method
CN109518586A (en) It is a kind of novel to increase plate girder, steel-concrete connecting beam and its processing method
CN205115992U (en) Corrugated -steel -web combined box girder
CN103835434B (en) H profile steel with ribbing and H profile steel xoncrete structure with ribbing
CN109403465A (en) A kind of steel-concrete combined joint and preparation method thereof
CN112900262A (en) Combined bridge deck structure of bridge, bridge structure and construction method of bridge structure
CN209194845U (en) A kind of novel plate girder and steel-concrete connecting beam
CN107012984A (en) A kind of bolted honeycomb H girder steels and preparation method
CN107052683A (en) A kind of vertically and horizontally girder steel temporary fastening device and its fixing means
CN106835929A (en) A kind of assembled Wavelike steel webplate continuous composite beam
CN201785937U (en) H-shaped steel beam
CN209339326U (en) A kind of steel-concrete combined joint
CN108867345B (en) Steel bridge invisible bent cap structure capable of saving space under urban bridge and construction method thereof
CN106400668A (en) Combined shear connector for corrugated steel web and corrugated steel base plate and construction method
CN208280454U (en) Double steel plate Combination beam of steel and concrete
CN110453849A (en) A kind of longitudinal direction thickens I-steel
CN214831926U (en) Combined bridge deck structure of bridge and bridge structure
CN109372184A (en) A kind of novel plate girder and steel-concrete connecting beam
CN105803914A (en) Composite beam with channel beam and bridge
CN202831392U (en) Connecting steel component for joint part of steel reinforced concrete laminated beams

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination