CN109488209A - A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method - Google Patents

A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method Download PDF

Info

Publication number
CN109488209A
CN109488209A CN201811604988.7A CN201811604988A CN109488209A CN 109488209 A CN109488209 A CN 109488209A CN 201811604988 A CN201811604988 A CN 201811604988A CN 109488209 A CN109488209 A CN 109488209A
Authority
CN
China
Prior art keywords
tooth
steel
full
steel sleeve
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811604988.7A
Other languages
Chinese (zh)
Inventor
杨煌伟
叶丽君
唐俊华
林尚连
王波东
陈炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tengda Construction Group Co Ltd
Original Assignee
Tengda Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tengda Construction Group Co Ltd filed Critical Tengda Construction Group Co Ltd
Priority to CN201811604988.7A priority Critical patent/CN109488209A/en
Publication of CN109488209A publication Critical patent/CN109488209A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/42Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits
    • E21B10/43Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits characterised by the arrangement of teeth or other cutting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of steel sleeves, full-sleeve full-rotation drill and drilling machine drilling method, the steel sleeve includes steel bushing tube body, tooth bed, tooth set and fastener, multiple tooth beds are embedded on the tube wall of steel bushing tube body one end, the tooth set for cutting is installed on the tooth bed, the tooth bed and tooth set are connected and fixed by the fastener, the tooth set includes internal tooth casing and external tooth cover, circular diameter is greater than the outer diameter of the steel sleeve where the outer contour of the external tooth cover tooth top, circular diameter is less than the internal diameter of the steel sleeve where the inner outline of the internal tooth casing tooth top.The full-sleeve full-rotation drill includes the steel sleeve.The full-sleeve full-rotation drill drilling method fills mud between the steel bushing pipe outer wall and barrier in drilling process.Invention increases barriers and steel bushing pipe outer wall gap, improve penetration rate, meanwhile, the tooth set is replaceable, reduces maintenance cost, improves steel bushing tube lifetime.

Description

A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method
Technical field
The present invention relates to earthmoving equipment technical fields, more particularly, to a kind of steel sleeve, full-sleeve full-rotation drill And drilling machine drilling method.
Background technique
In recent years, with domestic economy fast development, large and medium-sized urban urban construction redevelopment project, old urban area change Make, the projects such as subway tunnel, underground exterior-protected structure, bridge reconstruction and extension project are continuously increased, be frequently encountered subsurface rock and The barriers such as remaining old concrete structure, old pile foundation.Barrier often results in underground structure and relocates change of address, directly affects engineering Construction speed and quality, therefore the work for removing underground obstacle is particularly significant.
Barrier can be pulled out or be replaced in the case where not destroying the periphery soil body by full-sleeve full-rotation drill, can also What progress drilling pouring occlusion pile was engaged firmly goes along with sb. to guard him construction.Full-sleeve full-rotation drill is widely used in rail traffic, large size Underground deep layer barrier and all kinds of occlusion pile foundation constructions are pulled out in cross-river tunnel construction.Existing full-sleeve full-rotation drill Casing cut the soil body or intensity it is not high barrier drilling depth it is very fast, but face barrier intensity higher (such as concrete structure, rock Body) when, penetration rate substantially reduces.Simultaneously because pipe tooth is integrated pipe tooth, once damage, entire casing will be scrapped.
Summary of the invention
The purpose of the present invention is to provide a kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling methods, to reduce The lower brill resistance of steel sleeve improves penetration rate, meanwhile, extend steel sleeve service life, improve construction efficiency, reduction is constructed into This.
In order to achieve the above object, the present invention provides a kind of steel sleeves, comprising: steel bushing tube body, tooth bed, tooth set and tight Firmware is embedded in multiple tooth beds on the tube wall of steel bushing tube body one end, the tooth set for cutting is equipped on the tooth bed, The tooth bed and tooth set are connected and fixed by the fastener, and the tooth set includes internal tooth casing and external tooth cover, the external tooth Circular diameter where covering the outer contour of tooth top is greater than the outer diameter of the steel sleeve, circle where the inner outline of the internal tooth casing tooth top Diameter is less than the internal diameter of the steel sleeve.
Optionally, steel bushing tube body one end tube wall be equipped with multiple recessed rectangular notches, the tooth bed for institute The adaptable rectangular block of notch is stated, the tooth bed and the steel bushing tube body are welded to connect.
Optionally, the tooth set includes cutting edge part and coupling part, and the coupling part fluting is set with the tooth bed, The fastener is countersunk bolt, is provided with through-hole on the tooth bed, the coupling part corresponding position is provided with threaded hole, institute Tooth set is stated to connect with the tooth bed by the countersunk bolt.
Optionally, the tooth bed for installing the internal tooth casing is biased to inside the steel sleeve far from steel bushing tube body one end, The tooth bed for installing the external tooth cover is biased to outside the steel sleeve far from steel bushing tube body one end.
Optionally, the external tooth cover, the internal tooth casing are arranged as two external tooth covers, an internal tooth casing alternating Arrangement or the external tooth cover, the internal tooth casing be arranged as the external tooth cover, an internal tooth casing is alternately arranged.
Optionally, the tooth set further includes middle tooth set, and circular diameter where the outer contour of the middle tooth set tooth top is less than institute The outer diameter of steel sleeve is stated, circular diameter where the inner outline of the middle tooth set tooth top is greater than the internal diameter of the steel sleeve.
Optionally, the tooth bed for installing the middle tooth set is parallel with the axis of the steel bushing tube body, installs the internal tooth casing Tooth bed be biased to inside the steel sleeve far from steel bushing tube body one end, the tooth bed of the external tooth cover is installed far from the steel It is biased to outside the steel sleeve sleeve body one end.
Optionally, the external tooth cover, middle tooth set and the internal tooth casing are arranged as the middle tooth set, the external tooth Set, the middle tooth set, the internal tooth casing are alternately arranged.
The present invention also provides a kind of full-sleeve full-rotation drill, the full-sleeve full-rotation drill includes the steel sleeve.
The present invention also provides a kind of full-sleeve full-rotation drill drilling methods, are cut using the full-sleeve full-rotation drill Barrier in drilling process, fills mud between the steel bushing pipe outer wall and the barrier.
In a kind of steel sleeve provided by the invention, full-sleeve full-rotation drill and drilling machine drilling method, the steel sleeve Including steel bushing tube body, tooth bed, tooth set and fastener, multiple tooth beds, the tooth are embedded on the tube wall of steel bushing tube body one end The tooth set for cutting is installed, the tooth bed and tooth set are detachably connected by the fastener, are convenient on bed The tooth set damage replacement, the tooth set include internal tooth casing and external tooth cover, and circle where the outer contour of the external tooth cover tooth top is straight Diameter is greater than the outer diameter of the steel sleeve, and circular diameter is less than the interior of the steel sleeve where the inner outline of the internal tooth casing tooth top Diameter.It is crept into using the full-sleeve full-rotation drill of the steel sleeve, since the outer contour of external tooth is greater than steel bushing pipe outside diameter, internal tooth Inner outline be less than steel bushing bore, gap between barrier and the steel bushing pipe outer wall, inner wall increases, and reduces described The frictional resistance of steel sleeve improves penetration rate, meanwhile, mud is filled between the steel bushing pipe outer wall and the barrier Slurry can further decrease the frictional resistance of the steel sleeve, improve penetration rate.
Detailed description of the invention
Fig. 1 is the steel sleeve structural schematic diagram that one embodiment of the invention provides;
Fig. 2 is the external tooth cover for the steel sleeve that one embodiment of the invention provides, internal tooth casing arrangement schematic diagram;
Fig. 3 is external tooth cover, middle tooth set, internal tooth casing the arrangement schematic diagram for the steel sleeve that one embodiment of the invention provides;
Fig. 4 is the schematic cross-sectional view for the steel sleeve that one embodiment of the invention provides;
Fig. 5 is the steel sleeve drilling schematic diagram that one embodiment of the invention provides;
Fig. 6 is the end view for the steel sleeve that one embodiment of the invention provides;
Wherein: 10- steel bushing tube body, 20- tooth bed, 30- tooth set, 31- external tooth cover, 32- internal tooth casing, tooth set in 33-, 40- Mud.
Specific embodiment
A specific embodiment of the invention is described in more detail below in conjunction with schematic diagram.According to following description and Claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing is all made of very simplified form and Using non-accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
One embodiment of the invention provides a kind of steel sleeve, and Fig. 1 is the steel sleeve structural representation that one embodiment of the invention provides Figure, Fig. 4 are the schematic cross-sectional views for the steel sleeve that one embodiment of the invention provides, and as shown in Figure 1 and Figure 4, the steel sleeve includes Steel bushing tube body 10, tooth bed 20, tooth cover 30 and fastener, are embedded in multiple tooth beds 20 on 10 one end tube wall of steel bushing tube body, It is equipped on the tooth bed 20 and covers 30 for the tooth of cutting, the tooth bed 20 and tooth set 30 are connected by the fastener Fixation is connect, the tooth set 30 includes internal tooth casing 32 and external tooth cover 31, circular diameter where the outer contour of 31 tooth top of external tooth cover Greater than the outer diameter 1cm of the steel sleeve, circular diameter is less than the steel sleeve where the inner outline of 32 tooth top of internal tooth casing Internal diameter 1cm.
The steel sleeve pipe tooth of existing full-sleeve full-rotation drill is an integral structure with steel bushing tube body, the interior table of pipe tooth The inner wall of face and steel bushing tube body is in same plane, and the outer surface of pipe tooth and the outer wall of steel bushing tube body are in same plane.Steel bushing The pipe tooth of pipe cuts barrier (such as concrete structure, rock mass), and barrier can still be close to steel sleeve, later period steel sleeve after incision Overcome and bored under the frictional resistance of tube wall and barrier, therefore, integrated steel casing cut the soil body or the not high barrier of intensity into Ruler is very fast, but when cutting the rock mass higher or with some strength of barrier intensity, penetration rate is substantially reduced.Simultaneously because pipe Tooth is integrated pipe tooth, once damage, entire steel sleeve will be scrapped.In the present embodiment, the steel sleeve includes steel sleeve sheet Body 10, tooth bed 20 and tooth set 30, the tooth bed 20 are connected with tooth set 30 by fastener, can after 30 damage of tooth set Replacement rapidly, has saved production cost.Tooth set 30 includes internal tooth casing 32 and external tooth cover 31,31 tooth top of external tooth cover it is outer Circular diameter where contour line is greater than the outer diameter of the steel sleeve, and circular diameter where the inner outline of 32 tooth top of internal tooth casing is less than The internal diameter of the steel sleeve.In the steel sleeve drilling process, barrier and steel bushing pipe outer wall gap increase, and reduce institute The frictional resistance for stating steel sleeve, improves penetration rate.
As preferable embodiment, as shown in Figure 1 and Figure 4,10 one end tube wall of steel bushing tube body is equipped with multiple Recessed rectangular notch, the tooth bed 20 are the rectangular block being adapted with the notch, the tooth bed 20 and the steel sleeve sheet Body 10 is welded to connect.The tooth set 30 includes cutting edge part and coupling part, and the coupling part fluting is set with the tooth bed 20, the fastener is countersunk bolt, is provided with through-hole on the tooth bed 20, the coupling part corresponding position is provided with screw thread Hole, the tooth set 30 are connect with the tooth bed 20 by the countersunk bolt.
As preferable embodiment, Fig. 6 is the end view for the steel sleeve that one embodiment of the invention provides, such as Fig. 6 Shown, on 10 one end end face of steel bushing tube body, the center of circle O of the notch center line L and the steel sleeve has a spacing From.The tooth bed 20 is embedded in the notch, and the tooth covers on the tooth bed 20 that 30 are mounted on, and a seamed edge of the tooth set 30 is stretched The outer wall of the steel bushing tube body 10 cuts barrier as main cutting edge out, improves the stress of the tooth set 30, mentions The high tooth covered for 30 service life.
As preferable embodiment, as shown in figure 4, the axis of the tooth bed 20 and the steel bushing tube body 10 has centainly Angle, the tooth bed 20 for installing the internal tooth casing 32 are biased to inside the steel sleeve (form β far from described 10 one end of steel bushing tube body Angle), after installing the internal tooth casing 32, circular diameter is less than the interior of the steel sleeve where the inner outline of 32 tooth top of internal tooth casing Diameter;The tooth bed 20 for installing the external tooth cover 31 is biased to outside the steel sleeve (form α far from described 10 one end of steel bushing tube body Angle), after installing the external tooth cover 31, circular diameter where the outer contour of 31 tooth top of external tooth cover is greater than the outer of the steel sleeve Diameter.In the steel sleeve drilling process, due to the presence of external tooth cover and internal tooth casing, barrier and the steel bushing pipe outer wall, inside Between gap increase, reduce the frictional resistance of the steel sleeve, improve penetration rate, be suitable for cutting barrier intensity compared with The high or rock mass with some strength.
As preferable embodiment, Fig. 2 is the external tooth cover for the steel sleeve that one embodiment of the invention provides, internal tooth casing arrangement Schematic diagram, as shown in Fig. 2, the external tooth cover 31, the internal tooth casing 32 be arranged as two external tooth covers 31, one it is described in Tooth set 32 is alternately arranged.The arrangement of the external tooth cover 31, the internal tooth casing 32 is also possible to 31, internal tooth casings of an external tooth cover 32 are alternately arranged.
As preferable embodiment, the tooth set 30 is also designed to include external tooth cover 31, middle tooth set 33 and internal tooth Set 32, circular diameter where the middle tooth covers the outer contour of 33 tooth tops are less than the outer diameter of the steel sleeve, and the middle tooth covers 33 teeth Circular diameter is greater than the internal diameter of the steel sleeve where the inner outline on top.The tooth bed 20 and the steel bushing of the middle tooth set 33 are installed The axis of tube body 10 is parallel, installs the tooth bed 20 and the steel bushing tube body 10 of the external tooth cover 31 and the internal tooth casing 32 Axis has certain angle.The tooth bed 20 for installing the internal tooth casing 32 is biased to the steel sleeve far from described 10 one end of steel bushing tube body Inside, after installing the internal tooth casing 32, circular diameter is less than the steel sleeve where the inner outline of 32 tooth top of internal tooth casing Internal diameter;The tooth bed 20 for installing the external tooth cover 31 is biased to outside the steel sleeve far from described 10 one end of steel bushing tube body, installation After the external tooth cover 31, circular diameter is greater than the outer diameter of the steel sleeve where the outer contour of 31 tooth top of external tooth cover.Outside Tooth set in increasing on the basis of tooth set, internal tooth casing, due to the presence of external tooth cover and internal tooth casing, outside barrier and the steel sleeve Gap increases between wall, inside, reduces the frictional resistance of the steel sleeve and middle tooth set, accelerates middle tooth set cutting speed, Improve penetration rate.
As preferable embodiment, Fig. 3 is the external tooth cover of steel sleeve, middle tooth set, interior that one embodiment of the invention provides Tooth set arrangement schematic diagram, as shown in figure 3, the external tooth cover 31, middle tooth set 33 and the internal tooth casing 32 be arranged as it is described Middle tooth set 33, the external tooth cover 31, the middle tooth set 33, the internal tooth casing 32 are alternately arranged.It should be noted that the external tooth The quantity and arrangement mode of set, the middle tooth set and the internal tooth casing can adjust according to the actual situation, and the present embodiment is not to institute The quantity and arrangement mode for stating external tooth cover, the middle tooth set and the internal tooth casing are limited in any way.
One embodiment of the invention also provides a kind of full-sleeve full-rotation drill, and the full-sleeve full-rotation drill includes described Steel sleeve.
One embodiment of the invention also provides a kind of full-sleeve full-rotation drill drilling method, using the full-sleeve full-rotation Drilling machine cuts barrier, and Fig. 5 is the steel sleeve drilling schematic diagram that one embodiment of the invention provides, as shown in figure 5, drilling process In, mud 40 is filled between the steel bushing pipe outer wall and the barrier.The steel bushing pipe outer wall and the barrier it Between fill mud 40, can further decrease the frictional resistance of the steel sleeve, improve penetration rate.
In conclusion a kind of steel sleeve, full-sleeve full-rotation drill and the drilling machine drilling that are provided in one embodiment of the invention In method, including steel bushing tube body, tooth bed, tooth cover and fastener, is embedded in multiple tooth beds on the tube wall of steel bushing tube body one end, The tooth set for cutting is installed on the tooth bed, the tooth bed and tooth set are connected and fixed by the fastener, The tooth set includes internal tooth casing and external tooth cover, and circular diameter is greater than the steel sleeve where the outer contour of the external tooth cover tooth top Outer diameter, circular diameter is less than the internal diameter of the steel sleeve where the inner outline of the internal tooth casing tooth top.The full-sleeve full-rotation Drilling machine includes the steel sleeve.The tooth bed and tooth set are detachably connected by the fastener, convenient for tooth set damage Bad replacement, reduces maintenance cost, improves steel bushing tube lifetime;Crept into using the full-sleeve full-rotation drill, barrier with Gap between the steel bushing pipe outer wall, inner wall increases, and reduces the frictional resistance of the steel sleeve, improves penetration rate; The full-sleeve full-rotation drill drilling method cuts barrier using the full-sleeve full-rotation drill, in drilling process, Mud is filled between the steel bushing pipe outer wall and the barrier, the mud of filling can further decrease the friction of the steel sleeve Resistance further improves penetration rate.
The above is only a preferred embodiment of the present invention, does not play the role of any restrictions to the present invention.Belonging to any Those skilled in the art, in the range of not departing from technical solution of the present invention, to the invention discloses technical solution and Technology contents make the variation such as any type of equivalent replacement or modification, belong to the content without departing from technical solution of the present invention, still Within belonging to the scope of protection of the present invention.

Claims (10)

1. a kind of steel sleeve, which is characterized in that including steel bushing tube body, tooth bed, tooth set and fastener, the steel bushing tube body one It is embedded in multiple tooth beds on end pipe wall, the tooth set for cutting is installed on the tooth bed, the tooth set protrudes the steel bushing The end face of tube body, the tooth bed and tooth set are connected and fixed by the fastener, and the tooth set is including internal tooth casing and outside Tooth set, circular diameter is greater than the outer diameter of the steel sleeve where the outer contour of the external tooth cover tooth top, the internal tooth casing tooth top Circular diameter is less than the internal diameter of the steel sleeve where inner outline.
2. steel sleeve according to claim 1, which is characterized in that on the tube wall of steel bushing tube body one end circumferentially uniformly Equipped with multiple recessed rectangular notches, the tooth bed is the rectangular block being adapted with the notch, and the tooth bed is welded on described At the rectangular notch of steel bushing tube body.
3. steel sleeve according to claim 2, which is characterized in that the tooth set includes cutting edge part and coupling part, The coupling part fluting is set with the tooth bed, and the fastener is countersunk bolt, is provided with through-hole, the company on the tooth bed It connects partial response position and is provided with threaded hole, the tooth set is connect with the tooth bed by the countersunk bolt.
4. steel sleeve according to claim 3, which is characterized in that install the tooth bed of the internal tooth casing far from the steel sleeve Ontology one end is biased to inside the steel sleeve, installs the tooth bed of the external tooth cover far from described in the deviation of steel bushing tube body one end Outside steel sleeve.
5. steel sleeve according to claim 4, which is characterized in that the external tooth cover, the internal tooth casing are arranged as two The external tooth cover, an internal tooth casing is alternately arranged or the external tooth cover, the internal tooth casing be arranged as one it is described outer Tooth set, an internal tooth casing are alternately arranged.
6. steel sleeve according to claim 3, which is characterized in that the tooth set further includes middle tooth set, and the middle tooth covers tooth Circular diameter where the outer contour on top is less than the outer diameter of the steel sleeve, circular diameter where the inner outline of the middle tooth set tooth top Greater than the internal diameter of the steel sleeve.
7. steel sleeve according to claim 6, which is characterized in that the tooth bed of the installation middle tooth set and the steel sleeve sheet The axis of body is parallel, and the tooth bed for installing the internal tooth casing is biased to inside the steel sleeve far from steel bushing tube body one end, peace The tooth bed for filling the external tooth cover is biased to outside the steel sleeve far from steel bushing tube body one end.
8. steel sleeve according to claim 7, which is characterized in that the external tooth cover, the middle tooth set and the internal tooth casing The be arranged as middle tooth set, the external tooth cover, the middle tooth set, the internal tooth casing be alternately arranged.
9. a kind of full-sleeve full-rotation drill, which is characterized in that the full-sleeve full-rotation drill includes according to claim 1-8 Steel sleeve described in any one.
10. a kind of full-sleeve full-rotation drill drilling method, which is characterized in that use full-sleeve according to claim 9 Full-rotating drill cuts barrier, in drilling process, fills mud between the steel bushing pipe outer wall and the barrier.
CN201811604988.7A 2018-12-26 2018-12-26 A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method Pending CN109488209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811604988.7A CN109488209A (en) 2018-12-26 2018-12-26 A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811604988.7A CN109488209A (en) 2018-12-26 2018-12-26 A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method

Publications (1)

Publication Number Publication Date
CN109488209A true CN109488209A (en) 2019-03-19

Family

ID=65712358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811604988.7A Pending CN109488209A (en) 2018-12-26 2018-12-26 A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method

Country Status (1)

Country Link
CN (1) CN109488209A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155513A (en) * 2019-12-30 2020-05-15 深圳市盛业地下工程有限公司 Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761237A (en) * 2009-12-24 2010-06-30 上海隧道工程股份有限公司 Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN101871212A (en) * 2010-06-25 2010-10-27 中铁十八局集团有限公司 Deep-water bridge foundation pile casing for rocks with large inclination angle
CN201943581U (en) * 2010-12-24 2011-08-24 北京市三一重机有限公司 Inner spiral drum-type boring tool
CN103603342A (en) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN203655163U (en) * 2013-12-17 2014-06-18 北京市三一重机有限公司 Rotary drilling rig and variable diameter cylinder drill thereof
CN203742432U (en) * 2013-12-26 2014-07-30 深圳市工勘岩土工程有限公司 Large-diameter rotary excavating drilled pile hard rock drilling rig
CN104141455A (en) * 2014-07-08 2014-11-12 上海中联重科桩工机械有限公司 Drilling machine device and drilling method of drilling machine
CN204370414U (en) * 2014-12-22 2015-06-03 中铁十九局集团有限公司 A kind of steel pile casting for cast-in-place concrete pile boring and a kind of drilling equipment
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN206986894U (en) * 2017-05-26 2018-02-09 中交一航局第一工程有限公司 Efficient device for clearing away obstacle in Deep Bored Piles hole
CN207093008U (en) * 2017-08-17 2018-03-13 中铁六局集团有限公司 Drill
CN208137891U (en) * 2018-03-22 2018-11-23 阳谷昊泉机械有限公司 A kind of casing tooth turning round ferrule sleeve brill

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761237A (en) * 2009-12-24 2010-06-30 上海隧道工程股份有限公司 Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN101871212A (en) * 2010-06-25 2010-10-27 中铁十八局集团有限公司 Deep-water bridge foundation pile casing for rocks with large inclination angle
CN201943581U (en) * 2010-12-24 2011-08-24 北京市三一重机有限公司 Inner spiral drum-type boring tool
CN103603342A (en) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN203655163U (en) * 2013-12-17 2014-06-18 北京市三一重机有限公司 Rotary drilling rig and variable diameter cylinder drill thereof
CN203742432U (en) * 2013-12-26 2014-07-30 深圳市工勘岩土工程有限公司 Large-diameter rotary excavating drilled pile hard rock drilling rig
CN104141455A (en) * 2014-07-08 2014-11-12 上海中联重科桩工机械有限公司 Drilling machine device and drilling method of drilling machine
CN204370414U (en) * 2014-12-22 2015-06-03 中铁十九局集团有限公司 A kind of steel pile casting for cast-in-place concrete pile boring and a kind of drilling equipment
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN206986894U (en) * 2017-05-26 2018-02-09 中交一航局第一工程有限公司 Efficient device for clearing away obstacle in Deep Bored Piles hole
CN207093008U (en) * 2017-08-17 2018-03-13 中铁六局集团有限公司 Drill
CN208137891U (en) * 2018-03-22 2018-11-23 阳谷昊泉机械有限公司 A kind of casing tooth turning round ferrule sleeve brill

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋志彬: "全套管钻进套管柱损坏机理与应用技术研究", 《中国博士学位论文全文数据库 基础科学辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155513A (en) * 2019-12-30 2020-05-15 深圳市盛业地下工程有限公司 Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method
CN111155513B (en) * 2019-12-30 2021-10-08 深圳市盛业建筑科技(集团)有限公司 Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method

Similar Documents

Publication Publication Date Title
CN207598254U (en) A kind of shield radial direction stratum bracing means
CN104074461B (en) Engineering groover is rushed in suspension type convolution shake
CN103982135B (en) Rising pouring water in rotary pile-digging machine hole becomes the multi-functional rock of wearing of tooth and bores
CN104047542B (en) Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method
CN202577411U (en) Milling excavator
CN105114109A (en) Self-drilling type hollow anchor rod grouting connector
CN105822234A (en) Drill rod assembly with drillable expanded bit for piling machine
CN109488209A (en) A kind of steel sleeve, full-sleeve full-rotation drill and drilling machine drilling method
CN105089506B (en) A kind of double-layer cross self-drilling anchor rod bit
CN212201908U (en) Double-section hobbing cutter drill bit for large-diameter piles
CN113737776A (en) Ultra-long steel pipe pile under condition of marine-facies deep mucky soil and construction method thereof
CN105317381A (en) Drill bit for constructing cast-in-situ bored pile and hole forming method using same
CN102926654B (en) Stake holes ring cutting system and stake holes ring cutting method
CN109610494B (en) Rock-socketed construction process for large-diameter pile foundation
CN109058583B (en) Tool pipe for hand-digging type pipe jacking construction
CN109027419B (en) Hand-digging type pipe jacking construction method
CN103662686B (en) A kind of method for making of shaftless conveyor screw
CN102767337A (en) Sleeve type screw pile machine drill and construction method for eliminating barriers
CN104763332A (en) Percussive-rotary drilling method and system for horizontal directional drilling crossing
CN209621211U (en) A kind of drill bit combination unit
CN208152954U (en) A kind of self-drilling type borehole wall guard system
CN103573202A (en) Sand bailing mechanism and drilling tool
CN108590533B (en) Drill bit for construction of bored pile
CN210315526U (en) Steel sleeve for improving construction speed of cast-in-place pile
CN205400585U (en) Ground bored pile subassembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190319