CN109494738A - A kind of electric network fault fast and stable control method of automatic synchronization control - Google Patents

A kind of electric network fault fast and stable control method of automatic synchronization control Download PDF

Info

Publication number
CN109494738A
CN109494738A CN201811603633.6A CN201811603633A CN109494738A CN 109494738 A CN109494738 A CN 109494738A CN 201811603633 A CN201811603633 A CN 201811603633A CN 109494738 A CN109494738 A CN 109494738A
Authority
CN
China
Prior art keywords
control
power grid
limit
load
avc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811603633.6A
Other languages
Chinese (zh)
Other versions
CN109494738B (en
Inventor
韩保军
吕颖
秦军伟
王丹
杨宵
代飞
李岩
鲁华永
韩伟
李朝晖
宋开振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Electric Power Co Ltd filed Critical State Grid Henan Electric Power Co Ltd
Priority to CN201811603633.6A priority Critical patent/CN109494738B/en
Publication of CN109494738A publication Critical patent/CN109494738A/en
Application granted granted Critical
Publication of CN109494738B publication Critical patent/CN109494738B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of electric network fault fast and stable control method of automatic synchronization control, this method comprises: obtaining regional power grid model and regional power grid Data of State Estimation every the first preset time period;The whole network model and the whole network Data of State Estimation comprising outer net are obtained every the second preset time period;According to the difference of powernet safety analysis and forecast failure safety analysis demand, select regional power grid model and its Data of State Estimation or the whole network model and its Data of State Estimation as calculating online data respectively;According to calculating online data, powernet safety analysis and forecast failure safety analysis are carried out, obtains analysis result and aid decision strategy;Based on the analysis results, stability contorting is carried out to power grid by aid decision strategy by AGC, AVC and load lot control system.The present invention can adapt to bulk power grid operation control needs, and can realize that the fast and stable of power grid controls by " one-touch " operation when catastrophe failure occurs for power grid.

Description

A kind of electric network fault fast and stable control method of automatic synchronization control
Technical field
The present invention relates to dispatching of power netwoks control running technology field more particularly to a kind of electric network faults of automatic synchronization control Fast and stable control method.
Background technique
With gradually forming for China's extra-high voltage alternating current-direct current mixed connection bulk power grid pattern, power system security stability characteristic (quality) and machine Manage it is increasingly sophisticated, operation of power networks control difficulty continue to increase, the fining and lean of power system security stability analysis are mentioned New requirement is gone out.As the important link of " big operation " construction in State Grid Corporation of China " three collection five are big ", State Grid Corporation of China System carried out the construction of smart grid Dispatching Control System since 2009, wherein safety on line analysis system, early warning and auxiliary Help decision making function, Automatic Generation Control function (Automatic Generation Control;AGC), automatism voltage control function It can (Automatic Voltage Control;AVC) and load batch control function is gradually at power grid regulation centers at different levels Deployment is implemented.
On-line security and stability analysis system application range has covered state, has divided, saves three-class power network, grasps electricity to real-time Net invariant feature improves electric power netting safe running level and has played positive effect.Electricity wherein based on safety on line analytical calculation Net online dynamic secure estimation realize utilize online data carry out static security analysis, multilayer output feedback network, small interference stability The functions such as calculating, frequency stabilization calculate, voltage stabilization calculates, the section limit calculates, calculated result is accurate, improves system emulation The precision for calculating analysis completes off-line calculation to the technology leap in line computation.The system can not only grasp current system Operating condition, additionally it is possible to analyze power grid potential risk, carry out prediction failure, and provide aid decision suggestion, be management and running people Member's discovery potential risk, grasps operation of power networks trend, successfully manages burst accident and provides strong help, but since auxiliary is determined The real-time of plan and adaptability Shortcomings with other control functions not yet realize that aid decision closed loop executes at present.
AGC function makes generating automatic tracking load variations by the active power of generating set in control dispatcher-controlled territory, ties up Holding system frequency is rated value, and interconnecting ties is maintained to exchange power, realizes the control of electric network active frequency, maintains system frequency matter Tie line Power and the control of local power net inner section transmission power between amount, interconnected network.
AVC function calculates the optimal setting of each node voltage in power grid by the idle work optimization to power grid in real time, according to It contributes according to the setting value to generator reactive and Substation Reactive-power Compensation equipment switching controls, to realize reactive voltage Hierarchical and regional balance and control guarantee the voltage security and quality of entire power grid.
Load batch control function improves scheduling emergency disposal level for emergencies such as reply power grid accident, exceptions, Ensure that power network safety operation, regulating and controlling mechanisms at different levels are based on smart grid Dispatching Control System, deploys load batch and control System.When accident abnormality occurs for power grid, the load batch that junior's regulating and controlling mechanism is assigned according to higher level's regulating and controlling mechanism controls target value Or one's respective area grid operating conditions start load batch control function, generate load batch control program, confirm errorless rear execution Operation.It, can be according to difference again if load control system amount not up to controls target value after load batch control operational order is finished Secondary generation load batch control program simultaneously executes operation again, it is ensured that full-amount to complete load control system requirement.But it is directed to thing at present Therefore load control objective be to be determined offline according to operating experience, it is online to cut or owe the problem of cutting there may be crossing when executing. Therefore, it is necessary to study the load control system based on on-line security and stability analysis to refine computing technique.
Summary of the invention
To solve problems of the prior art, under the overall situation of extra-high voltage alternating current-direct current mixed connection access, the present invention is first It first constructs a safety on line early warning and aid decision Closed loop Control realizes frame, and be based on the realization frame, provide one The electric network fault fast and stable control method of kind automatic synchronization control can adapt to bulk power grid operation control needs, and in power grid It can realize that the fast and stable of power grid controls by " one-touch " operation when catastrophe failure occurs.
A kind of electric network fault fast and stable control method of automatic synchronization control provided by the invention, specifically includes following step It is rapid:
Step 1 obtains regional power grid model and regional power grid Data of State Estimation every the first preset time period;
Step 2 obtains the whole network model and the whole network Data of State Estimation comprising outer net every the second preset time period;
Step 3, according to the difference of powernet safety analysis and forecast failure safety analysis demand, select the area respectively Domain electric network model and regional power grid Data of State Estimation or the whole network model comprising outer net and the whole network Data of State Estimation point It Zuo Wei not calculating online data;
Step 4, according to the calculating online data, carry out powernet safety analysis and forecast failure safety analysis, Obtain analysis result and aid decision strategy;
Step 5 is analyzed according to described as a result, by AGC, AVC and load lot control system according to the aid decision Strategy carries out closed-loop control to power grid.
Further, the powernet safety analysis in the step 4 includes:
According to the calculating online data, judge mains frequency within the scope of regional power grid, alternating current circuit, transformer and Transmission cross-section load whether be more than within the scope of respective pre-set limit and regional power grid busbar voltage whether default allow model In enclosing.
Further, the forecast failure safety analysis in the step 4 includes:
According to the calculating online data, alternating current circuit forecast failure, the transformer within the scope of regional power grid are envisioned Failure and extra-high voltage alternating current-direct current are latched forecast failure, Transient Stability Evaluation and static security analysis are carried out, after judging forecast failure Regional power grid whether there is generator rotor angle destabilization problems and/or Voltage Instability problem.
Further, the aid decision strategy includes: that the mains frequency based on AGC and load batch control function is got over Promptly closing in the case of limit, cross section limit and the urgent closed-loop control under Overload and the power grid out-of-limit based on AVC Ring control and the preventative closed-loop control of power grid based on AGC and AVC.
Further, the step 5 specifically includes:
If analysis result is indicated without controlling generator output, busbar voltage, transmission cross-section load, not to AGC, AVC and load lot control system sending strategy switching control order, AGC, AVC, load lot control system still according to Former control strategy controls power grid;
If analyzing result indicates that closed-loop control need to be carried out to power grid, sent to AGC, AVC and load lot control system The former controlling tactic switch of AGC, AVC and load lot control system is auxiliary decision strategy, root by tactful switching control order After so that operation of power networks state is restored normal according to the aid decision strategy, to described in AGC, AVC, the transmission of load lot control system The aid decision strategy is switched to former control strategy by tactful switching control order;
Wherein, the tactful switching control order is used to indicate AGC, AVC and load lot control system and controls plan in original Slightly switched between aid decision strategy.
Further, the mains frequency based on AGC and load batch control function in the step 5 is out-of-limit, section is got over Urgent closed-loop control under limit and Overload specifically includes:
If it is determined that the mains frequency, alternating current circuit, transformer and transmission cross-section load within the scope of regional power grid are out-of-limit, then hold Row step 1.1 and step 1.2;
After having executed the step 1.1 and step 1.2, if determining that out-of-limit problem is not present in next calculating cycle, Then follow the steps 1.3;If determining to then follow the steps 1.4 and step 1.5 there are still out-of-limit problem in next calculating cycle;
After executing the step 1.4 and step 1.5, if determining that out-of-limit problem is not present in next calculating cycle, no Control target is issued again gives load lot control system;
Wherein, the step 1.1 to step 1.5 is respectively as follows:
Sensitivity of the generator output to out-of-limit equipment in step 1.1, zoning power grid scope selects sensitivity big Control unit is used as in the generator of given threshold;
Step 1.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection It is sent to AGC with the power output limit value of each generator, carries out closed loop in the way of the limitation generator upper limit and/or lower limit by AGC Control;
Step 1.3, issue control instruction release to AGC to the generator output upper limit each in the generator collection and/or The closed-loop control of lower limit;
Sensitivity of each load control system node to out-of-limit equipment in step 1.4, calculated load lot control system, selection Sensitivity is greater than the load control system node of given threshold as control object;
Step 1.5 calculates the load bus set for needing to control power, by the load bus set for needing to control and needs The load to be cut off is sent to load lot control system, is controlled by load of the load lot control system to load bus System.
Further, the urgent closed-loop control in the case of the power grid out-of-limit based on AVC in the step 5 is specifically wrapped It includes:
If it is determined that busbar voltage is out-of-limit within the scope of regional power grid, 2.1 are thened follow the steps;
After having executed the step 2.1, if determining that the out-of-limit problem of busbar voltage is not present in next calculating cycle, Execute step 2.2;
Wherein, the step 2.1 and step 2.2 are respectively as follows:
Step 2.1 filters out out-of-limit bus nodes, and the bus nodes and control reference voltage are sent to AVC, by AVC carries out closed-loop control in the way of control bus upper voltage limit and/or lower limit;
Step 2.2 issues control instruction and releases to AVC to the bus voltage upper limits of the bus nodes and/or lower limit Closed-loop control.
Further, the preventative closed-loop control of the power grid based on AGC, AVC in the step 5 specifically includes:
If it is determined that forecast failure rear region power grid thens follow the steps 3.1 and step 3.2 there are generator rotor angle destabilization problems;
After having executed the step 3.1 and step 3.2, if determining forecast failure rear region electricity in next calculating cycle Generator rotor angle destabilization problems are not present in net, then follow the steps 3.3;
Wherein, the step 3.1 to step 3.3 is respectively as follows:
The sensitivity of step 3.1, each generator output of zoning power grid to generator rotor angle unstability selects sensitivity to be greater than setting The unit of threshold value is as control unit;
Step 3.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection And the power output upper limit value of each generator is sent to AGC, carries out closed loop control in the way of controlling generator output upper limit value by AGC System;
Step 3.3, under issue a command to AGC and release closed loop control to generator output upper limit value each in the generator collection System.
Further, the preventative closed-loop control of the power grid based on AGC, AVC in the step 5 is specific further include:
If it is determined that forecast failure rear region power grid has Voltage Instability, 4.1 and step 4.2 are thened follow the steps;
After having executed the step 4.1 and step 4.2, if determining forecast failure rear region electricity in next calculating cycle Voltage Instability problem is not present in net, thens follow the steps 4.3;
Wherein, the step 4.1 to step 4.3 is respectively as follows:
Step 4.1 calculates sensitivity of each bus nodes voltage to Voltage Instability, filters out sensitivity greater than given threshold Critical busses;
Step 4.2 calculates the bus nodes for needing to control voltage, will need to control the bus nodes and voltage control of voltage Lower limit processed is sent to AVC, carries out closed-loop control in the way of control bus lower voltage limit by AVC;
Step 4.3, under issue a command to AVC and release closed-loop control to the busbar voltage lower limits of the bus nodes.
Beneficial effects of the present invention:
The electric network fault fast and stable control method of automatic synchronization control provided by the invention, it is existing by comprehensively utilizing Powernet Safety Analysis System, AGC, AVC and network load lot control system are accessed in power grid extra-high voltage alternating current-direct current mixed connection Overall situation under, when power grid occurs or when in the case of will breaking down, without additionally increasing new grid equipment, can be realized Safety on line early warning decision closed-loop control to electric network fault is needed with adapting to current extra-high voltage interconnected network scheduling controlling operation It wants.Analysis of the regulating and controlling mechanism to power grid is reinforced and is promoted in development of the present invention for promotion extra-high voltage interconnected network dispatching technique Assessment and the quick disposing capacity of power grid catastrophe failure ensure power network safety operation, realize peopleware, technical support, tune Comprehensive raising of degree control operation level etc. is of great significance.
Detailed description of the invention
Fig. 1 is that the process of the electric network fault fast and stable control method of automatic synchronization provided in an embodiment of the present invention control is shown It is intended to;
Fig. 2 is the stream of the electric network fault fast and stable control method for the automatic synchronization control that further embodiment of this invention provides Journey schematic diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached in the embodiment of the present invention Figure, technical solution in the embodiment of the present invention are explicitly described, it is clear that described embodiment is a part of the invention Embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making wound Every other embodiment obtained under the premise of the property made labour, shall fall within the protection scope of the present invention.
The electric network fault fast and stable control method of automatic synchronization control proposed by the present invention, firstly, carrying out powernet Safety analysis and forecast failure safety analysis find the safety problem under power grid real-time status and forecast failure, propose that auxiliary is determined Plan scheme;Then, according to aid decision scheme, realize that mains frequency is out-of-limit, transmission of electricity is disconnected using AGC and load batch control function Urgent closed-loop control under face is out-of-limit and equipment Overload is realized urgent in the case of power grid out-of-limit using AVC Closed-loop control, and preventative closed-loop control is carried out using AGC and AVC, it eliminates under the forecast failures such as generator rotor angle unstability, Voltage Instability Safety problem.
Fig. 1 is that the process of the electric network fault fast and stable control method of automatic synchronization provided in an embodiment of the present invention control is shown It is intended to.As shown in Figure 1, method includes the following steps:
S101, regional power grid model and regional power grid Data of State Estimation are obtained every the first preset time period;
S102, the whole network model and the whole network Data of State Estimation comprising outer net are obtained every the second preset time period;
Specifically, it first sets the period and is generally less than the second pre- preset time period, optionally, the setting of the first preset time period It is 2 minutes, the second preset time period is set as 5 minutes.Regional power grid model and regional power grid Data of State Estimation are by other The file that relative application software is automatically generated with the title, type and format arranged, and it is placed in specified storage location, it obtains The period is taken to be determined by the file generated period of other relative application softwares;The whole network model and the whole network state estimation comprising outer net Data are the files transmitted by higher level's scheduling institution with title, type and the format timing arranged, and are placed in specified storage Position, acquisition time section are determined by higher level's scheduling institution supported file transmission cycle time.
S103, according to the difference of powernet safety analysis and forecast failure safety analysis demand, select the area respectively Domain electric network model and regional power grid Data of State Estimation or the whole network model comprising outer net and the whole network Data of State Estimation point It Zuo Wei not calculating online data;
It should be noted that if obtain comprising outer net the whole network model and the whole network Data of State Estimation second it is default when Between section when can achieve the requirement of the first preset time period, can be only with the whole network model comprising outer net and the whole network state estimative figure According to as general calculating online data.
S104, according to the calculating online data, carry out powernet safety analysis and forecast failure safety analysis, obtain To analysis result and aid decision strategy;
S105, it is analyzed according to described as a result, by AGC, AVC and load lot control system according to the aid decision plan Closed-loop control slightly is carried out to power grid.
The electric network fault fast and stable control method of automatic synchronization control proposed by the present invention, it is existing by comprehensively utilizing Powernet Safety Analysis System, AGC, AVC and network load lot control system are accessed in power grid extra-high voltage alternating current-direct current mixed connection Overall situation under, when power grid occurs or when in the case of will breaking down, without additionally increasing new grid equipment, can be realized Safety on line early warning decision closed-loop control to electric network fault is needed with adapting to current extra-high voltage interconnected network scheduling controlling operation It wants.
On the basis of the above embodiments, the present invention provides another embodiment, in conjunction with Fig. 2, the embodiment mainly include with Lower step:
S201 to S203: with step S101 to step S103;
S204, powernet safety analysis, relate generally to following analysis target: judging the power grid frequency within the scope of regional power grid Whether rate, alternating current circuit, transformer and transmission cross-section load are more than bus within the scope of respective pre-set limit and regional power grid Whether voltage is in default allowed band;
And, it is contemplated that failure safe analysis relates generally to following analysis target: to the alternating current circuit within the scope of regional power grid Forecast failure, transformer forecast failure and extra-high voltage alternating current-direct current are latched forecast failure, carry out Transient Stability Evaluation and static security Analysis judges forecast failure rear region power grid with the presence or absence of generator rotor angle destabilization problems and/or Voltage Instability problem.
Aid decision strategy specifically includes that the mains frequency based on AGC and load batch control function is out-of-limit, cross section limit With in the case of the urgent closed-loop control under Overload and the power grid out-of-limit based on AVC urgent closed-loop control and base In the preventative closed-loop control of the power grid of AGC and AVC.
Specifically, the purpose of the aid decision strategy is: firstly, be calculated in power grid control to Control object (such as generator collection, bus nodes and load bus set for needing to control etc.) and control target value (such as The power output limit value of each generator in generator collection, in busbar voltage limit value and load bus set each load bus load Deng);Then, the object to be controlled and control target value are sent to AGC, AVC and load lot control system;Finally, utilizing AGC, AVC and load lot control system carry out closed-loop control to power grid, keep power system restoration normal.
If S205, analysis result are (for example, the mains frequency, alternating current circuit, transformer and transmission of electricity within the scope of regional power grid are disconnected Face load and busbar voltage are not got over line or are in allowed band) it indicates without to generator output, bus electricity Pressure, transmission cross-section load are controlled, then not to AGC, AVC and load lot control system sending strategy switching control order, AGC, AVC, load lot control system still control power grid according to former control strategy;
If analyzing result (for example, the mains frequency, alternating current circuit, transformer and transmission cross-section within the scope of regional power grid are negative At least one of lotus and busbar voltage get over line or exceed allowed band, and operation of power networks state is abnormal) indicate need to be according to Aid decision strategy carries out closed-loop control to power grid, then to AGC, AVC and load lot control system sending strategy switching control The former controlling tactic switch of AGC, AVC and load lot control system is auxiliary decision strategy, is determined according to the auxiliary by order Plan strategy carries out after closed-loop control makes operation of power networks state restore normal, and automatic (can also be after manual confirmation) be to AGC, AVC, negative Lotus lot control system sends the tactful switching control order, and the aid decision strategy is switched to former control strategy;
Wherein, the tactful switching control order is used to indicate AGC, AVC and load lot control system and controls plan in original Slightly switched between aid decision strategy.
As shown in the above, extra-high voltage alternating current-direct current mixed connection access overall situation under, the present invention by building one Line safe early warning and aid decision Closed loop Control realize frame, can adapt to bulk power grid operation control needs, and in power grid It can realize that the fast and stable of power grid controls by " one-touch " operation when catastrophe failure occurs.
The aid decision strategy being related in the various embodiments described above is specifically introduced below.The aid decision strategy packet Include: the mains frequency based on AGC and load batch control function is out-of-limit, the urgent closed loop control under cross section limit and Overload Urgent closed-loop control in the case of system and the power grid out-of-limit based on AVC and the preventative closed loop of power grid based on AGC and AVC Control.
Wherein, the mains frequency of (1) based on AGC and load batch control function is out-of-limit, cross section limit and Overload Under urgent closed-loop control specifically include:
If it is determined that the mains frequency, alternating current circuit, transformer and transmission cross-section load within the scope of regional power grid are out-of-limit, then hold Row step 1.1 and step 1.2;
After having executed the step 1.1 and step 1.2, if determining that out-of-limit problem is not present in next calculating cycle, Then follow the steps 1.3;If determining to then follow the steps 1.4 and step 1.5 there are still out-of-limit problem in next calculating cycle;
After executing the step 1.4 and step 1.5, if determining that out-of-limit problem is not present in next calculating cycle, no Control target is issued again gives load lot control system.
Specifically, calculating cycle refers to implementation procedure composed by step S101 to step S104.That is, working as power grid When failure, by using urgent closed-loop control, (such as step 1.1, step 1.2, step 1.4 and step 1.5) then need pair Control result is verified, and whether examination power grid restores normally in next calculating cycle, if restoring normal, releases closed loop control System.
Wherein, the step 1.1 to step 1.5 is respectively as follows:
Sensitivity of the generator output to out-of-limit equipment in step 1.1, zoning power grid scope selects sensitivity big Control unit is used as in the generator of given threshold;
Step 1.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection It is sent to AGC with the power output limit value of each generator, carries out closed loop in the way of the limitation generator upper limit and/or lower limit by AGC Control;
Step 1.3, issue control instruction release to AGC to the generator output upper limit each in the generator collection and/or The closed-loop control of lower limit;
Sensitivity of each load control system node to out-of-limit equipment in step 1.4, calculated load lot control system, selection Sensitivity is greater than the load control system node of given threshold as control object;
Step 1.5 calculates the load bus set for needing to control power, by the load bus set for needing to control and needs The load to be cut off is sent to load lot control system, is controlled by load of the load lot control system to load bus System.
(2) the urgent closed-loop control in the case of the power grid out-of-limit based on AVC specifically includes:
If it is determined that busbar voltage is out-of-limit within the scope of regional power grid, 2.1 are thened follow the steps;
After having executed the step 2.1, if determining that the out-of-limit problem of busbar voltage is not present in next calculating cycle, Execute step 2.2;
Wherein, the step 2.1 and step 2.2 are respectively as follows:
Step 2.1 filters out out-of-limit bus nodes, and the bus nodes and control reference voltage are sent to AVC, by AVC carries out closed-loop control in the way of control bus upper voltage limit and/or lower limit;
Step 2.2 issues control instruction and releases to AVC to the bus voltage upper limits of the bus nodes and/or lower limit Closed-loop control.
(3) the preventative closed-loop control of power grid based on AGC and AVC, for generator rotor angle destabilization problems and Voltage Instability problem point It Cai Yong not two different prevention closed-loop control processes.
For generator rotor angle destabilization problems, prevents closed-loop control process and specifically includes:
If it is determined that forecast failure rear region power grid thens follow the steps 3.1 and step 3.2 there are generator rotor angle destabilization problems;
After having executed the step 3.1 and step 3.2, if determining forecast failure rear region electricity in next calculating cycle Generator rotor angle destabilization problems are not present in net, then follow the steps 3.3;
Wherein, the step 3.1 to step 3.3 is respectively as follows:
The sensitivity of step 3.1, each generator output of zoning power grid to generator rotor angle unstability selects sensitivity to be greater than setting The unit of threshold value is as control unit;
Step 3.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection And the power output upper limit value of each generator is sent to AGC, carries out closed loop control in the way of controlling generator output upper limit value by AGC System;
Step 3.3, under issue a command to AGC and release closed loop control to generator output upper limit value each in the generator collection System.
For Voltage Instability problem, prevents closed-loop control process and specifically includes:
If it is determined that forecast failure rear region power grid has Voltage Instability, 4.1 and step 4.2 are thened follow the steps;
After having executed the step 4.1 and step 4.2, if determining forecast failure rear region electricity in next calculating cycle Voltage Instability problem is not present in net, thens follow the steps 4.3;
Wherein, the step 4.1 to step 4.3 is respectively as follows:
Step 4.1 calculates sensitivity of each bus nodes voltage to Voltage Instability, filters out sensitivity greater than given threshold Critical busses;
Step 4.2 calculates the bus nodes for needing to control voltage, will need to control the bus nodes and voltage control of voltage Lower limit processed is sent to AVC, carries out closed-loop control in the way of control bus lower voltage limit by AVC;
Step 4.3, under issue a command to AVC and release closed-loop control to the busbar voltage lower limits of the bus nodes.
In order to verify the validity for the power grid fast and stable control method that automatic synchronization provided by the invention controls, with Henan It is analyzed for the operation data of power grid load peak one day period.
The safety and stability problem found by contingency analysis is as shown in table 1.It is calculated using method of the invention, It is as shown in table 2 to obtain Control Measure.
The safety and stability problem found by safety on line analysis is as shown in table 3.It is calculated using method of the invention, It is as shown in table 4 to obtain emergent control measure.
1 Henan Electric Power System forecast failure safety problem of table
Serial number Failure-description Safety and stability problem
1 Male II line of Central China Ji, the male I line double line down of Central China Ji Generator rotor angle unstability
2 DC bipolar block in it Henan south Voltage Instability
2 Henan Electric Power System forecast failure aid decision measure of table
3 Henan Electric Power System actual time safety problem of table
Serial number Safety and stability problem
1 Ma Sidong send cross section limit 100MW
2 The female voltage in the south the osmanthus Gui Yuanzhan/220kV., Henan 220kV is less than 210kV
4 Henan Electric Power System emergent control policy making steps of table
As shown in the above, the electric network fault fast and stable control method of automatic synchronization control provided by the invention, tool Have it is following the utility model has the advantages that
1) it can be based on power grid real-time running state, pass through safety on line analysis and forecast failure safety analysis, discovery electricity The safety problem of net.
2) it can be controlled for the safety problem under Henan Electric Power System malfunction by coordinating AGC, AVC and load batch System realizes the closed-loop control to state of emergency such as frequency out-of-limit, line section and the out-of-limit, voltage out-of-limits of equipment, quickly makes electricity Network recovery is to normal operating condition.
3) it can be realized by AGC, AVC to generator rotor angle unstability, Voltage Instability for the safety problem under power grid forecast failure Prevention and control closed loop, the safety and stability for improving power grid is horizontal.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (9)

1. a kind of electric network fault fast and stable control method of automatic synchronization control characterized by comprising
Step 1 obtains regional power grid model and regional power grid Data of State Estimation every the first preset time period;
Step 2 obtains the whole network model and the whole network Data of State Estimation comprising outer net every the second preset time period;
Step 3, according to the difference of powernet safety analysis and forecast failure safety analysis demand, select the region electricity respectively Pessimistic concurrency control and regional power grid Data of State Estimation or the whole network model comprising outer net and the whole network Data of State Estimation are as meter Calculation online data;
Step 4, according to the calculating online data, carry out powernet safety analysis and forecast failure safety analysis, obtain Analyze result and aid decision strategy;
Step 5 is analyzed according to described as a result, by AGC, AVC and load lot control system according to the aid decision strategy Closed-loop control is carried out to power grid.
2. the method according to claim 1, wherein the powernet safety analysis in the step 4 includes:
According to the calculating online data, mains frequency, alternating current circuit, transformer and the transmission of electricity within the scope of regional power grid are judged Section load whether be more than within the scope of respective pre-set limit and regional power grid busbar voltage whether in default allowed band It is interior.
3. the method according to claim 1, wherein the forecast failure safety analysis in the step 4 includes:
According to the calculating online data, to alternating current circuit forecast failure, the transformer forecast failure within the scope of regional power grid It is latched forecast failure with extra-high voltage alternating current-direct current, Transient Stability Evaluation and static security analysis is carried out, judges forecast failure rear region Power grid whether there is generator rotor angle destabilization problems and/or Voltage Instability problem.
4. according to the method in claim 2 or 3, which is characterized in that the aid decision strategy includes: based on AGC and to bear The mains frequency of lotus batch control function is out-of-limit, cross section limit and urgent closed-loop control under Overload and based on AVC's Urgent closed-loop control in the case of power grid out-of-limit and the preventative closed-loop control of the power grid based on AGC and AVC.
5. the method according to claim 1, wherein the step 5 specifically includes:
If analysis result is indicated without controlling generator output, busbar voltage, transmission cross-section load, not to AGC, AVC and load lot control system sending strategy switching control order, AGC, AVC, load lot control system are still controlled according to original System strategy controls power grid;
If analyzing result indicates that closed-loop control need to be carried out to power grid according to aid decision strategy, to AGC, AVC and load batch Control system sending strategy switching control order, supplemented by the former controlling tactic switch of AGC, AVC and load lot control system Decision strategy is helped, after so that operation of power networks state is restored normal according to the aid decision strategy, is controlled to AGC, AVC, load batch System processed sends the tactful switching control order, and the aid decision strategy is switched to former control strategy;
Wherein, the tactful switching control order be used to indicate AGC, AVC and load lot control system former control strategy with It is switched between aid decision strategy.
6. according to the method described in claim 4, it is characterized in that, controlling function based on AGC and load batch in the step 5 Can mains frequency is out-of-limit, the urgent closed-loop control under cross section limit and Overload specifically includes:
If it is determined that the mains frequency, alternating current circuit, transformer and transmission cross-section load within the scope of regional power grid are out-of-limit, then step is executed Rapid 1.1 and step 1.2;
After having executed the step 1.1 and step 1.2, if determining that out-of-limit problem is not present in next calculating cycle, hold Row step 1.3;If determining to then follow the steps 1.4 and step 1.5 there are still out-of-limit problem in next calculating cycle;
After executing the step 1.4 and step 1.5, if next calculating cycle determine be not present out-of-limit problem, no longer under Hair control target gives load lot control system;
Wherein, the step 1.1 to step 1.5 is respectively as follows:
Sensitivity of the generator output to out-of-limit equipment in step 1.1, zoning power grid scope selects sensitivity to be greater than and sets The generator of threshold value is determined as control unit;
Step 1.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection and respectively The power output limit value of generator is sent to AGC, carries out closed-loop control in the way of the limitation generator upper limit and/or lower limit by AGC;
Step 1.3 issues control instruction to AGC releasing to the generator output upper limit each in the generator collection and/or lower limit Closed-loop control;
Sensitivity of each load control system node to out-of-limit equipment in step 1.4, calculated load lot control system selects sensitive Degree is greater than the load control system node of given threshold as control object;
Step 1.5 calculates the load bus set for needing to control power, will need the load bus set controlled and needs to cut The load removed is sent to load lot control system, is controlled by load of the load lot control system to load bus.
7. according to the method described in claim 4, it is characterized in that, power grid out-of-limit feelings based on AVC in the step 5 Urgent closed-loop control under condition specifically includes:
If it is determined that busbar voltage is out-of-limit within the scope of regional power grid, 2.1 are thened follow the steps;
After having executed the step 2.1, if determining that the out-of-limit problem of busbar voltage is not present in next calculating cycle, execute Step 2.2;
Wherein, the step 2.1 and step 2.2 are respectively as follows:
Step 2.1 filters out out-of-limit bus nodes, the bus nodes and control reference voltage is sent to AVC, by AVC Closed-loop control is carried out in the way of control bus upper voltage limit and/or lower limit;
Step 2.2 issues control instruction to AVC releasing to the bus voltage upper limit of the bus nodes and/or the closed loop of lower limit Control.
8. according to the method described in claim 4, it is characterized in that, the power grid based on AGC and AVC in the step 5 prevents Property closed-loop control specifically includes:
If it is determined that forecast failure rear region power grid thens follow the steps 3.1 and step 3.2 there are generator rotor angle destabilization problems;
After having executed the step 3.1 and step 3.2, if determining forecast failure rear region power grid not in next calculating cycle There are generator rotor angle destabilization problems, then follow the steps 3.3;
Wherein, the step 3.1 to step 3.3 is respectively as follows:
The sensitivity of step 3.1, each generator output of zoning power grid to generator rotor angle unstability selects sensitivity to be greater than given threshold Unit as control unit;
Step 3.2 calculates the generator collection for needing to control power output in the control unit, by the generator collection and respectively The power output upper limit value of generator is sent to AGC, carries out closed-loop control in the way of controlling generator output upper limit value by AGC;
Step 3.3, under issue a command to AGC and release closed-loop control to generator output upper limit value each in the generator collection.
9. according to the method described in claim 4, it is characterized in that, the power grid based on AGC and AVC in the step 5 prevents Property closed-loop control is specific further include:
If it is determined that forecast failure rear region power grid has Voltage Instability, 4.1 and step 4.2 are thened follow the steps;
After having executed the step 4.1 and step 4.2, if determining forecast failure rear region power grid not in next calculating cycle There are problems that Voltage Instability, thens follow the steps 4.3;
Wherein, the step 4.1 to step 4.3 is respectively as follows:
Step 4.1 calculates sensitivity of each bus nodes voltage to Voltage Instability, filters out the pass that sensitivity is greater than given threshold Key bus;
Step 4.2 calculates the bus nodes for needing to control voltage, will be under the bus nodes and voltage control that need to control voltage Limit is sent to AVC, carries out closed-loop control in the way of control bus lower voltage limit by AVC;
Step 4.3, under issue a command to AVC and release closed-loop control to the busbar voltage lower limits of the bus nodes.
CN201811603633.6A 2018-12-26 2018-12-26 Automatic coordination control power grid fault rapid and stable control method Active CN109494738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811603633.6A CN109494738B (en) 2018-12-26 2018-12-26 Automatic coordination control power grid fault rapid and stable control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811603633.6A CN109494738B (en) 2018-12-26 2018-12-26 Automatic coordination control power grid fault rapid and stable control method

Publications (2)

Publication Number Publication Date
CN109494738A true CN109494738A (en) 2019-03-19
CN109494738B CN109494738B (en) 2022-03-29

Family

ID=65712415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811603633.6A Active CN109494738B (en) 2018-12-26 2018-12-26 Automatic coordination control power grid fault rapid and stable control method

Country Status (1)

Country Link
CN (1) CN109494738B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN111030107A (en) * 2019-12-26 2020-04-17 中国电力科学研究院有限公司 Multi-transmission-section cooperative control assistant decision early warning control method and system
CN111146779A (en) * 2019-12-25 2020-05-12 国家电网公司西北分部 Flexible safety control method and system for large power grid with sequential faults of power equipment
CN111697562A (en) * 2020-04-27 2020-09-22 中国电力科学研究院有限公司 SVM-based transient stability prevention control strategy generation method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120179301A1 (en) * 2010-09-17 2012-07-12 Aivaliotis Sarantos K System and method for power grid management
CN102938588A (en) * 2012-12-10 2013-02-20 上海市电力公司 Intelligent power grid safety and stability early-warning and control system
CN103166219A (en) * 2013-01-30 2013-06-19 中国电力科学研究院 Power grid on-line decision-stabilizing control system and control method based on super real-time emulation
CN103400302A (en) * 2013-07-01 2013-11-20 国家电网公司 Risk perception and early warning method and system for cascading failures of wind power base
CN105205571A (en) * 2015-10-20 2015-12-30 河海大学 Risk-considered urban power network operation security assessment method
CN106099906A (en) * 2016-05-13 2016-11-09 国电南瑞科技股份有限公司 A kind of power system safety and stability online integrated campaign method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120179301A1 (en) * 2010-09-17 2012-07-12 Aivaliotis Sarantos K System and method for power grid management
CN102938588A (en) * 2012-12-10 2013-02-20 上海市电力公司 Intelligent power grid safety and stability early-warning and control system
CN103166219A (en) * 2013-01-30 2013-06-19 中国电力科学研究院 Power grid on-line decision-stabilizing control system and control method based on super real-time emulation
CN103400302A (en) * 2013-07-01 2013-11-20 国家电网公司 Risk perception and early warning method and system for cascading failures of wind power base
CN105205571A (en) * 2015-10-20 2015-12-30 河海大学 Risk-considered urban power network operation security assessment method
CN106099906A (en) * 2016-05-13 2016-11-09 国电南瑞科技股份有限公司 A kind of power system safety and stability online integrated campaign method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐泰山: "互联电网预防控制和紧急控制在线预决策系统", 《电力系统自动化》 *
潘鹏飞: "《调度自动化系统与运维技术》", 31 August 2018, 东北大学出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN110350595B (en) * 2019-06-19 2023-10-27 国网河南省电力公司 Load fast decision control method for maintaining stable section of subarea in accident state
CN111146779A (en) * 2019-12-25 2020-05-12 国家电网公司西北分部 Flexible safety control method and system for large power grid with sequential faults of power equipment
CN111146779B (en) * 2019-12-25 2024-02-23 国家电网公司西北分部 Flexible safety control method and system for large power grid with successive faults of power equipment
CN111030107A (en) * 2019-12-26 2020-04-17 中国电力科学研究院有限公司 Multi-transmission-section cooperative control assistant decision early warning control method and system
CN111030107B (en) * 2019-12-26 2022-07-01 中国电力科学研究院有限公司 Multi-transmission-section cooperative control assistant decision early warning control method and system
CN111697562A (en) * 2020-04-27 2020-09-22 中国电力科学研究院有限公司 SVM-based transient stability prevention control strategy generation method and device
CN111697562B (en) * 2020-04-27 2022-11-11 中国电力科学研究院有限公司 SVM-based transient stability prevention control strategy generation method and device

Also Published As

Publication number Publication date
CN109494738B (en) 2022-03-29

Similar Documents

Publication Publication Date Title
CN102882229B (en) Automatic control system for dynamic voltage of wind power plant
CN109494738A (en) A kind of electric network fault fast and stable control method of automatic synchronization control
CN102193504B (en) Safety and stability control system modeling method in power system dynamic simulation
Cai et al. A hierarchical multi-agent control scheme for a black start-capable microgrid
Jiang et al. Short-term voltage stability-constrained unit commitment for receiving-end grid with multi-infeed HVDCs
Dong et al. Simulation and analysis of cascading faults in hybrid AC/DC power grids
Benasla et al. Power system security enhancement by HVDC links using a closed-loop emergency control
CN107181321A (en) It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric
CN110071499B (en) Method and system for rapidly judging safety loop closing of power distribution network
Ballal et al. Improvements in Existing System Integrity Protection Schemes Under Stressed Conditions by Synchrophasor Technology—Case Studies
Sass et al. Control center implementation of advanced optimization and decision support applications
CN111435788B (en) Method and device for improving capacity of power distribution network for accommodating distributed power supply
CN115907526A (en) Power grid voltage sag evaluation method and system, storage medium and computing device
CN109245117A (en) Area power grid static security aid decision automatic generation method
CN110957744B (en) Frequency and voltage safety and stability emergency regulation and control online pre-decision method
CN112865117A (en) Reactive emergency control method, device and system after new energy collection direct current blocking
CN112398129A (en) Power grid post-accident risk control aid decision-making method and device and storage medium
Wang et al. Power system real time reliability monitoring and security assessment in short-term and on-line mode
Xiaoyang et al. A New Method of Data Fusion Calculation for Relay Protection Setting Calculation
Sun et al. Extended application of online security and stability analysis system in Liaoning power grid
Shao et al. Key Technologies of Multi-Source Data Integration System for Large Power Grid Operation
Thomas et al. Cloud Based Dynamic Energy Management in Power System Using Message Queuing Telemetry Transport (MQTT) Protocol
Dou et al. Fast Load Recovery Optimization Method After Under Frequency Load Shedding Considering Demand-Side Resources
Xue Progresses of blackout defense systems in China
Cui et al. Reliability Evaluation of Hybrid AC/DC Distribution Network based on DC Conversion

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant