CN109510205A - A kind of distribution network load turns for decision Analysis method - Google Patents

A kind of distribution network load turns for decision Analysis method Download PDF

Info

Publication number
CN109510205A
CN109510205A CN201910008649.0A CN201910008649A CN109510205A CN 109510205 A CN109510205 A CN 109510205A CN 201910008649 A CN201910008649 A CN 201910008649A CN 109510205 A CN109510205 A CN 109510205A
Authority
CN
China
Prior art keywords
route
distribution network
transferred
turns
network load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910008649.0A
Other languages
Chinese (zh)
Other versions
CN109510205B (en
Inventor
周福举
薛风华
王洪寅
石爱祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co ltd Suqian Power Supply Branch
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Suqian Power Supply Branch Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Power Supply Branch Jiangsu Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Suqian Power Supply Branch Jiangsu Electric Power Co Ltd
Priority to CN201910008649.0A priority Critical patent/CN109510205B/en
Publication of CN109510205A publication Critical patent/CN109510205A/en
Application granted granted Critical
Publication of CN109510205B publication Critical patent/CN109510205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to technical field of power systems, and what is involved is a kind of distribution network loads to turn for decision Analysis method.Turn including 1) distribution network load for security verification;2) distribution network load turns to verify for reliability;3) distribution network load turns to verify for corrective;4) distribution network load turns to select for optimal case.The present invention overcomes conventional electrical distribution net load transfer that the shortcomings that leading to load transfer time length, low efficiency, poor reliability is manually roughly calculated mainly by regulation personnel, ensure that distribution network load turns for safe, reliable, efficient, the safety in production of promotion power distribution network and good service are horizontal.

Description

A kind of distribution network load turns for decision Analysis method
Technical field
The invention belongs to technical field of power systems, and what is involved is a kind of distribution network loads to turn for decision Analysis side Method.
Background technique
Power distribution network is directly facing huge numbers of families, is the key link for ensureing customer power supply reliability, due to distribution net work structure Complexity, circuit element is various, running environment is severe, and distribution network line fault is caused to take place frequently.In order to ensure power supply reliability, in addition to Power distribution network faults itself is required to carry out power distribution network in accident treatments such as the urgent defect elimination of higher level's power grid, substation's internal faults Load transfer.
At present mainly by when value regulation personnel according to route current loads, by being manually roughly calculated, in conjunction with operating experience Determine turning solution, turn, poor reliability lower for efficiency, under power distribution network wiring increasingly complicated developing state, it is many and diverse and with The load transfer of machine increases huge operating pressure to regulation personnel, and power distribution network safety in production is made to face a severe test.Only By regulation personnel manually calculate determine turn line load can not deeply be studied and judged for route, easily cause when load is heavier by Turn for circuit overload, while being also difficult to analyze the operation conditions and particular form turned for route comprehensively, if transferring a load onto event Barrier rate very high route is easy expansion accident instead, seriously affects the power supply reliability and power grid enterprises' good service of user Favorable image.
Summary of the invention
To overcome the shortcomings of that existing distribution network load turns for method, the present invention provides a kind of distribution network load and turns to determine for auxiliary Plan analysis method can help to regulate and control personnel selection load transfer optimal case in accident treatment.
The present invention adopts the following technical solutions to achieve, and a kind of distribution network load turns for decision Analysis method, packet Include following steps:
1) distribution network load turns for security verification;
2) distribution network load turns to verify for reliability;
3) distribution network load turns to verify for corrective;
4) distribution network load turns to select for optimal case.
The dispatch automated system that the present invention refers to is that power industry regulates and controls the common operation of power networks control technology branch of personnel Hold system, such as D5000, D5200 system of southern auspicious production.
Step (1) distribution network load turns
1-1) route to be produced and its all preceding 3 days history load curves for being transferred to route are read from dispatch automated system;
1-2) line load curve to be produced is transferred to that can be transferred to the additional combining one by one of line load curve, rejecting, produces line Abnormal load during the adjustment of road usual manner;
According to load transfer time requirement, extracted from preceding 3 days history load curves of synthesis in the corresponding periodkSynthetic thread The peak load on roadI kmax ,k=1,2 ...,m,mFor route to be produced get in touch with number of lines, calculate each item be transferred to route turn for peace Overall coefficientS k ,
,
In formulaI kN It iskItem is transferred to the current-carrying limit of route;IfS k ≤ 0.9, then this is transferred to route by security verification, incites somebody to action It is all to be denoted as by the number of lines of security verificationnIfn>=1, then the verification of (2) reliability is entered step, it is on the contrary then show All to be transferred to route not by security verification, producing line load can not turn to supply, then Flow ends, i.e., do not pass through safety The route of verification does not enter reliability verification.
Step (2) distribution network load turns the specific steps that verify for reliability
The historical data that permanent fault occurs for every route 2-1) is read from dispatch automated system, by historical failure data point Road, protection act two classes of tripping are drawn for single-phase earthing, counts the number that two class failures occur for each route, history of forming event respectively Hinder database, and is timely updated database according to power grid real time execution situation;
2-2) as unit of year, the historical failure number that step 2-1) is obtained as abscissa, sit as vertical by the number of lines Mark, obtains annual the whole network line fault number distribution map, the number of lines increases along the ordinate direction;
2-3) according to 2-2) obtained in year the whole network line fault number distribution map, obtain the distribution of the number of stoppages over the years annual Characteristic determines current year number of stoppages green alarm limit valueL A, yellow alarm limit valueL B
2-4) every is passed through the current year historical failure number for being transferred to route of security verificationL 1WithL 2After addition with phase The alarm limit value answered compares, and obtains risk class, whereinL 1Indicate that current year single-phase earthing draws road number,L 2Indicate that the current year protects Shield acts tripping times;
2-5) risk of selection is elementary is transferred to route, and the number of lines is denoted asl, and corresponding risk management and control is carried out, such asl≥ 1, then it enters step (3) distribution network load and turns to verify for corrective.
Compare and show that the method and step of risk class is as follows:
aIf)L 1+L 2<L A, then it is green early warning, the reliability for being transferred to route is higher, and regulation personnel should reinforce turning to supervise for route Depending on;
bIf)L AL 1+L 2L B, then it is yellow early warning, the reliability for being transferred to route is general, and regulation personnel should analyze comprehensively to be turned For dangerous point, prediction failure is carried out;
cIf)L 1+L 2>L B, then it is red early warning, the reliability for being transferred to route is lower, and it is pre- that regulation personnel should formulate accident treatment Case, notice operation maintenance personnel are reinforced making an inspection tour, and notice sales department carries out responsible consumer and protects electricity.
The distribution network load turns to include the following steps: for corrective method of calibration
3-1) according to the special method of operation and current service requirement that can be transferred to route, calculate same risk grade is respectively transferred to line Road correction factorM i ,
,
Wherein M (1) indicates that route has important guarantor's electricity, and value is -4;M (2) indicates that route has small power supply reclosing to exit, value It is -2;M (3) indicates that route turns to need to adjust for protection definite value, and value is -1;M (4) indicates route without special service requirement, value It is 0;
Same risk grade that step 3-1) is obtained respectively 3-2) is transferred to the route sequence descending by correction factor, arrangement Form load transfer priority sequence table.
The step (4), which is determined by regulation personnel by the priority sequence table that step (3-2) obtains, optimal is transferred to route.
The method of the present invention is practical, mainly by when value regulation personnel are manually rough when overcoming conventional electrical distribution net load transfer Calculating leads to the shortcomings that load transfer time length, low efficiency, poor reliability, according to route historical load curve to load transfer into Row security verification carries out reliability verification to load transfer according to route historical failure data, while according to the special of route The method of operation and current service requirement verify being modified property of load transfer, to ensure that distribution network load turns for that can pacify Entirely, reliably, efficiently implement, strong promotion power distribution network safety in production and good service are horizontal.
Detailed description of the invention
Below with reference to attached drawing, the invention will be further described:
Fig. 1 is that distribution network load of the present invention turns for decision Analysis method flow diagram;
Fig. 2 is that distribution network load turns for security verification method flow diagram;
Fig. 3 is that distribution network load turns for reliability method of calibration flow chart.
Specific embodiment
Further details of elaboration made to the present invention in the following with reference to the drawings and specific embodiments, but the invention is not limited to Following implementation.
As shown in Figure 1, distribution network load of the present invention turn for decision Analysis method the following steps are included:
Step 1, distribution network load turn for security verification;
Fig. 2 is that distribution network load turns for security verification method flow diagram, in this embodiment, from dispatch automated system Read route to be produced and its all preceding 3 days history load curves for being transferred to route, will line load curve be produced with can It is transferred to the additional combining one by one of line load curve, closes solution ring test, scheduled outage transfer load etc. often due to being transferred to, producing route Rule mode adjusts the anomalous variation that can cause line load, and maximum turns for the pre- of load when to eliminate usual manner adjustment to failure It surveys, by regulation personnel after executing usual manner adjustment every time, will be transferred to, produces the load before line load is adjusted by mode and deposit Storage, reject be transferred to, produce route usual manner adjustment during peakload.According to load transfer time requirement, from synthesis It is extracted on preceding 3 days history load curves in the corresponding periodkThe peak load of synthetic lineI kmax ,k=1,2 ...,m,mFor to Produce route contact number of lines, calculate each item be transferred to route turn for safety coefficientS k ,
In formulaI kN It iskItem is transferred to the current-carrying limit of route.According to distribution network line safe operation and alarm limit value requirement, ifS k ≤ 0.9, then this is transferred to route by security verification, is denoted as all by the number of lines of security verificationnIfn >=1, then enter reliability verify, on the contrary it is then show it is all be transferred to routes do not pass through security verification, produce line load without Method turns to supply.
Step 2, distribution network load turn to verify for reliability;
Fig. 3 is that distribution network load turns for reliability method of calibration flow chart, in this embodiment, from dispatch automated system The historical data that permanent fault occurs for every route is read, historical failure data is divided into single-phase earthing and draws road, protection act Trip two classes, counts the number that two class failures occur for each route respectively, history of forming Mishap Database, and real-time according to power grid Operating condition timely updates database.The form of expression of one same failure of route can mutually convert, and may start to behave as Single-phase earthing just develops into line tripping after a period of time, or develops again after line tripping successful reclosing occurs for a period of time Can not be overlapped the accuracy and integrality for once for principle, guaranteeing data only being counted with the same failure, if occurring single-phase to connect Ground is then uniformly denoted as single-phase earthing drawing Lu Yici with line tripping again, if development is to be overlapped not again after tripping successful reclosing occurs At being then uniformly denoted as, protection act tripping is primary.As unit of year, using historical failure number as abscissa, the number of lines (by sequence from less to more) is used as ordinate, obtains annual the whole network line fault number distribution map, according to annual failure time over the years Several distribution characters determines that the current year number of stoppages alerts green alarm limit valueL A, yellow alarm limit valueL B.Generally desirable 3-5 The average time that annual the whole network number of stoppages is distributed preceding 20% is green alarm limit valueL A, take 3-5 year the whole network number of stoppages point 70% average time is yellow alarm limit value before clothL B, route current year history is transferred to by security verification by every The number of stoppagesL 1L 2After addition compared with corresponding alarm limit value, risk class is obtained, L 1Indicate that single-phase earthing draws road number,L 2Indicate protection act tripping times, specific as follows:
aIf)L 1+L 2<L A, green early warning, it is higher to be transferred to circuit reliability, and regulation personnel should reinforce turning for line supervision;
bIf)L AL 1+L 2L B, yellow early warning, it is general to be transferred to circuit reliability, and regulation personnel should analyze comprehensively to be turned for danger Point, carries out prediction failure;
cIf)L 1+L 2>L B, red early warning is transferred to that circuit reliability is lower, and regulation personnel should formulate accident treatment prediction scheme, notice Operation maintenance personnel is reinforced making an inspection tour, and notice sales department carries out responsible consumer and protects electricity.
Risk of selection is elementary to be transferred to route, and the number of lines is denoted asl, and corresponding risk management and control is carried out, such asl≥ 1, then enter corrective and verifies.
Step 3, basis can be transferred to the special method of operation and current service requirement of route, calculate each of same risk grade It is transferred to route correction factorM i ,
WhereinM(1) indicating that route has important guarantor's electricity, value is -4,M(2) indicate that route has small power supply reclosing to exit, value It is -2,M(3) indicating that route turns to need to adjust for protection definite value, value is -1,M(4) indicate route without special service requirement, value It is 0.The route that is respectively transferred to of same risk grade forms load transfer priority sequence table by the descending arrangement of correction factor.
Step 4, regulation personnel are prioritized to table and determine optimal be transferred to route.
Embodiment of above is the preferred embodiment of the present invention, is not to impose any restrictions to the present invention, it is any not It is detached from made by essence of the present invention and simply modifies or convert, within the scope of protection of the patent of the invention.

Claims (6)

1. a kind of distribution network load turns for decision Analysis method, which comprises the following steps:
1) distribution network load turns for security verification;
2) distribution network load turns to verify for reliability;
3) distribution network load turns to verify for corrective;
4) distribution network load turns to select for optimal case.
2. distribution network load according to claim 1 turns for decision Analysis method, which is characterized in that step (1) is matched Network load turns
1-1) route to be produced and its all preceding 3 days history load curves for being transferred to route are read from dispatch automated system;
1-2) line load curve to be produced is transferred to that can be transferred to the additional combining one by one of line load curve, rejecting, produces line Abnormal load during the adjustment of road usual manner;
According to load transfer time requirement, extracted from preceding 3 days history load curves of synthesis in the corresponding periodkSynthetic thread The peak load on roadI kmax ,k=1,2 ...,m,mFor route to be produced get in touch with number of lines, calculate each item be transferred to route turn for peace Overall coefficientS k ,
,
In formulaI kN It iskItem is transferred to the current-carrying limit of route;IfS k ≤ 0.9, then this is transferred to route by security verification, incites somebody to action It is all to be denoted as by the number of lines of security verificationnIfn>=1, then the verification of (2) reliability is entered step, it is on the contrary then show All to be transferred to route not by security verification, producing line load can not turn to supply, then Flow ends, i.e., do not pass through safety The route of verification does not enter reliability verification.
3. distribution network load according to claim 1 turns for decision Analysis method, which is characterized in that step (2) is matched Network load turns the specific steps that verify for reliability
The historical data that permanent fault occurs for every route 2-1) is read from dispatch automated system, by historical failure data point Road, protection act two classes of tripping are drawn for single-phase earthing, counts the number that two class failures occur for each route, history of forming event respectively Hinder database, and is timely updated database according to power grid real time execution situation;
2-2) as unit of year, the historical failure number that step (2-1) is obtained as abscissa, sit as vertical by the number of lines Mark, obtains annual the whole network line fault number distribution map, the number of lines increases along the ordinate direction;
2-3) year the whole network line fault number distribution map according to obtained in (2-2) obtains point of the annual number of stoppages over the years Cloth characteristic determines current year number of stoppages green alarm limit valueL A, yellow alarm limit valueL B
2-4) every is passed through the current year historical failure number for being transferred to route of security verificationL 1WithL 2After addition and accordingly Alarm limit value compare, obtain risk class, whereinL 1Indicate that current year single-phase earthing draws road number,L 2Indicate current year protection Act tripping times;
2-5) risk of selection is elementary is transferred to route, and the number of lines is denoted asl, and corresponding risk management and control is carried out, such asl≥ 1, then it enters step (3) distribution network load and turns to verify for corrective.
4. distribution network load according to claim 3 turns for decision Analysis method, which is characterized in that the step Relatively show that the method and step of risk class is as follows in (2-4):
aIf)L 1+L 2<L A, then it is green early warning, the reliability for being transferred to route is higher, and regulation personnel should reinforce turning to supervise for route Depending on;
bIf)L AL 1+L 2L B, then it is yellow early warning, the reliability for being transferred to route is general, and regulation personnel should analyze comprehensively to be turned to supply Prediction failure is carried out in dangerous point;
cIf)L 1+L 2>L B, then it is red early warning, the reliability for being transferred to route is lower, and it is pre- that regulation personnel should formulate accident treatment Case, notice operation maintenance personnel are reinforced making an inspection tour, and notice sales department carries out responsible consumer and protects electricity.
5. distribution network load according to claim 1 turns for decision Analysis method, which is characterized in that the power distribution network Load transfer corrective method of calibration, includes the following steps:
3-1) according to the special method of operation and current service requirement that can be transferred to route, calculate same risk grade is respectively transferred to line Road correction factorM i ,
,
Wherein M (1) indicates that route has important guarantor's electricity, and value is -4;M (2) indicates that route has small power supply reclosing to exit, value It is -2;M (3) indicates that route turns to need to adjust for protection definite value, and value is -1;M (4) indicates route without special service requirement, value It is 0;
Same risk grade that step (3-1) obtains respectively 3-2) is transferred to the route sequence descending by correction factor, row Column form load transfer priority sequence table.
6. distribution network load according to claim 1 turns for decision Analysis method, which is characterized in that the step (4) it is determined by regulation personnel by the priority sequence table that step (3-2) obtains and optimal is transferred to route.
CN201910008649.0A 2019-01-04 2019-01-04 Power distribution network load transfer auxiliary decision analysis method Active CN109510205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910008649.0A CN109510205B (en) 2019-01-04 2019-01-04 Power distribution network load transfer auxiliary decision analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910008649.0A CN109510205B (en) 2019-01-04 2019-01-04 Power distribution network load transfer auxiliary decision analysis method

Publications (2)

Publication Number Publication Date
CN109510205A true CN109510205A (en) 2019-03-22
CN109510205B CN109510205B (en) 2021-01-12

Family

ID=65756238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910008649.0A Active CN109510205B (en) 2019-01-04 2019-01-04 Power distribution network load transfer auxiliary decision analysis method

Country Status (1)

Country Link
CN (1) CN109510205B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110263078A (en) * 2019-08-14 2019-09-20 广东电网有限责任公司佛山供电局 A kind of distribution line heavy-overload Intelligent statistical system and statistical method
CN110299708A (en) * 2019-07-10 2019-10-01 国网江苏省电力有限公司无锡供电分公司 Distribution network load turns for aid decision-making method and system
CN113541128A (en) * 2021-06-24 2021-10-22 深圳供电局有限公司 Power distribution network feeder line power supply transfer method and device, computer equipment and storage medium
CN113809822A (en) * 2021-08-12 2021-12-17 国网浙江嘉善县供电有限公司 Power distribution network load rapid transfer auxiliary decision system based on PI database
CN115603465A (en) * 2022-11-07 2023-01-13 安徽网华信息科技有限公司(Cn) Power distribution network load transfer data monitoring and regulating system and method based on big data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method
CN102916431A (en) * 2012-09-20 2013-02-06 中国电力科学研究院 Assisted decision making method for load transfer in regional power grid
US20130144575A1 (en) * 2011-10-31 2013-06-06 Tolga Han Seyhan Simulating customer behavior for demand response
CN103700039A (en) * 2014-01-10 2014-04-02 国家电网公司 Power grid real-time risk assessment and precontrol method
CN105207213A (en) * 2015-10-23 2015-12-30 国家电网公司 Power distribution network N-1 calibration method taking segmental load transfer into consideration
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method
US20130144575A1 (en) * 2011-10-31 2013-06-06 Tolga Han Seyhan Simulating customer behavior for demand response
CN102916431A (en) * 2012-09-20 2013-02-06 中国电力科学研究院 Assisted decision making method for load transfer in regional power grid
CN103700039A (en) * 2014-01-10 2014-04-02 国家电网公司 Power grid real-time risk assessment and precontrol method
CN105207213A (en) * 2015-10-23 2015-12-30 国家电网公司 Power distribution network N-1 calibration method taking segmental load transfer into consideration
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
P. DJAPIC ETAL: "Value of load transfer capacity in distribution network design", 《IET INTERNATIONAL CONFERENCE ON RESILIENCE OF TRANSMISSION AND DISTRIBUTION NETWORKS (RTDN 2017)》 *
葛文林等: "新一代配电自动化系统单元制配电网运行控制功能设计", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110299708A (en) * 2019-07-10 2019-10-01 国网江苏省电力有限公司无锡供电分公司 Distribution network load turns for aid decision-making method and system
CN110299708B (en) * 2019-07-10 2022-08-12 国网江苏省电力有限公司无锡供电分公司 Power distribution network load transfer auxiliary decision-making method and system
CN110263078A (en) * 2019-08-14 2019-09-20 广东电网有限责任公司佛山供电局 A kind of distribution line heavy-overload Intelligent statistical system and statistical method
CN113541128A (en) * 2021-06-24 2021-10-22 深圳供电局有限公司 Power distribution network feeder line power supply transfer method and device, computer equipment and storage medium
CN113809822A (en) * 2021-08-12 2021-12-17 国网浙江嘉善县供电有限公司 Power distribution network load rapid transfer auxiliary decision system based on PI database
CN115603465A (en) * 2022-11-07 2023-01-13 安徽网华信息科技有限公司(Cn) Power distribution network load transfer data monitoring and regulating system and method based on big data
CN115603465B (en) * 2022-11-07 2023-11-07 安徽网华信息科技有限公司 Power distribution network load transfer data monitoring and controlling system and method based on big data

Also Published As

Publication number Publication date
CN109510205B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
CN109510205A (en) A kind of distribution network load turns for decision Analysis method
KR102218268B1 (en) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
McDermott et al. Distributed generation impact on reliability and power quality indices
Makarov et al. Blackout prevention in the united states, europe, and russia
US8135550B2 (en) System for monitoring and assessing electrical circuits and method of operation
CN107844891A (en) A kind of method for judging Power grid structure and changing and calculating schedule risk value
CN107167709A (en) A kind of electric network fault localization method and alignment system
CN104156881A (en) Comprehensive power distribution network fault risk assessment method
CN109672175B (en) Power grid control method and device
Gomes New strategies to improve bulk power system security: lessons learned from large blackouts
Chakraborty et al. Survey on major blackouts analysis and prevention methodologies
CN106998061A (en) A kind of KV of single supply 10 protection three-level configuration and fixed value adjusting method
CN107067126B (en) Thermal stability key power transmission channel identification method based on power flow transfer ratio
CN104332999A (en) Automatic main grid power supply transferring strategy generation method for regional power grid
CN105703341B (en) There is the layering point domain isolated island guard method of anti-jump function for large-scale wind power
CN103887775B (en) Distribution network microcomputer protection system integrating distribution automation master station dynamic setting
Nair et al. IEC 61850 enabled automatic bus transfer scheme for primary distribution substations
CN111682591B (en) Anti-islanding protection method and device for low-voltage distributed power supply
CN110797863B (en) Economic dispatching method considering safety constraints of N-1 and N-2 of power grid
CN114696467B (en) Method and system for analyzing and processing fault tripping event of high-voltage transmission long line
CN109066664A (en) A kind of quantitative estimation method based on the control of 110kV substation full cut-off risk closed loop
Matic-Cuka et al. Improving smart grid operation with new hierarchically coordinated protection approach
CN107749623A (en) Single busbar trip loss of electrical load accident grade decision method under double bus scheme mode
CN109818335A (en) A kind of protection system exception event diagnosis system and method based on failure tree analysis (FTA)
CN105515166B (en) 110 kilovolts of system busbar combining units of intelligent substation double bus scheme mode can back brake maintenance voltage allocation plan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200907

Address after: No. 2481 Suqian City, Jiangsu province 223800 Avenue development Sucheng District

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. SUQIAN POWER SUPPLY BRANCH

Address before: No. 2481 Suqian City, Jiangsu province 223800 Avenue development Sucheng District

Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. SUQIAN POWER SUPPLY BRANCH

Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co.

Applicant before: STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201119

Address after: No. 2481 Suqian City, Jiangsu province 223800 Avenue development Sucheng District

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. SUQIAN POWER SUPPLY BRANCH

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: No. 2481 Suqian City, Jiangsu province 223800 Avenue development Sucheng District

Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. SUQIAN POWER SUPPLY BRANCH

GR01 Patent grant
GR01 Patent grant