CN109508942A - Commodity distribution control method and system suitable for capital construction industry electric business - Google Patents

Commodity distribution control method and system suitable for capital construction industry electric business Download PDF

Info

Publication number
CN109508942A
CN109508942A CN201811632887.0A CN201811632887A CN109508942A CN 109508942 A CN109508942 A CN 109508942A CN 201811632887 A CN201811632887 A CN 201811632887A CN 109508942 A CN109508942 A CN 109508942A
Authority
CN
China
Prior art keywords
logistics transportation
materials
capital construction
route
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811632887.0A
Other languages
Chinese (zh)
Inventor
蒋丁立
王慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wurong Technology Co Ltd
Original Assignee
Wurong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wurong Technology Co Ltd filed Critical Wurong Technology Co Ltd
Priority to CN201811632887.0A priority Critical patent/CN109508942A/en
Publication of CN109508942A publication Critical patent/CN109508942A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0835Relationships between shipper or supplier and carriers
    • G06Q10/08355Routing methods

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present invention discloses a kind of commodity distribution control method and system suitable for capital construction industry electric business, and wherein method includes the following steps: that exporting transit node information to the materials for capital construction that logistics transporting equipment is returned according to transportation route purchases method, apparatus;Request is changed according to route and updates the transport pathway, and the route change request is that the materials for capital construction purchases what method, apparatus was generated according to the transit node information;Updated transport pathway is sent to logistics transportation equipment, so that the logistics transportation equipment updates logistics transportation route.Using the present invention, by in Material Transportation on the way by logistics transportation node Real-time Feedback to purchase of goods and materials side, and it is pleaded according to the change of the route of purchase of goods and materials side and changes transit route, transit route can be changed according to buying side's demand in time, so as to reduce the purchase cost that transportation cost reduces construction project.

Description

Commodity distribution control method and system suitable for capital construction industry electric business
Technical field
The present invention relates to logistics management field more particularly to a kind of commodity distribution control method suitable for capital construction industry electric business and System.
Background technique
After shopping platform bought articles, buyer can know purchase by the logistics transportation information that platform provides Transit route, for example, having bought dress in certain this precious electric business platform, buyer is by checking that logistics is known that bought clothing Take logistics transportation information.In capital construction industry, the electric business platform that purchase of goods and materials side can also be traded by goods and materials obtains logistics fortune Defeated information.Before delivery, buyer or purchase of goods and materials side can modify shipping address by connection seller or material supply side, But after seller or material supply side deliver, the route of logistics transportation, which has determined, to be changed.
Since the usual quantity of materials for capital construction of purchase of goods and materials side's buying is more and bulky (for example, 1 ton of steel, 2 tons of water Mud etc.), after the delivery of material supply side, when needing to change the route of Material Transportation, deliver after needing to return to goods and materials from new, Transportation cost is increased, and then increases the purchase cost of construction project.
Summary of the invention
The embodiment of the present invention provides a kind of logistics management and system suitable for capital construction industry electric business, by Material Transportation On the way by logistics transportation node Real-time Feedback to purchase of goods and materials side, and is pleaded according to the change of the route of purchase of goods and materials side and change transport Route can change transit route according to buying side's demand in time, reduce construction project so as to reduce transportation cost Purchase cost.
First aspect of the embodiment of the present invention provides a kind of commodity distribution control method suitable for capital construction industry electric business, can wrap It includes:
The transit node information that output logistics transporting equipment is returned according to transportation route to materials for capital construction purchases method, apparatus;
Request is changed according to route and updates the transport pathway, and the route change request is the materials for capital construction buying side Equipment is generated according to the transit node information;
Updated transport pathway is sent to logistics transportation equipment, so that the logistics transportation equipment updates logistics transportation Route.
Second aspect of the embodiment of the present invention provides a kind of logistic management system suitable for capital construction industry electric business, can wrap It includes:
Information output unit, the transit node information returned according to transportation route for exporting logistics transporting equipment to capital construction Purchase of goods and materials method, apparatus;
Approach updating unit updates the transport pathway for changing request according to route, and the route change request is What the materials for capital construction buying method, apparatus was generated according to the transit node information;
More new route transmission unit, for updated transport pathway to be sent to logistics transportation equipment, for the object It flows transporting equipment and updates logistics transportation route.
In embodiments of the present invention, by by the transit node information Real-time Feedback in materials for capital construction transportational process to goods and materials Method, apparatus is purchased, is set so that new transit route is timely conveyed to logistics transportation according to project demands by purchase of goods and materials method, apparatus It is standby, to improve the timeliness because of buying side's demand Reroute, transportation cost when route change is reduced, base is reduced Build the purchase cost of project.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of process signal of commodity distribution control method suitable for capital construction industry electric business provided in an embodiment of the present invention Figure;
Fig. 2 is that the process of another commodity distribution control method for being suitable for capital construction industry electric business provided in an embodiment of the present invention is shown It is intended to;
Fig. 3 is a kind of structural representation of logistic management system suitable for capital construction industry electric business provided in an embodiment of the present invention Figure;
Fig. 4 is that the structure of another logistic management system for being suitable for capital construction industry electric business provided in an embodiment of the present invention is shown It is intended to.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Below in conjunction with attached drawing 1 and attached drawing 2, to the stream tube provided in an embodiment of the present invention suitable for capital construction industry electric business Reason method describes in detail.
Referring to Figure 1, for the embodiment of the invention provides a kind of commodity distribution control methods suitable for capital construction industry electric business Flow diagram.As shown in Figure 1, the embodiment of the present invention the method may include following steps S101- step S103.
S101, transit node information to the materials for capital construction buying side that output logistics transporting equipment is returned according to transportation route are set It is standby.
It is provided it is understood that materials for capital construction supplier can reach materials for capital construction buying side based on digital map Shipping address transportation route, the available logistics transportation equipment of materials for capital construction supplier returns according to the transportation route The transit node information returned, in an alternative embodiment, the shipping address can be sent to institute by the materials for capital construction supplier Logistics transportation equipment is stated, the logistics transportation equipment can generate the transportation route according to the shipping address.It is understood that , the transit node information can be the information of the important transportation website in the transportation route, for example, it may be a certain The location information of the location information of rest station or a certain terminal.
It should be noted that the logistics transportation equipment can feeding back to the logistic management system based on preset time Transit node information.Feedback based on preset time can be real-time feedback, be also possible to every hour, two small When or one day etc. feedback.
Specifically, the available above-mentioned transit node information of logistic management system, and can be by the transit node Information exports to the materials for capital construction and purchases method, apparatus, and the materials for capital construction buying method, apparatus can be saved according to transport obtained The transportation logistics for the materials for capital construction that point information monitoring is purchased.
S102 changes request according to route and updates the transport pathway.
It should be noted that due to the demand of construction project, it may be desirable to the receipts for the materials for capital construction that change is being transported Goods address, for example, in Railway Construction Projects, the rail purchased in the A of location since other reasons do not have timely arrival, need will be The rail of location B buying draws to help meet an urgent need and use.After the materials for capital construction purchased has been delivered, the materials for capital construction buying side is set It is standby that route change request can be generated according to the transit node information, and route change request can be sent to described Logistic management system.
Specifically, the logistic management system, which can change request according to route obtained, updates the transport pathway.
Updated transport pathway is sent to logistics transportation equipment by S103.
Specifically, updated transport pathway can be sent to logistics transportation equipment by the logistic management system.It is described Logistics transportation equipment can update logistics transportation route according to new transport pathway.
In an alternative embodiment, the route can also be changed the new of request carrying and received by the logistic management system Address is sent to the logistics transportation equipment, and the logistics transportation equipment can change transportation route according to new shipping address.
In embodiments of the present invention, by by the transit node information Real-time Feedback in materials for capital construction transportational process to goods and materials Method, apparatus is purchased, is set so that new transit route is timely conveyed to logistics transportation according to project demands by purchase of goods and materials method, apparatus It is standby, to improve the timeliness because of buying side's demand Reroute, transportation cost when route change is reduced, base is reduced Build the purchase cost of project.
Fig. 2 is referred to, for the embodiment of the invention provides another commodity distribution control methods for being suitable for capital construction industry electric business Flow diagram.As shown in Fig. 2, the embodiment of the present invention the method may include following steps S201- step S209.
S201 obtains the logistics transportation request that materials for capital construction supply method, apparatus is sent.
It is understood that after materials for capital construction buying method, apparatus places an order and purchases materials for capital construction, materials for capital construction supplier Equipment can prepare to deliver, and logistics transportation can be requested to be sent to logistic management system.
S202 plans transport pathway according to the distribution information that logistics transportation request carries.
Specifically, the logistic management system can request the distribution information carried to plan transport according to the logistics transportation Approach, the distribution information may include shipping address, distribution time etc..
The transport pathway is sent to logistics transportation equipment by S203.
In an alternative embodiment, the distribution information can be sent to the logistics transportation by the materials for capital construction supplier Equipment, the logistics transportation equipment can generate the transportation route according to the shipping address in the distribution information.
S204 detects the transit node information that the logistics transportation equipment returns whether is received in preset time period.
It should be noted that the logistics transportation equipment can feeding back to the logistic management system based on preset time Transit node information.Feedback based on preset time can be real-time feedback, be also possible to every hour, two small When or one day etc. feedback.
Specifically, whether the logistic management system can detecte receives the logistics transportation equipment in preset time period The transit node information of return.When the testing result, which is, is, the corresponding operation of step S205- step S207 can be executed, When the testing result is no, the corresponding operation of step S208 can be executed.
S205 exports the transit node information to materials for capital construction and purchases method, apparatus when the testing result, which is, is.
Specifically, when detecting the transit node information for receiving the logistics transportation equipment in preset time period and returning When, the logistic management system can export the transit node information to materials for capital construction and purchase method, apparatus.
It is understood that the materials for capital construction buying method, apparatus can be according to transit node information monitoring institute obtained The transportation logistics of the materials for capital construction of buying.
S206 changes request according to route and updates the transport pathway.
It should be noted that due to the demand of construction project, it may be desirable to the receipts for the materials for capital construction that change is being transported Goods address, for example, in Railway Construction Projects, the rail purchased in the A of location since other reasons do not have timely arrival, need will be The rail of location B buying draws to help meet an urgent need and use.After the materials for capital construction purchased has been delivered, the materials for capital construction buying side is set It is standby that route change request can be generated according to the transit node information, and route change request can be sent to described Logistic management system.
Specifically, the logistic management system, which can change request according to route obtained, updates the transport pathway.
Updated transport pathway is sent to logistics transportation equipment by S207.
Specifically, updated transport pathway can be sent to logistics transportation equipment by the logistic management system.It is described Logistics transportation equipment can update logistics transportation route according to new transport pathway.
In an alternative embodiment, the route can also be changed the new of request carrying and received by the logistic management system Address is sent to the logistics transportation equipment, and the logistics transportation equipment can change transportation route according to new shipping address.
S208, when the transit node information that the logistics transportation equipment returns is not received in preset time period, output Suspicious confirmation message is to the logistics transportation equipment.
Specifically, when detecting the transit node information for not receiving the logistics transportation equipment in preset time period and returning When, the logistic management system can export suspicious confirmation message to the logistics transportation equipment.It is understood that described can Doubtful confirmation message, which can be, is confirmed whether that the information of transport failure occurs to the logistics transportation equipment, if do not had in transportational process Problematic generation can return to transit node information to the logistic management system.
S209 detects whether to get the transit node that the logistics transportation equipment is returned according to the suspicious confirmation message Information.
Specifically, whether the logistic management system can detecte gets the logistics transportation equipment according to described suspicious The transit node information that confirmation message returns.
When the testing result, which is, is, it is transferred to and executes step S205.Unit 208
S210, when the transit node information for the logistics transportation equipment has not been obtained being returned according to the suspicious confirmation message When, output abnormality warning information to the materials for capital construction purchases method, apparatus.
Specifically, being believed when the logistics transportation equipment has not been obtained according to the transit node that the suspicious confirmation message returns When breath, the logistic management system can consider that the logistics transportation equipment in transit may be out of joint, can export Abnormality alarming information to the materials for capital construction purchases method, apparatus.The abnormality alarming information can prompt the materials for capital construction to purchase Method, apparatus Material Transportation on the way the problem of being likely to occur, arranged so that the materials for capital construction buying side can make other replies It applies.
In embodiments of the present invention, by further confirming that whether logistics transportation equipment normal in transit, can and When to materials for capital construction buying side outputting alarm information, so that it makes reply operation, avoid the construction for delaying construction project, guarantee The fairness of construction project progress.
S211, when getting when being dispensed into information of the logistics transportation equipment transmission, successfully prompt letter is transported in output Breath.
Specifically, when getting when being dispensed into information of the logistics transportation equipment transmission, the logistic management system It can export and transport successfully prompt information.The successfully prompt information of transporting can prompt the materials for capital construction buying method, apparatus base It builds goods and materials to have arrived at, can sign for.
In embodiments of the present invention, by by the transit node information Real-time Feedback in materials for capital construction transportational process to goods and materials Method, apparatus is purchased, is set so that new transit route is timely conveyed to logistics transportation according to project demands by purchase of goods and materials method, apparatus It is standby, to improve the timeliness because of buying side's demand Reroute, transportation cost when route change is reduced, base is reduced Build the purchase cost of project;It, can be in time to capital construction by further confirming that whether logistics transportation equipment is normal in transit Purchase of goods and materials side's outputting alarm information avoids the construction for delaying construction project, ensure that capital construction item so that it makes reply operation The fairness of mesh progress.
Below in conjunction with attached drawing 3 and attached drawing 4, to the stream tube provided in an embodiment of the present invention suitable for capital construction industry electric business Reason system describes in detail.It should be noted that attached drawing 3 and attached logistic management system shown in Fig. 4, for executing the present invention The method of Fig. 1 and embodiment illustrated in fig. 2, for ease of description, only parts related to embodiments of the present invention are shown, specific skill Art details does not disclose, please refers to Fig. 1 of the present invention and embodiment shown in Fig. 2.
Fig. 3 is referred to, for the embodiment of the invention provides a kind of logistic management systems suitable for capital construction industry electric business Structural schematic diagram.As shown in figure 3, the logistic management system 100 suitable for capital construction industry electric business of the embodiment of the present invention can To include: information output unit 101, approach updating unit 102 and more new route transmission unit 103.
Information output unit 101, the transit node information returned according to transportation route for exporting logistics transporting equipment is extremely Materials for capital construction purchases method, apparatus.
It is provided it is understood that materials for capital construction supplier can reach materials for capital construction buying side based on digital map Shipping address transportation route, the available logistics transportation equipment of materials for capital construction supplier returns according to the transportation route The transit node information returned, in an alternative embodiment, the shipping address can be sent to institute by the materials for capital construction supplier Logistics transportation equipment is stated, the logistics transportation equipment can generate the transportation route according to the shipping address.It is understood that , the transit node information can be the information of the important transportation website in the transportation route, for example, it may be a certain The location information of the location information of rest station or a certain terminal.
It should be noted that the logistics transportation equipment can feeding back to the logistic management system based on preset time Transit node information.Feedback based on preset time can be real-time feedback, be also possible to every hour, two small When or one day etc. feedback.
In the specific implementation, the available above-mentioned transit node information of information output unit 101, and the transport can be saved Point information exports to the materials for capital construction and purchases method, apparatus, and the materials for capital construction buying method, apparatus can be according to transport obtained Nodal information monitors the transportation logistics of purchased materials for capital construction.
Approach updating unit 102 updates the transport pathway for changing request according to route.
It should be noted that due to the demand of construction project, it may be desirable to the receipts for the materials for capital construction that change is being transported Goods address, for example, in Railway Construction Projects, the rail purchased in the A of location since other reasons do not have timely arrival, need will be The rail of location B buying draws to help meet an urgent need and use.After the materials for capital construction purchased has been delivered, the materials for capital construction buying side is set It is standby that route change request can be generated according to the transit node information, and route change request can be sent to described Logistic management system 100.
In the specific implementation, approach updating unit 102 can change request according to route obtained updates the transport way Diameter.
More new route transmission unit 103, for updated transport pathway to be sent to logistics transportation equipment.
It is set in the specific implementation, updated transport pathway can be sent to logistics transportation by more new route transmission unit 103 It is standby.The logistics transportation equipment can update logistics transportation route according to new transport pathway.
In an alternative embodiment, the route can also be changed what request carried by the more new route transmission unit 103 New shipping address is sent to the logistics transportation equipment, and the logistics transportation equipment can be changed according to new shipping address and be transported Defeated path.
In embodiments of the present invention, by by the transit node information Real-time Feedback in materials for capital construction transportational process to goods and materials Method, apparatus is purchased, is set so that new transit route is timely conveyed to logistics transportation according to project demands by purchase of goods and materials method, apparatus It is standby, to improve the timeliness because of buying side's demand Reroute, transportation cost when route change is reduced, base is reduced Build the purchase cost of project.
Fig. 4 is referred to, for the embodiment of the invention provides another logistic management systems for being suitable for capital construction industry electric business Structural schematic diagram.As shown in figure 4, the logistic management system 200 suitable for capital construction industry electric business of the embodiment of the present invention It may include: request unit 201, path planning unit 202, path transmission unit 203, information output unit 204, approach Updating unit 205, more new route transmission unit 206, execute jump-transfer unit 208, warning information at confirmation message output unit 207 Output unit 209 and successful information output unit 210.
Request unit 201, the logistics transportation request sent for obtaining materials for capital construction supply method, apparatus.
It is understood that after materials for capital construction buying method, apparatus places an order and purchases materials for capital construction, materials for capital construction supplier Equipment can prepare to deliver, and logistics transportation can be requested to be sent to request unit 201.
Path planning unit 202, the distribution information for being carried according to logistics transportation request plan transport pathway.
In the specific implementation, path planning unit 202 can request the distribution information carried to be planned according to the logistics transportation Transport pathway, the distribution information may include shipping address, distribution time etc..
Path transmission unit 203, for the transport pathway to be sent to logistics transportation equipment.
In the specific implementation, the transport pathway can be sent to logistics transportation equipment by path transmission unit 203.
In an alternative embodiment, the distribution information can be sent to the logistics transportation by the materials for capital construction supplier Equipment, the logistics transportation equipment can generate the transportation route according to the shipping address in the distribution information.
It should be noted that the logistics transportation equipment can feeding back to the logistic management system based on preset time Transit node information.Feedback based on preset time can be real-time feedback, be also possible to every hour, two small When or one day etc. feedback.
In the specific implementation, the logistic management system 200 can detecte whether receive the logistics in preset time period The transit node information that transporting equipment returns.
When the testing result, which is, is, with execution information output unit 204, routing update unit 205 and road can be updated It is corresponding can to execute confirmation message output unit 207 when the testing result is no for the corresponding operation of diameter transmission unit 206 Operation.
Information output unit 204, the transit node information returned according to transportation route for exporting logistics transporting equipment is extremely Materials for capital construction purchases method, apparatus.
In the specific implementation, receiving the logistics transportation equipment in preset time period when logistic management system 200 detects When the transit node information of return, information output unit 204 can export the transit node information to materials for capital construction buying side Equipment.
It is understood that the materials for capital construction buying method, apparatus can be according to transit node information monitoring institute obtained The transportation logistics of the materials for capital construction of buying.
Approach updating unit 205 updates the transport pathway for changing request according to route.
It should be noted that due to the demand of construction project, it may be desirable to the receipts for the materials for capital construction that change is being transported Goods address, for example, in Railway Construction Projects, the rail purchased in the A of location since other reasons do not have timely arrival, need will be The rail of location B buying draws to help meet an urgent need and use.After the materials for capital construction purchased has been delivered, the materials for capital construction buying side is set It is standby that route change request can be generated according to the transit node information, and route change request can be sent to described Logistic management system 200.
In the specific implementation, approach updating unit 205 can change request according to route obtained updates the transport way Diameter.
More new route transmission unit 206, for updated transport pathway to be sent to logistics transportation equipment.
It is set in the specific implementation, updated transport pathway can be sent to logistics transportation by more new route transmission unit 206 It is standby.The logistics transportation equipment can update logistics transportation route according to new transport pathway.
In an alternative embodiment, the route can also be changed what request carried by the more new route transmission unit 206 New shipping address is sent to the logistics transportation equipment, and the logistics transportation equipment can be changed according to new shipping address and be transported Defeated path.
Confirmation message output unit 207 does not receive what the logistics transportation equipment returned for working as in preset time period When transit node information, suspicious confirmation message is exported to the logistics transportation equipment.
In the specific implementation, when detecting the transit node for not receiving the logistics transportation equipment in preset time period and returning When information, confirmation message output unit 207 can export suspicious confirmation message to the logistics transportation equipment.It is understood that It is that the suspicious confirmation message can be to be confirmed whether that the information of transport failure occurs to the logistics transportation equipment, if fortune There is no problem during defeated occurs, and can return to transit node information to the logistic management system 200.
It is understood that whether the logistic management system 200 can detecte gets the logistics transportation equipment root The transit node information returned according to the suspicious confirmation message.When the test results is yes, it can execute and execute jump-transfer unit 208 Corresponding operation can execute the corresponding operation of warning information output unit 209 when testing result is no.
Jump-transfer unit 208 is executed, gets the logistics transportation equipment according to the suspicious confirmation message return for working as Transit node information when, be transferred to the corresponding operation of execution information output unit 204.
The logistics transportation equipment has not been obtained according to the suspicious confirmation letter for working as in warning information output unit 209 When ceasing the transit node information returned, output abnormality warning information to the materials for capital construction purchases method, apparatus.
In the specific implementation, when the logistics transportation equipment has not been obtained according to the transport section of the suspicious confirmation message return When point information, warning information output unit 209 can consider that the logistics transportation equipment in transit may be out of joint, can Method, apparatus is purchased with output abnormality warning information to the materials for capital construction.The abnormality alarming information can prompt the capital construction object Money buying method, apparatus Material Transportation on the way the problem of being likely to occur, answered so that the materials for capital construction buying side can make other To measure.
In embodiments of the present invention, by further confirming that whether logistics transportation equipment normal in transit, can and When to materials for capital construction buying side outputting alarm information, so that it makes reply operation, avoid the construction for delaying construction project, guarantee The fairness of construction project progress.
Successful information output unit 210, for when getting that the logistics transportation equipment sends when being dispensed into information, Successfully prompt information is transported in output.
In the specific implementation, when getting when being dispensed into information of the logistics transportation equipment transmission, successful information output Unit 210, which can export, transports successfully prompt information.The successfully prompt information of transporting can prompt the materials for capital construction to purchase Method, apparatus materials for capital construction has arrived at, and can sign for.
In embodiments of the present invention, by by the transit node information Real-time Feedback in materials for capital construction transportational process to goods and materials Method, apparatus is purchased, is set so that new transit route is timely conveyed to logistics transportation according to project demands by purchase of goods and materials method, apparatus It is standby, to improve the timeliness because of buying side's demand Reroute, transportation cost when route change is reduced, base is reduced Build the purchase cost of project;It, can be in time to capital construction by further confirming that whether logistics transportation equipment is normal in transit Purchase of goods and materials side's outputting alarm information avoids the construction for delaying construction project, ensure that capital construction item so that it makes reply operation The fairness of mesh progress.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access Memory, RAM) etc..
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.

Claims (10)

1. a kind of commodity distribution control method suitable for capital construction industry electric business characterized by comprising
The transit node information that output logistics transporting equipment is returned according to transportation route to materials for capital construction purchases method, apparatus;
Request is changed according to route and updates the transport pathway, and the route change request is that the materials for capital construction purchases method, apparatus It is generated according to the transit node information;
Updated transport pathway is sent to logistics transportation equipment, so that the logistics transportation equipment updates logistics transportation road Line.
2. the method according to claim 1, wherein obtaining what logistics transportation equipment was returned according to transportation route Before transit node information, the method also includes:
Obtain the logistics transportation request that materials for capital construction supply method, apparatus is sent;
Transport pathway is planned according to the distribution information that logistics transportation request carries;
The transport pathway is sent to logistics transportation equipment, so that the logistics transportation equipment is transported according to the transport pathway Materials for capital construction.
3. according to the method described in claim 2, it is characterized in that, which comprises
When not receiving the transit node information that the logistics transportation equipment returns in preset time period, suspicious confirmation letter is exported It ceases to the logistics transportation equipment;
When getting the transit node information that the logistics transportation equipment is returned according to the suspicious confirmation message, it is transferred to execution The step of exporting the transit node information.
4. according to the method described in claim 3, it is characterized in that, exporting suspicious confirmation message to the logistics transportation equipment Later, the method also includes:
When the transit node information that the logistics transportation equipment is returned according to the suspicious confirmation message has not been obtained, export different Normal warning information to the materials for capital construction purchases method, apparatus, so that materials for capital construction buying method, apparatus is corresponding to the transport request Financial guarantee device request financial guarantee.
5. the method according to claim 1, wherein the method also includes:
When getting when being dispensed into information of the logistics transportation equipment transmission, successfully prompt information is transported in output.
6. a kind of logistic management system suitable for capital construction industry electric business characterized by comprising
Information output unit, the transit node information returned according to transportation route for exporting logistics transporting equipment to materials for capital construction Purchase method, apparatus;
Approach updating unit updates the transport pathway for changing request according to route, and the route change request is described Materials for capital construction buying method, apparatus is generated according to the transit node information;
More new route transmission unit, for updated transport pathway to be sent to logistics transportation equipment, for logistics fortune Transfer device updates logistics transportation route.
7. system according to claim 6, which is characterized in that the system also includes:
Request unit, the logistics transportation request sent for obtaining materials for capital construction supply method, apparatus;
Path planning unit, the distribution information for being carried according to logistics transportation request plan transport pathway;
Path transmission unit, for the transport pathway to be sent to logistics transportation equipment, so that the logistics transportation equipment root Materials for capital construction is transported according to the transport pathway.
8. system according to claim 7, which is characterized in that the system also includes:
Confirmation message output unit, for when the transit node for not receiving the logistics transportation equipment return in preset time period When information, suspicious confirmation message is exported to the logistics transportation equipment;
Jump-transfer unit is executed, for working as the transport section for getting the logistics transportation equipment and returning according to the suspicious confirmation message When point information, it is transferred to the step of execution exports the transit node information.
9. system according to claim 8, which is characterized in that the system also includes:
Warning information output unit has not been obtained what the logistics transportation equipment was returned according to the suspicious confirmation message for working as When transit node information, output abnormality warning information to the materials for capital construction purchases method, apparatus, so that materials for capital construction buying side is set It is standby to the corresponding financial guarantee device request financial guarantee of the transport request.
10. system according to claim 6, which is characterized in that the system also includes:
Successful information output unit, for when getting when being dispensed into information of the logistics transportation equipment transmission, output to be transported Defeated success prompt information.
CN201811632887.0A 2018-12-29 2018-12-29 Commodity distribution control method and system suitable for capital construction industry electric business Pending CN109508942A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811632887.0A CN109508942A (en) 2018-12-29 2018-12-29 Commodity distribution control method and system suitable for capital construction industry electric business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811632887.0A CN109508942A (en) 2018-12-29 2018-12-29 Commodity distribution control method and system suitable for capital construction industry electric business

Publications (1)

Publication Number Publication Date
CN109508942A true CN109508942A (en) 2019-03-22

Family

ID=65756791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811632887.0A Pending CN109508942A (en) 2018-12-29 2018-12-29 Commodity distribution control method and system suitable for capital construction industry electric business

Country Status (1)

Country Link
CN (1) CN109508942A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090076933A1 (en) * 2007-09-13 2009-03-19 Electronics And Telecommunications Research Institute System and method of planning and managing real-time postal delivery work
CN101561896A (en) * 2008-04-17 2009-10-21 北京中食新华科技有限公司 Logistics information analytical system based on geographic information system (GIS) and global positioning system (GPS)
CN102230970A (en) * 2011-07-15 2011-11-02 东莞市阜康电子科技有限公司 Method for positioning and tracking articles in logistics transportation process and system for implementing same
CN103295110A (en) * 2012-03-03 2013-09-11 江阴中科今朝科技有限公司 Modern logistics information system based on hazardous chemical substance transportation
CN105096067A (en) * 2014-04-29 2015-11-25 阿里巴巴集团控股有限公司 Logistics network early warning information generation method and server
CN107895247A (en) * 2017-10-17 2018-04-10 佳佳供应链管理(廊坊)有限公司 A kind of automatic material flow management system
CN108269042A (en) * 2018-01-25 2018-07-10 牡丹江师范学院 A kind of logistics supply chain management system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090076933A1 (en) * 2007-09-13 2009-03-19 Electronics And Telecommunications Research Institute System and method of planning and managing real-time postal delivery work
CN101561896A (en) * 2008-04-17 2009-10-21 北京中食新华科技有限公司 Logistics information analytical system based on geographic information system (GIS) and global positioning system (GPS)
CN102230970A (en) * 2011-07-15 2011-11-02 东莞市阜康电子科技有限公司 Method for positioning and tracking articles in logistics transportation process and system for implementing same
CN103295110A (en) * 2012-03-03 2013-09-11 江阴中科今朝科技有限公司 Modern logistics information system based on hazardous chemical substance transportation
CN105096067A (en) * 2014-04-29 2015-11-25 阿里巴巴集团控股有限公司 Logistics network early warning information generation method and server
CN107895247A (en) * 2017-10-17 2018-04-10 佳佳供应链管理(廊坊)有限公司 A kind of automatic material flow management system
CN108269042A (en) * 2018-01-25 2018-07-10 牡丹江师范学院 A kind of logistics supply chain management system and method

Similar Documents

Publication Publication Date Title
CN108269042B (en) Logistics supply chain management system and method
CN106156884A (en) The method of online shopping mall of a kind of enterprise dispensing express delivery, Apparatus and system
CN108154323A (en) The dynamic management approach and system of a kind of inventory
CN110659859B (en) E-commerce order inventory ERP management method and system
CN102779315A (en) Online trading platform for international E-commerce and logistics and operating method thereof
CN108701286A (en) Determine the delivery date of multiple product type
CN107368994A (en) Commodity distribution control method, terminal and system
CN106127560A (en) The method and system of commodity purchasing
KR101855097B1 (en) Device for shipping car and method thereof
CN109074609A (en) Intelligence E-Business System and its implementation and device
KR100361594B1 (en) Method for managing the information of imported and exported goods using computer network and its system
CN108090721A (en) A kind of logistics order processing method, apparatus, server and storage medium
KR20190032044A (en) Decision method of terminal according to parcel delivery address
CN107122945A (en) Information processing method and transportation system applied to cross-border electric business transportation system
US8489436B1 (en) System and method for an order handling data model with item-level granularity
CN109508942A (en) Commodity distribution control method and system suitable for capital construction industry electric business
CN110020821A (en) Logistics Distribution Method and system for electronic trade platform
CN113298479A (en) Cross-border transportation management platform, method, equipment and storage medium
CN113780926B (en) Method, device and system for processing article order
CN114997796A (en) Shared bin based delivery method, device, equipment and storage medium
JP2020506495A (en) Method and system for replacing shipping containers
CN108492062A (en) A kind of self-defined waybill numbering system of client
KR20010038598A (en) Method of delivering goods using agencies in an internet shopping mall
KR100370727B1 (en) Transporting method of goods used subway stations
JP2005196484A (en) Production management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322