CN109494763A - A kind of battery participation wind-powered electricity generation fluctuation suppressing method - Google Patents

A kind of battery participation wind-powered electricity generation fluctuation suppressing method Download PDF

Info

Publication number
CN109494763A
CN109494763A CN201811295413.1A CN201811295413A CN109494763A CN 109494763 A CN109494763 A CN 109494763A CN 201811295413 A CN201811295413 A CN 201811295413A CN 109494763 A CN109494763 A CN 109494763A
Authority
CN
China
Prior art keywords
battery
wind
condition
wind power
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811295413.1A
Other languages
Chinese (zh)
Other versions
CN109494763B (en
Inventor
欧阳强
左浩
李家珏
张涛
邵宝珠
李胜辉
孙峰
戈阳阳
滕云
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shenyang University of Technology
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Shenyang University of Technology
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shenyang University of Technology, State Grid Liaoning Electric Power Co Ltd, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811295413.1A priority Critical patent/CN109494763B/en
Publication of CN109494763A publication Critical patent/CN109494763A/en
Application granted granted Critical
Publication of CN109494763B publication Critical patent/CN109494763B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Abstract

The invention belongs to intelligent power grid technology fields, and in particular to a kind of battery participates in wind-powered electricity generation and fluctuates suppressing method, be it is a kind of based on battery energy storage to the method for stabilizing wind-powered electricity generation fluctuation, effectively inhibit due to wind-powered electricity generation it is unstable caused by power network fluctuation.Including taking the wind power plant of different installed capacitys different control methods;Battery investment is carried out for the wind power plant of different installed capacitys or excision calculates;As 1 < s≤5, judge whether climbing puts into battery;When again to declineJudgement;As s > 5, judge whether climbing puts into battery, then decline is carried outJudgement;To wind-powered electricity generation climbing, the mathematical model for maintaining an equal level, cooperating inhibition wind power fluctuation under decline state with battery.The present invention carries out battery energy storage to the wind-powered electricity generation of wind power plant, in the larger situation of wind power output, carries out battery energy storage, dissolves part wind-powered electricity generation, guarantees grid stability.Solve due to the load becomes large conventional rack cannot meet the requirements when frequency fluctuation, guarantee that the power supply of electric system is reliable and stability.

Description

A kind of battery participation wind-powered electricity generation fluctuation suppressing method
Technical field
The invention belongs to intelligent power grid technology fields, and in particular to a kind of battery participation wind-powered electricity generation fluctuation suppressing method, is one Kind based on battery energy storage to stabilize wind-powered electricity generation fluctuation method, effectively inhibit due to wind-powered electricity generation it is unstable caused by power network fluctuation.
Background technique
In the continuous interconnected electric power system of current wind power generation, due to the uncertainty and fluctuation of wind-power electricity generation, to electricity The safe and reliable operation of net brings more and more challenges, for the rule of the wind power plant access electric system of different installed capacitys It is set to, in the wind power plant less than 30MW, maximum variable quantity is 20MW within 10min clock, and maximum variable quantity is within 1min clock 6MW, in the power plant that installed capacity is 30MW-150MW, the maximum variable quantity within 1min clock is no more than the 1/ of installed capacity Maximum variable quantity within 5,10min clocks is no more than the 2/3 of installed capacity, in the wind power plant greater than 150MW, within 1min clock Maximum rate of change be no more than 30MW, 100MW is no more than within 10min clock.Since the limitation that above-mentioned condition requires results in In the biggish situation of Changes in weather, it is relatively difficult that wind power plant can reach grid-connected conditions, causes a large amount of wind-abandoning phenomenon.
Summary of the invention
The present invention is the influence basis in deficiency and wind power output fluctuation in view of the above technology to power grid operation On, a kind of battery participation wind-powered electricity generation fluctuation suppressing method is proposed, is a kind of side for stabilizing wind power fluctuation based on battery energy storage Method.Its purpose is to solve wind farm grid-connected the technical issues of generating a large amount of wind-abandoning phenomenons in the process.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of battery participation wind-powered electricity generation fluctuation suppressing method, comprising the following steps:
The wind power plant of step 1. pair difference installed capacity takes different control methods;
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to be directed to wind-powered electricity generation wave Emotionally condition makes real-time judge, guarantees the security reliability of power system power supply;First to the wind power plant of different installed capacitys into The limitation modeling of row condition:
It enables
In above formula: S indicates wind energy turbine set installed capacity judgement factor, g1Indicate wind power output mean change amount in one minute, g10Indicate wind power output mean change amount in ten minutes;
Step 3. judges as 1 < s≤5, to whether climbing puts into battery;When again to declineJudgement;
Step 4. judges as s > 5, to whether climbing puts into battery, then carries out to declineJudgement;
Step 5. climbs to wind-powered electricity generation, maintains an equal level, cooperates the mathematical modulo for inhibiting wind power fluctuation under decline state with battery Type.
The step 1 includes: to take the wind power plant of different installed capacitys different control methods, if the installation of wind power plant Capacity is Pz, the real-time power output of wind power plant is acquired, if the current power output of wind power plant is Pd, the power output before one minute is Pd1, the power output before ten minutes is Pd10
The step 2 includes: to calculate for the wind power plant progress battery investment of different installed capacitys or excision, guarantees needle Real-time judge is made to wind-powered electricity generation fluctuation situation, guarantees the security reliability of power system power supply;First to different installed capacitys Wind power plant carries out condition limitation modeling:
It enables
In above formula: S indicates wind energy turbine set installed capacity judgement factor, g1Indicate wind power output mean change amount in one minute, g10Indicate wind power output mean change amount in ten minutes;
As s≤1, judges whether wind-powered electricity generation climbing puts into battery, carry out firstJudgement, If meeting condition, it will start to put into battery progress energy storage, following formula calculating, P carried out for the accumulator capacity of investmentdc1=2ln (Pd-Pd1) P in formuladc1Indicate the battery energy storage capacity put into needed for meeting 1 minute undulate quantity of wind-powered electricity generation;If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=ln (Pd-Pd1), P in formuladc10Table Show the battery energy storage capacity put into needed for meeting 10 minutes undulate quantities of wind-powered electricity generation, when being unsatisfactory for condition, does not need access battery;
In wind-powered electricity generation decline to whether putting into electric power storage tank discharge and judging, carry out firstSentence It is disconnected, if meeting condition, investment battery will be started and discharged, following formula calculating, P are carried out for the accumulator capacity of investmentdc1= 2ln(Pd-Pd1);If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected capacity It calculates, Pdc10=2 (Pd-Pd1), when being unsatisfactory for condition, do not need access electric power storage tank discharge.
The step 3 includes: to judge whether climbing puts into battery, carry out first as 1 < s≤5Judgement will start to put into battery progress energy storage, the accumulator capacity of investment carried out if meeting condition Following formula calculates, Pdc1=5ln (Pd-Pd1);If being unsatisfactory for condition, carry outJudgement meets condition and carries out battery Grid connection capacity calculates, Pdc10=4 (Pd-Pd1), when being unsatisfactory for condition, do not need access battery;
When again to declineJudgement will start investment battery and discharge if meeting condition, for The accumulator capacity of investment carries out following formula calculating, Pdc1=5ln (Pd-Pd1);If being unsatisfactory for condition, carry out Judgement meets the condition and carries out storage battery grid-connected calculation of capacity, carries out discharge power Pdc10=4 (Pd-Pd1), it is unsatisfactory for condition When, do not need access battery.
The step 4 includes: to judge whether climbing puts into battery, carry out first as s > 5Judgement will start to put into battery progress energy storage, for the accumulator capacity of investment if meeting condition Following formula calculating is carried out,If being unsatisfactory for condition, carry outJudgement, meet condition into The storage battery grid-connected calculation of capacity of row,When being unsatisfactory for condition, access battery is not needed;
Decline is carried out againJudgement will start investment battery and put if meeting condition Electricity carries out following formula calculating for the accumulator capacity of investment,If being unsatisfactory for condition, carry outJudgement meets the condition and carries out storage battery grid-connected calculation of capacity,No When meeting condition, does not need access battery and discharge.
The step 5 includes: to climb to wind-powered electricity generation, is maintained an equal level, and cooperates under decline state with battery and inhibits wind power fluctuation Mathematical model, if having n less than the wind power plant of 30MW1It is a, there is 30MW < n2≤150MWn2It is a, there is n greater than 150MW3It is a;It is defeated Entering amount is (n1+n2+n3)Pd1+(n1+n2+n3)Pd10
A kind of battery participates in wind-powered electricity generation and fluctuates suppressing method, comprising:
The wind power plant of step 1. pair difference installed capacity takes different control methods, if the installed capacity of certain wind power plant is Pz=500MW is acquired the real-time power output of wind power plant, if the current power output of wind power plant is Pd=300MW, before one minute Power output be Pd1=305MW, the power output before ten minutes are Pd10=450MW;Carry out wind power output fluctuation situation and wind-powered electricity generation Field capacity judgement, carries out power output control, to carry out the investment of batteries to store energy;
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to be directed to wind-powered electricity generation wave Emotionally condition makes real-time judge, guarantees the security reliability of power system power supply;First to the wind power plant of different installed capacitys into The limitation modeling of row condition;It is specifically calculated by process as follows:
S wind energy turbine set installed capacity judgement factor is 16.67, g in above formula1Indicate wind power output mean change amount in one minute For 5MW, g10Indicate that wind power output mean change amount is -15MW in ten minutes, the above process does not need to carry out stabilizing for battery Effect;
Step 3. is P when the installed capacity of certain wind power plantz=25MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=20MW, the power output before one minute are Pd1=12MW, the power output before ten minutes are Pd10= 20MW;
To whether putting into battery and judging, carry out firstMeet condition, will start to put into battery progress energy storage, for investment Accumulator capacity carries out following formula calculating, Pdc1=2ln (Pd-Pd1)=2ln8;So needing to carry out storage battery grid-connected, grid connection capacity For 4ln4MW;
Step 4. is P when the installed capacity of certain wind power plantz=250MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=150MW, the power output before one minute are Pd1=140MW, the power output before ten minutes are Pd10= 230MW;
As s=8.3 > 5, to whether putting into battery and judging, carry out firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, above formula is unsatisfactory for Condition carries outJudgement,It is unsatisfactory for condition, is not required to Access battery;
It carries out againIt calculates, so being unsatisfactory for condition, does not need to start to put into Battery discharges, and carries out following formula calculating for the accumulator capacity of investment,It carries out down Condition judgement is stated, is carried outJudgement, condition is not satisfied, carries out electric power storage Pond grid connection capacity calculates, grid connection capacityAccess battery is not needed in summary to be put Electricity;
Step 5. sets the installed capacity of certain wind power plant as Pz=120MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=80MW, the power output before one minute are Pd1=40MW, the power output before ten minutes are Pd10= 50MW;So 1 s≤5 <, to whether putting into battery and judging, calculate firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, Pdc1=0;It carries outJudgement, is unsatisfactory for condition, carries out storage battery grid-connected calculation of capacity, Pdc10=0, it to sum up calculates and does not need access battery;
For step 6. to the overall calculation of above-mentioned wind power plant, obtaining final calculated result is (n1+n2+n3)Pd1+(n1+n2+ n3)Pd10=4ln 4MW;So the capacity for being currently incorporated to battery is 4ln4MW, current wind-powered electricity generation can effectively be inhibited to fluctuate.
The present invention has the following advantages and beneficial effects:
The present invention leads to the problem of a large amount of wind-abandoning phenomenons in the process wind farm grid-connected in the prior art, to wind power plant Wind-powered electricity generation carries out battery energy storage, in the biggish situation of wind power output, carries out battery energy storage, dissolves part wind-powered electricity generation, guarantee power grid Stability.When output of wind electric field is lower, battery is needed to discharge, fill up the phenomenon of wind power output deficiency, when wind-powered electricity generation goes out When power is smaller, battery is discharged, solve due to the load becomes large conventional rack is unappeasable require when frequency fluctuation, protect Demonstrate,proved electric system power supply is reliable and stability.
Detailed description of the invention
Understand for the ease of those of ordinary skill in the art and implement the present invention, with reference to the accompanying drawing and specific embodiment The present invention is described in further detail, it is to be understood that protection scope of the present invention is not by the limit of specific embodiment System.
Fig. 1 be battery of the present invention follow wind-powered electricity generation be incorporated to control figure;
Fig. 2 is that the present invention stabilizes wind-powered electricity generation undulated control flow chart.
Specific embodiment
The present invention is a kind of battery participation wind-powered electricity generation fluctuation suppressing method, comprising the following steps:
The wind power plant of step 1. pair difference installed capacity takes different control methods, if the installed capacity of wind power plant is Pz, the real-time power output of wind power plant is acquired, if the current power output of wind power plant is Pd, the power output before one minute is Pd1, ten Power output before minute is Pd10
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to be directed to wind-powered electricity generation wave Emotionally condition makes real-time judge, guarantees the security reliability of power system power supply.First to the wind power plant of different installed capacitys into The limitation modeling of row condition.
It enables
In above formula: S indicates wind energy turbine set installed capacity judgement factor, g1Indicate wind power output mean change amount in one minute, g10Indicate wind power output mean change amount in ten minutes.
As s≤1, judges whether wind-powered electricity generation climbing puts into battery, carry out firstJudgement, If meeting condition, it will start to put into battery progress energy storage, following formula calculating, P carried out for the accumulator capacity of investmentdc1=2ln (Pd-Pd1) P in formuladc1Indicate the battery energy storage capacity put into needed for meeting 1 minute undulate quantity of wind-powered electricity generation.If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=ln (Pd-Pd1), P in formuladc10Table Show the battery energy storage capacity put into needed for meeting 10 minutes undulate quantities of wind-powered electricity generation, when being unsatisfactory for condition, does not need access battery.
In wind-powered electricity generation decline to whether putting into electric power storage tank discharge and judging, carry out firstSentence It is disconnected, if meeting condition, investment battery will be started and discharged, following formula calculating, P are carried out for the accumulator capacity of investmentdc1= 2ln(Pd-Pd1).If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected capacity It calculates, Pdc10=2 (Pd-Pd1), when being unsatisfactory for condition, do not need access electric power storage tank discharge.
Step 3. judges as 1 < s≤5, to whether climbing puts into battery, carries out firstSentence It is disconnected, if meeting condition, it will start to put into battery progress energy storage, following formula calculating, P carried out for the accumulator capacity of investmentdc1= 5ln(Pd-Pd1).If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=4 (Pd-Pd1), when being unsatisfactory for condition, do not need access battery.
When again to declineJudgement will start investment battery and discharge if meeting condition, for The accumulator capacity of investment carries out following formula calculating, Pdc1=5ln (Pd-Pd1).If being unsatisfactory for condition, carry out Judgement meets the condition and carries out storage battery grid-connected calculation of capacity, carries out discharge power Pdc10=4 (Pd-Pd1), it is unsatisfactory for condition When, do not need access battery.
Step 4. judges as s > 5, to whether climbing puts into battery, carries out firstSentence It is disconnected, if meeting condition, it will start to put into battery progress energy storage, following formula calculating carried out for the accumulator capacity of investment,If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected appearance Amount calculates,When being unsatisfactory for condition, access battery is not needed.
Decline is carried out againJudgement will start investment battery and put if meeting condition Electricity carries out following formula calculating for the accumulator capacity of investment,If being unsatisfactory for condition, carry outJudgement meets the condition and carries out storage battery grid-connected calculation of capacity, When being unsatisfactory for condition, does not need access battery and discharge.
Step 5. climbs to wind-powered electricity generation, maintains an equal level, and cooperates the mathematical modulo for inhibiting wind power fluctuation under decline state with battery Type, if the wind power plant less than 30MW has n1It is a, there is 30MW < n2≤150MWn2It is a, there is n greater than 150MW3It is a.Input quantity is, (n1+n2+n3)Pd1+(n1+n2+n3)Pd10
Embodiment 1:
The wind power plant of step 1. pair difference installed capacity takes different control methods, if the installed capacity of certain wind power plant is Pz=500MW is acquired the real-time power output of wind power plant, if the current power output of wind power plant is Pd=300MW, before one minute Power output be Pd1=305MW, the power output before ten minutes are Pd10=450MW.As shown in Figure 1, Fig. 1 be battery of the present invention with Control figure is incorporated to wind-powered electricity generation.Wind power output is carried out by Fig. 1 and fluctuates situation and the judgement of wind power plant capacity, carries out power output control System, to carry out the investment of batteries to store energy.
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to be directed to wind-powered electricity generation wave Emotionally condition makes real-time judge, guarantees the security reliability of power system power supply.First to the wind power plant of different installed capacitys into The limitation modeling of row condition.As shown in Fig. 2, Fig. 2 is that the present invention stabilizes wind-powered electricity generation undulated control flow chart.It is specifically calculated by flow chart It is as follows:
S wind energy turbine set installed capacity judgement factor is 16.67, g in above formula1Indicate wind power output mean change amount in one minute For 5MW, g10Indicate that wind power output mean change amount is -15MW in ten minutes, the above process does not need to carry out stabilizing for battery Effect.
Step 3. is P when the installed capacity of certain wind power plantz=25MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=20MW, the power output before one minute are Pd1=12MW, the power output before ten minutes are Pd10= 20MW。
To whether putting into battery and judging, carry out firstMeet condition, will start to put into battery progress energy storage, for investment Accumulator capacity carries out following formula calculating, Pdc1=2ln (Pd-Pd1)=2ln8.So needing to carry out storage battery grid-connected, grid connection capacity For 4ln4MW.
Step 4. is P when the installed capacity of certain wind power plantz=250MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=150MW, the power output before one minute are Pd1=140MW, the power output before ten minutes are Pd10= 230MW
As s=8.3 > 5, to whether putting into battery and judging, carry out firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, above formula is unsatisfactory for Condition carries outJudgement,It is unsatisfactory for condition.It is not required to Access battery.
It carries out againIt calculates, so being unsatisfactory for condition, does not need to start to put into Battery discharges, and carries out following formula calculating for the accumulator capacity of investment,It carries out down Condition judgement is stated, is carried outJudgement, condition is not satisfied, carries out electric power storage Pond grid connection capacity calculates, grid connection capacityAccess battery is not needed in summary to be put Electricity.
Step 5. sets the installed capacity of certain wind power plant as Pz=120MW is acquired the real-time power output of wind power plant, if wind The current power output of electric field is Pd=80MW, the power output before one minute are Pd1=40MW, the power output before ten minutes are Pd10= 50MW。So 1 s≤5 <, to whether putting into battery and judging, calculate firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, Pdc1 =0.It carries outJudgement, is unsatisfactory for condition, carries out storage battery grid-connected calculation of capacity, Pdc10 =0, it to sum up calculates and does not need access battery.
For step 6. to the overall calculation of above-mentioned wind power plant, obtaining final calculated result is (n1+n2+n3)Pd1+(n1+n2+ n3)Pd10=4ln 4MW.So the capacity for being currently incorporated to battery is 4ln4MW, current wind-powered electricity generation can effectively be inhibited to fluctuate.

Claims (7)

1. a kind of battery participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the following steps are included:
The wind power plant of step 1. pair difference installed capacity takes different control methods;
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to fluctuate feelings for wind-powered electricity generation Condition makes real-time judge, guarantees the security reliability of power system power supply;Item is carried out to the wind power plant of different installed capacitys first Part limitation modeling:
It enables
In above formula: S indicates wind energy turbine set installed capacity judgement factor, g1Indicate wind power output mean change amount in one minute, g10Table Show wind power output mean change amount in ten minutes;
Step 3. judges as 1 < s≤5, to whether climbing puts into battery;When again to declineSentence It is disconnected;
Step 4. judges as s > 5, to whether climbing puts into battery, then carries out to declineJudgement;
Step 5. climbs to wind-powered electricity generation, maintains an equal level, cooperates the mathematical model for inhibiting wind power fluctuation under decline state with battery.
2. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the step 1 includes: Different control methods is taken the wind power plant of different installed capacitys, if the installed capacity of wind power plant is Pz, to the reality of wind power plant When power output be acquired, if the current power output of wind power plant is Pd, the power output before one minute is Pd1, the power output before ten minutes is Pd10
3. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the step 2 includes: Battery investment is carried out for the wind power plant of different installed capacitys or excision calculates, and guarantees to make in real time for wind-powered electricity generation fluctuation situation Judgement, guarantees the security reliability of power system power supply;Condition limitation modeling is carried out to the wind power plant of different installed capacitys first:
It enables
In above formula: S indicates wind energy turbine set installed capacity judgement factor, g1Indicate wind power output mean change amount in one minute, g10Table Show wind power output mean change amount in ten minutes;
As s≤1, judges whether wind-powered electricity generation climbing puts into battery, carry out firstJudgement, if full Sufficient condition will start to put into battery progress energy storage, carry out following formula calculating, P for the accumulator capacity of investmentdc1=2ln (Pd- Pd1) P in formuladc1Indicate the battery energy storage capacity put into needed for meeting 1 minute undulate quantity of wind-powered electricity generation;If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=ln (Pd-Pd1), P in formuladc10Table Show the battery energy storage capacity put into needed for meeting 10 minutes undulate quantities of wind-powered electricity generation, when being unsatisfactory for condition, does not need access battery;
In wind-powered electricity generation decline to whether putting into electric power storage tank discharge and judging, carry out firstJudgement, if full Sufficient condition, will start investment battery and discharges, and carry out following formula calculating, P for the accumulator capacity of investmentdc1=2ln (Pd- Pd1);If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=2 (Pd-Pd1), when being unsatisfactory for condition, do not need access electric power storage tank discharge.
4. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the step 3 includes: As 1 < s≤5, judges whether climbing puts into battery, carry out firstJudgement, if meeting condition, It will start to put into battery progress energy storage, following formula calculating, P carried out for the accumulator capacity of investmentdc1=5ln (Pd-Pd1);If It is unsatisfactory for condition, is carried outJudgement meets condition and carries out storage battery grid-connected calculation of capacity, Pdc10=4 (Pd-Pd1), When being unsatisfactory for condition, access battery is not needed;
When again to declineJudgement will start investment battery and discharge, for investment if meeting condition Accumulator capacity carry out following formula calculating, Pdc1=5ln (Pd-Pd1);If being unsatisfactory for condition, carry outJudgement, Meet the condition and carry out storage battery grid-connected calculation of capacity, carries out discharge power Pdc10=4 (Pd-Pd1), when being unsatisfactory for condition, it is not required to Access battery.
5. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the step 4 includes: As s > 5, judges whether climbing puts into battery, carry out firstJudgement, if meeting item Part will start to put into battery progress energy storage, carry out following formula calculating for the accumulator capacity of investment, If being unsatisfactory for condition, carry outJudgement meets condition and carries out storage battery grid-connected calculation of capacity,When being unsatisfactory for condition, access battery is not needed;
Decline is carried out againJudgement will start investment battery and discharge if meeting condition, right Following formula calculating is carried out in the accumulator capacity of investment,If being unsatisfactory for condition, carry outJudgement meets the condition and carries out storage battery grid-connected calculation of capacity,No When meeting condition, does not need access battery and discharge.
6. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the step 5 includes: Climb to wind-powered electricity generation, maintain an equal level, cooperate the mathematical model for inhibiting wind power fluctuation under decline state with battery, if less than 30MW's Wind power plant has n1It is a, there is 30MW < n2≤150MWn2It is a, there is n greater than 150MW3It is a;Input quantity is (n1+n2+n3)Pd1+(n1+ n2+n3)Pd10
7. a kind of battery according to claim 1 participates in wind-powered electricity generation and fluctuates suppressing method, it is characterized in that: the described method includes:
The wind power plant of step 1. pair difference installed capacity takes different control methods, if the installed capacity of certain wind power plant is Pz= 500MW is acquired the real-time power output of wind power plant, if the current power output of wind power plant is Pd=300MW, going out before one minute Power is Pd1=305MW, the power output before ten minutes are Pd10=450MW;It carries out wind power output fluctuation situation and wind power plant is held Amount judgement, carries out power output control, to carry out the investment of batteries to store energy;
Step 2. carries out battery investment for the wind power plant of different installed capacitys or excision calculates, and guarantees to fluctuate feelings for wind-powered electricity generation Condition makes real-time judge, guarantees the security reliability of power system power supply;Item is carried out to the wind power plant of different installed capacitys first Part limitation modeling;It is specifically calculated by process as follows:
S wind energy turbine set installed capacity judgement factor is 16.67, g in above formula1Indicate that wind power output mean change amount is in one minute 5MW, g10Indicate in ten minutes that wind power output mean change amount is -15MW, the above process does not need to carry out battery to stabilize work With;
Step 3. is P when the installed capacity of certain wind power plantz=25MW is acquired the real-time power output of wind power plant, if wind power plant Current power output is Pd=20MW, the power output before one minute are Pd1=12MW, the power output before ten minutes are Pd10=20MW;
To whether putting into battery and judging, carry out firstMeet condition, will start to put into battery progress energy storage, for investment Accumulator capacity carries out following formula calculating, Pdc1=2ln (Pd-Pd1)=2ln8;So needing to carry out storage battery grid-connected, grid connection capacity For 4ln4MW;
Step 4. is P when the installed capacity of certain wind power plantz=250MW is acquired the real-time power output of wind power plant, if wind power plant It is current power output be Pd=150MW, the power output before one minute are Pd1=140MW, the power output before ten minutes are Pd10= 230MW;
As s=8.3 > 5, to whether putting into battery and judging, carry out firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, above formula is unsatisfactory for Condition carries outJudgement,It is unsatisfactory for condition, is not required to Access battery;
It carries out againIt calculates, so being unsatisfactory for condition, does not need to start to put into electric power storage Pond is discharged, and carries out following formula calculating for the accumulator capacity of investment,Carry out following Part judgement, carries outJudgement, condition is not satisfied, carries out battery simultaneously Net calculation of capacity, grid connection capacityAccess battery is not needed in summary to discharge;
Step 5. sets the installed capacity of certain wind power plant as Pz=120MW is acquired the real-time power output of wind power plant, if wind power plant It is current power output be Pd=80MW, the power output before one minute are Pd1=40MW, the power output before ten minutes are Pd10=50MW;So 1 s≤5 <, to whether putting into battery and judging, calculate firstIt is unsatisfactory for condition, investment battery is not needed and carries out energy storage, Pdc1=0;It carries outJudgement, is unsatisfactory for condition, carries out storage battery grid-connected calculation of capacity, Pdc10=0, it to sum up calculates and does not need access battery;
For step 6. to the overall calculation of above-mentioned wind power plant, obtaining final calculated result is (n1+n2+n3)Pd1+(n1+n2+n3)Pd10 =4ln4MW;So the capacity for being currently incorporated to battery is 4ln4MW, current wind-powered electricity generation can effectively be inhibited to fluctuate.
CN201811295413.1A 2018-11-01 2018-11-01 Method for restraining wind power fluctuation by battery participation Active CN109494763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811295413.1A CN109494763B (en) 2018-11-01 2018-11-01 Method for restraining wind power fluctuation by battery participation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811295413.1A CN109494763B (en) 2018-11-01 2018-11-01 Method for restraining wind power fluctuation by battery participation

Publications (2)

Publication Number Publication Date
CN109494763A true CN109494763A (en) 2019-03-19
CN109494763B CN109494763B (en) 2022-03-22

Family

ID=65693542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811295413.1A Active CN109494763B (en) 2018-11-01 2018-11-01 Method for restraining wind power fluctuation by battery participation

Country Status (1)

Country Link
CN (1) CN109494763B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109861292A (en) * 2019-03-28 2019-06-07 国网辽宁省电力有限公司经济技术研究院 One kind improving clean energy resource based on multiple-energy-source energy-storage system and dissolves method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593853A (en) * 2012-02-27 2012-07-18 东北电力大学 Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity
CN104779630A (en) * 2015-05-08 2015-07-15 武汉大学 Capacity allocation method for hybrid energy storage system capable of restraining wind power output power fluctuation
KR101847991B1 (en) * 2017-06-09 2018-04-11 주식회사 에니텍시스 Method for strong wind generation mode of a wind power generator and wind power generator controller using the method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593853A (en) * 2012-02-27 2012-07-18 东北电力大学 Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity
CN104779630A (en) * 2015-05-08 2015-07-15 武汉大学 Capacity allocation method for hybrid energy storage system capable of restraining wind power output power fluctuation
KR101847991B1 (en) * 2017-06-09 2018-04-11 주식회사 에니텍시스 Method for strong wind generation mode of a wind power generator and wind power generator controller using the method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PENG YE: "Research on Flexible Self Starting Strategy of Wind Storage Isolated Network System", 《2017 IEEE 3RD INTERNATIONAL CONFERENCE ON CONTROL SCIENCE AND SYSTEMS ENGINEERING》 *
张冠锋: "基于恒功率控制的风电场储能系统研究", 《新能源发电控制技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109861292A (en) * 2019-03-28 2019-06-07 国网辽宁省电力有限公司经济技术研究院 One kind improving clean energy resource based on multiple-energy-source energy-storage system and dissolves method
CN109861292B (en) * 2019-03-28 2022-05-03 国网辽宁省电力有限公司经济技术研究院 Method for improving clean energy consumption based on multi-energy storage system

Also Published As

Publication number Publication date
CN109494763B (en) 2022-03-22

Similar Documents

Publication Publication Date Title
CN104377726B (en) A kind of peak regulating method of extensive new energy grid-connected power
CN105958538B (en) Power distribution network isolated island division methods based on Monte Carlo method
CN101707378B (en) Method for dispatching power grid pitch peak capability based on large-scale wind power sychronization
Qiu et al. Stochastic online generation control of cascaded run-of-the-river hydropower for mitigating solar power volatility
CN110854880B (en) Method for stabilizing wind power generation power fluctuation based on water pumping energy storage power station
CN112467807A (en) Day-ahead optimal scheduling method and system for multi-energy power system
CN109149562B (en) Economic dispatching method and device suitable for alternating current-direct current hybrid power grid
Vigueras‐Rodríguez et al. Wind model for low frequency power fluctuations in offshore wind farms
CN112600209A (en) Multi-objective capacity optimization configuration method for island independent micro-grid containing tidal current energy
CN107425534A (en) A kind of micro-capacitance sensor dispatching method based on optimization accumulator cell charging and discharging strategy
CN106099991A (en) A kind of power grid wind electricity digestion capability appraisal procedure
CN109494763A (en) A kind of battery participation wind-powered electricity generation fluctuation suppressing method
CN103311923B (en) A kind of method of Identification of Power System generation cascading failure
CN109510238B (en) Coordinated dispatching unit combination method for efficiently solving hydroelectric power, thermal power and wind power
CN107359611A (en) Consider the power distribution network equivalence method of a variety of enchancement factors
CN105956713A (en) New energy annual/monthly electric quantity plan making method
Zhang et al. Operational characteristics and optimization of Hydro-PV power hybrid electricity system
CN109378843A (en) Peak load shifting lever control method based on battery energy storage
CN104362666B (en) A kind of wind farm low voltage cuts machine emergency control method
CN105244921B (en) Unserved capacity optimal distribution method in the electric power system dispatching of the water phosgene of fire containing wind
CN106485593B (en) Power grid side new energy power generation limitation reason analysis method
CN107332249A (en) Consider the fuzzy optimal trend method of the multiple target dynamic random of power system containing wind-powered electricity generation of transmission & distribution collaboration
Lu et al. Annual Benefit Analysis of Integrating the Seasonal Hydrogen Storage into the Renewable Power Grids
Ren et al. Research on the Internal Flow Characteristics of Pump Turbines for Smoothing the Output Fluctuation of the Wind–Photovoltaic Complementary System
Si et al. Modeling the Heat-Hydrogen Balance Characteristic of Hydrogen Energy Storage and Cooperative Dispatch of Wind-Hydrogen Hybrid System

Legal Events

Date Code Title Description