CN109488010A - A kind of section steel beam clip system and its construction method being used in turn - Google Patents

A kind of section steel beam clip system and its construction method being used in turn Download PDF

Info

Publication number
CN109488010A
CN109488010A CN201811019878.4A CN201811019878A CN109488010A CN 109488010 A CN109488010 A CN 109488010A CN 201811019878 A CN201811019878 A CN 201811019878A CN 109488010 A CN109488010 A CN 109488010A
Authority
CN
China
Prior art keywords
section steel
steel beam
buried ring
shaped pre
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811019878.4A
Other languages
Chinese (zh)
Inventor
童伟猛
刘健楠
尤晓锋
王新宇
闫文胜
刘锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201811019878.4A priority Critical patent/CN109488010A/en
Publication of CN109488010A publication Critical patent/CN109488010A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/041Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffolds on roof frameworks or on roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses the section steel beam clip systems that one kind can be used in turn, including U-shaped pre-buried ring, rubber base plate, steel plate gasket, nut and PVC casing, the lower end of the U-shaped pre-buried ring is fixed on rubber base plate, section steel beam is placed on floorslab concrete, the steel plate gasket passes through U-shaped pre-buried ring and is placed on section steel beam, upper end is equipped with locking nut by section steel beam banding on floorslab concrete, and the portion outboard that the U-shaped pre-buried ring is in inside floorslab concrete is nested with PVC casing.In the section steel beam clip system, in addition to rubber base plate, also by the way that PVC casing is arranged on U-shaped pre-buried ring, contact U-shaped pre-buried ring directly with nothing between structure, entire clip system buries simple, efficient and accurate positioning, and clip is not susceptible to deviate, tilt in structure reinforcing bars binding and concreting process, greatly reduce the clip amount of manually adjusting, it installs simultaneously, convenient disassembly, repeats turnover and utilize, reduce the economic cost of material.

Description

A kind of section steel beam clip system and its construction method being used in turn
Technical field
The invention belongs to technical field of building construction, and in particular to the section steel beam clip system that can be used in turn of one kind and its Construction method.
Background technique
Construction site operating platform such as discharging platform, builder's jack etc. is that construction is indispensable, by main body knot Pre-buried clip fastening section steel beam (or I-steel) is as putting up platform basis on structure floor.Traditional clip, which has positioning, is not allowed, Gu Determine mode complexity, impacted by concrete and be easy to happen offset, inclination, needs largely to carry out hammering tune by force to clip before girder steel is installed It is whole to lead to problems such as pre-buried ring material is impaired to reduce safety coefficient.In addition, traditional clip is difficult to have enough to meet the need after, special messenger need to be arranged The clamping piece for stretching out flooring is cut off, not only fee of material is high, and additionally increase quadratic cost, does not meet and is advocated at present Recyclable recycling, the new era requirement of green construction.
Summary of the invention
In order to overcome in the prior art, traditional clip is inaccurate in the presence of positioning, fixed form is complicated, is impacted easy hair by concrete Raw offset tilts, and is difficult to have enough to meet the need after, needs the technological deficiencies such as special messenger's cutting, and can have enough to meet the need the present invention provides one kind makes The lower end of U-shaped pre-buried ring is fixed on rubber base plate by section steel beam clip system, and upper end is equipped with locking nut for fashioned iron Beam banding is nested with PVC casing on floorslab concrete, and in the portion outboard that U-shaped pre-buried ring is in inside floorslab concrete, Solves above-mentioned technical problem.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of section steel beam clip system being used in turn, Including U-shaped pre-buried ring, rubber base plate, steel plate gasket, nut and PVC casing, the lower end of the U-shaped pre-buried ring is fixed on rubber-sole On seat, section steel beam is placed on floorslab concrete, and the steel plate gasket passes through U-shaped pre-buried ring and is placed on section steel beam, upper end peace Equipped with locking nut by section steel beam banding on floorslab concrete, the U-shaped pre-buried ring is in the part inside floorslab concrete Outside is nested with PVC casing.
In above-mentioned technical proposal, the rubber base plate uses down big up small shape, and stability is preferable, the rubber material of selection Material meet have enough intensity, elasticity, tear resistance, it is alkaline-resisting and it is heat-resisting etc. require, in the construction process, according to field control Line is positioned, and rubber base plate is fixed in template using 6 common nails, easy to operate, rapid.
In above-mentioned technical proposal, the portion outboard that the U-shaped pre-buried ring is in inside floorslab concrete is nested PVC Casing makes pre-buried ring, without directly contacting, after use, only need to gently hammer top with concrete with hammer, can easily take off It falls, goes to next place week and use.
The present invention is using, the section steel beam clip system pair for mainly utilizing this that can be used in turn by following construction procedure Operation platform sets up basis:
Step 1: template is cleaned out, the pre-buried ring burial place of unwrapping wire positioning U type;
Step 2: the U-shaped pre-buried ring of assembling and rubber base plate place rubber base plate according to positioning, using 6 iron nails by pedestal follow closely in In template;
Step 3: assembling reinforcement, to the intralamellar part of U-shaped pre-buried ring point nesting PVC casing;
Step 4: casting concrete guarantees that vibrating head cannot touch U-shaped pre-buried ring in casting process;
Step 5: check whether U-shaped pre-buried ring shifts before installation section steel beam, if need to adjust, and in time to offsetting The U-shaped pre-buried ring of amount is adjusted;
Step 6: using steel plate gasket, nut and it is aided with the fixed section steel beam of timber wedge;
Step 7: removing section steel beam after use, hammers U-shaped pre-buried ring from up to down using hammer, i.e., tear-away turnover is extremely Other regions use.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can achieve following has Beneficial effect:
1, in the section steel beam clip system, in addition to rubber base plate, also by the way that PVC casing is arranged on U-shaped pre-buried ring, make U-shaped Pre-buried ring with without directly contacting, entire clip system work progress is simple between structure, efficient and accurate positioning, tied up in structure reinforcing bars Clip is not susceptible to offset, inclination in bundle and concreting process, greatly reduces the clip amount of manually adjusting;
2, U-shaped pre-buried ring, steel plate gasket, nut and the PVC casing used in the present invention are seen everywhere at the construction field (site), are easy to obtain , at the same install, disassembly process it is convenient, repeat turnover and utilize, reduce the economic cost of material.
Detailed description of the invention
Specific embodiments of the present invention are further described in detail with reference to the accompanying drawing, in which:
Fig. 1 is the overall structure diagram of section steel beam clip system and its construction method that one kind of the present invention can be used in turn;
In figure: the pre-buried ring of 1-U type, 2- rubber base plate, 3- steel plate gasket, 4- nut, 5-PVC casing, 6- floorslab concrete, 7- type Girder steel.
Specific embodiment
As shown in Figure 1, the whole knot for the section steel beam clip system and its construction method that can be used in turn for one kind of the present invention Structure schematic diagram, including U-shaped pre-buried ring 1, rubber base plate 2, steel plate gasket 3, nut 4 and PVC casing 5, the U-shaped pre-buried ring 1 Lower end is fixed on rubber base plate 2, and section steel beam 7 is placed on floorslab concrete 6, and the steel plate gasket 3 passes through U-shaped pre-buried ring 1 It is placed on section steel beam 7, upper end is equipped with nut 4 by 7 banding of section steel beam on floorslab concrete 6, at the U-shaped pre-buried ring 1 Portion outboard inside floorslab concrete 6 is nested with PVC casing 5.
The portion outboard that U-shaped pre-buried ring 1 is in inside floorslab concrete 6 is nested PVC casing 5, makes U-shaped pre-buried ring 1 with concrete without directly contacting, after use, only need to gently hammer top with hammer, can easily fall off, week goes to next Place uses;Rubber base plate 2 uses down big up small shape, and stability is preferable, and the rubber material of selection meets with enough strong Degree, elasticity, tear resistance, it is alkaline-resisting and it is heat-resisting etc. require, in the construction process, positioned according to field control line, using 6 Rubber base plate is fixed in template by common nail, easy to operate, rapid.
The present invention is using, the section steel beam clip system pair for mainly utilizing this that can be used in turn by following construction procedure Operation platform sets up basis, and completes turnover and reuse:
Step 1: template is cleaned out, the burial place of the pre-buried ring 1 of unwrapping wire positioning U type;
Step 2: the U-shaped pre-buried ring 1 of assembling and rubber base plate 2 place rubber base plate 2 according to positioning, using 6 iron nails by rubber Pedestal 2 is followed closely in template;
Step 3: assembling reinforcement, to the intralamellar part of U-shaped pre-buried ring 1 point nesting PVC casing 5;
Step 4: casting concrete guarantees that vibrating head cannot touch U-shaped pre-buried ring 1 in casting process;
Step 5: check whether U-shaped pre-buried ring 1 shifts before installation section steel beam 7, if need to adjust, and inclined to having in time The U-shaped pre-buried ring 1 of shifting amount is adjusted;
Step 6: using steel plate gasket 3, nut 4 and it is aided with the fixed section steel beam 7 of timber wedge;
Step 7: section steel beam 7 is removed after use, hammers U-shaped pre-buried ring 1, i.e., tear-away turnover from up to down using hammer It is used to other regions.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (2)

1. the section steel beam clip system that one kind can be used in turn, including U-shaped pre-buried ring (1), rubber base plate (2), steel plate gasket (3), nut (4) and PVC casing (5), it is characterised in that: the lower end of the U-shaped pre-buried ring (1) is fixed on rubber base plate (2), Section steel beam (7) is placed on floorslab concrete (6), and the steel plate gasket (3) passes through U-shaped pre-buried ring (1) and is placed on section steel beam (7) On, upper end is equipped with locking nut (4) by section steel beam (7) banding on floorslab concrete (6), and the U-shaped pre-buried ring (1) is in The internal portion outboard of floorslab concrete (6) is nested with PVC casing (5).
2. the construction method for the section steel beam clip system that one kind can be used in turn, it is characterised in that: the construction method includes following Step:
S1: template is cleaned out, the pre-buried ring of unwrapping wire positioning U type (1) burial place;
S2: the U-shaped pre-buried ring (1) of assembling and rubber base plate (2) place rubber base plate (2) according to positioning, using 6 iron nails the bottom of by Seat nail is in template;
S3: assembling reinforcement, to the intralamellar part of U-shaped pre-buried ring (1) point nesting PVC casing (5);
S4: casting concrete, vibrating head cannot touch U-shaped pre-buried ring (1) in casting process;
S5: check whether U-shaped pre-buried ring (1) shifts before installation section steel beam (7), if need to adjust;
S6: using steel plate gasket (3), nut (4) and it is aided with timber wedge fixation section steel beam (7);
S7: section steel beam (7) are removed after use, hammer U-shaped pre-buried ring (1), i.e., tear-away turnover from up to down using hammer It is used to other regions.
CN201811019878.4A 2018-09-03 2018-09-03 A kind of section steel beam clip system and its construction method being used in turn Pending CN109488010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811019878.4A CN109488010A (en) 2018-09-03 2018-09-03 A kind of section steel beam clip system and its construction method being used in turn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811019878.4A CN109488010A (en) 2018-09-03 2018-09-03 A kind of section steel beam clip system and its construction method being used in turn

Publications (1)

Publication Number Publication Date
CN109488010A true CN109488010A (en) 2019-03-19

Family

ID=65690412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811019878.4A Pending CN109488010A (en) 2018-09-03 2018-09-03 A kind of section steel beam clip system and its construction method being used in turn

Country Status (1)

Country Link
CN (1) CN109488010A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519770A (en) * 2020-05-06 2020-08-11 中铁建设集团有限公司 Improved construction method for manufacturing and positioning U-shaped ring of discharging platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06167126A (en) * 1992-11-30 1994-06-14 Kunimoto Shokai:Kk Device for mounting temporary construction
CN101575875A (en) * 2009-06-09 2009-11-11 中天建设集团有限公司天津分公司 Construction method of cantilever steel girder
CN202577939U (en) * 2012-06-06 2012-12-05 中建三局第二建设工程有限责任公司 Reusable overhanging I-beam fixing device
CN202745359U (en) * 2012-08-06 2013-02-20 中建三局建设工程股份有限公司 U-shaped steel bar bolt pull ring system for fixing cantilever frame steel beam
CN104032945A (en) * 2013-08-19 2014-09-10 重庆建工第九建设有限公司 Recyclable rebar anchor pull ring and mounting support thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06167126A (en) * 1992-11-30 1994-06-14 Kunimoto Shokai:Kk Device for mounting temporary construction
CN101575875A (en) * 2009-06-09 2009-11-11 中天建设集团有限公司天津分公司 Construction method of cantilever steel girder
CN202577939U (en) * 2012-06-06 2012-12-05 中建三局第二建设工程有限责任公司 Reusable overhanging I-beam fixing device
CN202745359U (en) * 2012-08-06 2013-02-20 中建三局建设工程股份有限公司 U-shaped steel bar bolt pull ring system for fixing cantilever frame steel beam
CN104032945A (en) * 2013-08-19 2014-09-10 重庆建工第九建设有限公司 Recyclable rebar anchor pull ring and mounting support thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519770A (en) * 2020-05-06 2020-08-11 中铁建设集团有限公司 Improved construction method for manufacturing and positioning U-shaped ring of discharging platform

Similar Documents

Publication Publication Date Title
CN108915725B (en) A kind of small template lining construction method in double -side approach tunnel
CN104831756B (en) A kind of construction method utilizing template jacking instrument to carry out Bars In Poured Concrete Slab post-cast strip formwork
CN105715068A (en) Underpinning and reinforcing structure for seismic isolation bearing of existing brick-concrete structure and construction method for underpinning and reinforcing structure
CN102535648A (en) Steel pipe column ring beam column node structure and construction method thereof
KR20130092370A (en) Material for building slab
CN109488010A (en) A kind of section steel beam clip system and its construction method being used in turn
CN106193590A (en) Concrete-type steel form Construction of Supporting method
KR101787321B1 (en) Prestressed bridge with abuttment
CN107988921A (en) A kind of cross-line bridge single-point successively incremeantal launching method construction method of overcrossing railway, highway
CN103938871A (en) Method for constructing concrete-filled steel tube column and bonded prestressed frame beam structure adopting reinforced concrete ring beam joints
CN109441094A (en) The fixed pre-embedded device of builder's jack I-steel and its installation method
CN211666206U (en) Overhanging and landing dual-purpose scaffold
CN108858740A (en) The construction method of prefabricated negative moment of girder tension slot groove
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN208907298U (en) A kind of fashioned iron Overhanging Outside Scaffold
CN208267342U (en) High-altitude overhanging concrete structure formwork scaffold
JP2000336929A (en) Beam form structure and its formation method
CN106087694A (en) Assembling steel plate beams of concrete combined bridge structure and construction method
CN209523458U (en) Builder's jack I-steel fixes pre-embedded device
CN208857960U (en) A kind of Large-Span Continuous domes and its top plate supporting system
CN208251112U (en) A kind of detachable structural steel combination crown beam
CN111827673B (en) ECC (error correction code) enhanced coal gangue concrete beam column joint template and application thereof
CN217536682U (en) Pier top operation platform that precast beam erect
KR101618200B1 (en) Girder bridge construction method using temporary support member and tendon and the girder bridge therewith
CN108951865A (en) A kind of Large-Span Continuous domes, top plate supporting system and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319