Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811615088.2A
Other languages
Chinese (zh)
Inventor
汪少华
郭军超
霍延中
刘晓丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acre Coking and Refractory Engineering Consulting Corp MCC
Original Assignee
Acre Coking and Refractory Engineering Consulting Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acre Coking and Refractory Engineering Consulting Corp MCC filed Critical Acre Coking and Refractory Engineering Consulting Corp MCC
Priority to CN201811615088.2A priority Critical patent/CN109513300A/en
Publication of CN109513300A publication Critical patent/CN109513300A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B41/00Safety devices, e.g. signalling or controlling devices for use in the discharge of coke

Abstract

The present invention relates to a kind of coke oven uncontrollable discharge pollutant comprehensive treatment systems, including coke oven booth, coke side flue dust collecting unit, pusher side flue dust collecting unit, flue dust supply unit, dust separation unit, tedge flue gas guide unit, fresh air unit and spray dust-arrest temperature reducing unit;Coke oven booth is divided into coke side space, pusher side and furnace roof space by gear cigarette partition;It is equipped with coke side flue dust collecting unit in coke side space, sets pusher side flue dust collecting unit in pusher side and furnace roof space;Coke side flue dust collecting unit and pusher side flue dust collecting unit pass through flue gas supply unit connection dust separation unit;Tedge flue gas guide unit is set at the coal gas diffusion mouth of coke oven coke oven uprising tube;Fresh air unit and spray dust-arrest temperature reducing unit are additionally provided in coke oven booth.The present invention coke oven normally produce and accident off-position under, can be realized the flue dust that will be generated inside coke oven booth trapped, purified, outlet, guarantee coke oven production safety, and make to keep good working environment inside coke oven booth.

Description

A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system
Technical field
The present invention relates to coke oven dust technical field more particularly to a kind of coke oven uncontrollable discharge pollutant comprehensive treatment systems System.
Background technique
Attention with state and society to environmental protection, requirement of the various industries to environmental protection is increasingly stringenter, and coking industry It is pollution sources keypoint treatment object again, therefore coke-oven plant new (changing) builds coke oven common configuration dust pelletizing system both at home and abroad, being used for will It coalings, discharge of the coke, pusher side, burner smoke carry out centralized collection processing.The paroxysmal pollutant that above-mentioned dust pelletizing system generates coke oven It collects the controllable discharge of processing and has played key effect, but due to the inherent characteristic of coking furnace shaft structure and with coke oven furnace life Increase, has long-term, amount in coaling hole, peephole etc. of coke oven cokery side fire door, tedge gap, furnace roof in production process Less, irregularly, multi-source, sporadic flue dust overflow, these flue dust single-point amounts are seldom, but escape it is a little more and more dispersed, uniformly It is extremely difficult to collect processing.Meanwhile coaling, discharge of the coke, the dust-extraction units such as pusher side, burner fume and dust are to coke oven coal-charging, coking process In the flue dust of spilling can not realize complete trapping, have some limitations, and to generate uncontrollable discharge flue dust important Pollution sources.Although the pollutant concentration of above-mentioned pollution sources flue dust is less, flue dust spilling point source multi-panel is wide, to atmosphere and operation ring The pollution level in border is no less than the influence coaling, direct emission of the discharging of the coke generates.
Currently, it is closed to implement coking furnace shaft covering in the completed region of the city of national requirements key area, and exhaust gas is received Collect the measure of processing.To reach this new demand, need coke oven ontology and cokery side coke vehicle carrying out whole envelope with greenhouse It closes.It needs that flue dust, waste heat and the other materials in greenhouse discharge after effectively focusing on after coke oven integrally closed, and Reach following requirement: one, effectively trapping coke oven in process of production the dust, gas of the continuous and discontinuous generation in each position, The pollutants such as waste heat, and prevent flue dust from escaping;Two, guarantee various pieces well-ventilated in greenhouse, pernicious gas, fuel gas are not It can assemble, concentration of harmful substance is no more than the 10% of lower safety limit;Three, improve coke oven production operation element environment.
Therefore, the organized discharge for the sporadic flue dust of multi-source that totally-enclosed coke oven generates in process of production how is realized, All standing collection processing is realized to pollution sources, while meeting the working environment of coke oven production operating space, is to realize that coke oven production is big Gas pollutant discharge in compliance with the standard even cleans an important topic of hamlessizing technology.
Summary of the invention
The present invention provides a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system, normally produced and accident in coke oven Under off-position, can be realized the flue dust that will be generated inside coke oven booth trapped, purified, outlet, to guarantee coke oven The safety of production, and make to keep good working environment inside coke oven booth.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system, including coke oven booth, coke side flue dust collecting unit, machine Side flue dust collecting unit, flue dust supply unit, dust separation unit, tedge flue gas guide unit, fresh air unit and spraying suppression Dirt temperature reducing unit;In the coke over machinery of coke oven ontology and machine, burnt two sides is all enclosed in by the coke oven booth, in coke oven booth It is long to setting gear cigarette partition along coke oven, inner space is separated into coke side space, pusher side and 2, furnace roof space part;Coke side It is equipped with coke side flue dust collecting unit in space, sets pusher side flue dust collecting unit in pusher side and furnace roof space;Coke side flue dust collecting list Member and pusher side flue dust collecting unit pass through flue gas supply unit connection dust separation unit;It is set at coke oven coke oven uprising tube coal gas diffusion mouth Tedge flue gas guide unit;Fresh air unit and spray dust-arrest temperature reducing unit are additionally provided in coke oven booth.
The coke oven booth is made of across crossbeam and coke side pair across crossbeam girder, pusher side column, coke side column, pusher side pair; The both ends of girder are supported in the resistance wall at coke oven both ends respectively by bracket;Pusher side column is located at outside pusher side pushing ram operating space Pusher side pair is set across crossbeam between at the top of side, girder and pusher side column;Coke side column is set on the outside of coke side third track support, and burnt Heel post is arranged in a one-to-one correspondence with pusher side column, sets coke side pair across crossbeam between girder and coke side column top;Coke oven booth four The alien invasion in week is all closed with color profiling steel plate in addition to reserved gate and ventilation opening region, by girder, pusher side pair across crossbeam And coke side pair is all closed with heat-resisting steel sheet and plate in addition to reserved smoke outlet region across the greenhouse top cover that crossbeam is constituted.
The gear cigarette partition is arranged at the top of the interface valve of coalingging on coke side furnace stay.
The coke side flue dust collecting unit is by the multiple coke side smoke outlets, the coke that are arranged on the coke oven booth top cover of coke side space Side smoke discharging pipe and multiple coke sides very diffusion valve form, and coke side smoke outlet connects flue dust conveying list by coke side smoke discharging pipe Member;The pusher side flue dust collecting unit by be arranged on pusher side and furnace roof space coke oven booth top cover multiple pusher side smoke outlets, Pusher side smoke discharging pipe and multiple pusher sides very diffusion valve form, and pusher side smoke outlet connects flue dust conveying list by pusher side smoke discharging pipe Member.
The flue dust supply unit is made of pusher side flue dust conveyance conduit and coke side flue dust conveyance conduit, the conveying of pusher side flue dust One end of pipeline connects pusher side smoke discharging pipe, and the other end connects the pusher side dust removing earth station in dust separation unit, pusher side flue dust Repid cut-off valve one is set on conveyance conduit, sets branch pipe(tube) one, branch pipe on the pusher side flue dust conveyance conduit in one downstream of repid cut-off valve Very motor-driven valve one and very positive pressure fan one are set on road one;One end of coke side flue dust conveyance conduit is separately connected coke side smoke exhaust pipe Road and the dust main pipe that discharges of the coke, the other end connect the coke side dedusting earth station in dust separation unit, wherein connection coke side smoke exhaust pipe Repid cut-off valve two is set on the coke side flue dust conveyance conduit in road, sets branch on the coke side flue dust conveyance conduit in two downstream of repid cut-off valve Pipeline two sets very motor-driven valve two and very positive pressure fan two on branch pipe(tube) two.
The dust separation unit is made of pusher side dust removing earth station and coke side dedusting earth station, and pusher side dust removing earth station sets In coke oven machine side, including by the sequentially connected pulse bag type dust collector one of air hose one, dedusting fan one, outlet noise silencer one and Chimney one;Coke side dedusting earth station is set to coke oven coke side, including passes through the sequentially connected pulse bag type dust collector of air hose two Two, dedusting fan two, outlet noise silencer two and chimney two, dedusting fan two set 2 groups, a-worker-a-backup;Pulse bag type dust collector one, Pulse bag type dust collector two connects corresponding dust cabin additionally by the scrapper conveyor being correspondingly arranged.
The tedge flue gas guide unit includes the flue gas guiding device being arranged at tedge coal gas diffusion mouth;Its by Multilayer diversion pipe, conical cowl and mounting bracket composition;Diversion pipe is made of the straight tube on top and the Taper Pipe of lower part, under Taper Pipe Mouth internal diameter is greater than upper internal diameter;Each layer diversion pipe is sequentially connected from top to bottom, and straight tube successively successively decreases with the diameter of corresponding Taper Pipe; The straight tube upper end of lower layer's diversion pipe is protruded into the Taper Pipe of adjacent upper layer diversion pipe;Multilayer diversion pipe is fixed on by mounting bracket The top of tedge, conical cowl are fixedly connected with the diversion pipe of top layer.
The fresh air unit includes the pusher side set on the coke side fresh air pipeline in coke side space and set on pusher side and furnace roof space Fresh air pipeline;The coke side fresh air pipeline setting is coaling in coke side at the top of interface valve main pipe, and coke side fresh air pipeline is equipped with multiple Air supply duct, each air supply duct are located at the gap between interface valve of respectively coalingging, and air outlet extends in furnace roof area It is square, pulse valve is set respectively on air supply duct;The pusher side fresh air pipeline is arranged on pusher side gas collecting tube station, pusher side fresh wind tube Multiple high speed spouts are set on road, and each high speed spout is located at the gap between each tedge.
The spray dust-arrest temperature reducing unit includes water main, spraying vibration means for main pipe for supplying water and atomizer;The water main One end connect with external high service pipe, the other end is connected with a plurality of vibration means for main pipe for supplying water that is sprayed;A plurality of spraying vibration means for main pipe for supplying water edge Coke oven is long to side by side set on furnace roof area top;Water main is equipped with filter and water supply main valve, and each item is sprayed vibration means for main pipe for supplying water Water inlet end sets branching supply water valve respectively, and the bottom of spraying vibration means for main pipe for supplying water is along long to being uniformly arranged multiple atomizers;The water supply Main valve is electric switching valve, and branching supply water valve is electric control valve;Multiple spot is divided to sense in coke oven booth equipped with multiple dust concentrations Device and temperature sensor, water supply main valve, branching supply water valve and sensor of dust concentration and temperature sensor are interlocked by controller Control.
Compared with prior art, the beneficial effects of the present invention are:
1) coke oven during normal production, the present invention can effectively trap the multi-source that each position generates during coke oven production, Paroxysmal, sporadic flue dust, by process flows such as trapping, purification, outlets, the flue dust that coke oven is generated is realized organized net Change processing and safety dumping, clean coke oven production more, and guarantees the safety after coke oven is totally-enclosed;
2) present invention can be realized waste heat, the pernicious gas etc. generated during trapping coke oven production, improve coke oven production Working environment;
3) when coke oven production is abnormal, flue dust largely containing raw coke oven gas can be distributed, is gathered in coke under heat buoyancy effect At the top of furnace greenhouse, the present invention mixed gas in coke oven booth can be discharged rapidly in the case where external power-free, thus really Protect coke oven production safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of coke oven booth of the present invention.
Fig. 2 is pusher side flue dust collecting unit, coke side flue dust collecting unit and tedge flue gas guide unit of the present invention Layout drawing.
Fig. 3 is pusher side flue dust collecting unit of the present invention and dust separation unit connection schematic diagram.
Fig. 4 is that coke side flue dust collecting unit of the present invention with dust separation unit connect 33 schematic diagrames.
Fig. 5 is the structural schematic diagram of tedge flue gas guide unit of the present invention.
Fig. 6 is the layout drawing of fresh air unit of the present invention.
Fig. 7 is the structural schematic diagram of spray dust-arrest temperature reducing unit of the present invention.
In figure: 1. coke oven booth, 11. girder, 12. pusher side column, 13. coke side column, 14. pusher side pair is burnt across crossbeam 15. Side pair keeps off 17. coke side facade air inlet of cigarette partition, 18. pusher side facade air inlet, 21. coke side smoke outlet 22. across crossbeam 16. 23. coke side of coke side smoke discharging pipe very 31. pusher side smoke outlet of diffusion valve, 32. pusher side smoke discharging pipe, 33. pusher side diffuses very much 411. pusher side flue dust conveyance conduit of valve, the 412. repid cut-off valve 1 very very positive pressure fan one of motor-driven valve 1 The very positive pressure fan two of 421. coke side flue dust conveyance conduit, 422. repid cut-off valve 2 423. very motor-driven valve 2 424. 425. 51. pusher side dust removing earth station of dust main pipe, 511. pulse bag type dust collector, one 512. dedusting fans 1 that discharge of the coke go out One 52. 521. pulse bag type dust collector of coke side dedusting earth station of mouth one 514. chimney of silencer, 2 522. dedusting fan two 523. outlet noise silencer, 2 524. chimney, 2 53. ash exhauster, 54. scrapper conveyor, 55. dust cabin, 6. flue gas guiding device 61. 72. air supply duct of diversion pipe 62. conical cowl, 63. mounting bracket, 71. coke side fresh air pipeline, 73. pusher side fresh air pipeline 74. 81. water main 82. of high speed spout is sprayed 83. filter of vibration means for main pipe for supplying water, 84. water supply main valve, 85. branching supply water valve 86. I, coke side space of atomizer 87. sensor of dust concentration, 88. temperature sensor, 89. controller, 9. coke oven, II, machine Side and furnace roof space
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing:
As shown in Fig. 1-Fig. 7, a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system of the present invention, including coke oven Greenhouse 1, coke side flue dust collecting unit, pusher side flue dust collecting unit, flue dust supply unit, dust separation unit, tedge flue gas Guide unit, fresh air unit and spray dust-arrest temperature reducing unit;The coke oven booth 1 is by 9 ontology of coke oven and machine, the coke oven of burnt two sides It is mechanical be all enclosed in, keep off cigarette partition 16 to setting along coke oven 9 is long in coke oven booth 1, inner space be separated into coke side Space I, pusher side and II 2, furnace roof space part;Coke side flue dust collecting unit, pusher side and furnace roof space are equipped in coke side space I Pusher side flue dust collecting unit is set in II;Coke side flue dust collecting unit and pusher side flue dust collecting unit are connected by flue gas supply unit Dust separation unit;Tedge flue gas guide unit is set at the coal gas diffusion mouth of coke oven coke oven uprising tube;It is additionally provided in coke oven booth 1 new Wind unit and spray dust-arrest temperature reducing unit.
As shown in Figure 1, the coke oven booth 1 is by girder 11, pusher side column 12, coke side column 13, pusher side pair across crossbeam 14 And coke side pair is formed across crossbeam 15;The both ends of girder 11 are supported in the resistance wall at 9 both ends of coke oven respectively by bracket;Pusher side column 12 are located on the outside of pusher side pushing ram operating space, and girder 11 and pusher side column set pusher side pair across crossbeam 14 between 12 top;Coke side Column 13 is set on the outside of coke side third track support, and coke side column 13 is arranged in a one-to-one correspondence with pusher side column 12, girder 11 and Coke side column sets coke side pair across crossbeam 15 between 13 top;The alien invasion of 1 surrounding of coke oven booth removes reserved gate and ventilation mouth region Greenhouse that is overseas all to be closed with color profiling steel plate, being made of across crossbeam 14 and coke side pair across crossbeam 15 girder 11, pusher side pair Top cover is all closed with heat-resisting steel sheet and plate in addition to reserved smoke outlet region.
The gear cigarette partition 16 is arranged at the top of the interface valve of coalingging on coke side furnace stay.
As shown in Fig. 2, the coke side flue dust collecting unit is multiple on I coke oven booth of coke side space, 1 top cover by being arranged in Coke side smoke outlet 21, coke side smoke discharging pipe 22 and multiple coke sides very diffusion valve 23 form, and coke side smoke outlet 21 is arranged by coke side Smoke pipeline 22 connects flue dust supply unit;The pusher side flue dust collecting unit is by being arranged in II coke oven booth of pusher side and furnace roof space Multiple pusher side smoke outlets 31, pusher side smoke discharging pipe 32 and multiple pusher sides very diffusion valve 33 on 1 top cover forms, pusher side smoke outlet 31 connect flue dust supply unit by pusher side smoke discharging pipe 32.
As shown in Figure 3, Figure 4, the flue dust supply unit is by pusher side flue dust conveyance conduit 411 and coke side flue dust conveyance conduit 421 compositions, one end of pusher side flue dust conveyance conduit 411 connect pusher side smoke discharging pipe 32, and the other end connects in dust separation unit Pusher side dust removing earth station 51, set repid cut-off valve 1, one 412 downstream of repid cut-off valve on pusher side flue dust conveyance conduit 411 Pusher side flue dust conveyance conduit 411 on set branch pipe(tube) one, very motor-driven valve 1 and very positive pressure fan one are set on branch pipe(tube) one 313;One end of coke side flue dust conveyance conduit 421 is separately connected coke side smoke discharging pipe 22 and the dust main pipe 425 that discharges of the coke, and the other end connects The coke side dedusting earth station 52 in dust separation unit is met, wherein the coke side flue dust conveyance conduit of connection coke side smoke discharging pipe 22 Repid cut-off valve 2 422 is set on 421, sets branch pipe(tube) two on the coke side flue dust conveyance conduit 421 in 2 422 downstream of repid cut-off valve, Very motor-driven valve 2 423 and very positive pressure fan 2 424 are set on branch pipe(tube) two.
The dust separation unit is made of pusher side dust removing earth station 51 and coke side dedusting earth station 52, pusher side dust removing ground Stand 51 be set to 9 pusher side of coke oven, including by the sequentially connected pulse bag type dust collector 1 of air hose one, dedusting fan 1, Outlet noise silencer 1 and chimney 1;Coke side dedusting earth station 52 be set to 9 coke side of coke oven, including by air hose two according to Pulse bag type dust collector 2 521, dedusting fan 2 522, outlet noise silencer 2 523 and the chimney 2 524 of secondary connection, dedusting fan 2 522 set 2 groups, a-worker-a-backup;Pulse bag type dust collector 1, pulse bag type dust collector 2 521 are additionally by being correspondingly arranged Scrapper conveyor 54 connects corresponding dust cabin 55.
As shown in Fig. 2, Fig. 5, the tedge flue gas guide unit includes the cigarette being arranged at tedge coal gas diffusion mouth Conductance leading-in device 6 is made of multilayer diversion pipe 61, conical cowl 62 and mounting bracket 63;Diversion pipe 61 by top straight tube And the Taper Pipe composition of lower part, the lower internal diameter of Taper Pipe are greater than upper internal diameter;Each layer diversion pipe 61 is sequentially connected from top to bottom, and straight Pipe successively successively decreases with the diameter of corresponding Taper Pipe;The straight tube upper end of lower layer's diversion pipe is protruded into the Taper Pipe of adjacent upper layer diversion pipe; Multilayer diversion pipe 61 is fixed on the top of tedge by mounting bracket 63, and conical cowl 62 and the diversion pipe 61 of top layer are fixed Connection.
As shown in fig. 6, the fresh air unit includes set on the coke side fresh air pipeline 71 in coke side space I and set on pusher side and furnace II pusher side fresh air pipeline 73 between head space;The setting of coke side fresh air pipeline 71 is coaling in coke side at the top of interface valve main pipe, coke side Fresh air pipeline 71 is equipped with multiple air supply ducts 72, and each air supply duct 72 is located at the gap between interface valve of respectively coalingging Place, air outlet extend to above furnace roof area, set pulse valve respectively on air supply duct 72;The setting of pusher side fresh air pipeline 73 exists On pusher side gas collecting tube station, multiple high speed spouts 74 are set, each high speed spout 74 is located on pusher side fresh air pipeline 73 Gap between each tedge.
As shown in fig. 7, the spray dust-arrest temperature reducing unit includes water main 81, spraying vibration means for main pipe for supplying water 82 and atomizer 86;One end of the water main 81 is connect with external high service pipe, and the other end is connected with a plurality of spraying vibration means for main pipe for supplying water 82; A plurality of spraying vibration means for main pipe for supplying water 82 is long to being set to above furnace roof area side by side along coke oven 9;Water main 81 is equipped with filter 83 and supplies Water main valve 84, the water inlet end that each item is sprayed vibration means for main pipe for supplying water 82 set branching supply water valve 85 respectively, the bottom edge of spraying vibration means for main pipe for supplying water 82 It is long to being uniformly arranged multiple atomizers 86;The water supply main valve 84 is electric switching valve, and branching supply water valve 85 is motorized adjustment Valve;Multiple spot is divided to be equipped with multiple sensor of dust concentration 87 and temperature sensor 88 in coke oven booth 1, water supply main valve 84, branch supply Water valve 85 and sensor of dust concentration 87 and temperature sensor 88 pass through 89 interlocked control of controller.
A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system of the present invention includes coke oven booth 1, coke side cigarette altogether Dirt collector unit, pusher side flue dust collecting unit, flue dust supply unit, dust separation unit, tedge flue gas guide unit, fresh air 8 functional units such as unit and spray dust-arrest temperature reducing unit;Concrete function is as follows:
One, coke oven booth 1;
1) coke oven booth 1 uses structure type of the intermediate host with both wings;By girder 11 and bracket undertake coke oven booth 1 and The Main Load of top portion ventilation facility, when being equipped with coal tower in the middle part of coke oven 9, one end of girder 11 is supported by bracket, the other end and coal Tower is fixedly connected, keep the overall structure of coke oven booth 1 more stable with it is secured;
2) girder 11 is set to the surface in 9 furnace roof area of coke oven, pusher side column 12, the setting of coke side column 13 and 9 furnace of coke oven Column is corresponding, and spacing is the integral multiple of coke furnace carbonization chamber width, is divulged information convenient for being arranged in the position of each coke furnace carbonization chamber of correspondence Mouth and smoke outlet;
3) pusher side pair has great slope across crossbeam 15 across crossbeam 14, coke side pair, convenient for removing rainwater and accumulated snow;
4) girder 11 is respectively provided with a shorter side elevation across crossbeam 14,15 joints with two sides pair, is easily installed logical Wind devices;
5) alien invasion of coke oven booth 1 is all sealed with color profiling steel plate in addition to equipment installation region, on top cover It is all sealed with heat-resisting steel sheet and plate in addition to equipment installation region, and is filled at all splicing gaps with high temperature resistant clay, it can It effectively prevent air leakage phenomena occur;
6) gear cigarette partition 16 is arranged at the top of the interface valve of coalingging on coke side furnace stay, keeps off bottom and the coke oven furnace of cigarette partition 16 Column is using flexible connection.1 inner space of coke oven booth is divided into coke side space I and pusher side by gear cigarette partition 16 and furnace roof is empty Between II, two spaces are completely independent, in two spaces production area generate different flue dust can be collected processing respectively;Together When, when 9 section of coke oven has lateral crosswind, the flue gas of side will not be overflowed from other side in coke oven 9, ensure that coke oven booth Effective collection discharge of flue gas in 1.
Two, coke side flue dust collecting unit;
1) top of I coke oven booth 1 of coke side space is equipped with coke side smoke discharging pipe 22 and coke side smoke outlet 21 and coke side is non- Normal diffusion valve 23.Coke side smoke outlet 21, to being equally spaced, is separately positioned on the center line of carbonization chamber along the length of coke oven 9, and Spacing is equal to the integral multiple of carbonization chamber spacing.Highest point of the coke side pair across caping is arranged in coke side smoke outlet 21, and arranges with coke side Smoke pipeline 22 connects.Exhaust air rate meets red burnt tank operating condition and duty requirements when burnt non-fortune in coke oven booth 1.Coke oven coke side is more Property flue dust in source is gathered in the top of I coke oven booth 1 of coke side space under the action of hot pressing and system suction and gear cigarette partition 16, It is drawn in coke side flue dust conveyance conduit 421 by coke side smoke discharging pipe 22, and discharged of the coke with what the dust main pipe 425 that discharges of the coke was collected into Flue dust is sent to coke side dedusting earth station 52 together and is dusted purified treatment.
2) 1 side of coke oven booth in coke side space I sets coke side facade air inlet 17, and edge is marked in elevation of top and coke tank truck It is high consistent, guarantee in coke tank truck since the dust that heat buoyancy generates will not be spilt over outside outside coke oven booth 1;Meanwhile coke side facade into Air port 17 and the absolute altitude of coke side station are almost the same, can be effectively improved coke side working environment.
3) coke side smoke outlet 21 is long to being placed equidistant with multiple coke sides very diffusion valve 23 along coke oven 9.Coke side very diffusion valve 23 can be with the dedusting wind of the temperature sensor and combustible gas detecting device, coke side dedusting earth station 52 that are arranged in coke oven booth 1 2 522 interlocked control of machine guarantees that ventilation condition is good in the coke oven booth 1 of coke side, and fuel gas volumetric concentration is lower than under explosion The 10% of limit.
Three, pusher side flue dust collecting unit;
1) pusher side smoke discharging pipe 32 and pusher side smoke outlet 31 are equipped at the top of pusher side and the coke oven booth in furnace roof space II 1.Machine Side smoke outlet 31 is long to being equally spaced along coke oven 9, and is separately positioned on carbonization chamber center line, and its spacing is equal between carbonization chamber Away from integral multiple.Pusher side smoke outlet 31 is arranged in the highest point of II coke oven booth 1 of pusher side and furnace roof space, i.e. oven top of coke oven area Surface.Pusher side smoke discharging pipe 32 includes 2 smoke evacuation main pipelines, and each carbonization chamber is correspondingly arranged 2 pusher side smoke outlets 31.Loss Flue dust is sent to pusher side dust removing earth station 51 after suction pusher side smoke discharging pipe 32 by pusher side smoke outlet 31 and is dusted at purification Reason.
2) pusher side and 1 side of the coke oven booth in furnace roof space II set pusher side facade air inlet 18.The main behaviour of coke oven production Make space in pusher side station and oven top of coke oven.The sporadic flue dust of coke oven 9 is mainly concentrated in the small fire door of pusher side, burner and furnace Top position, pusher side furnace stay is more than 40 meters apart from 1 alien invasion horizontal distance of coke oven booth, and coke furnace carbonization chamber middle and lower part generates once in a while Flue dust drifts about upwards under the action of heat buoyancy and top suction force, can not laterally escape to outside coke oven booth 1.Pusher side facade into 18 absolute altitude of air port is consistent with coke furnace carbonization chamber elevation of top, so that pusher side station is opened wide completely in this way, ensure that pusher side The environment temperature and air quality of station region worker operation.The height of pusher side facade air inlet 18 can shorten fresh air to coke The stroke distances in furnace furnace roof area are effectively improved the operating temperature and air quality of furnace roof operating area.
3) pusher side and 1 top of the coke oven booth in furnace roof space II and 31 coaxial line of pusher side smoke outlet are placed equidistant with multiple pusher sides Very diffusion valve 33.Pusher side very diffusion valve 33 can be with the temperature sensor that is arranged in II coke oven booth 1 of pusher side and furnace roof space And one 512 interlocked control of dedusting fan of combustible gas detecting device, pusher side dust removing earth station 51, guarantee pusher side and furnace roof space Ventilation condition is good in II coke oven booth 1, and fuel gas volumetric concentration is lower than the 10% of lower explosion limit.
Four, flue gas supply unit;
Loss flue gas and coke oven coke discharging and dedusting flue gas in coke oven booth 1 are sent through flue gas supply unit to corresponding dedusting ground Station is purified.It is made of pusher side flue dust conveyance conduit 411 and coke side flue dust conveyance conduit 421, working principle is essentially identical: When i.e. (a) is worked normally, liquid (gas) cylinder pressure solenoid of one 412/ repid cut-off valve 2 422 of repid cut-off valve obtains electric, liquid (gas) cylinder pressure stretches out, and valve opening, air-flow passes through, and the very positive very positive pressure fan 2 424 of pressure fan 1, which is in, closes shape State;(b) when abnormal condition, liquid (gas) cylinder pressure solenoid power loss of one 412/ repid cut-off valve 2 422 of repid cut-off valve, liquid (gas) cylinder pressure retracts, and valve is closed, and air-flow is cut off, and the very positive pressure fan 2 424 of very positive pressure fan 1 starts, outdoor Air is pumped down in 411/ coke side flue dust conveyance conduit 421 of pusher side flue dust conveyance conduit.It can guarantee each pusher side smoke evacuation in this way 31/ coke side smoke outlet 21 of mouth is in barotropic state in abnormal condition.At this time coke oven 9 diffuse the flue dust containing fuel gas without Method enters in 411/ coke side flue dust conveyance conduit 421 of pusher side flue dust conveyance conduit, to ensure that system safety.
Five, dust separation unit;
1) flue dust after coke side smoke discharging pipe 22 and the dust main pipe 425 that discharges of the coke are collected is pumped to coke by dedusting fan 2 522 Side dedusting earth station 52, through dedusting fan 2 522, outlet noise silencer two after 2 521 purification filtering of pulse bag type dust collector 523, chimney 2 524 is discharged to atmosphere;The dust that pulse bag type dust collector 2 521 separates passes through ash exhauster 53 and scraper plate In the storage to dust cabin 55 of machine 54, periodically humidification outward transport.Dedusting fan 2 522 uses speed governing operation.(a) when coke pushing, dedusting wind 2 522 low-speed running of machine meets the needs that discharge of the coke flue dust and other sporadic flue dust are trapped when the discharging of the coke;(b) when burnt tank is in coke oven In greenhouse 1 when walking, dedusting fan 2 522 runs at high speed, and meets discharge because heat buoyancy enters 1 interior air-flow of coke oven booth and other The needs of sporadic flue dust;(c) after burnt tank removes coke oven booth 1, the operation of 2 522 low speed of dedusting fan meets discharge coke oven The needs of waste heat and other sporadic flue dust.
2) flue dust after pusher side smoke discharging pipe 32 is collected is pumped to pusher side dust removing earth station 51 by dedusting fan 1, passes through By dedusting fan 1, outlet noise silencer 1, one 514 quilt of chimney after one 511 purification filtering of extra pulse sack cleaner Drain into atmosphere;The dust separated is by the way that in ash exhauster 53, the storage to dust cabin 55 of scrapper conveyor 54, periodically humidification is transported outward. The operation of one 512 constant speed of dedusting fan meets the needs of discharge waste heat of coke oven, dust and hazardous gas.Because in handled flue gas Dust content is lower, and the equipment running status of pusher end dust-removing system and lectotype selection should meet section while meeting the working condition requirement The demand of energy environmental protection.
Specific work process is as follows:
1, coke side space I;
During normal production, effect of the polyphyly flue dust of 9 coke side of coke oven in hot pressing and system suction and gear cigarette partition 16 Under be gathered in the top of I coke oven booth 1 of coke side space, be drawn in coke side smoke discharging pipe 22 by coke side smoke outlet 21;Flue dust Pulse bag type dust collector 2 521 is sent to by coke side flue dust conveyance conduit 421;After filtration, purification, clean gas is through removing Dirt blower 2 522 passes through after aspirating and is emitted into atmosphere by outlet noise silencer 2 523, chimney 2 524;Pulse bag type dust collector 2 522 The dust trapped is sent by ash exhauster 53, scrapper conveyor 54 to dust cabin 55;After the humidified dust unloadnig apparatus humidification of dust periodically Outward transport.Dedusting fan 2 522 is arranged using redundancy, breaks down when working fan is run, standby fan can be with quick start.
Abnormal condition refers mainly to dedusting fan 2 522 and has a power failure on a large scale and happen in accident condition shutdown or whole plant.For Abnormal condition takes following measures:
(a) under accident condition, repid cut-off valve 2 422 is closed rapidly after obtaining middle control signal, and dedusting fan 2 522 stops Operation, coke side very diffusion valve 23 automatically open;Very positive pressure fan 2 424 opens operating with very motor-driven valve 423 simultaneously, protects It demonstrate,proves and keeps positive pressure in coke side smoke discharging pipe 22, flammable explosive gas will not be gathered in coke side smoke discharging pipe 22;In hot pressing function The volume of smoke that fuel gas is included at the top of I coke oven booth 1 of lower coke side space drains into outdoor greatly by coke side very diffusion valve 23 Gas.
(b) when whole plant, which is had a power failure on a large scale, to be occurred, repid cut-off valve 2 422 is automatically closed;Coke side very diffusion valve 23 is automatic It opens, the volume of smoke for including fuel gas at the top of I coke oven booth 1 of coke side space under hot pressing function is diffused very much by coke side Valve 23 drains into outside atmosphere.
After abnormal condition releases, dedusting fan 2 522 first starts;Subsequent repid cut-off valve 2 422 is opened;Then very just Pressure fan 2 424 shuts down, and very motor-driven valve 2 423 is closed;Being delayed, (such as 1min) coke side very diffusion valve 23 is automatically multiple afterwards Position is closed.
2, pusher side and furnace roof space II;
During normal production, pusher side polyphyly flue dust is gathered in pusher side and furnace roof space under the action of hot pressing and system suction The top of II coke oven booth 1, is drawn in pusher side smoke discharging pipe 32 by pusher side smoke outlet 31, and is sent to pulse bag type dust collector One 511, flue dust is after filtration, purification, and clean gas is after the suction of dedusting fan 1 through by outlet noise silencer 1, chimney One 514 are emitted into atmosphere;The dust that pulse bag type dust collector 1 traps by ash exhauster 53, scrapper conveyor 54 send to Dust cabin 55;It is periodically transported outward after the humidified dust unloadnig apparatus humidification of dust.
When abnormal condition (referring mainly to dedusting fan 1 to have a power failure on a large scale and happen in accident condition shutdown or whole plant), Take following measures:
(a) when dedusting fan 1 breaks down, repid cut-off valve 1 is closed rapidly after obtaining middle control signal;Dedusting Blower 1 is out of service, and pusher side very diffusion valve 33 automatically opens;And then, very positive pressure fan 1 with it is very electronic Valve 1 opens operating simultaneously, guarantees to keep positive pressure in pusher side smoke discharging pipe 32, flammable explosive gas will not be gathered in pusher side row In smoke pipeline 32;The volume of smoke for including fuel gas at the top of II coke oven booth 1 of pusher side and furnace roof space under hot pressing function is logical It crosses pusher side very diffusion valve 33 and drains into outside atmosphere.
(b) when whole plant, which is had a power failure on a large scale, to be occurred, repid cut-off valve 1 is automatically closed;At the same time, pusher side diffuses very much Valve 33 automatically opens, and includes the volume of smoke of fuel gas at the top of II coke oven booth 1 of pusher side and furnace roof space under hot pressing function Outside atmosphere is drained by pusher side very diffusion valve 33.
After abnormal condition releases, dedusting fan 1 first starts;Subsequent repid cut-off valve 1 is opened;Then very just Pressure fan 1 shuts down, and very motor-driven valve 1 is closed at the same time;33 pusher sides diffuse very much afterwards for delay (such as 1min) Valve automatically resets closing.
Six, tedge flue gas guide unit;
Each carbonization chamber is equipped with tedge in 9 pusher side of coke oven, and tedge is connected with gas collecting tube;Rise before coke pushing starts The bridge tube shutdown that tube top portion water-sealed valve is opened, is connected with gas collecting tube, cuts off the channel that the carbonization chamber coal gas enters gas collecting tube;Charing Gas of the interior containing coke-stove gas is diffused outward by tedge upper opening, is completed until the discharging of the coke.It is outside by rising nozzle The gas of ejection contains a large amount of coal gas, and most is in flame combustion state.In order to make this portion gas as early as possible, it is as more as possible Be expelled to outside coke oven booth 1, reduce the free diffusing into coke oven booth 1, right above tedge be arranged flue gas guiding device 6.The device is in multistage diffusion structure design, and flue gas forms high-speed flow in diversion pipe 61 after tedge ejection, to lure Leading surrounding air reduces flue-gas temperature and combustable gas concentration, most by incremental induction step by step into next layer of diversion pipe It guides the partial fume to outside coke oven booth 1 safely, while ensure that coke oven booth 1 is safe, reduces exhaust air rate.
Seven, fresh air unit;
9 furnace roof of coke oven is completely disposed in inside coke oven booth 1, although having carried out a large amount of air draft and having mended wind, furnace roof worker Unfavorable area of the operating space still in stream swirl.For the operating ambient temperature and air quality requirements for guaranteeing operating space, prevent Toxic and harmful gas accumulation, is provided with 2 groups of fresh air pipelines.1 group of pusher side fresh wind tube is set on pusher side gas collecting tube station top Multiple high speed spouts 74, gap of the position of high speed spout 74 between each tedge is arranged on pusher side fresh air pipeline 73 in road 73 Place.It coalings in coke side and 1 group of coke side fresh air pipeline 71 is set at the top of interface valve main pipe, set multiple air supply tubes on coke side fresh air pipeline 71 Road 72, gap of the air supply duct 72 between each interface valve, the air outlet of air supply duct 72 extend on 9 furnace roof of coke oven Side.To reinforce air agitation, using pulse valve control air-supply sequence, guarantee the range of fresh air air-flow.
Eight, spray dust-arrest temperature reducing unit;
Multiple rows of spraying vibration means for main pipe for supplying water 82 of spray dust-arrest temperature reducing unit is set in coke oven booth 1 above furnace roof, by atomization Water fog particle afterwards is uniformly sprayed at oven top of coke oven operating space, plays the role of the dust suppression that cools down, and can not only improve furnace roof behaviour Make the operating environment in area, can also reduce the air quantity of exhaust system, making corresponding dedusting fan, deduster includes that exhaust duct etc. is set Standby investment with material reduces, thus achieve the purpose that it is energy-saving, reducing the construction costs.
The present invention on the basis of carrying out coke oven booth 1 of integrally closed to coke oven 9, realize, amount long-term to coke oven 9 less, Irregularly, the improvement of the pollutions such as multi-source, sporadic flue dust, waste heat, than it is existing coaling, discharge of the coke, pusher side, burner smoke and furnace roof The control effect of smoke catching dust pelletizing system more comprehensively, realizes coke oven pollution sources all standing.Compared to furnace top smoke catching dedusting, The processing air quantity of system of the present invention is less, more energy efficient.It is transported safely in addition, the present invention has comprehensively considered system under abnormal condition Row problem guarantees production operation regional environment problem in coke oven booth, is conducive to promote coke oven production air pollution emission level, Realize coke oven clean manufacturing.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system, which is characterized in that received including coke oven booth, coke side flue dust Collect unit, pusher side flue dust collecting unit, flue dust supply unit, dust separation unit, tedge flue gas guide unit, fresh air unit And spray dust-arrest temperature reducing unit;The coke over machinery of coke oven ontology and machine, burnt two sides is all enclosed in interior, coke by the coke oven booth It is long to setting gear cigarette partition along coke oven in furnace greenhouse, inner space is separated into coke side space, pusher side and 2, furnace roof space portion Point;It is equipped with coke side flue dust collecting unit in coke side space, sets pusher side flue dust collecting unit in pusher side and furnace roof space;Coke side flue dust Collector unit and pusher side flue dust collecting unit pass through flue gas supply unit connection dust separation unit;The coal gas of coke oven coke oven uprising tube is put Tedge flue gas guide unit is set at raw edge;Fresh air unit and spray dust-arrest temperature reducing unit are additionally provided in coke oven booth.
2. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Coke oven booth is made of across crossbeam and coke side pair across crossbeam girder, pusher side column, coke side column, pusher side pair;The both ends of girder point It is not supported on by bracket in the resistance wall at coke oven both ends;Pusher side column is located on the outside of pusher side pushing ram operating space, girder and machine Pusher side pair is set across crossbeam between at the top of heel post;Coke side column is set on the outside of coke side third track support, and coke side column and machine Heel post is arranged in a one-to-one correspondence, and sets coke side pair across crossbeam between girder and coke side column top;The alien invasion of coke oven booth surrounding All closed with color profiling steel plate in addition to reserved gate and ventilation opening region, by girder, pusher side pair across crossbeam and coke side pair across The greenhouse top cover that crossbeam is constituted all is closed with heat-resisting steel sheet and plate in addition to reserved smoke outlet region.
3. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Gear cigarette partition is arranged at the top of the interface valve of coalingging on coke side furnace stay.
4. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Coke side flue dust collecting unit by be arranged on the coke oven booth top cover of coke side space multiple coke side smoke outlets, coke side smoke discharging pipe and Multiple coke sides very diffusion valve forms, and coke side smoke outlet connects flue dust supply unit by coke side smoke discharging pipe;The pusher side cigarette Dirt collector unit by be arranged on pusher side and furnace roof space coke oven booth top cover multiple pusher side smoke outlets, pusher side smoke discharging pipe and Multiple pusher sides very diffusion valve forms, and pusher side smoke outlet connects flue dust supply unit by pusher side smoke discharging pipe.
5. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Flue dust supply unit is made of pusher side flue dust conveyance conduit and coke side flue dust conveyance conduit, and one end of pusher side flue dust conveyance conduit connects Pick side smoke discharging pipe, and the other end connects the pusher side dust removing earth station in dust separation unit, sets on pusher side flue dust conveyance conduit Repid cut-off valve one sets branch pipe(tube) one on the pusher side flue dust conveyance conduit in one downstream of repid cut-off valve, sets very on branch pipe(tube) one Motor-driven valve one and very positive pressure fan one;One end of coke side flue dust conveyance conduit is separately connected coke side smoke discharging pipe and the dust that discharges of the coke Main pipe, the other end connect the coke side dedusting earth station in dust separation unit, wherein the coke side flue dust of connection coke side smoke discharging pipe Repid cut-off valve two is set on conveyance conduit, sets branch pipe(tube) two, branch pipe on the coke side flue dust conveyance conduit in two downstream of repid cut-off valve Very motor-driven valve two and very positive pressure fan two are set on road two.
6. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Dust separation unit is made of pusher side dust removing earth station and coke side dedusting earth station, and pusher side dust removing earth station is set to coke oven machine side, Including passing through the sequentially connected pulse bag type dust collector one of air hose one, dedusting fan one, outlet noise silencer one and chimney one;It is described Coke side dedusting earth station is set to coke oven coke side, including passes through the sequentially connected pulse bag type dust collector two of air hose two, dedusting fan Two, outlet noise silencer two and chimney two, dedusting fan two set 2 groups, a-worker-a-backup;Pulse bag type dust collector one, impulse bag remove Dirt device two connects corresponding dust cabin additionally by the scrapper conveyor being correspondingly arranged.
7. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Tedge flue gas guide unit includes the flue gas guiding device being arranged at tedge coal gas diffusion mouth;Its by multilayer diversion pipe, Conical cowl and mounting bracket composition;Diversion pipe is made of the straight tube on top and the Taper Pipe of lower part, and the lower internal diameter of Taper Pipe is greater than Upper internal diameter;Each layer diversion pipe is sequentially connected from top to bottom, and straight tube successively successively decreases with the diameter of corresponding Taper Pipe;Lower layer's diversion pipe Straight tube upper end protrude into the Taper Pipe of adjacent upper layer diversion pipe;Multilayer diversion pipe is fixed on the upper of tedge by mounting bracket Side, conical cowl are fixedly connected with the diversion pipe of top layer.
8. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Fresh air unit includes the pusher side fresh air pipeline set on the coke side fresh air pipeline in coke side space and set on pusher side and furnace roof space;It is described The setting of coke side fresh air pipeline is coaling in coke side at the top of interface valve main pipe, and coke side fresh air pipeline is equipped with multiple air supply ducts, each Air supply duct is located at the gap between interface valve of respectively coalingging, and air outlet extends to above furnace roof area, on air supply duct Pulse valve is set respectively;The pusher side fresh air pipeline is arranged on pusher side gas collecting tube station, is arranged on pusher side fresh air pipeline multiple High speed spout, each high speed spout are located at the gap between each tedge.
9. a kind of coke oven uncontrollable discharge pollutant comprehensive treatment system according to claim 1, which is characterized in that described Spray dust-arrest temperature reducing unit includes water main, spraying vibration means for main pipe for supplying water and atomizer;One end and outside of the water main High service pipe connection, the other end with it is a plurality of be sprayed vibration means for main pipe for supplying water be connected;A plurality of spraying vibration means for main pipe for supplying water is long to side by side along coke oven Above furnace roof area;Water main is equipped with filter and water supply main valve, and the water inlet end that each item is sprayed vibration means for main pipe for supplying water is set respectively Branching supply water valve, the bottom of spraying vibration means for main pipe for supplying water is along long to being uniformly arranged multiple atomizers;The water supply main valve is driven opening Valve is closed, branching supply water valve is electric control valve;Multiple spot is divided to be equipped with multiple sensor of dust concentration and temperature sensing in coke oven booth Device, water supply main valve, branching supply water valve and sensor of dust concentration and temperature sensor pass through controller interlocked control.
CN201811615088.2A 2018-12-27 2018-12-27 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system Pending CN109513300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811615088.2A CN109513300A (en) 2018-12-27 2018-12-27 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811615088.2A CN109513300A (en) 2018-12-27 2018-12-27 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system

Publications (1)

Publication Number Publication Date
CN109513300A true CN109513300A (en) 2019-03-26

Family

ID=65797208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811615088.2A Pending CN109513300A (en) 2018-12-27 2018-12-27 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system

Country Status (1)

Country Link
CN (1) CN109513300A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112662408A (en) * 2020-11-24 2021-04-16 山东省冶金设计院股份有限公司 Continuous collection technology for unorganized discharge of coke side furnace door of coke oven machine
CN113510127A (en) * 2021-08-03 2021-10-19 大连重工环保工程有限公司 Ventilation and dust removal system for closed greenhouse of coke oven
CN113583687A (en) * 2020-04-30 2021-11-02 宝山钢铁股份有限公司 Method for improving environment of top area of coke oven
CN115250806A (en) * 2022-06-13 2022-11-01 大连重工环保工程有限公司 Fresh air replacement device for skeleton-free greenhouse at coke side of coke oven

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4941824A (en) * 1988-05-13 1990-07-17 Heinz Holter Method of and apparatus for cooling and cleaning the roof and environs of a coke oven
JP2008075018A (en) * 2006-09-22 2008-04-03 Nippon Steel Corp Temporary shed for coke oven and coke oven facility equipped therewith
CN101195751A (en) * 2007-11-30 2008-06-11 中冶焦耐工程技术有限公司 Mobile bell-type pusher side dust removing technique for heat reclamation coke oven
JP2010275451A (en) * 2009-05-29 2010-12-09 Jfe Steel Corp Temporary protective covering for coke oven
CN104610986A (en) * 2014-11-17 2015-05-13 刘瑞军 Internal-suction type multifunctional car capable of guiding smoke, recovering coal gas and eliminating smoke and dust via combustion
CN104826416A (en) * 2015-05-08 2015-08-12 中冶焦耐工程技术有限公司 Coke oven roof multi-source occasional smoke dust collecting and purifying complete equipment
CN204644265U (en) * 2015-05-28 2015-09-16 山东兖煤凯达环保机械有限公司 Coke oven dust arrester installation
CN209501207U (en) * 2018-12-27 2019-10-18 中冶焦耐(大连)工程技术有限公司 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4941824A (en) * 1988-05-13 1990-07-17 Heinz Holter Method of and apparatus for cooling and cleaning the roof and environs of a coke oven
JP2008075018A (en) * 2006-09-22 2008-04-03 Nippon Steel Corp Temporary shed for coke oven and coke oven facility equipped therewith
CN101195751A (en) * 2007-11-30 2008-06-11 中冶焦耐工程技术有限公司 Mobile bell-type pusher side dust removing technique for heat reclamation coke oven
JP2010275451A (en) * 2009-05-29 2010-12-09 Jfe Steel Corp Temporary protective covering for coke oven
CN104610986A (en) * 2014-11-17 2015-05-13 刘瑞军 Internal-suction type multifunctional car capable of guiding smoke, recovering coal gas and eliminating smoke and dust via combustion
CN104826416A (en) * 2015-05-08 2015-08-12 中冶焦耐工程技术有限公司 Coke oven roof multi-source occasional smoke dust collecting and purifying complete equipment
CN204644265U (en) * 2015-05-28 2015-09-16 山东兖煤凯达环保机械有限公司 Coke oven dust arrester installation
CN209501207U (en) * 2018-12-27 2019-10-18 中冶焦耐(大连)工程技术有限公司 A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113583687A (en) * 2020-04-30 2021-11-02 宝山钢铁股份有限公司 Method for improving environment of top area of coke oven
CN113583687B (en) * 2020-04-30 2022-10-21 宝山钢铁股份有限公司 Method for improving environment of top area of coke oven
CN112662408A (en) * 2020-11-24 2021-04-16 山东省冶金设计院股份有限公司 Continuous collection technology for unorganized discharge of coke side furnace door of coke oven machine
CN113510127A (en) * 2021-08-03 2021-10-19 大连重工环保工程有限公司 Ventilation and dust removal system for closed greenhouse of coke oven
CN113510127B (en) * 2021-08-03 2023-08-01 大连重工环保工程有限公司 Ventilating and dedusting system for closed greenhouse of coke oven
CN115250806A (en) * 2022-06-13 2022-11-01 大连重工环保工程有限公司 Fresh air replacement device for skeleton-free greenhouse at coke side of coke oven
CN115250806B (en) * 2022-06-13 2024-02-02 大连重工环保工程有限公司 Frame-free greenhouse fresh air replacement device on coke side of coke oven

Similar Documents

Publication Publication Date Title
CN109513300A (en) A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system
CN101619881B (en) Dedusting system of whole factory building
CN104826416B (en) A kind of sporadic smoke catching of oven top of coke oven multi-source is cleaned into covering device
CN209501207U (en) A kind of coke oven uncontrollable discharge pollutant comprehensive treatment system
CN101530736A (en) High-efficiency desulfurization and dust-removal method for glass kiln
CN107461746B (en) A kind of small-sized domestic garbage pyrolysis gasification oven and purification system
CN107339700A (en) A kind of garbage incinerating system
CN204637828U (en) The sporadic smoke catching of a kind of oven top of coke oven multi-source is cleaned into covering device
CN208395615U (en) A kind of environment-friendly type bituminous mixing plant
CN106861328B (en) A kind of biomass gasification fired device purification system
CN104165364A (en) Environment-friendly energy-saving waste incineration disposal device
CN101457146A (en) Coke oven coal-charging pushing burning and cyclone wet-type water-curtain dust separation method
CN211274055U (en) Cremation machine tail gas treatment equipment
CN201815384U (en) Spinning oil fume purifying device
CN213193052U (en) Domestic waste burns burning furnace and supporting equipment is handled to flue gas thereof
CN116791436A (en) Asphalt mixture stirring, dedusting and humidifying system and process
CN207065577U (en) A kind of garbage incinerating system
CN210021536U (en) High-efficient atomizing wet-type shower nozzle dust remover
CN209271118U (en) A kind of glance coal purification system suitable for prebaked anode kneading pot
RU2816389C1 (en) Method for purifying waste gases from alumina production kilns
CN204829883U (en) Novel smokeless boiler
CN201055749Y (en) Water immersion type flue gas dust wiper
CN203469740U (en) Smoke purification device for flue fire prevention
CN220229177U (en) Incinerator capable of purifying flue gas
CN110094741A (en) A kind of consumer waste incineration processing corollary apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination