CN109500041A - A kind of sewage stench processing system of refuse transfer station - Google Patents

A kind of sewage stench processing system of refuse transfer station Download PDF

Info

Publication number
CN109500041A
CN109500041A CN201811584938.7A CN201811584938A CN109500041A CN 109500041 A CN109500041 A CN 109500041A CN 201811584938 A CN201811584938 A CN 201811584938A CN 109500041 A CN109500041 A CN 109500041A
Authority
CN
China
Prior art keywords
steel plate
inclination
plate
operation chamber
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811584938.7A
Other languages
Chinese (zh)
Other versions
CN109500041B (en
Inventor
郭杰
刘海云
刘珊
张锋
刘彦圻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jianyi Decoration Group Co Ltd
Original Assignee
Shenzhen Jianyi Decoration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jianyi Decoration Group Co Ltd filed Critical Shenzhen Jianyi Decoration Group Co Ltd
Priority to CN201811584938.7A priority Critical patent/CN109500041B/en
Publication of CN109500041A publication Critical patent/CN109500041A/en
Application granted granted Critical
Publication of CN109500041B publication Critical patent/CN109500041B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B17/00Methods preventing fouling

Abstract

The present invention provides a kind of sewage stench processing system of refuse transfer station, including operation chamber, the front of operation chamber forms chamber entrance;The V-groove being obliquely installed is provided on ground, the lowest part of V-groove is provided with a liquid collection opening, and liquid collection opening is connected with underground blow-off line;The rear of inclination ceiling from the front direction operation chamber of operation chamber tilts gradually downward;It is provided with door-plate at chamber entrance, offers ventilation opening on door-plate;The bottom of rear wall offers a suction opening, and emission-control equipment is additionally provided with outside suction opening.On the one hand, by the V-groove being obliquely installed, sewage generated during compressed garbage can be pooled at liquid collection opening, then is discharged into underground blow-off line, to prevent sewage diffusion;On the other hand, by tilting ceiling, so that operation chamber forms from front to rear diminishing laneway type space, then cooperate suction opening and emission-control equipment, negative pressure can be formed in operation chamber, prevent foul smell from spreading.

Description

A kind of sewage stench processing system of refuse transfer station
Technical field
The present invention relates to technical field of waste treatment, it is related to sewage stench processing system, more particularly to a kind of suitable for rubbish The sewage stench processing system of rubbish transfer station.
Background technique
Refuse transfer station is exactly in order to facilitate garbage disposal and in the rubbish place of production to garbage transfer set between treatment plant It stands.Handle, which is put into compression box, in refuse transfer station, after operator concentrates the rubbish that each bleeding point is cleared compresses, It is further continued for a compression box and transports to next process points, such as refuse-burning plant together with compressed rubbish.
Refuse transfer station can generate sewage and foul smell during collecting neutralisation treatment rubbish.Under normal circumstances, rubbish turns Fortune station should avoid residential block, prevent sewage and foul smell from influencing the daily life and health of resident, and cannot be from residential block Efficiency that is too far, preventing the cost for increasing garbage collection and reduce garbage collection.It can imagine, this balance is difficult handle It holds, resident collective opposes to happen occasionally in the event that refuse transfer station is built on periphery.
In order to avoid sewage and foul smell cause to perplex to surrounding resident, buried design, i.e. rubbish is can be used in refuse transfer station Rubbish transfer station is arranged in below ground, in this way, just can effectively prevent the diffusion of sewage and foul smell.But buried rubbish turns Fortune station haves the shortcomings that cost is excessively high, and the cost of a buried refuse transfer station probably needs 8,000,000, and excessively high cost is not Convenient for implementing on a large scale.
Therefore, how under the premise of not improving cost, prevent sewage produced by refuse transfer station and foul smell from influencing periphery The life of resident is industry urgent problem to be solved.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, providing a kind of refuse transfer station Sewage stench processing system, low cost, while can prevent the diffusion of sewage and foul smell well minimizes Influence to nearby residents.
The technical proposal for solving the technical problem of the invention is as follows:
A kind of sewage stench processing system of refuse transfer station, including operation chamber, the operation chamber is by ground, inclination smallpox Plate, the first side wall and second sidewall, which are enclosed, to be set, and a chamber entrance, the operating cavity are formed in front of the operation chamber The rear of room is provided with rear wall;
Be provided with V-groove on the ground, the rear of operation chamber described in front direction of the V-groove from the operation chamber by It gradually tilts down, the lowest part of the V-groove is provided with a liquid collection opening, and the liquid collection opening is connected with underground blow-off line;
The rear of operation chamber described in front direction of the inclination ceiling from the operation chamber tilts gradually downward;
It is provided with openable and closable door-plate at the chamber entrance, offers ventilation opening on the door-plate;
The bottom of the rear wall offers a suction opening, and emission-control equipment is additionally provided with outside the suction opening.
Now compare with the prior art, the beneficial effect of the technical program is: on the one hand, can be by the V-groove being obliquely installed Sewage caused by during compressed garbage is pooled at liquid collection opening, then is discharged into underground blow-off line, to prevent sewage diffusion; On the other hand, by tilting ceiling, so that operation chamber forms from front to rear diminishing laneway type space, then match Suction opening and emission-control equipment are closed, negative pressure can be formed in operation chamber, the air of outside constantly pours in operation through ventilation opening Chamber, to prevent foul smell from spreading.
Further, the bottom of the first side wall and the second sidewall is provided with multiple flooding nozzles, the flushing The water discharging direction of nozzle is towards the V-groove.
Beneficial effect using the above scheme is:, can be by flooding nozzle to ground when there are sewage or rubbish in ground It is rinsed, guarantees the neat and tidy inside operation chamber.
Further, the door-plate includes the first side plate and the second side plate, and first side plate is hinged on first side On wall, second side plate is hinged in the second sidewall;
The first notch is offered on first side plate, offers the second notch on second side plate;When first side plate When closing with second side plate, the ventilation opening is formed between first notch and second notch.
Beneficial effect using the above scheme is: so that the structure of whole system is simpler, having and saves space, operation The advantages that convenient and low cost.
It further, further include horizontal ceilings;
The inclination ceiling is positioned close to the position at the operation chamber rear, and the horizontal ceilings are positioned close to institute State the position in front of operation chamber, the horizontal ceilings on one side be connected to the inclination ceiling highest point while;Institute It states and forms diminishing inclined spaces between inclination ceiling and the ground, between the horizontal ceilings and the ground Form rectangular space.
Beneficial effect using the above scheme is: providing enough operating spaces for handling compression box, while ensure that The efficiency of negative pressure is formed in operation chamber.
Further, the both sides of the V-groove are respectively arranged with the first track and the second track;
It is provided with the first inclination plateau between first track and the first side wall, the first inclination plateau is from described the One side wall tilts gradually downward to first track, is formed between the first inclination plateau and first track step-like Transition;
It is provided with the second inclination plateau between second track and the second sidewall, the second inclination plateau is from described the Two side walls tilt gradually downward to second track, are formed between the second inclination plateau and second track step-like Transition.
Beneficial effect using the above scheme is: tilting between plateau and the first track by first, the second inclination plateau Step-like transition is formed between the second track, compression box can be limited, be prevented compression box from de-orbiting.
Further, reinforced concrete floor, the V-groove, the first inclination plateau are provided with below the ground Polyurethane cement layer is additionally provided with the upper surface of the second inclination plateau.
Beneficial effect using the above scheme is: polyurethane cement layer can prevent the percolate in rubbish from corroding ground.
It further, further include the first support component and the second support component being arranged on the reinforced concrete floor;
First support component include first level steel plate, the first inclined steel plate, the second inclined steel plate, the first vertical steel plate and Second vertical steel plate;The first level steel plate is laid on first track, and first inclined steel plate is laid on described For first inclination plateau close to the edge of first track, second inclined steel plate is laid on the V-groove close to described the The edge of one track;One side of first inclined steel plate and the top margin of the described first vertical steel plate are fixedly linked, and described second One side of inclined steel plate and the top margin of the described second vertical steel plate are fixedly linked;One side of the first level steel plate and described It is fixedly linked in the middle part of one vertical steel plate, the another side of the first level steel plate and the top margin of the described second vertical steel plate are fixed It is connected;The first vertical steel plate and the second vertical steel plate are arranged in the reinforced concrete floor;
Second support component include the second horizontal steel plate, third inclined steel plate, the 4th inclined steel plate, the vertical steel plate of third and 4th vertical steel plate;Second horizontal steel plate is laid on second track, and the third inclined steel plate is laid on described For second inclination plateau close to the edge of second track, the 4th inclined steel plate is laid on the V-groove close to described the The edge of two tracks;One side of the third inclined steel plate and the top margin of the vertical steel plate of the third are fixedly linked, and the described 4th One side of inclined steel plate and the top margin of the 4th vertical steel plate are fixedly linked;One side of second horizontal steel plate and described It is fixedly linked in the middle part of three vertical steel plates, the another side of second horizontal steel plate and the top margin of the 4th vertical steel plate are fixed It is connected;The vertical steel plate of third and the 4th vertical steel plate are arranged in the reinforced concrete floor.
Beneficial effect using the above scheme is: on the one hand, being able to ascend the intensity of the first track and the second track, avoids First track and the second track are damaged by pressure by compression box;On the other hand, it enables to ground in integration, reduces ground to greatest extent On gap.
Further, the polyurethane cement layer of the upper surface of the V-groove with a thickness of 8-12mm, first inclination is high Platform and it is described second inclination plateau upper surface polyurethane cement layer with a thickness of 4-6mm.
Beneficial effect using the above scheme is: while guaranteeing anticorrosion ability, additionally it is possible to reduce cost.
Further, drop window is additionally provided with above the door-plate.
Beneficial effect using the above scheme is: mitigating the weight of door-plate, opens and closes door-plate convenient for operator.
Further, the operation chamber is provided at least one.
Beneficial effect using the above scheme is: handling rubbish by parallel form, improves garbage disposal ability.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of the sewage stench processing system of refuse transfer station of the present invention.
Fig. 2 is the cross-sectional view on ground in a kind of sewage stench processing system of refuse transfer station of the present invention.
Fig. 3 is the top view on ground in a kind of sewage stench processing system of refuse transfer station of the present invention.
Fig. 4 is a kind of schematic diagram of the sewage stench processing system middle door-plate of refuse transfer station of the present invention.
Fig. 5 is the schematic diagram of the first support component in a kind of sewage stench processing system of refuse transfer station of the present invention.
Fig. 6 is the schematic diagram of the second support component in a kind of sewage stench processing system of refuse transfer station of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer and more explicit, right as follows in conjunction with drawings and embodiments The present invention is further described.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and do not have to It is of the invention in limiting.
A kind of sewage stench processing system of refuse transfer station, including operation chamber.Operation chamber be carry out garbage reclamation, The place of the operations such as compression.Empty compression box 9 is put into operation chamber, then will be led to after rubbish that recycling comes pours into compression box 9 Overcompression case 9 compresses rubbish;Rubbish transiting vehicle is loaded onto after compression box 9 fills compressed rubbish, then compression box 9 On, compression box 9 is transported to together with compressed rubbish by rubbish transiting vehicle by next process points, such as refuse-burning plant.It needs Illustrating, the innovative point of the technical program does not lie in the specific structure and working principle of compression box 9, in the prior art, as long as The compression box 9 that rubbish is compressed can be can be applicable in the technical program.
As shown in Figure 1, the operation chamber is enclosed and is set by ground 1, inclination ceiling 2, the first side wall and second sidewall, It is formed with a chamber entrance in front of the operation chamber, the rear of the operation chamber is provided with rear wall, and the inclination The rear of operation chamber described in front direction of the ceiling 2 from the operation chamber tilts gradually downward.In Fig. 1, operation chamber Front be located at the right, and the rear of operation chamber is located at the left side.
In the present invention, ground 1 can be understood as the floor of building, and inclination ceiling 2 can be understood as building Smallpox, the first side wall and second sidewall can be understood as the wall of building.Just as general building, ground 1, inclination Ceiling 2, the first side wall and second sidewall are connected with each other, and can surround the duct type building of a both sides opening, intermediate sky Between be operation chamber.The rear of operation chamber is provided with rear wall, then is arranged at the chamber entrance in front of operation chamber After having openable and closable door-plate 3, operation chamber to cooperate rear wall and door-plate 3, a relatively closed space can be formed.
In the prior art, foul smell is spread in order to prevent, it will usually operation chamber and outside air isolation be opened, operation Chamber is completely closed, to guarantee that foul smell is merely able to recycle in the range of operation chamber.But inevitably, or it is more Or it is few all can some foul smell diffuse out.In order to solve the problems, such as to prevent foul smell from spreading this, the innovative point of the technical program is, On the one hand, operation chamber is not to be completely closed, and offers ventilation opening 31 on the door-plate 3;On the other hand, after described The bottom of wall offers a suction opening 4, is additionally provided with emission-control equipment 41 outside the suction opening 4.This be the present invention with it is existing The big distinctive points of the one of technology.Generally, in order not to allow foul smell to spread, the prior art would generally play whole operation cavity seal Come, without there are ventilation openings 31.
When specific works, door-plate 3 is opened 9 push operation chamber of compression box and rubbish is then put into compression box 9, then control Compression box 9 processed works.During compression box 9 works, foul smell is inevitably resulted from, at this point, emission-control equipment 41 In exhaust equipment be constantly evacuated out of operation chamber by suction opening 4, and ventilation opening 31 and exhaust gas at chamber entrance Processing unit 41 cooperates, and a negative pressure is formed in operation chamber, extraneous fresh air is constantly poured in from ventilation opening 31, then is connected Enter emission-control equipment 41 together with foul smell to be purified, be then discharged into outside air again by exhaust passage 42. At this point, foul smell has already passed through the purification of emission-control equipment 41, air will not be polluted.
There are two the emphasis of above-mentioned technical proposal, first is that being provided with door-plate 3 at chamber entrance, operation chamber is not closed , but it is provided with ventilation opening 31;Second is that being provided with inclination ceiling 2.
Different from limiting foul smell diffusion by way of sealing in the prior art, the present invention is by manufacturing negative pressure space Mode reaches this purpose.And in order to manufacture negative pressure space, ventilation opening 31 is set not enough on door-plate 3, it is also necessary to be arranged There is inclination ceiling 2.The space of operation chamber is gradually reduced from front to back in inclination ceiling 2, this is greatly improved exhaust gas The pumping efficiency of processing unit 41, if the top of operation chamber is general horizontally disposed smallpox, it will greatly improve behaviour Make the space of chamber, emission-control equipment 41 is difficult to be evacuated out of operation chamber.Therefore, if without ventilation opening 31 and inclination The cooperation of ceiling 2, can not just be efficiently formed negative pressure in operation chamber, and pumping effect is had a greatly reduced quality.
In addition, inclination ceiling 2 is in addition to can be other than the volume in reduction operation space, additionally it is possible to reduce manufacturing cost.If it Card is made relatively high, it is necessary to more materials, and more materials certainly will mean higher cost.Therefore, in this skill In art scheme, there are two the beneficial effects of aspect for inclination ceiling 2 tool, first is that guarantee that reducing space improves pumping efficiency, second is that Reduce manufacturing cost.
During 9 compressed garbage of compression box, the moisture in rubbish can be squeezed out, form percolate, these infiltrations Filtrate is exactly one of the source of sewage and foul smell.In the technical scheme, sewage diffusion in order to prevent, as shown in Fig. 2, institute It states and is provided with V-groove 11 on ground 1.
V-groove 11 is a both sides height, intermediate low groove body, and the sewage come out in compression box 9 can be from being pooled to V-groove 11 Center.In addition, as shown in Figure 1, V-groove 11 is arranged along the front-rear direction of the operation chamber, and the V-groove 11 is from institute The rear for stating operation chamber described in the front direction of operation chamber tilts gradually downward, and the lowest part of the V-groove 11 is provided with one Liquid collection opening 12, the liquid collection opening 12 are connected with underground blow-off line 17.Therefore, sewage can be further from the front of V-groove 11 Rear is flowed to, finally flows into liquid collection opening 12, then be discharged by underground blow-off line 17.
As shown in Figure 3, it is preferable that the bottom of the first side wall and the second sidewall is provided with multiple flooding nozzles 5, The water discharging direction of the flooding nozzle 5 is towards the V-groove 11.It, can on the ground 1 of operation chamber during handling rubbish The rubbish or sewage being scattered can be had.Water column is sprayed by flooding nozzle 5, ground 1 can be rinsed, operation chamber is kept Neat and tidy.
In addition, solid refuse enters underground blow-off line 17 from liquid collection opening 12 and results in blockage in order to prevent, it is preferable that institute It states and is additionally provided with filter screen on liquid collection opening 12.Further, it is preferable that be additionally provided with sedimentation basin 18 in the lower section of liquid collection opening 12, together Sample helps to prevent underground blow-off line 17 from blocking.
As shown in Figure 4, it is preferable that the door-plate 3 includes the first side plate 32 and the second side plate 33, and first side plate 32 is cut with scissors It connects on the first side wall, second side plate 33 is hinged in the second sidewall.It is offered on first side plate 32 First notch offers the second notch on second side plate 33;When first side plate 32 and second side plate 33 close When, the ventilation opening 31 is formed between first notch and second notch.
When specifically needing to open door-plate 3, operator pushes or pull on the first side plate 32 and the second side plate 33, the first side plate 32 can rotate by axis of the connection structure on the first side wall, and the second side plate 33 can turn by axis of the connection structure in second sidewall It is dynamic, to realize the opening of door-plate 3 or close function.Under normal circumstances, the first side plate 32 and the second side plate 33 are at The state closed can just open the first side plate 32 and the second side plate 33, only when compression box 9 passes in and out operation chamber convenient for allowing Compression box 9 passes through;When first side plate 32 and the second side plate 33 close, on the first notch and the second side plate 33 on the first side plate 32 The second notch will form ventilation opening 31 as shown in Figure 4.
Specifically, first side plate 32 is offering first close to the ground 1 and at second side plate 33 Notch, second side plate 33 are offering the second notch close to the ground 1 and at first side plate 32.
By the first side plate 32 and the second side plate 33 being hingedly arranged, the folding of door-plate 3 can be realized in simple structure Function, while ventilation opening 31 is formed on door-plate 3, be conducive to manufacture negative pressure in operation chamber.
Preferably, it is provided with observation window on the first side plate 32 and the second side plate 33, transparent glass is provided on observation window, just Do not have to open the inner case that door-plate 3 is observable operation chamber in operator.
Above-mentioned technical proposal merely provides a kind of implementation of door-plate, is not to say that door-plate can only side in this way Formula goes to realize.Such as, the door-plate is side-pull type door-plate, and operator is by pulling door-plate control folding;For another example, the door-plate is Lift door-plate, operator control folding by the lifting of control door-plate.But using the first side plate being hingedly arranged and Two side plates realize door-plate function, such mode do not have to it is additional increase layback track and lifting device etc., enable to entire The structure of system is simpler, has many advantages, such as to save space, easy to operate and low cost.
As illustrated in fig. 1, it is preferred that a kind of sewage stench processing system of refuse transfer station, further includes horizontal ceilings 6. The inclination ceiling 2 is positioned close to the position at the operation chamber rear, and the horizontal ceilings 6 are positioned close to described Position in front of operation chamber, the horizontal ceilings 6 on one side be connected to it is described inclination 2 highest point of ceiling while;Institute It states and forms diminishing inclined spaces between inclination ceiling 2 and the ground 1, the horizontal ceilings 6 and the ground 1 Between form rectangular space.If being not provided with horizontal ceilings 6, operation chamber is only an inclined spaces, and space is smaller, just It is unfavorable for carrying out the handling operation of compression box 9.
The effect of horizontal ceilings 6 is to provide enough spaces for handling compression box 9.Pressure is loaded and unloaded on rubbish transiting vehicle During contracting case 9, hoisting apparatus can be used, compression box 9 is lifted or put down, this just needs enough operating spaces.At this In invention, by being provided with horizontal ceilings 6, operation chamber can be divided into two parts space by shape difference, and a part is larger Rectangular space, positioned at the front of operation chamber, a part is diminishing inclined spaces, positioned at the rear of operation chamber. Handling compression box 9 is carried out in rectangular space to operate.Therefore, on the one hand the setting of horizontal ceilings 6 provides for handling compression box 9 On the other hand enough spaces can guarantee the efficiency that negative pressure is formed in operation chamber again.
As shown in Figure 2, it is preferable that the both sides of the V-groove 11 are respectively arranged with the first track 13 and the second track 14;Institute It states and is provided with the first inclination plateau 15 between the first track 13 and the first side wall, the first inclination plateau 15 is from described the One side wall tilts gradually downward to first track 13, is formed between the first inclination plateau 15 and first track 13 Step-like transition;The second inclination plateau 16, second inclination are provided between second track 14 and the second sidewall Plateau 16 tilts gradually downward from the second sidewall to second track 14, the second inclination plateau 16 and described second Step-like transition is formed between track 14.
Generally, the bottom of compression box 9 is provided with wheel, and compression box 9 is to pass in and out operation chamber by wheel rolling. The effect of first track 13 and the second track 14 is exactly the wheel for supporting compression box 9, therefore, the first track 13 and the second track 14 It is horizontal.But it in order to guarantee that sewage can smoothly collect, is provided between first track 13 and the first side wall First inclination plateau 15, the first inclination plateau 15 tilt gradually downward from the first side wall to first track 13; The second inclination plateau 16 is provided between second track 14 and the second sidewall, the second inclination plateau 16 is described in Second sidewall tilts gradually downward to second track 14.
Step-like transition, the second inclination plateau are formed between the first inclination plateau 15 and first track 13 Step-like transition is formed between 16 and second track 14.The two step-like transition, can play position-limiting action.It is compressing During case 9 is mobile, when the travel track of compression box 9 deviates, wheel can be against in step-like transition, wheel by To a reaction force, will not continue to deviate.Therefore, above-mentioned technical proposal can play position-limiting action to compression box 9, together When do not influence sewage again and collect efficiency.
Preferably, the lower section on the ground 1 is provided with reinforced concrete floor, the V-groove 11, the first inclination plateau 15 and it is described second inclination plateau 16 upper surface be additionally provided with polyurethane cement layer.Specifically, the upper surface of the V-groove 11 Polyurethane cement layer with a thickness of 8-12mm, the upper surface of the first inclination plateau 15 and the second inclination plateau 16 Polyurethane cement layer with a thickness of 4-6mm.More specifically, the polyurethane cement layer of the upper surface of the V-groove 11 with a thickness of 10mm, it is described first inclination plateau 15 and it is described second inclination plateau 16 upper surface polyurethane cement layer with a thickness of 5mm. In addition, the model C35 or more of armored concrete used in reinforced concrete floor, such as C35, C40 and C45, guarantee ground The intensity in face 1 prevents cracking.
The effect of polyurethane cement layer is corrosion-resistant.Generally there is percolate corrosivity therefore to pass through polyurethane sand Pulp layer can prevent percolate from slight crack out or notch are corroded in ground 1.Specifically, more contacted with V-groove 11 of percolate and It is less to be contacted with the first inclination inclination of plateau 15, second plateau 16, therefore, the polyurethane cement layer of the upper surface of V-groove 11 Thickness is larger, and the thickness of the polyurethane cement layer of the upper surface of the first inclination plateau 15 and the second inclination plateau 16 is smaller, While realizing corrosion proof function, moreover it is possible to control cost.
Fig. 2 clearly disclose ground 1 and V-groove 11, the first track 13, the second track 14, first inclination plateau 15 and The structural relation of second inclination plateau 16.As shown in Fig. 2, V-groove 11, the first track 13, the second track 14, first tilt plateau 15 and second inclination plateau 16 be arranged on ground 1.
As shown in Fig. 2, a kind of sewage stench processing system of refuse transfer station, further includes being arranged in the armored concrete The first support component 7 and the second support component 8 on layer.Wherein, the first support component 7 is similar slot with the second support component 8 The structure of steel, C-type steel and H profile steel, for cooperating with armored concrete, enhancing building intensity.
First support component 7 as described in Figure 5 includes first level steel plate 71, the first inclined steel plate 72, the second inclined steel plate 73, the first vertical steel plate 74 and the second vertical steel plate 75;The first level steel plate 71 is laid on first track 13, institute It states the first inclined steel plate 72 and is laid on the first inclination plateau 15 close to the edge of first track 13, second inclination Steel plate 73 is laid on the V-groove 11 close to the edge of first track 13;One side of first inclined steel plate 72 and institute The top margin for stating the first vertical steel plate 74 is fixedly linked, one side of second inclined steel plate 73 and the described second vertical steel plate 75 Top margin is fixedly linked;One side of the first level steel plate 71 and the middle part of the described first vertical steel plate 74 are fixedly linked, described The another side of first level steel plate 71 and the top margin of the described second vertical steel plate 75 are fixedly linked;First vertical 74 He of steel plate The second vertical steel plate 75 is arranged in the reinforced concrete floor.
As shown in fig. 6, second support component 8 includes the second horizontal steel plate 81, the inclination of third inclined steel plate the 82, the 4th The vertical steel plate 84 of steel plate 83, third and the 4th vertical steel plate 85;Second horizontal steel plate 81 is laid on second track 14 On, the third inclined steel plate 82 is laid on the second inclination plateau 16 close to the edge of second track 14, and described the Four inclined steel plates 83 are laid on the V-groove 11 close to the edge of second track 14;The one of the third inclined steel plate 82 Side and the top margin of the vertical steel plate 84 of the third are fixedly linked, one side and the 4th vertical steel of the 4th inclined steel plate 83 The top margin of plate 85 is fixedly linked;The middle part stationary phase on one side of second horizontal steel plate 81 and the vertical steel plate 84 of the third Even, the another side of second horizontal steel plate 81 and the top margin of the described 4th vertical steel plate 85 are fixedly linked;The third is vertical Steel plate 84 and the 4th vertical steel plate 85 are arranged in the reinforced concrete floor.
Firstly, first level steel plate 71 is laid on the first track 13, the second horizontal steel plate 81 is laid on the second track 14 On, first level steel plate 71 and the second horizontal steel plate 81 are used to support compression box 9, horizontal by first level steel plate 71 and second Steel plate 81 reduces compression box 9 and is formed by pressure on ground 1, guarantees ground.Secondly, the first inclined steel plate 72, second tilts steel The effect of plate 73, third inclined steel plate 82 and the 4th inclined steel plate 83 is, the first inclination plateau 15 and the first track 13 it Between, between the first track 13 and V-groove 11, between the second inclination plateau 16 and the second track 14, the second track 14 and V-groove 11 Between form rounding off, can the gap on ground 1 is close after being poured on the gap at edge by cement or concrete etc. It closes and;If it is not, along the first vertical steel plate 74, the second vertical steel plate 75, the vertical steel plate 84 of third and the 4th vertical steel plate 85, it just will form very deep gap, once diafiltration filter enters gap, will be difficult to clean up.Finally, the first vertical steel plate 74, The effect of two vertical steel plates 75 and the vertical steel plate 84 of third and the 4th vertical steel plate 85 is to fall into reinforced concrete floor, so that The structure of first support component 7 and the second support component 8 is more firm.
Specifically, as shown in Figure 5 and Figure 6, between first level steel plate 71 and the first vertical steel plate 74, first level steel plate 71 and second between vertical steel plate 75, between the second horizontal steel plate 81 and the vertical steel plate 84 of third and the second horizontal steel plate 81 and The angle steel 19 for reinforcing is additionally provided between four vertical steel plates 85, to further increase the first support component 7 and second The stability of support component 8.Specifically, angle steel 19 is fixed on first level steel plate 71 and the first vertical steel plate by welding Between 74, between first level steel plate 71 and the second vertical steel plate 75, between the second horizontal steel plate 81 and the vertical steel plate 84 of third And second between horizontal steel plate 81 and the 4th vertical steel plate 85.
As shown in Figure 4, it is preferable that the top of the door-plate 3 is additionally provided with drop window 34.In order to be mentioned for handling compression box 9 For enough operating spaces, the height of chamber entrance must be enough big.And when the height of door-plate 3 is the height of chamber entrance When, the quality of door-plate 3 will be greatly increased, causes to be difficult to push door-plate, is made troubles for operation door-plate.Therefore, can first be arranged In lesser door-plate, then drop window 34 is provided on door-plate 3, in this way, which the quality of door-plate 3 can be mitigated, convenient for operation Door-plate 3.
When needing to load and unload compression box 9, the first side plate 32 and the second side plate 33 can be first opened, then controls the rising of drop window 34, So that chamber entrance fully opens;After the completion of handling, the first side plate 32 and the second side plate 33 can be first closed, then control drop window 34 declines only retain ventilation opening 31 so that chamber entrance is closed.
Specifically, in the technical scheme, the height of the first side plate 32 and the second side plate 33 is 2700mm, drop window 34 Height is 1300mm, and the height of ventilation opening 31 is 1800mm, and the width of ventilation opening 31 is 900mm.Using such size design, Negative pressure space is formed in operation chamber.At this point, pouring in the indoor air velocity of operating cavity up to 2m/s, foul smell from ventilation opening 31 Collection rate is up to 90% or more;If being not provided with door-plate 3 and ventilation opening 31, pouring in the indoor air velocity of operating cavity is 0- 0.3m/s can not prevent foul smell from spreading.
The height of ventilation opening 31 is 1800mm, the width of ventilation opening 31 is 900mm, convenient for hand propelled refuse collecting cart into Out.In the technical scheme, there are two the effects of ventilation opening 31, first is that cooperating with emission-control equipment 41, in operation chamber Negative pressure is formed, two, which are easy for operator, which does not have to opening door-plate 3, to be received by ventilation hole propulsion or pull-out hand propelled refuse Collect vehicle.
Preferably, the operation chamber is provided at least one, specifically, operation chamber setting there are two, three or Four.Rubbish is handled by parallel form, improves garbage disposal ability.
As illustrated in fig. 1, it is preferred that shutter 35 before being provided in front of operation chamber, is blocked by preceding shutter 35 Sunlight rainwater provides the working environment of a relative comfort for operator.It is blocked after the top of exhaust passage 42 is provided with Plate 43 prevents foreign matter from falling into exhaust passage 42 and results in blockage by rear shutter 43.
In conclusion the present invention provides a kind of sewage stench processing system of refuse transfer station, on the one hand set by inclination The V-groove 11 set collects sewage, prevents sewage diffusion;On the other hand, by tilting ceiling 2, emission-control equipment 41 and leading to Air port 31, manufactures negative pressure in operation chamber, so that fresh air is poured in out of ventilation opening 31, prevents foul smell from spreading.Therefore, originally The sewage stench processing system of one of invention refuse transfer station, has the advantages that low cost, while can prevent well The only diffusion of sewage and foul smell minimizes the influence to nearby residents
It should be understood that the application of the present invention is not limited to the above, for those of ordinary skills, Ke Yigen It is improved or converted according to above description, all these modifications and variations all should belong to the protection model of appended claims of the present invention It encloses.

Claims (10)

1. a kind of sewage stench processing system of refuse transfer station, including operation chamber, it is characterised in that: the operation chamber by Ground, inclination ceiling, the first side wall and second sidewall are enclosed and are set, and chamber discrepancy is formed in front of the operation chamber Mouthful, the rear of the operation chamber is provided with rear wall;
Be provided with V-groove on the ground, the rear of operation chamber described in front direction of the V-groove from the operation chamber by It gradually tilts down, the lowest part of the V-groove is provided with a liquid collection opening, and the liquid collection opening is connected with underground blow-off line;
The rear of operation chamber described in front direction of the inclination ceiling from the operation chamber tilts gradually downward;
It is provided with openable and closable door-plate at the chamber entrance, offers ventilation opening on the door-plate;
The bottom of the rear wall offers a suction opening, and emission-control equipment is additionally provided with outside the suction opening.
2. a kind of sewage stench processing system of refuse transfer station according to claim 1, it is characterised in that: described first The bottom of side wall and the second sidewall is provided with multiple flooding nozzles, and the water discharging direction of the flooding nozzle is towards the V-type Slot.
3. a kind of sewage stench processing system of refuse transfer station according to claim 1, it is characterised in that: the door-plate Including the first side plate and the second side plate, first side plate is hinged on the first side wall, and second side plate is hinged on institute It states in second sidewall;
The first notch is offered on first side plate, offers the second notch on second side plate;When first side plate When closing with second side plate, the ventilation opening is formed between first notch and second notch.
4. a kind of sewage stench processing system of refuse transfer station according to claim 1, it is characterised in that: further include water Flat ceiling;
The inclination ceiling is positioned close to the position at the operation chamber rear, and the horizontal ceilings are positioned close to institute State the position in front of operation chamber, the horizontal ceilings on one side be connected to the inclination ceiling highest point while;Institute It states and forms diminishing inclined spaces between inclination ceiling and the ground, between the horizontal ceilings and the ground Form rectangular space.
5. a kind of sewage stench processing system of refuse transfer station according to claim 1, it is characterised in that: the V-type The both sides of slot are respectively arranged with the first track and the second track;
It is provided with the first inclination plateau between first track and the first side wall, the first inclination plateau is from described the One side wall tilts gradually downward to first track, is formed between the first inclination plateau and first track step-like Transition;
It is provided with the second inclination plateau between second track and the second sidewall, the second inclination plateau is from described the Two side walls tilt gradually downward to second track, are formed between the second inclination plateau and second track step-like Transition.
6. a kind of sewage stench processing system of refuse transfer station according to claim 5, it is characterised in that: the ground Lower section be provided with reinforced concrete floor, the upper surface of the V-groove, the first inclination plateau and the second inclination plateau It is additionally provided with polyurethane cement layer.
7. a kind of sewage stench processing system of refuse transfer station according to claim 6, it is characterised in that: further include setting Set the first support component and the second support component on the reinforced concrete floor;
First support component include first level steel plate, the first inclined steel plate, the second inclined steel plate, the first vertical steel plate and Second vertical steel plate;The first level steel plate is laid on first track, and first inclined steel plate is laid on described For first inclination plateau close to the edge of first track, second inclined steel plate is laid on the V-groove close to described the The edge of one track;One side of first inclined steel plate and the top margin of the described first vertical steel plate are fixedly linked, and described second One side of inclined steel plate and the top margin of the described second vertical steel plate are fixedly linked;One side of the first level steel plate and described It is fixedly linked in the middle part of one vertical steel plate, the another side of the first level steel plate and the top margin of the described second vertical steel plate are fixed It is connected;The first vertical steel plate and the second vertical steel plate are arranged in the reinforced concrete floor;
Second support component include the second horizontal steel plate, third inclined steel plate, the 4th inclined steel plate, the vertical steel plate of third and 4th vertical steel plate;Second horizontal steel plate is laid on second track, and the third inclined steel plate is laid on described For second inclination plateau close to the edge of second track, the 4th inclined steel plate is laid on the V-groove close to described the The edge of two tracks;One side of the third inclined steel plate and the top margin of the vertical steel plate of the third are fixedly linked, and the described 4th One side of inclined steel plate and the top margin of the 4th vertical steel plate are fixedly linked;One side of second horizontal steel plate and described It is fixedly linked in the middle part of three vertical steel plates, the another side of second horizontal steel plate and the top margin of the 4th vertical steel plate are fixed It is connected;The vertical steel plate of third and the 4th vertical steel plate are arranged in the reinforced concrete floor.
8. a kind of sewage stench processing system of refuse transfer station according to claim 6, it is characterised in that: the V-type The polyurethane cement layer of the upper surface of slot with a thickness of 8-12mm, the first inclination plateau and the second inclination plateau it is upper The polyurethane cement layer on surface with a thickness of 4-6mm.
9. a kind of sewage stench processing system of refuse transfer station according to claim 1, it is characterised in that: the door-plate Top be additionally provided with drop window.
10. a kind of -9 described in any item sewage stench processing systems of refuse transfer station, feature exist according to claim 1 In: the operation chamber is provided at least one.
CN201811584938.7A 2018-12-24 2018-12-24 Sewage odor treatment system of garbage transfer station Active CN109500041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811584938.7A CN109500041B (en) 2018-12-24 2018-12-24 Sewage odor treatment system of garbage transfer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811584938.7A CN109500041B (en) 2018-12-24 2018-12-24 Sewage odor treatment system of garbage transfer station

Publications (2)

Publication Number Publication Date
CN109500041A true CN109500041A (en) 2019-03-22
CN109500041B CN109500041B (en) 2023-10-20

Family

ID=65754448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811584938.7A Active CN109500041B (en) 2018-12-24 2018-12-24 Sewage odor treatment system of garbage transfer station

Country Status (1)

Country Link
CN (1) CN109500041B (en)

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5106428A (en) * 1989-04-07 1992-04-21 Automated Cleaning Systems, Inc. Method for cleaning containers
US5127540A (en) * 1987-11-23 1992-07-07 Baker Hughes Incorporated Double shell thickener
DE19747042C1 (en) * 1997-10-24 1999-05-06 D D C Planungs Entwicklungs Un Method of assembly of building frame
DE19961391A1 (en) * 1999-12-20 2001-06-21 Bahnbau Wels Gmbh Wels Fixture arrangement, particularly for sound protection plates, between or next to rails of railway track involves fixture body secured on at least one sleeper or track support plate
US6379078B1 (en) * 1999-02-22 2002-04-30 Permaloc Corporation Method and apparatus for providing an edging structure for pavement
JP2003313997A (en) * 2002-04-18 2003-11-06 Daisuke Inoue Roof floor greening method for building
JP2005097999A (en) * 2003-09-26 2005-04-14 Fuji Koatsu Concrete Kk Protrusion sidewalk structure and foundation part block used for the same
CN200958191Y (en) * 2006-09-06 2007-10-10 新疆八一钢铁集团有限责任公司 Steel-tapping rail base of converter
WO2009153604A1 (en) * 2008-06-20 2009-12-23 Permaban Limited Screed rail apparatus
CN202117367U (en) * 2011-03-30 2012-01-18 卢丹 Underground parking garage
JP2012030177A (en) * 2010-07-30 2012-02-16 Hakushou:Kk Washing apparatus for flexible object
CN103195158A (en) * 2013-04-03 2013-07-10 济南城建集团有限公司 Municipal drainage pipeline slurry balance pipe-jacking construction method
KR20150006502A (en) * 2013-07-08 2015-01-19 주식회사 우진 Odor for clean room
CN205114236U (en) * 2015-10-30 2016-03-30 福建省百洁环卫机械有限公司 Sealed rubbish compression station
CN105692006A (en) * 2016-03-30 2016-06-22 四川中环环保设备有限公司 Buried double-box vertical waste compression station
CN106400693A (en) * 2016-11-13 2017-02-15 中交路桥建设有限公司 Slope ramp steel box beam conveying vehicle and method
CN206088028U (en) * 2016-10-18 2017-04-12 贵州盛红科技有限责任公司 Indoor perpendicular compression station
CN206221912U (en) * 2016-11-23 2017-06-06 四川中车玉柴发动机股份有限公司 A kind of high-power diesel generating set common mounting underframe
CN106868959A (en) * 2017-03-17 2017-06-20 中铁三局集团有限公司 A kind of method that high ferro non-fragment orbit circuit is quickly repaired
CN108360618A (en) * 2018-04-04 2018-08-03 深圳市建艺装饰集团股份有限公司 A kind of building drainage system
WO2018172778A1 (en) * 2017-03-23 2018-09-27 Grass Concrete Limited Slot drain for concrete slabs and method of forming concrete paving
CN108589465A (en) * 2018-05-08 2018-09-28 杭州江润科技有限公司 Cast-in-place concrete gutter rail gliding style formwork system and construction method
CN209334416U (en) * 2018-12-24 2019-09-03 深圳市建艺装饰集团股份有限公司 A kind of sewage stench processing system of refuse transfer station

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5127540A (en) * 1987-11-23 1992-07-07 Baker Hughes Incorporated Double shell thickener
US5106428A (en) * 1989-04-07 1992-04-21 Automated Cleaning Systems, Inc. Method for cleaning containers
DE19747042C1 (en) * 1997-10-24 1999-05-06 D D C Planungs Entwicklungs Un Method of assembly of building frame
US6379078B1 (en) * 1999-02-22 2002-04-30 Permaloc Corporation Method and apparatus for providing an edging structure for pavement
DE19961391A1 (en) * 1999-12-20 2001-06-21 Bahnbau Wels Gmbh Wels Fixture arrangement, particularly for sound protection plates, between or next to rails of railway track involves fixture body secured on at least one sleeper or track support plate
JP2003313997A (en) * 2002-04-18 2003-11-06 Daisuke Inoue Roof floor greening method for building
JP2005097999A (en) * 2003-09-26 2005-04-14 Fuji Koatsu Concrete Kk Protrusion sidewalk structure and foundation part block used for the same
CN200958191Y (en) * 2006-09-06 2007-10-10 新疆八一钢铁集团有限责任公司 Steel-tapping rail base of converter
WO2009153604A1 (en) * 2008-06-20 2009-12-23 Permaban Limited Screed rail apparatus
JP2012030177A (en) * 2010-07-30 2012-02-16 Hakushou:Kk Washing apparatus for flexible object
CN202117367U (en) * 2011-03-30 2012-01-18 卢丹 Underground parking garage
CN103195158A (en) * 2013-04-03 2013-07-10 济南城建集团有限公司 Municipal drainage pipeline slurry balance pipe-jacking construction method
KR20150006502A (en) * 2013-07-08 2015-01-19 주식회사 우진 Odor for clean room
CN205114236U (en) * 2015-10-30 2016-03-30 福建省百洁环卫机械有限公司 Sealed rubbish compression station
CN105692006A (en) * 2016-03-30 2016-06-22 四川中环环保设备有限公司 Buried double-box vertical waste compression station
CN206088028U (en) * 2016-10-18 2017-04-12 贵州盛红科技有限责任公司 Indoor perpendicular compression station
CN106400693A (en) * 2016-11-13 2017-02-15 中交路桥建设有限公司 Slope ramp steel box beam conveying vehicle and method
CN206221912U (en) * 2016-11-23 2017-06-06 四川中车玉柴发动机股份有限公司 A kind of high-power diesel generating set common mounting underframe
CN106868959A (en) * 2017-03-17 2017-06-20 中铁三局集团有限公司 A kind of method that high ferro non-fragment orbit circuit is quickly repaired
WO2018172778A1 (en) * 2017-03-23 2018-09-27 Grass Concrete Limited Slot drain for concrete slabs and method of forming concrete paving
CN108360618A (en) * 2018-04-04 2018-08-03 深圳市建艺装饰集团股份有限公司 A kind of building drainage system
CN108589465A (en) * 2018-05-08 2018-09-28 杭州江润科技有限公司 Cast-in-place concrete gutter rail gliding style formwork system and construction method
CN209334416U (en) * 2018-12-24 2019-09-03 深圳市建艺装饰集团股份有限公司 A kind of sewage stench processing system of refuse transfer station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘晓进;: "采用F型钢承口钢筋混凝土管道顶管施工的施工技术", 居舍, no. 08, pages 84 - 85 *
罗世东;饶少臣;: "四线铁路钢箱混合梁弯斜拉桥设计研究", 中国铁道科学, no. 05, pages 34 - 39 *

Also Published As

Publication number Publication date
CN109500041B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
KR20100070347A (en) Waste collection and management
CN211077591U (en) Automatic garbage collection system
CN209334416U (en) A kind of sewage stench processing system of refuse transfer station
CN105442696B (en) Waterpower particle sorting apparatus
CN208415460U (en) A kind of novel municipal works anti-clogging draining hoistway structure
CN109500041A (en) A kind of sewage stench processing system of refuse transfer station
KR100665002B1 (en) Deposit sewage remove apparatus of sink-hole
CN211863947U (en) Metal hydraulic baling press sump oil separator
CN219430958U (en) Environment-friendly inspection shaft
CN220536604U (en) Closed multifunctional garbage trestle
CN111481969A (en) Bury formula circulation and deposit device
CN215654245U (en) House building construction waste water recycling device
CN216379831U (en) Groove type intercepting well with grating
CN211990171U (en) Aggregate bin dust collector
CN210887546U (en) Sewage raiser
CN220461684U (en) Dust collection device for coke discharging line of train
CN218757190U (en) Carriage of sanitation vehicle
CN217704048U (en) Movable ceramic tile washing treatment platform
CN217375827U (en) Clear discharging equipment that transports of building site rubbish
CN214160733U (en) Portable concrete tank car belt cleaning device
CN212772721U (en) Anti-blocking rainwater inlet device
CN114148651B (en) Construction waste classification and recovery method
CN220003062U (en) Sedimentation tank is used in concrete processing
CN216092490U (en) Gravel collector
CN215162077U (en) Sewage solid waste extraction element

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant