CN109484979A - A kind of building engineering construction equipment and construction method - Google Patents
A kind of building engineering construction equipment and construction method Download PDFInfo
- Publication number
- CN109484979A CN109484979A CN201710819617.XA CN201710819617A CN109484979A CN 109484979 A CN109484979 A CN 109484979A CN 201710819617 A CN201710819617 A CN 201710819617A CN 109484979 A CN109484979 A CN 109484979A
- Authority
- CN
- China
- Prior art keywords
- pylon
- tower crane
- bull stick
- controller
- connect
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/48—Automatic control of crane drives for producing a single or repeated working cycle; Programme control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/03—Cranes with arms or jibs; Multiple cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/08—Electrical assemblies or electrical control devices for cranes, winches, capstans or electrical hoists
Abstract
The present invention provides a kind of building engineering construction equipment and construction method, is related to a kind of Architectural Equipment technical field.The invention includes pedestal and pylon, pedestal includes lower bottom base and upper bed-plate disposed in parallel, pylon includes the first pylon and the second pylon being set side by side, first pylon and the second pylon respectively with upper bed-plate, lower bottom base connection, the upper end of first pylon is provided with the first bull stick, one end of first bull stick is rotatablely connected by first rotating shaft and the first pylon, the other end of first bull stick is connect by the first rotating electric machine with upper bed-plate, the upper end of second pylon is provided with the second bull stick, one end of second bull stick is connect by the second shaft with the second pylon, the other end of second bull stick is connect by the second rotating electric machine with upper bed-plate, the flat arm of tower crane is provided on pylon.The configuration of the present invention is simple, easy for installation, using flexible can largely save labour, improve the working efficiency of vertical transport in construction, increase working security, save construction cost.
Description
Technical field
The present invention relates to a kind of Architectural Equipment technical fields, more particularly to a kind of building engineering construction equipment and construction party
Method.
Background technique
There are mainly two types of methods for vertical transport construction material in previous construction.First is that utilizing tower crane, truck crane or portal frame
Vertical transport, there are certain limitations for this method, and equipment leasing is costly, increase construction cost, do not install tower crane or gantry
It is not available under conditions of frame;Second is that being pulled up using manpower, it is clear that the weight of lifting heavy is restricted, labour cost is big, when
Between it is long, and there are certain risk in work progress.
Summary of the invention
Aiming at the shortcomings existing in the above problems, the present invention provides a kind of building engineering construction equipment and construction party
Method keeps its structure simple, easy for installation, using flexible, can largely save labour, improves the work effect of vertical transport in construction
Rate increases working security, saves construction cost.
To solve the above-mentioned problems, the present invention provides a kind of building engineering construction equipment, wherein including pedestal and pylon,
The pedestal includes lower bottom base and upper bed-plate disposed in parallel, and the pylon includes the first pylon and the second tower being set side by side
Frame, first pylon and second pylon are connect with the upper bed-plate, the lower bottom base respectively, first pylon
Upper end is provided with the first bull stick, and one end of first bull stick is rotatablely connected by first rotating shaft and first pylon, described
The other end of first bull stick is connect by the first rotating electric machine with the upper bed-plate, and the upper end of second pylon is provided with second
One end of bull stick, second bull stick is connect by the second shaft with second pylon, and the other end of second bull stick is logical
It crosses the second rotating electric machine to connect with the upper bed-plate, the flat arm of tower crane, first bull stick and described is provided on the pylon
Be respectively arranged with the first slideway and the second slideway on two bull sticks, the flat arm of tower crane respectively with first bull stick, described second
Bull stick is connected by first slideway, second slideway, is provided with boom hoisting below the flat arm of tower crane, and described
Device for hoisting includes lifting driving motor, pulley and suspension hook, and the pulley includes being arranged in the first of the flat arm left end of the tower crane to slide
Take turns and be arranged in the second pulley of the flat arm right end of the tower crane, the lifting driving motor by setting in the first pulley and
Hoist cable in the second pulley is connect with the suspension hook, and the lifting driving motor is arranged on the lower bottom base, described to hang
The right end of the flat arm of tower is provided with horizontal drive motor, be respectively arranged on the upper bed-plate and the lower bottom base second controller and
First controller, first controller respectively with the second controller, the lifting driving motor and described laterally driven
Motor connection, the second controller are connect with first rotating electric machine, second rotating electric machine respectively.
Preferably, be provided with lateral pulley on the flat arm of the tower crane, the transverse direction pulley respectively with first slideway, institute
The second slideway is stated to be correspondingly connected with.
Preferably, the first rotating shaft and second shaft are arranged above the flat arm of the tower crane.
Preferably, first controller and the second controller are TMS320F2812DSP processor.
A kind of construction method of building engineering construction equipment, wherein the following steps are included:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, passes through the camera
Tower crane forearm and two sides picture signal are exported to image processing module, picture signal is transmitted to by image processing module by optical fiber
In the ground control cabinet that ground is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and reality are built on the ground
1: 1 Mimetic design of border station, simulation operations platform include sensor, and by sensor sensing, operator is acted;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to
Action signal is transcoded into tower crane control signal by the converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes second
Controller and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, operation
Case controls each electric motor operation of tower crane.
Compared with prior art, the invention has the following advantages that
The configuration of the present invention is simple, easy for installation, using flexible can largely save labour, improve vertical transport in construction
Working efficiency, increase working security, save construction cost.
Detailed description of the invention
Fig. 1 is the embodiment of the present invention structural schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawing with example to this
Invention is described in further detail, but example is not as a limitation of the invention.
As shown in Figure 1, the embodiment of the present invention includes pedestal and pylon, pedestal includes lower bottom base 1 disposed in parallel and upper
Pedestal 2, pylon include the first pylon 3 and the second pylon 4 being set side by side, the first pylon 3 and the second pylon 4 respectively with upper bottom
Seat 2, lower bottom base 1 connect, and the upper end of the first pylon 3 is provided with the first bull stick 5, and one end of the first bull stick 5 passes through first rotating shaft 7
It is rotatablely connected with the first pylon 3, the other end of the first bull stick 5 is connect by the first rotating electric machine 9 with upper bed-plate 2, the second pylon
4 upper end is provided with the second bull stick 6, and one end of the second bull stick 6 is connect by the second shaft 8 with the second pylon 4, the second bull stick 6
The other end connect with upper bed-plate 2 by the second rotating electric machine 10, be provided with the flat arm 11 of tower crane on pylon, the first bull stick 5 and the
The first slideway and the second slideway are respectively arranged on two bull sticks 6, the flat arm 11 of tower crane is logical with the first bull stick 5, the second bull stick 6 respectively
The first slideway, the connection of the second slideway are crossed, the lower section of the flat arm 11 of tower crane is provided with boom hoisting, and boom hoisting includes lifting driving electricity
Machine 12, pulley and suspension hook 13, pulley include that the first pulley 14 of flat 11 left end of arm of tower crane is arranged in and is arranged in the flat arm 11 of tower crane
The second pulley 15 of right end, lifting driving motor 12 pass through the hoist cable being arranged in first pulley 14 and second pulley 15 and hang
Hook 13 connects, and lifting driving motor 12 is arranged on lower bottom base 1, and the right end of the flat arm 11 of tower crane is provided with horizontal drive motor 16,
It is respectively arranged with second controller 18 and the first controller 17 on upper bed-plate 2 and lower bottom base 1, the first controller 17 is respectively with second
Controller 18, lifting driving motor 12 and horizontal drive motor 16 connect, second controller 18 respectively with the first rotating electric machine 9,
The connection of second rotating electric machine 10.
Lateral pulley is provided on the flat arm 11 of tower crane, lateral pulley is correspondingly connected with the first slideway, the second slideway respectively.The
One shaft 7 and the second shaft 8 are arranged at flat 11 top of arm of tower crane.First controller 17 and second controller 18 are
TMS320F2812DSP processor.
A kind of construction method of building engineering construction equipment, wherein the following steps are included:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, passes through the camera
Tower crane forearm and two sides picture signal are exported to image processing module, picture signal is transmitted to by image processing module by optical fiber
In the ground control cabinet that ground is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and reality are built on the ground
1: 1 Mimetic design of border station, simulation operations platform include sensor, and by sensor sensing, operator is acted;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to
Action signal is transcoded into tower crane control signal by the converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes second
Controller and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, operation
Case controls each electric motor operation of tower crane.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (5)
1. a kind of building engineering construction equipment, which is characterized in that including pedestal and pylon, under the pedestal includes disposed in parallel
Pedestal and upper bed-plate, the pylon include the first pylon and the second pylon being set side by side, first pylon and described second
Pylon is connect with the upper bed-plate, the lower bottom base respectively, and the upper end of first pylon is provided with the first bull stick, and described
One end of one bull stick is rotatablely connected by first rotating shaft and first pylon, and the other end of first bull stick passes through the first rotation
Rotating motor is connect with the upper bed-plate, and the upper end of second pylon is provided with the second bull stick, and one end of second bull stick is logical
It crosses the second shaft to connect with second pylon, the other end of second bull stick passes through the second rotating electric machine and the upper bed-plate
It connects, is provided with the flat arm of tower crane on the pylon, is respectively arranged with the first slideway on first bull stick and second bull stick
With the second slideway, the flat arm of tower crane passes through first slideway, described the with first bull stick, second bull stick respectively
Two slideways connect, and boom hoisting is provided with below the flat arm of tower crane, and the boom hoisting includes lifting driving motor, pulley
And suspension hook, the pulley include that the first pulley of the flat arm left end of the tower crane is arranged in and the flat arm right end of the tower crane is arranged in
Second pulley, the lifting driving motor pass through the hoist cable being arranged in the first pulley and the second pulley and hang with described
Hook connects, the lifting driving motor are arranged on the lower bottom base, and the right end of the flat arm of tower crane is provided with laterally driven electricity
Second controller and the first controller, first controller point are respectively arranged on machine, the upper bed-plate and the lower bottom base
It is not connect with the second controller, the lifting driving motor and the horizontal drive motor, the second controller difference
It is connect with first rotating electric machine, second rotating electric machine.
2. building engineering construction equipment as described in claim 1, which is characterized in that be provided with lateral cunning on the flat arm of tower crane
Wheel, the transverse direction pulley are correspondingly connected with first slideway, second slideway respectively.
3. building engineering construction equipment as claimed in claim 2, which is characterized in that the first rotating shaft and second shaft
It is arranged above the flat arm of the tower crane.
4. building engineering construction equipment as claimed in claim 4, which is characterized in that first controller and second control
Device processed is TMS320F2812DSP processor.
5. a kind of construction method based on building engineering construction equipment described in claim 1, which is characterized in that including following step
It is rapid:
S10, camera is set on the downside of the long-armed top of tower crane and at left and right sides of overhead console, is exported by the camera
To image processing module, picture signal is transmitted on ground by image processing module by optical fiber for tower crane forearm and two sides picture signal
The ground control cabinet that face is built;
S20, ground control cabinet, including display and simulation operations platform, simulation operations platform and practical behaviour are built on the ground
Make 1: 1 Mimetic design of platform, simulation operations platform includes sensor, and operator acts by sensor sensing;
S30, the analog signal that sensor exports is converted to by digital signal by converter, the first controller is connected to described
Action signal is transcoded into tower crane control signal by converter;
S40, tower crane control signal is transmitted to by overhead console at the top of tower crane by optical fiber, overhead console includes the second control
Device and control box receive tower crane control signal by second controller and decode, output decoded signal to control box, control box control
Each electric motor operation of tower crane processed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710819617.XA CN109484979A (en) | 2017-09-12 | 2017-09-12 | A kind of building engineering construction equipment and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710819617.XA CN109484979A (en) | 2017-09-12 | 2017-09-12 | A kind of building engineering construction equipment and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109484979A true CN109484979A (en) | 2019-03-19 |
Family
ID=65688944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710819617.XA Pending CN109484979A (en) | 2017-09-12 | 2017-09-12 | A kind of building engineering construction equipment and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109484979A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980391A (en) * | 2020-08-24 | 2020-11-24 | 中建三局集团有限公司 | Integral hoisting platform and building method of building outer facade construction platform |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2544298A1 (en) * | 1983-04-15 | 1984-10-19 | Pupovic Milenko | Crane with mobile working platform |
CN2170291Y (en) * | 1993-09-25 | 1994-06-29 | 白志远 | Automatic gantry lifting type crane |
US20050189179A1 (en) * | 2004-02-26 | 2005-09-01 | Jlg Industries, Inc. | Boom lift vehicle and method of controlling lifting functions |
CN103790378A (en) * | 2014-01-08 | 2014-05-14 | 中建钢构有限公司 | Construction equipment and construction method for constructional engineering |
CN104150363A (en) * | 2014-08-01 | 2014-11-19 | 青岛盛嘉信息科技有限公司 | Tower-crane control system |
CN203998713U (en) * | 2014-08-12 | 2014-12-10 | 刁占峰 | A kind of gig and elevator system |
CN104310223A (en) * | 2014-08-18 | 2015-01-28 | 青岛盛嘉信息科技有限公司 | A control method of a high-altitude tower crane |
CN204125082U (en) * | 2014-05-26 | 2015-01-28 | 中联重科股份有限公司 | Workpiece turning equipment |
EP2845835A1 (en) * | 2013-09-06 | 2015-03-11 | N & B KNAUF et Cie S.C.S./E.C.V. | Lifting device |
CN104555750A (en) * | 2015-01-22 | 2015-04-29 | 孙欣 | Mechanical transportation and hoisting device |
CN205381880U (en) * | 2016-01-29 | 2016-07-13 | 张嘉强 | Novel high -rise building is with compound column equipment that hangs |
-
2017
- 2017-09-12 CN CN201710819617.XA patent/CN109484979A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2544298A1 (en) * | 1983-04-15 | 1984-10-19 | Pupovic Milenko | Crane with mobile working platform |
CN2170291Y (en) * | 1993-09-25 | 1994-06-29 | 白志远 | Automatic gantry lifting type crane |
US20050189179A1 (en) * | 2004-02-26 | 2005-09-01 | Jlg Industries, Inc. | Boom lift vehicle and method of controlling lifting functions |
EP2845835A1 (en) * | 2013-09-06 | 2015-03-11 | N & B KNAUF et Cie S.C.S./E.C.V. | Lifting device |
CN103790378A (en) * | 2014-01-08 | 2014-05-14 | 中建钢构有限公司 | Construction equipment and construction method for constructional engineering |
CN204125082U (en) * | 2014-05-26 | 2015-01-28 | 中联重科股份有限公司 | Workpiece turning equipment |
CN104150363A (en) * | 2014-08-01 | 2014-11-19 | 青岛盛嘉信息科技有限公司 | Tower-crane control system |
CN203998713U (en) * | 2014-08-12 | 2014-12-10 | 刁占峰 | A kind of gig and elevator system |
CN104310223A (en) * | 2014-08-18 | 2015-01-28 | 青岛盛嘉信息科技有限公司 | A control method of a high-altitude tower crane |
CN104555750A (en) * | 2015-01-22 | 2015-04-29 | 孙欣 | Mechanical transportation and hoisting device |
CN205381880U (en) * | 2016-01-29 | 2016-07-13 | 张嘉强 | Novel high -rise building is with compound column equipment that hangs |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980391A (en) * | 2020-08-24 | 2020-11-24 | 中建三局集团有限公司 | Integral hoisting platform and building method of building outer facade construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203855328U (en) | Novel hoisting machine | |
CN206511849U (en) | A kind of mobile tower crane | |
CN208869222U (en) | Hanging apparatus | |
CN207811106U (en) | A kind of novel lifting machine for construction site | |
CN106088609A (en) | A kind of integral lifting method of large span steel structure vestibule | |
CN206427945U (en) | A kind of adjustable hanging apparatus for building | |
CN208166419U (en) | A kind of Architectural Equipment hanging apparatus | |
CN204588550U (en) | A kind of lifting mechanism inhead type lands electric power pole | |
CN109484979A (en) | A kind of building engineering construction equipment and construction method | |
CN205802845U (en) | A kind of civil engineering is with hanging a liter machine | |
CN210825204U (en) | High-precision four-hoisting-point synchronous lifting appliance | |
CN208516864U (en) | A kind of architectural engineering construction material carrying lifting device | |
CN204958320U (en) | Building heavy object lifting machine | |
CN106429879A (en) | Equipment hoisting device used on telegraph pole | |
CN202829361U (en) | Small-size hoisting machine | |
CN206438406U (en) | Utilize BIM management and control bridge construction devices | |
CN205676050U (en) | A kind of hydraulic lifting apparatus for building | |
CN112421498B (en) | Cable laying device | |
CN210710521U (en) | Elevating gear for construction | |
CN204529154U (en) | Cement brick hoisting machine | |
CN210340141U (en) | House building engineering lifting device | |
CN110304569A (en) | The movable small-sized platform sound barrier hanging apparatus of one kind and construction method | |
CN220283367U (en) | Lifting machine for building engineering | |
CN207419473U (en) | A kind of crawler-belt type full-automatic piling machine | |
CN202912587U (en) | Collection device for producing wellhead accessories |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |