CN109501334A - A kind of high intensity aramid fiber conveying belt joint process - Google Patents

A kind of high intensity aramid fiber conveying belt joint process Download PDF

Info

Publication number
CN109501334A
CN109501334A CN201811510025.0A CN201811510025A CN109501334A CN 109501334 A CN109501334 A CN 109501334A CN 201811510025 A CN201811510025 A CN 201811510025A CN 109501334 A CN109501334 A CN 109501334A
Authority
CN
China
Prior art keywords
aramid fiber
conveying belt
finger
fiber conveying
joint process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811510025.0A
Other languages
Chinese (zh)
Inventor
刘天哲
汤占鹏
姚红卫
李培旺
杜新闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Tiangong Polytron Technologies Inc
Original Assignee
Henan Tiangong Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Tiangong Polytron Technologies Inc filed Critical Henan Tiangong Polytron Technologies Inc
Priority to CN201811510025.0A priority Critical patent/CN109501334A/en
Publication of CN109501334A publication Critical patent/CN109501334A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D29/00Producing belts or bands
    • B29D29/06Conveyor belts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Belt Conveyors (AREA)

Abstract

The invention discloses a kind of high-intensitive aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;A, it draws lines: drawing lines by Fig. 2;B, fixed length: fixed length is carried out by Fig. 3;C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;D, it polishes: being polished with special grinding tool removing position and sealing;E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to.The present invention by setting-out, fixed length, take off glue, polishing, picture refer to, cut finger, fixation, cleaning, brush coating slurry, paving lower caldding layer, arrange the operation for referring to, spreading coating, prepare in advance, being cold-pressed sizing, heat cure and depanning step, utilize the advantage of aramid fiber canvas framework material high-strength and high-modulus, enhance the intensity of aramid fiber conveying belt connector, solve the problems, such as that traditional aramid fiber conveying belt strength of joint is low, connector when conveying material is prevented to be broken, casualties is avoided, is worth of widely use.

Description

A kind of high intensity aramid fiber conveying belt joint process
Technical field
The present invention relates to aramid fiber conveying belt joint technique field, specially a kind of high-intensitive aramid fiber conveying belt joint process.
Background technique
In recent years, the fast development of national economy be catalyzed the manufacturing industry scale such as steel, cement it is continuous expand, production capacity It is continuously improved, these are all that material conveyer belt industry brings bigger opportunities and challenges, and client wants belt intension specification Continuous improvement is asked, but common plain weave canvas improves intensity by the way of lamination, with body in the process through roller of overdriving In, the difference of each layer skeleton radius of curvature causes the difference of stress, and strength specification improves, and the number of plies is more, and dynamic flexing performance is got over Difference, band body is also heavier, and with the development of present technology, user replaces plain weave canvas with aramid fiber, however traditional aramid fiber is defeated The shear strength for sending the intensity of belt lacing to fully rely on sizing material bulk strength and adhesive interface absolutely not utilizes aramid fiber canvas bone The advantage of frame material high-strength and high-modulus, however traditional aramid fiber conveying belt strength of joint is low, and it is disconnected that connector easily occurs when conveying material It splits, causes casualties.
Summary of the invention
The purpose of the present invention is to provide a kind of high-intensitive aramid fiber conveying belt joint process, have the high advantage of intensity, solve It has determined the low problem of traditional aramid fiber conveying belt strength of joint.
To achieve the above object, the invention provides the following technical scheme: a kind of high intensity aramid fiber conveying belt joint process, packet Following steps are included, head-molding-vulcanization is shelled;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Preferably, conveyer belt is put finger-type above according to center line to good when being fixed in the G step, and refer to root with Finger tip pulls open half span from carrying out by Fig. 7 to finger.
Preferably, one layer of high-tenacity sticking adhesive layer is respectively covered in conveyer belt top and bottom when fixing in the G step, in high-tenacity Dedicated kiss-coating framework material is placed on sticking adhesive layer as enhancement layer, pastes upper and lower covering glue layer again on enhancement layer.
Preferably, first pass is brushed second time after parching when brush coating is starched in the I step, and with a thickness of 0.2mm, second time dry Brushing third time after thoroughly, with a thickness of 0.3mm, third refers to all over the rear preparation row of rubber cement dry 80% or so.
Preferably, curing temperature is 135-165 °C, vulcanization time 25-45min when heat cure in the O step, vulcanization Pressure is 7-12MPa.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention by setting-out, fixed length, take off glue, polishing, picture refer to, cut finger, fixation, cleaning, brush coating slurry, paving lower caldding layer, arrange The operation for referring to, spreading coating, prepare in advance, being cold-pressed sizing, heat cure and depanning step, it is high using aramid fiber canvas framework material The advantage of strong Gao Mo, enhances the intensity of aramid fiber conveying belt connector, solves the problems, such as that traditional aramid fiber conveying belt strength of joint is low, prevents Connector is broken when only conveying material, is avoided casualties, is worth of widely use.
Detailed description of the invention
Fig. 1 is operation of the present invention flow chart;
Fig. 2 is present invention setting-out partial front elevation view;
Fig. 3 is fixed length partial front elevation view of the present invention;
Fig. 4 is that present invention picture refers to partial front elevation view;
Fig. 5 is that finger partial front elevation view is cut in present invention left side;
Fig. 6 is that finger partial front elevation view is cut on present invention right side;
Fig. 7 is the present invention to finger partial front elevation view;
Fig. 8 is conveyer belt partial sectional view of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-8 is please referred to, a kind of high intensity aramid fiber conveying belt joint process include the following steps, shell head-molding-sulphur Change;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Embodiment one:
A kind of high intensity aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Embodiment two:
In example 1, following processes are added:
Conveyer belt is put finger-type above according to center line to good when being fixed in G step, and refer to root and finger tip pull open two/ One span by Fig. 7 from being carried out to finger.
A kind of high intensity aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Embodiment three:
In example 2, following processes are added:
One layer of high-tenacity sticking adhesive layer is respectively covered in conveyer belt top and bottom when fixing in G step, is placed on high-tenacity sticking adhesive layer special It uses kiss-coating framework material as enhancement layer, pastes upper and lower covering glue layer again on enhancement layer.
A kind of high intensity aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Example IV:
In the third embodiment, following processes are added:
First pass is brushed second time after parching when brush coating is starched in I step, with a thickness of 0.2mm, brushing third time after parching for second time, With a thickness of 0.3mm, third refers to all over the rear preparation row of rubber cement dry 80% or so.
A kind of high intensity aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
Embodiment five:
In example IV, following processes are added:
Curing temperature is 135-165 °C, vulcanization time 25-45min, sulfide stress 7-12MPa when heat cure in O step.
A kind of high intensity aramid fiber conveying belt joint process, include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of high intensity aramid fiber conveying belt joint process, it is characterised in that: include the following steps, shell head-molding-vulcanization;
A, it draws lines: drawing lines by Fig. 2;
B, fixed length: fixed length is carried out by Fig. 3;
C, it takes off glue: the rubber cover of conveyer belt two sides rectangular region is pulled down;
D, it polishes: being polished with special grinding tool removing position and sealing;
E, it draws and refers to: referring in the tape surface picture polished, carry out picture by Fig. 4 and refer to;
F, it cuts finger: the dash area of two heads being cut away with specific purpose tool, carries out cutting finger by Figures 5 and 6;
G, fixation: putting vulcanizer in order, spread isolated material on hot plate, is fixed conveyer belt with fixture;
H, it cleans: the burr trimming on finger being cleaned out, buffings, dust are wiped, then are cleaned up with 120# gasoline;
I, brush coating is starched: rubber cement brushing 3 times;
J, lower caldding layer is spread;
K, row refers to: brush coating is starched in lower caldding layer core rubber, is arranged and is referred in order after dry;
L, coating is spread;
M, it prepares in advance: putting isolated material, suitable baffle, molding, fixing bolt, preparation sulphur on the made-up belt of forming Change;
N, cold pressing sizing: being first put into cold press molding band embryo and carry out cold pressing sizing, time 20-30min;
O, heat cure: then the band embryo after cold pressing sizing is put into vulcameter and carries out vulcanizing treatment;
P, depanning: user is taken out the band embryo that vulcanization is completed using fixture.
2. a kind of high-intensitive aramid fiber conveying belt joint process according to claim 1, it is characterised in that: in the G step Conveyer belt is put finger-type above according to center line to good when fixed, and refers to that root and finger tip pull open half span from pressing Fig. 7 is carried out to finger.
3. a kind of high-intensitive aramid fiber conveying belt joint process according to claim 1, it is characterised in that: in the G step One layer of high-tenacity sticking adhesive layer is respectively covered in conveyer belt top and bottom when fixed, dedicated kiss-coating skeleton material is placed on high-tenacity sticking adhesive layer Material is used as enhancement layer, pastes upper and lower covering glue layer again on enhancement layer.
4. a kind of high-intensitive aramid fiber conveying belt joint process according to claim 1, it is characterised in that: in the I step First pass is brushed second time after parching when brush coating is starched, with a thickness of 0.2mm, brushing third time after parching for second time, with a thickness of 0.3mm, third refer to all over the rear preparation row of rubber cement dry 80% or so.
5. a kind of high-intensitive aramid fiber conveying belt joint process according to claim 1, it is characterised in that: in the O step Curing temperature is 135-165 °C, vulcanization time 25-45min, sulfide stress 7-12MPa when heat cure.
CN201811510025.0A 2018-12-11 2018-12-11 A kind of high intensity aramid fiber conveying belt joint process Pending CN109501334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811510025.0A CN109501334A (en) 2018-12-11 2018-12-11 A kind of high intensity aramid fiber conveying belt joint process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811510025.0A CN109501334A (en) 2018-12-11 2018-12-11 A kind of high intensity aramid fiber conveying belt joint process

Publications (1)

Publication Number Publication Date
CN109501334A true CN109501334A (en) 2019-03-22

Family

ID=65752136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811510025.0A Pending CN109501334A (en) 2018-12-11 2018-12-11 A kind of high intensity aramid fiber conveying belt joint process

Country Status (1)

Country Link
CN (1) CN109501334A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110722814A (en) * 2019-09-20 2020-01-24 郑州粘接新材料有限公司 PVG/PVC whole core flame-retardant conveyor belt joint method
CN111016305A (en) * 2019-12-12 2020-04-17 无锡宝通科技股份有限公司 Conveying belt capable of being rapidly connected
CN111516356A (en) * 2020-05-15 2020-08-11 昆山市华峰制带有限公司 Conduction band of gravure printing machine
CN111516333A (en) * 2020-05-26 2020-08-11 昆山市华峰制带有限公司 High-strength aramid fiber printing guide belt of printing machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002372106A (en) * 2001-06-13 2002-12-26 Bando Chem Ind Ltd Conveyor belt with aramid core body and joining method for conveyor belt with aramid core body
CN103133600A (en) * 2013-03-05 2013-06-05 无锡宝通带业股份有限公司 Joint structure of high-strength aramid fiber conveying belt and jointing method thereof
CN104044290A (en) * 2014-06-30 2014-09-17 兖矿集团有限公司 Finger-shaped connector of aramid fiber conveying belt and preparation method of finger-shaped connector
CN105151644A (en) * 2015-08-25 2015-12-16 无锡宝通科技股份有限公司 High-strength single-layer aramid fiber conveying belt joint structure and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002372106A (en) * 2001-06-13 2002-12-26 Bando Chem Ind Ltd Conveyor belt with aramid core body and joining method for conveyor belt with aramid core body
CN103133600A (en) * 2013-03-05 2013-06-05 无锡宝通带业股份有限公司 Joint structure of high-strength aramid fiber conveying belt and jointing method thereof
CN104044290A (en) * 2014-06-30 2014-09-17 兖矿集团有限公司 Finger-shaped connector of aramid fiber conveying belt and preparation method of finger-shaped connector
CN105151644A (en) * 2015-08-25 2015-12-16 无锡宝通科技股份有限公司 High-strength single-layer aramid fiber conveying belt joint structure and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110722814A (en) * 2019-09-20 2020-01-24 郑州粘接新材料有限公司 PVG/PVC whole core flame-retardant conveyor belt joint method
CN111016305A (en) * 2019-12-12 2020-04-17 无锡宝通科技股份有限公司 Conveying belt capable of being rapidly connected
CN111516356A (en) * 2020-05-15 2020-08-11 昆山市华峰制带有限公司 Conduction band of gravure printing machine
CN111516333A (en) * 2020-05-26 2020-08-11 昆山市华峰制带有限公司 High-strength aramid fiber printing guide belt of printing machine

Similar Documents

Publication Publication Date Title
CN109501334A (en) A kind of high intensity aramid fiber conveying belt joint process
CN105151644B (en) Preparation method of high-strength single-layer aramid fiber conveying belt joint structure
CN105266279B (en) The method that one side glues shoemaking
CN104029267A (en) Bamboo mat processing method
CN102406282A (en) One-piece formed sole processing process
CN104044290A (en) Finger-shaped connector of aramid fiber conveying belt and preparation method of finger-shaped connector
CN103183199A (en) Patterned conveying belt and manufacturing method thereof
CN104759076B (en) A kind of adhesive sport ball ball sheet folding brake
CN107802056A (en) Manufacturing method of shoes is glued using the one side of plastic powder
KR101347923B1 (en) Manufacturing method of leather for industrial safety shoes
CN105690814A (en) Conveyor belt damage repairing method
CN105774009B (en) A kind of production method, sole and the shoes of the sole with metal-like
CN103072786A (en) Straight conveyor belt finger-model connector and preparation method thereof
CN102742966A (en) Novel sole
CN109401675A (en) Suede type cow split skin hot vulcanized rubber boots water based adhesive system and its shoemaking technique for applying
CN105686218A (en) Leather sneaker production technology
CN103363021B (en) The hot adhering method of a kind of steel wire stripe
CN204938094U (en) A kind of high-tenacity individual layer aramid fiber conveying belt joint design
CN108715315B (en) High-temperature-resistant conveying belt and manufacturing process thereof
EP2586567A3 (en) Method for making a sanding pad lining
CN105555511B (en) Prepare compound die plastomer method and corresponding composite mold plastomer
CN109431002A (en) Blended 1X1 camouflage color plain cloth hot vulcanized rubber boots adherend of polyester-cotton blend and preparation method and application
CN205695996U (en) One-body molded sole in a kind of mould
CN105881939A (en) Method for repairing conveying belt
CN107841255A (en) PU artificial leathers and shoe rubber foxing binding system and preparation method thereof and application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190322

WD01 Invention patent application deemed withdrawn after publication