CN109505264A - A kind of installation method of half-through tubular arch sunpender - Google Patents

A kind of installation method of half-through tubular arch sunpender Download PDF

Info

Publication number
CN109505264A
CN109505264A CN201811494192.0A CN201811494192A CN109505264A CN 109505264 A CN109505264 A CN 109505264A CN 201811494192 A CN201811494192 A CN 201811494192A CN 109505264 A CN109505264 A CN 109505264A
Authority
CN
China
Prior art keywords
sunpender
girder steel
anchor point
installation
advance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811494192.0A
Other languages
Chinese (zh)
Inventor
白利勇
马欣
陈慧
骆国建
赵恒�
温苍海
魏莹飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
Xiamen Construction Engineering Co Ltd of of China Railway First Engineering Group Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
Xiamen Construction Engineering Co Ltd of of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd, Xiamen Construction Engineering Co Ltd of of China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN201811494192.0A priority Critical patent/CN109505264A/en
Publication of CN109505264A publication Critical patent/CN109505264A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of installation methods of half-through tubular arch sunpender, in advance in the venue by the end part anchoring of casting anchor of sunpender anchorage and girder steel end, then sunpender is allowed to lift together with girder steel, hoist engine and pulley blocks are placed on the girder steel lifted to pull anchor point on sunpender to reeve, auxiliary enters hole manually to pull sunpender using traction rope, and the nut for installing anchor point on sunpender is positioned;It requires only to carry out sunpender in advance to tight according to the linear absolute altitude of girder steel in installation process, whole the adjusting of suspender power is carried out after the completion of all hanger erections of full-bridge.Traditional hanger erection mode has been overturned in the installation of sunpender of the present invention, substantially increases the efficiency of hanger erection, and security risk when reducing installation reduces installation cost, significant effect.

Description

A kind of installation method of half-through tubular arch sunpender
Technical field
The present invention relates to a kind of installation methods of half-through tubular arch sunpender.
Background technique
When installing sunpender on half-through tubular arch, sunpender one end is anchored on girder steel, and the other end is anchored at arch rib lower chord tube On the anchor slab of center.
Progress arch rib hanger erection, which mostly uses, under existing technical conditions is first mounted on the upper anchor point of sunpender on arch rib Anchor head, then the anchorage of sunpender is mounted on girder steel lower anchor end.Such method needs in advance lift sunpender under Portion penetrates anchor head, and since lower part girder steel does not install the people that can not stand, operating platform is limited, penetrate diameter be 900 large steel pipe it Between, tensioning platform only has 80cm × 100cm, and personnel's trick is limited, and from length 172cm, the steel sleeve of internal diameter 217mm penetrates outer diameter The sunpender anchor head of 200mm, required precision is quite high, difficult quite big;Then in steel beam lifting by sunpender lower tine ear and steel Beam anchor case lifting lug is connect by steel pin pivot pin;The adjustment for carrying out Suo Li is finally enabled according to the lifting that monitoring unit is provided.
Disadvantage of the existing technology:
1, it is small first to install anchor head job platform, construction is limited, and speed of application is slow, and construction safety coefficient is low.
2, the construction period is long, specially takes out the time and carrys out tying up bar, seriously affects the duration.
3, since the housing bore of sunpender only has 217mm, anchor head outer screw diameter is 200mm, and the gap penetrated is small, and outer Casing has 172cm long, has larger requirement to the straight degree of sunpender, difficulty of construction is big.
Summary of the invention
The present invention provides a kind of installation methods of half-through tubular arch sunpender, and which overcome described in background technology existing There is the deficiency of technology.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of installation method of half-through tubular arch sunpender, in advance casting anchor sunpender anchorage and girder steel end in the venue End part anchoring, then allows sunpender to lift together with girder steel, and hoist engine is placed on the girder steel lifted and pulley blocks come Anchor point on sunpender is pulled to reeve, auxiliary enters hole manually to pull sunpender using traction rope, installs the nut of anchor point on sunpender It is positioned;Require a progress sunpender in advance to tight according to the linear absolute altitude of girder steel in installation process, it is complete to all hanger erections of full-bridge At the whole the adjusting of suspender power of rear progress.
Among one embodiment: during the hanger erection, anchor point is equipped with guiding cap, the hoist engine and pulley thereon Group is by pulling the guiding cap of anchor point installation on sunpender to reeve.
The technical program compared with the background art, it has the following advantages:
1, just the anchorage of sunpender is installed in place before steel girder erection, saves the time, while constructing from high-altitude will Anchorage penetrates the risk of girder steel anchored end.
2, anchor point on sunpender is connect with the upper anchor head on arch rib again after girder steel is in place, girder steel provides for operating personnel Job platform, personnel can reach sunpender vertical base and conveniently reeve.
3, it is constructed using hoist engine, speed is accelerated, and mechanization degree is high.
4, guiding cap auxiliary device is installed on sunpender anchor head additional, difficulty of reeving substantially reduces.
5, hanger erection is completed without cable force adjustment, only require to carry out to save to tight in advance according to line style have bad luck it is very heavy The time and cable force adjustment time on top, greatly accelerate speed of application.
6, hanger erection and the reinforcing of girder steel Bolt carry out simultaneously, and change key job is greatly saved into non-key work 1 month time duration will be expended by reeving in advance;Benefit has been created for enterprise, has won the favorable comment of owner.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the main view of half-through tubular arch described in the present embodiment.
Fig. 2 is the side view of half-through tubular arch described in the present embodiment.
Specific embodiment
Please refer to Fig. 1 and Fig. 2, a kind of installation method of half-through tubular arch sunpender provided by the invention are as follows: on the scene in advance By the end part anchoring of casting anchor of 10 anchorage of sunpender and 20 end of girder steel in ground, sunpender is then allowed to lift together with girder steel 20, Hoist engine and pulley blocks are placed on girder steel 20 through having lifted to pull anchor point on sunpender 10 to reeve, and are assisted manually to utilize Traction rope pulls sunpender 10 and enters hole, and the nut for installing anchor point on sunpender 10 is positioned;It is linear according to girder steel 20 in installation process Absolute altitude requires only to carry out sunpender in advance to tight, and 10 cable force adjustment of whole sunpenders is carried out after all sunpenders 10 of full-bridge are installed.
The installation method specifically includes process in detail below:
10 anchorage of sunpender end part right angle setting and is anchored with casting anchor for 20 end of girder steel in the venue by crane, is convenient for Steel pin axis penetrates, and speed is fast, safer.
Hoist engine is placed in bridge floor as power and has set up on girder steel 20, and installing leading block in 20 front end of girder steel in place will Wirerope is oriented on arch rib, is hung directive wheel in arch rib eminence and is again turned to wirerope from the sunpender outer steel pipe of internal diameter 217mm It wears, on the guiding cap for hanging over 10 front end of sunpender, and bolt traction rope assists on sunpender 10.Wherein, leading block and guiding Wheel constitutes pulley blocks.
Hoist engine to be opened to withdraw wirerope, sunpender 10 is just pulled up, until when outer steel pipe mouth (hole) front end, manually Dilatory traction rope is adjusted, and since guiding cap is circle, no corner angle can facilitate into outer steel pipe (in hole).
Sunpender 10 was slowly drawn into outer steel pipe, it is interchangeable to be drawn with motor-driven chain hoist, and with 10 top of upper hanger Screw thread, the nut for installing anchor point on sunpender 10 are positioned.
According to the absolute altitude and camber requirement for having set up beam-ends, screw thread position to be reached is determined, carry out in advance to tight.
Suo Li, which is carried out, after full-bridge closure concentrates adjustment.
Traditional hanger erection mode has been overturned in the installation of sunpender of the present invention, is substantially increased the efficiency of hanger erection, is subtracted Lack security risk when installing, reduce installation cost, significant effect.
The above is only the preferred embodiment of the present invention, the range implemented of the present invention that therefore, it cannot be limited according to, i.e., according to Equivalent changes and modifications made by the invention patent range and description, should still be within the scope of the present invention.

Claims (2)

1. a kind of installation method of half-through tubular arch sunpender, it is characterised in that: in advance in the venue by sunpender anchorage and steel The end part anchoring of casting anchor of beam-ends, then allows sunpender to lift together with girder steel, places hoist engine on the girder steel lifted And pulley blocks pull the anchor point on sunpender to reeve, auxiliary enters hole manually to pull sunpender using traction rope, installs on sunpender The nut of anchor point is positioned;It requires only to carry out sunpender in advance to tight according to the linear absolute altitude of girder steel in installation process, owns to full-bridge Whole the adjusting of suspender power are carried out after the completion of hanger erection.
2. a kind of installation method of half-through tubular arch sunpender according to claim 1, it is characterised in that: the sunpender peace During dress, anchor point is equipped with guiding cap, the hoist engine and pulley blocks by pulling the guiding that anchor point is installed on sunpender thereon Cap is reeved.
CN201811494192.0A 2018-12-07 2018-12-07 A kind of installation method of half-through tubular arch sunpender Pending CN109505264A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811494192.0A CN109505264A (en) 2018-12-07 2018-12-07 A kind of installation method of half-through tubular arch sunpender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811494192.0A CN109505264A (en) 2018-12-07 2018-12-07 A kind of installation method of half-through tubular arch sunpender

Publications (1)

Publication Number Publication Date
CN109505264A true CN109505264A (en) 2019-03-22

Family

ID=65752956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811494192.0A Pending CN109505264A (en) 2018-12-07 2018-12-07 A kind of installation method of half-through tubular arch sunpender

Country Status (1)

Country Link
CN (1) CN109505264A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130000641A (en) * 2011-06-23 2013-01-03 주식회사 교량과 고속철도 A half-trough arch bridge with connection girder for additional longitudinal forces control of continuous welded rail and construction method
CN102953342A (en) * 2012-12-13 2013-03-06 中铁四局集团第二工程有限公司 Assembling and lifting method of half-span skeleton of tied arch bridge
CN203174507U (en) * 2013-03-25 2013-09-04 广东省基础工程公司 Steel pipe arch suspender installation device
CN105672134A (en) * 2016-01-26 2016-06-15 河海大学 Through concrete-filled steel tube tied-arch bridge erection construction method
CN107761542A (en) * 2017-11-14 2018-03-06 江苏科技大学 One kind arch oblique pull combined system bridge and its construction method
CN108532465A (en) * 2018-04-20 2018-09-14 中交第三航务工程局有限公司 A kind of construction method of Through Steel case arch bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130000641A (en) * 2011-06-23 2013-01-03 주식회사 교량과 고속철도 A half-trough arch bridge with connection girder for additional longitudinal forces control of continuous welded rail and construction method
CN102953342A (en) * 2012-12-13 2013-03-06 中铁四局集团第二工程有限公司 Assembling and lifting method of half-span skeleton of tied arch bridge
CN203174507U (en) * 2013-03-25 2013-09-04 广东省基础工程公司 Steel pipe arch suspender installation device
CN105672134A (en) * 2016-01-26 2016-06-15 河海大学 Through concrete-filled steel tube tied-arch bridge erection construction method
CN107761542A (en) * 2017-11-14 2018-03-06 江苏科技大学 One kind arch oblique pull combined system bridge and its construction method
CN108532465A (en) * 2018-04-20 2018-09-14 中交第三航务工程局有限公司 A kind of construction method of Through Steel case arch bridge

Similar Documents

Publication Publication Date Title
CN106744351A (en) The method that cable-stayed bridge main-beam lifting is carried out using cable crane
CN101830388B (en) Installation method of counter-weight frame of elevator
CN209758838U (en) Special lifting appliance device for lifting T beam by bridge girder erection machine
CN207244452U (en) A kind of suspension bridge vice saddle adjusting apparatus in place
CN107161879B (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN109505264A (en) A kind of installation method of half-through tubular arch sunpender
CN109653513A (en) A kind of large-scale 7 font truss structure turn-over hanging method
CN212670961U (en) Prefabricated floor convenient to stabilize hoist and mount
CN210178366U (en) Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination
CN217172942U (en) Hoist device is used in installation of prefabricated stair of assembled
CN109505423A (en) A kind of concrete chimney method for dismounting and its application
CN108221697A (en) A kind of entirety steel arch bridge bridge floor panel grider construction method for hanging
CN108252224A (en) It is a kind of that the method for moving hoisting steel beam is swung using the collaboration of dual stage deck unit erection gantry
CN201102869Y (en) Large arm device of midair-disassembling horizontal lazy-arm type tower crane
CN209778235U (en) Communication pipeline manhole cover device of uncapping
CN111173522A (en) Construction method for hoisting and descending air shaft shield machine
CN109987501A (en) A kind of device threaded off in Quick air in steel structure hoisting and tripping method
CN205935712U (en) Simple and easy jack bracket
CN205973423U (en) Steel column exchanges hoist device soon
CN204081447U (en) A kind of tool-type latch draw piece for overhanging type discharging platform
CN104344075A (en) Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN111977522B (en) Ground reeving and lifting installation method for cable crane crown block
CN213173353U (en) Bridge construction is with lifting by crane stop device
CN117819362B (en) Hoisting device and hoisting method for prefabricated outer wall
CN217376980U (en) double-T-beam self-balancing hoisting sling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322