CN109484979A - A kind of building engineering construction equipment and construction method - Google Patents

A kind of building engineering construction equipment and construction method Download PDF

Info

Publication number
CN109484979A
CN109484979A CN201710819617.XA CN201710819617A CN109484979A CN 109484979 A CN109484979 A CN 109484979A CN 201710819617 A CN201710819617 A CN 201710819617A CN 109484979 A CN109484979 A CN 109484979A
Authority
CN
China
Prior art keywords
pylon
tower crane
bull stick
controller
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710819617.XA
Other languages
Chinese (zh)
Inventor
王欣
白双江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201710819617.XA priority Critical patent/CN109484979A/en
Publication of CN109484979A publication Critical patent/CN109484979A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/48Automatic control of crane drives for producing a single or repeated working cycle; Programme control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/03Cranes with arms or jibs; Multiple cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/08Electrical assemblies or electrical control devices for cranes, winches, capstans or electrical hoists

Abstract

The present invention provides a kind of building engineering construction equipment and construction method, is related to a kind of Architectural Equipment technical field.The invention includes pedestal and pylon, pedestal includes lower bottom base and upper bed-plate disposed in parallel, pylon includes the first pylon and the second pylon being set side by side, first pylon and the second pylon respectively with upper bed-plate, lower bottom base connection, the upper end of first pylon is provided with the first bull stick, one end of first bull stick is rotatablely connected by first rotating shaft and the first pylon, the other end of first bull stick is connect by the first rotating electric machine with upper bed-plate, the upper end of second pylon is provided with the second bull stick, one end of second bull stick is connect by the second shaft with the second pylon, the other end of second bull stick is connect by the second rotating electric machine with upper bed-plate, the flat arm of tower crane is provided on pylon.The configuration of the present invention is simple, easy for installation, using flexible can largely save labour, improve the working efficiency of vertical transport in construction, increase working security, save construction cost.

Description

A kind of building engineering construction equipment and construction method
Technical field
The present invention relates to a kind of Architectural Equipment technical fields, more particularly to a kind of building engineering construction equipment and construction party Method.
Background technique
There are mainly two types of methods for vertical transport construction material in previous construction.First is that utilizing tower crane, truck crane or portal frame Vertical transport, there are certain limitations for this method, and equipment leasing is costly, increase construction cost, do not install tower crane or gantry It is not available under conditions of frame;Second is that being pulled up using manpower, it is clear that the weight of lifting heavy is restricted, labour cost is big, when Between it is long, and there are certain risk in work progress.
Summary of the invention
Aiming at the shortcomings existing in the above problems, the present invention provides a kind of building engineering construction equipment and construction party Method keeps its structure simple, easy for installation, using flexible, can largely save labour, improves the work effect of vertical transport in construction Rate increases working security, saves construction cost.
To solve the above-mentioned problems, the present invention provides a kind of building engineering construction equipment, wherein including pedestal and pylon, The pedestal includes lower bottom base and upper bed-plate disposed in parallel, and the pylon includes the first pylon and the second tower being set side by side Frame, first pylon and second pylon are connect with the upper bed-plate, the lower bottom base respectively, first pylon Upper end is provided with the first bull stick, and one end of first bull stick is rotatablely connected by first rotating shaft and first pylon, described The other end of first bull stick is connect by the first rotating electric machine with the upper bed-plate, and the upper end of second pylon is provided with second One end of bull stick, second bull stick is connect by the second shaft with second pylon, and the other end of second bull stick is logical It crosses the second rotating electric machine to connect with the upper bed-plate, the flat arm of tower crane, first bull stick and described is provided on the pylon Be respectively arranged with the first slideway and the second slideway on two bull sticks, the flat arm of tower crane respectively with first bull stick, described second Bull stick is connected by first slideway, second slideway, is provided with boom hoisting below the flat arm of tower crane, and described Device for hoisting includes lifting driving motor, pulley and suspension hook, and the pulley includes being arranged in the first of the flat arm left end of the tower crane to slide Take turns and be arranged in the second pulley of the flat arm right end of the tower crane, the lifting driving motor by setting in the first pulley and Hoist cable in the second pulley is connect with the suspension hook, and the lifting driving motor is arranged on the lower bottom base, described to hang The right end of the flat arm of tower is provided with horizontal drive motor, be respectively arranged on the upper bed-plate and the lower bottom base second controller and First controller, first controller respectively with the second controller, the lifting driving motor and described laterally driven Motor connection, the second controller are connect with first rotating electric machine, second rotating electric machine respectively.
Preferably, be provided with lateral pulley on the flat arm of the tower crane, the transverse direction pulley respectively with first slideway, institute The second slideway is stated to be correspondingly connected with.
Preferably, the first rotating shaft and second shaft are arranged above the flat arm of the tower crane.
Preferably, first controller and the second controller are TMS320F2812DSP processor.
A kind of construction method of building engineering construction equipment, wherein the following steps are included:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, passes through the camera Tower crane forearm and two sides picture signal are exported to image processing module, picture signal is transmitted to by image processing module by optical fiber In the ground control cabinet that ground is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and reality are built on the ground 1: 1 Mimetic design of border station, simulation operations platform include sensor, and by sensor sensing, operator is acted;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to Action signal is transcoded into tower crane control signal by the converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes second Controller and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, operation Case controls each electric motor operation of tower crane.
Compared with prior art, the invention has the following advantages that
The configuration of the present invention is simple, easy for installation, using flexible can largely save labour, improve vertical transport in construction Working efficiency, increase working security, save construction cost.
Detailed description of the invention
Fig. 1 is the embodiment of the present invention structural schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawing with example to this Invention is described in further detail, but example is not as a limitation of the invention.
As shown in Figure 1, the embodiment of the present invention includes pedestal and pylon, pedestal includes lower bottom base 1 disposed in parallel and upper Pedestal 2, pylon include the first pylon 3 and the second pylon 4 being set side by side, the first pylon 3 and the second pylon 4 respectively with upper bottom Seat 2, lower bottom base 1 connect, and the upper end of the first pylon 3 is provided with the first bull stick 5, and one end of the first bull stick 5 passes through first rotating shaft 7 It is rotatablely connected with the first pylon 3, the other end of the first bull stick 5 is connect by the first rotating electric machine 9 with upper bed-plate 2, the second pylon 4 upper end is provided with the second bull stick 6, and one end of the second bull stick 6 is connect by the second shaft 8 with the second pylon 4, the second bull stick 6 The other end connect with upper bed-plate 2 by the second rotating electric machine 10, be provided with the flat arm 11 of tower crane on pylon, the first bull stick 5 and the The first slideway and the second slideway are respectively arranged on two bull sticks 6, the flat arm 11 of tower crane is logical with the first bull stick 5, the second bull stick 6 respectively The first slideway, the connection of the second slideway are crossed, the lower section of the flat arm 11 of tower crane is provided with boom hoisting, and boom hoisting includes lifting driving electricity Machine 12, pulley and suspension hook 13, pulley include that the first pulley 14 of flat 11 left end of arm of tower crane is arranged in and is arranged in the flat arm 11 of tower crane The second pulley 15 of right end, lifting driving motor 12 pass through the hoist cable being arranged in first pulley 14 and second pulley 15 and hang Hook 13 connects, and lifting driving motor 12 is arranged on lower bottom base 1, and the right end of the flat arm 11 of tower crane is provided with horizontal drive motor 16, It is respectively arranged with second controller 18 and the first controller 17 on upper bed-plate 2 and lower bottom base 1, the first controller 17 is respectively with second Controller 18, lifting driving motor 12 and horizontal drive motor 16 connect, second controller 18 respectively with the first rotating electric machine 9, The connection of second rotating electric machine 10.
Lateral pulley is provided on the flat arm 11 of tower crane, lateral pulley is correspondingly connected with the first slideway, the second slideway respectively.The One shaft 7 and the second shaft 8 are arranged at flat 11 top of arm of tower crane.First controller 17 and second controller 18 are TMS320F2812DSP processor.
A kind of construction method of building engineering construction equipment, wherein the following steps are included:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, passes through the camera Tower crane forearm and two sides picture signal are exported to image processing module, picture signal is transmitted to by image processing module by optical fiber In the ground control cabinet that ground is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and reality are built on the ground 1: 1 Mimetic design of border station, simulation operations platform include sensor, and by sensor sensing, operator is acted;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to Action signal is transcoded into tower crane control signal by the converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes second Controller and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, operation Case controls each electric motor operation of tower crane.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (5)

1. a kind of building engineering construction equipment, which is characterized in that including pedestal and pylon, under the pedestal includes disposed in parallel Pedestal and upper bed-plate, the pylon include the first pylon and the second pylon being set side by side, first pylon and described second Pylon is connect with the upper bed-plate, the lower bottom base respectively, and the upper end of first pylon is provided with the first bull stick, and described One end of one bull stick is rotatablely connected by first rotating shaft and first pylon, and the other end of first bull stick passes through the first rotation Rotating motor is connect with the upper bed-plate, and the upper end of second pylon is provided with the second bull stick, and one end of second bull stick is logical It crosses the second shaft to connect with second pylon, the other end of second bull stick passes through the second rotating electric machine and the upper bed-plate It connects, is provided with the flat arm of tower crane on the pylon, is respectively arranged with the first slideway on first bull stick and second bull stick With the second slideway, the flat arm of tower crane passes through first slideway, described the with first bull stick, second bull stick respectively Two slideways connect, and boom hoisting is provided with below the flat arm of tower crane, and the boom hoisting includes lifting driving motor, pulley And suspension hook, the pulley include that the first pulley of the flat arm left end of the tower crane is arranged in and the flat arm right end of the tower crane is arranged in Second pulley, the lifting driving motor pass through the hoist cable being arranged in the first pulley and the second pulley and hang with described Hook connects, the lifting driving motor are arranged on the lower bottom base, and the right end of the flat arm of tower crane is provided with laterally driven electricity Second controller and the first controller, first controller point are respectively arranged on machine, the upper bed-plate and the lower bottom base It is not connect with the second controller, the lifting driving motor and the horizontal drive motor, the second controller difference It is connect with first rotating electric machine, second rotating electric machine.
2. building engineering construction equipment as described in claim 1, which is characterized in that be provided with lateral cunning on the flat arm of tower crane Wheel, the transverse direction pulley are correspondingly connected with first slideway, second slideway respectively.
3. building engineering construction equipment as claimed in claim 2, which is characterized in that the first rotating shaft and second shaft It is arranged above the flat arm of the tower crane.
4. building engineering construction equipment as claimed in claim 4, which is characterized in that first controller and second control Device processed is TMS320F2812DSP processor.
5. a kind of construction method based on building engineering construction equipment described in claim 1, which is characterized in that including following step It is rapid:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, is exported by the camera To image processing module, picture signal is transmitted on ground by image processing module by optical fiber for tower crane forearm and two sides picture signal The ground control cabinet that face is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and practical behaviour are built on the ground Make 1: 1 Mimetic design of platform, simulation operations platform includes sensor, and operator acts by sensor sensing;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to described Action signal is transcoded into tower crane control signal by converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes the second control Device and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, control box control Each electric motor operation of tower crane processed.
CN201710819617.XA 2017-09-12 2017-09-12 A kind of building engineering construction equipment and construction method Pending CN109484979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710819617.XA CN109484979A (en) 2017-09-12 2017-09-12 A kind of building engineering construction equipment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710819617.XA CN109484979A (en) 2017-09-12 2017-09-12 A kind of building engineering construction equipment and construction method

Publications (1)

Publication Number Publication Date
CN109484979A true CN109484979A (en) 2019-03-19

Family

ID=65688944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710819617.XA Pending CN109484979A (en) 2017-09-12 2017-09-12 A kind of building engineering construction equipment and construction method

Country Status (1)

Country Link
CN (1) CN109484979A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980391A (en) * 2020-08-24 2020-11-24 中建三局集团有限公司 Integral hoisting platform and building method of building outer facade construction platform

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2544298A1 (en) * 1983-04-15 1984-10-19 Pupovic Milenko Crane with mobile working platform
CN2170291Y (en) * 1993-09-25 1994-06-29 白志远 Automatic gantry lifting type crane
US20050189179A1 (en) * 2004-02-26 2005-09-01 Jlg Industries, Inc. Boom lift vehicle and method of controlling lifting functions
CN103790378A (en) * 2014-01-08 2014-05-14 中建钢构有限公司 Construction equipment and construction method for constructional engineering
CN104150363A (en) * 2014-08-01 2014-11-19 青岛盛嘉信息科技有限公司 Tower-crane control system
CN203998713U (en) * 2014-08-12 2014-12-10 刁占峰 A kind of gig and elevator system
CN104310223A (en) * 2014-08-18 2015-01-28 青岛盛嘉信息科技有限公司 A control method of a high-altitude tower crane
CN204125082U (en) * 2014-05-26 2015-01-28 中联重科股份有限公司 Workpiece turning equipment
EP2845835A1 (en) * 2013-09-06 2015-03-11 N & B KNAUF et Cie S.C.S./E.C.V. Lifting device
CN104555750A (en) * 2015-01-22 2015-04-29 孙欣 Mechanical transportation and hoisting device
CN205381880U (en) * 2016-01-29 2016-07-13 张嘉强 Novel high -rise building is with compound column equipment that hangs

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2544298A1 (en) * 1983-04-15 1984-10-19 Pupovic Milenko Crane with mobile working platform
CN2170291Y (en) * 1993-09-25 1994-06-29 白志远 Automatic gantry lifting type crane
US20050189179A1 (en) * 2004-02-26 2005-09-01 Jlg Industries, Inc. Boom lift vehicle and method of controlling lifting functions
EP2845835A1 (en) * 2013-09-06 2015-03-11 N & B KNAUF et Cie S.C.S./E.C.V. Lifting device
CN103790378A (en) * 2014-01-08 2014-05-14 中建钢构有限公司 Construction equipment and construction method for constructional engineering
CN204125082U (en) * 2014-05-26 2015-01-28 中联重科股份有限公司 Workpiece turning equipment
CN104150363A (en) * 2014-08-01 2014-11-19 青岛盛嘉信息科技有限公司 Tower-crane control system
CN203998713U (en) * 2014-08-12 2014-12-10 刁占峰 A kind of gig and elevator system
CN104310223A (en) * 2014-08-18 2015-01-28 青岛盛嘉信息科技有限公司 A control method of a high-altitude tower crane
CN104555750A (en) * 2015-01-22 2015-04-29 孙欣 Mechanical transportation and hoisting device
CN205381880U (en) * 2016-01-29 2016-07-13 张嘉强 Novel high -rise building is with compound column equipment that hangs

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980391A (en) * 2020-08-24 2020-11-24 中建三局集团有限公司 Integral hoisting platform and building method of building outer facade construction platform

Similar Documents

Publication Publication Date Title
CN203855328U (en) Novel hoisting machine
CN206511849U (en) A kind of mobile tower crane
CN208869222U (en) Hanging apparatus
CN207811106U (en) A kind of novel lifting machine for construction site
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN206427945U (en) A kind of adjustable hanging apparatus for building
CN208166419U (en) A kind of Architectural Equipment hanging apparatus
CN204588550U (en) A kind of lifting mechanism inhead type lands electric power pole
CN109484979A (en) A kind of building engineering construction equipment and construction method
CN205802845U (en) A kind of civil engineering is with hanging a liter machine
CN210825204U (en) High-precision four-hoisting-point synchronous lifting appliance
CN208516864U (en) A kind of architectural engineering construction material carrying lifting device
CN204958320U (en) Building heavy object lifting machine
CN106429879A (en) Equipment hoisting device used on telegraph pole
CN202829361U (en) Small-size hoisting machine
CN206438406U (en) Utilize BIM management and control bridge construction devices
CN205676050U (en) A kind of hydraulic lifting apparatus for building
CN112421498B (en) Cable laying device
CN210710521U (en) Elevating gear for construction
CN204529154U (en) Cement brick hoisting machine
CN210340141U (en) House building engineering lifting device
CN110304569A (en) The movable small-sized platform sound barrier hanging apparatus of one kind and construction method
CN220283367U (en) Lifting machine for building engineering
CN207419473U (en) A kind of crawler-belt type full-automatic piling machine
CN202912587U (en) Collection device for producing wellhead accessories

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination