CN109513492A - A kind of efficient old metal crushing device - Google Patents
A kind of efficient old metal crushing device Download PDFInfo
- Publication number
- CN109513492A CN109513492A CN201811473195.6A CN201811473195A CN109513492A CN 109513492 A CN109513492 A CN 109513492A CN 201811473195 A CN201811473195 A CN 201811473195A CN 109513492 A CN109513492 A CN 109513492A
- Authority
- CN
- China
- Prior art keywords
- crusher chamber
- dust
- chamber
- settler
- charging aperture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C13/00—Disintegrating by mills having rotary beater elements ; Hammer mills
- B02C13/14—Disintegrating by mills having rotary beater elements ; Hammer mills with vertical rotor shaft, e.g. combined with sifting devices
- B02C13/18—Disintegrating by mills having rotary beater elements ; Hammer mills with vertical rotor shaft, e.g. combined with sifting devices with beaters rigidly connected to the rotor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D46/00—Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
- B01D46/10—Particle separators, e.g. dust precipitators, using filter plates, sheets or pads having plane surfaces
- B01D46/12—Particle separators, e.g. dust precipitators, using filter plates, sheets or pads having plane surfaces in multiple arrangements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C13/00—Disintegrating by mills having rotary beater elements ; Hammer mills
- B02C13/26—Details
- B02C13/28—Shape or construction of beater elements
- B02C13/2804—Shape or construction of beater elements the beater elements being rigidly connected to the rotor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C21/00—Disintegrating plant with or without drying of the material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/02—Feeding devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/08—Separating or sorting of material, associated with crushing or disintegrating
- B02C23/16—Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/18—Adding fluid, other than for crushing or disintegrating by fluid energy
- B02C23/24—Passing gas through crushing or disintegrating zone
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C4/00—Crushing or disintegrating by roller mills
- B02C4/02—Crushing or disintegrating by roller mills with two or more rollers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C13/00—Disintegrating by mills having rotary beater elements ; Hammer mills
- B02C13/26—Details
- B02C13/28—Shape or construction of beater elements
- B02C2013/2808—Shape or construction of beater elements the beater elements are attached to disks mounted on a shaft
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/08—Separating or sorting of material, associated with crushing or disintegrating
- B02C23/16—Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
- B02C2023/165—Screen denying egress of oversize material
Landscapes
- Engineering & Computer Science (AREA)
- Food Science & Technology (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention discloses a kind of efficient old metal crushing devices, including the first crusher chamber, second crusher chamber, dust settler and dust removal machine, first crusher chamber is set to the top of the second crusher chamber, it is connected between first crusher chamber and the second crusher chamber by connecting cavity, the side of first crusher chamber is equipped with first charging aperture, the other end of first charging aperture is equipped with feeding device, first crusher chamber is equipped with second charging aperture close to the side top of first charging aperture, the top side of first crusher chamber is equipped with fume pipe, first crusher chamber is connected to dust settler by fume pipe, the first asepwirator pump is provided on fume pipe, side of the dust settler far from the first crusher chamber is connected with dust removal machine by discharge pipe and the second asepwirator pump, dust settler and dust removal machine are respectively arranged on workbench, the bottom of workbench is equipped with supporting leg and auxiliary branch Frame, for the utility model by broken process twice, crushing effect is more preferable, and can achieve dust removing effects, safe and efficient.
Description
Technical field
The present invention relates to old metal utilization technology field, specially a kind of efficient old metal crushing device.
Background technique
Old metal and metal alloy be broken be will be under useless car body, tinplate class, old household electrical appliances, bicycle, slack tank etc.
Equal waste materials make the important important step of supervisory steel raw material processed, which is completed by scrap iron crusher, many
Crushing plant, material size is still larger and uneven after being crushed, and also needs to be crushed again many times, adds additional working hour,
The production cost of enterprise is improved, and dust-removing process is single during broken, dust removing effects are bad.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of efficient old metal crushing device
Problem.
To achieve the above object, the invention provides the following technical scheme: a kind of efficient old metal crushing device, including first
Crusher chamber, the second crusher chamber, dust settler and dust removal machine, first crusher chamber are set to the upper of second crusher chamber
The bottom end of side, second crusher chamber is equipped with column, passes through connecting cavity between first crusher chamber and second crusher chamber
Connection, the side of first crusher chamber are equipped with first charging aperture, and the other end of the first charging aperture is equipped with feeding device, institute
It states the first crusher chamber and is equipped with second charging aperture, the top one of first crusher chamber close to the side top of the first charging aperture
Side is equipped with fume pipe, and first crusher chamber is connected to the dust settler by the fume pipe, on the fume pipe
It is provided with the first asepwirator pump, the dust settler passes through discharge pipe and the second air-breathing far from the side of first crusher chamber
Pump is connected with the dust removal machine, and the dust settler and the dust removal machine are respectively arranged on workbench, the workbench
Bottom be equipped with supporting leg and auxiliary stand.
Preferably, the top of first crusher chamber is equipped with motor, and the inside of first crusher chamber is equipped with hammer axis, described
Hammer axis is connect with the motor, and the two sides of the hammer axis are uniformly provided with several hammer disks, the one end of the hammer disk far from the hammer axis
It is respectively equipped with tup.
Preferably, the inner wall of second crusher chamber is equipped with the first breaker roll and the second breaker roll, second crusher chamber
Inner wall two sides be respectively equipped with material-pulling device, the bottom end of second crusher chamber is equipped with screen plate and taper blanking bin, described the
The outer wall bottom end of sledging chamber is equipped with the first discharge port, and the bottom end of second crusher chamber is equipped with vibration damper plate.
Preferably, the inside of the dust settler is equipped with air blower and filter plate, the bottom of the dust settler
Equipped with the second discharge port.
Preferably, the junction of the discharge pipe and the dust settler is equipped with strainer, and the dust removal machine is far from institute
The side for stating dust settler is connected to dust containing box by dust flue.
Compared with prior art, the beneficial effects of the present invention are:
(1) old metal is carried out the crushing of two procedures by first crusher chamber and second crusher chamber by the present invention,
The metal of crushing is finer and smoother.
(2) first charging aperture and the feeding device that the present invention is arranged match, it can be achieved that in full-automation
Material, reduces the labor intensity of operator, ensure that the safety of operator.
(3) vibration damper plate that the present invention is arranged, can carry out damping noise reduction in the device at work, mention
The high service life of the device.
(4) present invention carries out further dedusting work to dust by the dust removal machine, and the dust of filtering is utilized institute
Dust flue is stated to be discharged in the dust containing box.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is dust settler internal structure chart of the present invention;
In figure: 1. first crusher chambers, 2. second crusher chambers, 3. dust settlers, 4. dust removal machines, 5. columns, 6. connecting cavities, 7.
First charging aperture, 8. feeding devices, 9. second charging apertures, 10. fume pipes, 11. first asepwirator pumps, 12. discharge pipes, 13. second
Asepwirator pump, 14. workbench, 15. supporting legs, 16. auxiliary stands, 17. motors, 18. hammer axis, 19. hammer disks, 20. tups, 21. the
One breaker roll, 22. second breaker rolls, 23. material-pulling devices, 24. screen plates, 25. taper blanking bins, 26. first discharge ports, 27.
Vibration damper plate, 28. air blowers, 29. filter plates, 30. second discharge ports, 31. strainers, 32. dust flues, 33. dust containing boxs.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of efficient old metal crushing device, including first broken
Broken chamber 1, the second crusher chamber 2, dust settler 3 and dust removal machine 4, first crusher chamber 1 are set to second crusher chamber 2
Top old metal is carried out by first crusher chamber 1 and second crusher chamber 2 by the crushing of two procedures, crushing
Metal is finer and smoother, and the bottom end of second crusher chamber 2 is equipped with column 5, first crusher chamber 1 and second crusher chamber 2 it
Between connected by connecting cavity 6, the side of first crusher chamber 1 is equipped with first charging aperture 7, the first charging aperture 7 it is another
End is equipped with feeding device 8, and the first charging aperture 7 and the feeding device 8 of setting match, it can be achieved that in full-automation
Material, reduces the labor intensity of operator, ensure that the safety of operator, first crusher chamber 1 is close to described first
The side top of feed inlet 7 is equipped with second charging aperture 9, and the top side of first crusher chamber 1 is equipped with fume pipe 10, and described the
One crusher chamber 1 is connected to the dust settler 3 by the fume pipe 10, is provided with the first air-breathing on the fume pipe 10
Pump 11, side of the dust settler 3 far from first crusher chamber 1 are connected by discharge pipe 12 and the second asepwirator pump 13
There is the dust removal machine 4, the dust settler 3 and the dust removal machine 4 are respectively arranged on workbench 14, the workbench 14
Bottom be equipped with supporting leg 15 and auxiliary stand 16.
In the present embodiment, the top of first crusher chamber 1 is equipped with motor 17, and the inside of first crusher chamber 1 is equipped with
Hammer axis 18 into shape, the hammer axis 18 is connect with the motor 17, and the two sides of the hammer axis 18 are uniformly provided with several hammer disks 19, the hammer disk
19 one end far from the hammer axis 18 are respectively equipped with tup 20.
In the present embodiment, the inner wall of second crusher chamber 2 is equipped with the first breaker roll 21 and the second breaker roll 22, and described the
The inner wall two sides of sledging chamber 2 are respectively equipped with material-pulling device 23, and the bottom end of second crusher chamber 2 is equipped with screen plate 24 and taper
The outer wall bottom end of blanking bin 25, second crusher chamber 2 is equipped with the first discharge port 26, and the bottom end of second crusher chamber 2 is equipped with
Vibration damper plate 27, the vibration damper plate 27 of setting can carry out damping noise reduction in the device at work, improve the dress
The service life set.
In the present embodiment, the inside of the dust settler 3 is equipped with air blower 28 and filter plate 29, the dust settling dress
The bottom for setting 3 is equipped with the second discharge port 30.
In the present embodiment, the junction of the discharge pipe 12 and the dust settler 3 is equipped with strainer 31, the dedusting
Side of the machine 4 far from the dust settler 3 is connected to dust containing box 33 by dust flue 32, passes through the dust removal machine 4
Further dedusting work is carried out to dust, the dust of filtering is discharged to the dust containing box 33 using the dust flue 32
It is interior.
Working principle: the first crusher chamber of the present invention is set to the top of second crusher chamber, and described first is broken
It is connected between chamber and second crusher chamber by connecting cavity, by first crusher chamber and second crusher chamber, will be given up
Metal carries out the crushing of two procedures, and the metal of crushing is finer and smoother, and the side of first crusher chamber is equipped with first charging aperture, institute
The other end for stating first charging aperture is equipped with feeding device, and the first charging aperture of setting and the feeding device match, can
It realizes full-automatic feeding, reduces the labor intensity of operator, ensure that the safety of operator, second crusher chamber
Bottom end be equipped with vibration damper plate, the vibration damper plate of setting can carry out damping noise reduction in the device at work, improve
The service life of the device carries out further dedusting work to dust by the dust removal machine, the dust of filtering is utilized
The dust flue is discharged in the dust containing box.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of efficient old metal crushing device, including the first crusher chamber (1), the second crusher chamber (2), dust settler (3)
With dust removal machine (4), it is characterised in that: first crusher chamber (1) is set to the top of second crusher chamber (2), and described
The bottom end of sledging chamber (2) is equipped with column (5), passes through between first crusher chamber (1) and second crusher chamber (2) and connect
The side of chamber (6) connection, first crusher chamber (1) is equipped with first charging aperture (7), the other end of the first charging aperture (7)
Equipped with feeding device (8), first crusher chamber (1) is equipped with the second charging close to the side top of the first charging aperture (7)
The top side of mouth (9), first crusher chamber (1) is equipped with fume pipe (10), and first crusher chamber (1) passes through the flue gas
Pipe (10) is connected to the dust settler (3), is provided with the first asepwirator pump (11), the dust on the fume pipe (10)
Side of the sedimentation device (3) far from first crusher chamber (1) is connected by discharge pipe (12) and the second asepwirator pump (13)
It states dust removal machine (4), the dust settler (3) and the dust removal machine (4) are respectively arranged on workbench (14), the work
The bottom of platform (14) is equipped with supporting leg (15) and auxiliary stand (16).
2. a kind of efficient old metal crushing device according to claim 1, it is characterised in that: first crusher chamber (1)
Top be equipped with motor (17), the inside of first crusher chamber (1) is equipped with hammer axis (18), the hammer axis (18) and the motor
(17) it connects, the two sides of hammer axis (18) are uniformly provided with several hammer disks (19), and the hammer disk (19) is far from the hammer axis (18)
One end be respectively equipped with tup (20).
3. a kind of efficient old metal crushing device according to claim 1, it is characterised in that: second crusher chamber (2)
Inner wall be equipped with the first breaker roll (21) and the second breaker roll (22), the inner wall two sides of second crusher chamber (2) are respectively equipped with
Material-pulling device (23), the bottom end of second crusher chamber (2) are equipped with screen plate (24) and taper blanking bin (25), and described second is broken
The outer wall bottom end of broken chamber (2) is equipped with the first discharge port (26), and the bottom end of second crusher chamber (2) is equipped with vibration damper plate (27).
4. a kind of efficient old metal crushing device according to claim 1, it is characterised in that: the dust settler
(3) inside is equipped with air blower (28) and filter plate (29), and the bottom of the dust settler (3) is equipped with the second discharge port
(30).
5. a kind of efficient old metal crushing device according to claim 1, it is characterised in that: the discharge pipe (12) and institute
The junction for stating dust settler (3) is equipped with strainer (31), and the dust removal machine (4) is far from the dust settler (3)
Side is connected to dust containing box (33) by dust flue (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811473195.6A CN109513492A (en) | 2018-12-04 | 2018-12-04 | A kind of efficient old metal crushing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811473195.6A CN109513492A (en) | 2018-12-04 | 2018-12-04 | A kind of efficient old metal crushing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109513492A true CN109513492A (en) | 2019-03-26 |
Family
ID=65794292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811473195.6A Withdrawn CN109513492A (en) | 2018-12-04 | 2018-12-04 | A kind of efficient old metal crushing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109513492A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111545322A (en) * | 2020-04-14 | 2020-08-18 | 安徽东方钙业有限公司 | A milling machine for heavy calcium carbonate production |
CN113058848A (en) * | 2021-04-26 | 2021-07-02 | 江苏鹏飞集团股份有限公司 | Scattering grader |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204620079U (en) * | 2015-04-24 | 2015-09-09 | 谢锡东 | A kind of Highefficientpulverizer of pulverizing capable of circulation |
CN205413190U (en) * | 2016-03-10 | 2016-08-03 | 张桂花 | Ceramic manufacture is with multi -functional high -efficient rubbing crusher |
CN206392155U (en) * | 2016-12-26 | 2017-08-11 | 惠安盛荣发机械有限责任公司 | A kind of sized ore disintegrating machine |
CN208050083U (en) * | 2018-01-09 | 2018-11-06 | 福建农林大学 | A kind of coal breaker |
CN108889431A (en) * | 2018-08-06 | 2018-11-27 | 南京环务资源再生科技有限公司 | A kind of waste metal crusher dust-extraction unit |
-
2018
- 2018-12-04 CN CN201811473195.6A patent/CN109513492A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204620079U (en) * | 2015-04-24 | 2015-09-09 | 谢锡东 | A kind of Highefficientpulverizer of pulverizing capable of circulation |
CN205413190U (en) * | 2016-03-10 | 2016-08-03 | 张桂花 | Ceramic manufacture is with multi -functional high -efficient rubbing crusher |
CN206392155U (en) * | 2016-12-26 | 2017-08-11 | 惠安盛荣发机械有限责任公司 | A kind of sized ore disintegrating machine |
CN208050083U (en) * | 2018-01-09 | 2018-11-06 | 福建农林大学 | A kind of coal breaker |
CN108889431A (en) * | 2018-08-06 | 2018-11-27 | 南京环务资源再生科技有限公司 | A kind of waste metal crusher dust-extraction unit |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111545322A (en) * | 2020-04-14 | 2020-08-18 | 安徽东方钙业有限公司 | A milling machine for heavy calcium carbonate production |
CN113058848A (en) * | 2021-04-26 | 2021-07-02 | 江苏鹏飞集团股份有限公司 | Scattering grader |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204523644U (en) | A kind of box vibrations log washer | |
CN210815606U (en) | Broken all-in-one of shakeout for machining | |
CN109513492A (en) | A kind of efficient old metal crushing device | |
CN108311202A (en) | A kind of breaker for recycling building waste | |
CN107081543A (en) | A kind of welder processed for wheel hub | |
CN202877467U (en) | Fine crusher screen | |
CN208356910U (en) | A kind of hammer waste crusher | |
CN210449317U (en) | Quick unloading breaker | |
CN210230969U (en) | Dust removal device for material screening machine | |
CN204503252U (en) | The metallurgical tungsten waste Universalpulverizer of a kind of recovery | |
CN207403221U (en) | A kind of ethylene glycol recycles squeezer | |
CN209594425U (en) | A kind of timber crushing system bits device for mushroom factory production | |
CN217664476U (en) | Multistage screening plant of steelmaking waste material | |
CN105148633A (en) | Full-automatic multistage filter-bag dust remover with discharge function | |
CN206624952U (en) | A kind of deduster of Eider down processing | |
CN220150911U (en) | Pouring device of concrete | |
CN113667789B (en) | Three wastes treatment device for steel mill | |
CN210787655U (en) | Rotor structure of sand making machine | |
CN205308878U (en) | Silica flour production line sewage treatment and broken system | |
CN215964832U (en) | Auto-parts scrap iron is recycled and is smashed edulcoration device | |
CN217856646U (en) | Dedicated novel vibrating feeder of machinery slag rod mill | |
CN105344654B (en) | A kind of sewage disposal and nitrogen for silica flour production is filled with formula silico briquette crushing system | |
CN114798071B (en) | Building rubbish scrap iron filters recovery unit for municipal works | |
CN105436131B (en) | A kind of silica flour production line first washes rear broken system | |
CN210525589U (en) | Processing apparatus based on tire production waste material later stage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190326 |
|
WW01 | Invention patent application withdrawn after publication |