The manufacturing process and methods of single track hanging wheel Download PDF

Info

Publication number
CN109483777A
CN109483777A CN201811619371.2A CN201811619371A CN109483777A CN 109483777 A CN109483777 A CN 109483777A CN 201811619371 A CN201811619371 A CN 201811619371A CN 109483777 A CN109483777 A CN 109483777A
Authority
CN
China
Prior art keywords
core wheel
wheel
single track
manufacturing process
polyurethane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811619371.2A
Other languages
Chinese (zh)
Inventor
孟宪睿
韩宾
刘国军
侯维兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo Debang Technology Co Ltd
Original Assignee
Jiaozuo Debang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Debang Technology Co Ltd filed Critical Jiaozuo Debang Technology Co Ltd
Priority to CN201811619371.2A priority Critical patent/CN109483777A/en
Publication of CN109483777A publication Critical patent/CN109483777A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C35/00Heating, cooling or curing, e.g. crosslinking or vulcanising; Apparatus therefor
    • B29C35/002Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/08Cleaning involving contact with liquid the liquid having chemical or dissolving effect
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C35/00Heating, cooling or curing, e.g. crosslinking or vulcanising; Apparatus therefor
    • B29C35/02Heating or curing, e.g. crosslinking or vulcanizing during moulding, e.g. in a mould

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Oral & Maxillofacial Surgery (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Manufacture Of Macromolecular Shaped Articles (AREA)

Abstract

The present invention relates to a kind of manufacturing process and methods of single track hanging wheel, single track hanging wheel of the invention is made of core wheel and polyurethane rubber-covered, encapsulated polyurethane is NDI system, core wheel is ZG270-500 cast steel, with certain toughness and plasticity, intensity and hardness are higher, machinability is good, pass through sandblasting again, cleaning, solidification, performed polymer preheating, mold preheating, ingredient, presulfurization, post-cure and etc. by polyurethane and core wheel vulcanization be integrated, in terms of polyurethane and core wheel bonding, select heat cure polyurethane adhesive, its peel strength is high, it can satisfy bonding demand, and;The present invention has the advantages that at low cost, stability is high, long service life.

Description

The manufacturing process and methods of single track hanging wheel
Technical field
The present invention relates to monorail crane technical fields, and in particular to a kind of manufacturing process and methods of single track hanging wheel.
Background technique
Mining monorail crane is the novel delivery vehicle that underground coal mine realizes personnel, material and heave-load device transport in recent years, Current single hanger rail equipment is import equipment, and single track hanging wheel is the important loss accessory of monorail crane, and single track hanging wheel is because of wrapped poly- ammonia The factors such as ester abrasion chip off-falling degumming are unable to normal use, need replacing within average 3-6 months one time, every monorail crane 6-8 wheel.By It is still import accessory in current single track hanging wheel, import cost is very big, and the replacement of price height frequently occupies a large amount of maintenance cost, Single track hanging wheel as the pain spot that monorail crane uses, therefore the low service life length of production prices replaces import accessory to compel to be essential as user It wants;Therefore it provides one kind is at low cost, stability is high, the manufacturing process and methods of single track hanging wheel with long service life are that have very much It is necessary.
Summary of the invention
The purpose of the invention is to overcome the deficiencies in the prior art, and provide it is a kind of it is at low cost, stability is high, using the longevity Order the manufacturing process and methods of long single track hanging wheel.
The object of the present invention is achieved like this: the manufacturing process and methods of single track hanging wheel, it the following steps are included:
Step 1): the good core wheel of vehicle is placed on sandblasting in sand-blasting machine by sandblasting, and it is the cast steel sand of 0.5mm-1mm that abrasive material, which selects diameter grain, Surface sand-blasting process is carried out, sandblasting can improve the mechanical performance of core wheel, and core wheel is formed uniformly after sandblasting in wheel wicking surface Subtle male and fomale(M&F), convenient for the operation such as subsequent heat cure;
Step 2: the core wheel after sandblasting is put into service sink cleaning by cleaning, and cleaning material selects trichloro ethylene, handles core wheel table The caducous abrasive material in face, dust and grease, trichloro ethylene is as excellent solvent, the inorganic agent as metal surface, and 120 DEG C or less to the corrosion-free effect of common metal;
Step 3): solidifying, and the agent of polyurethane bonding hot vulcanization is smeared on core wheel after the completion of cleaning, is uniformly applied to core wheel table Face, smearing number is 2 times, and the core wheel after smearing is placed on precuring 2 hours in baking oven, is put into mold stand-by;
Step 4): base polyurethane prepolymer for use as is placed in baking oven and is heated to 75-85 DEG C, for use by base polyurethane prepolymer for use as preheating;
Step 5): above-mentioned mold is placed in baking oven and preheats, is preheated to 110 DEG C -120 DEG C by mold preheating;
Step 6): ingredient, by after the completion of preheating base polyurethane prepolymer for use as and BDO be mixed and stirred for according to the ratio of 100:4-4.5 Uniformly;
Step 7): presulfurization, the mixture stirred evenly that step 6) is obtained are poured into mold, are put into after surface solidification Vulcanization 60 minutes in baking oven, 110 DEG C of curing temperature, modulus;
Step 8): carry out post-cure is centrally placed in the good workpiece of presulfurization by post-cure, and curing temperature is 110 DEG C -120 ℃。
Base polyurethane prepolymer for use as by by polyol component in 110 DEG C -130 DEG C, dehydrated under vacuum 2-4 hours, later by NDI To be obtained in the powdered polyol component for being added to 125 DEG C -135 DEG C.
Base polyurethane prepolymer for use as selects NDI system polyurethane.
Core wheel selects ZG270-500 cast steel.
Beneficial effects of the present invention: single track hanging wheel of the invention is made of core wheel and polyurethane rubber-covered, core wheel ZG270- 500 cast steels have certain toughness and plasticity, and intensity and hardness are higher, and machinability is good;Encapsulated polyurethane is NDI system, is led to It crosses special polyurethane bonding hot vulcanization agent to be integrated polyurethane and core wheel vulcanization, the strength of materials is high, compressive deformation is small, wear-resisting Damage is able to satisfy the requirement that encapsulated performance is taken turns in heavy duty.In order to solve the problems, such as the bonding of polyurethane and steel core wheel, special heat is selected Vulcanize polyurethane adhesive, peel strength is high, can satisfy bonding demand;The present invention has a kind of at low cost, stability The advantages of height, long service life.
Detailed description of the invention
Fig. 1 is the manufacturing process and methods structural schematic diagram of single track hanging wheel of the present invention.
Fig. 2 is the manufacturing process and methods structure front view of single track hanging wheel of the present invention.
1, core wheel 2, polyurethane in figure.
Specific embodiment
Following further describes the present invention with reference to the drawings.
Embodiment 1
As illustrated in fig. 1 and 2, the present invention relates to the manufacturing process and methods of single track hanging wheel, it the following steps are included:
Step 1): the good core wheel 1 of vehicle is placed on sandblasting in sand-blasting machine by sandblasting, and it is the cast steel sand of 0.5mm-1mm that abrasive material, which selects diameter grain, Surface sand-blasting process is carried out, sandblasting can improve the mechanical performance of core wheel 1, and core wheel 1 is formed after sandblasting on 1 surface of core wheel Uniformly subtle male and fomale(M&F), convenient for the operation such as subsequent heat cure;
Step 2: the core wheel 1 after sandblasting is put into service sink cleaning by cleaning, and cleaning material selects trichloro ethylene, handles core wheel 1 The caducous abrasive material in surface, dust and grease, trichloro ethylene is as excellent solvent, the inorganic agent as metal surface, and 120 DEG C or less to the corrosion-free effect of common metal;
Step 3): solidifying, and the agent of polyurethane bonding hot vulcanization is smeared on the core wheel 1 after the completion of cleaning, is uniformly applied to 1 table of core wheel Face, smearing number is 2 times, and the core wheel 1 after smearing is placed on precuring 2 hours in baking oven, is put into mold stand-by;
Step 4): base polyurethane prepolymer for use as is placed in baking oven and is heated to 75-85 DEG C, for use by base polyurethane prepolymer for use as preheating;
Step 5): above-mentioned mold is placed in baking oven and preheats, is preheated to 110 DEG C -120 DEG C by mold preheating;
Step 6): ingredient, by after the completion of preheating base polyurethane prepolymer for use as and BDO be mixed and stirred for according to the ratio of 100:4-4.5 Uniformly;
Step 7): presulfurization, the mixture stirred evenly that step 6) is obtained are poured into mold, are put into after surface solidification Vulcanization 60 minutes in baking oven, 110 DEG C of curing temperature, modulus;
Step 8): carry out post-cure is centrally placed in the good workpiece of presulfurization by post-cure, and curing temperature is 110 DEG C -120 ℃。
Single track hanging wheel of the invention is made of core wheel 1 and polyurethane rubber-covered, and core wheel 1 is ZG270-500 cast steel, is had certain Toughness and plasticity, intensity and hardness are higher, and machinability is good;Encapsulated polyurethane is NDI system, passes through special polyurethane heat Bonding by Vulcanization agent is integrated polyurethane and the vulcanization of core wheel 1, and the strength of materials is high, compressive deformation is small, wear-resistant, is able to satisfy heavily loaded wheel The requirement of encapsulated performance.In order to solve the problems, such as the bonding of polyurethane and steel core wheel 1, special heat cure polyurethane adhesive is selected Agent, peel strength is high, can satisfy bonding demand;The present invention is at low cost with one kind, stability is high, with long service life Advantage.
Embodiment 2
As illustrated in fig. 1 and 2, single track hanging wheel of the invention is made through the above steps, every technical parameter is as follows:
Name of product Hardness (HA) Tensile strength (MPa) Elongation (%) Wear away (mm3) Density (g/mm3)
Polyurethane single track hanging wheel 93 48 850 40 1.3
Single track hanging wheel of the invention is made of core wheel 1 and polyurethane rubber-covered, and core wheel 1 is ZG270-500 cast steel, has centainly tough Property and plasticity, intensity and hardness are higher, and machinability is good;Encapsulated polyurethane is NDI system, passes through special polyurethane heat cure Bonding agent is integrated polyurethane and the vulcanization of core wheel 1, and the strength of materials is high, compressive deformation is small, wear-resistant, and it is encapsulated to be able to satisfy heavy duty wheel The requirement of performance.In order to solve the problems, such as the bonding of polyurethane and steel core wheel 1, special heat cure polyurethane adhesive is selected, Its peel strength is high, can satisfy bonding demand.
Compared with traditional manufacturing process, single track hanging wheel its various aspects of performance manufactured through the above steps is more preferable, uses Service life is 2 times of imported product, and cost of manufacture is lower, and using effect is better than traditional manufacturing process;The present invention has one The advantages of kind is at low cost, stability is high, long service life.

Claims (4)

1. the manufacturing process and methods of single track hanging wheel, it is characterised in that: it the following steps are included:
Step 1): the good core wheel of vehicle is placed on sandblasting in sand-blasting machine by sandblasting, and it is the cast steel sand of 0.5mm-1mm that abrasive material, which selects diameter grain, Carry out surface sand-blasting process;
Step 2: the core wheel after sandblasting is put into service sink cleaning by cleaning, and cleaning material selects trichloro ethylene, handles core wheel table The caducous abrasive material in face, dust and grease;
Step 3): solidifying, and the agent of polyurethane bonding hot vulcanization is smeared on core wheel after the completion of cleaning, is uniformly applied to core wheel table Face, smearing number is 2 times, and the core wheel after smearing is placed on precuring 2 hours in baking oven, is put into mold stand-by;
Step 4): base polyurethane prepolymer for use as is placed in baking oven and is heated to 75-85 DEG C, for use by base polyurethane prepolymer for use as preheating;
Step 5): above-mentioned mold is placed in baking oven and preheats, is preheated to 110 DEG C -120 DEG C by mold preheating;
Step 6): ingredient, by after the completion of preheating base polyurethane prepolymer for use as and BDO be mixed and stirred for according to the ratio of 100:4-4.5 Uniformly;
Step 7): presulfurization, the mixture stirred evenly that step 6) is obtained are poured into mold, are put into after surface solidification Vulcanization 60 minutes in baking oven, 110 DEG C of curing temperature, modulus;
Step 8): carry out post-cure is centrally placed in the good workpiece of presulfurization by post-cure, and curing temperature is 110 DEG C -120 ℃。
2. the manufacturing process and methods of single track hanging wheel as described in claim 1, it is characterised in that: the base polyurethane prepolymer for use as is logical Cross polyol component in 110 DEG C -130 DEG C, dehydrated under vacuum 2-4 hours, later by NDI with it is powdered be added to 125 DEG C - It is obtained in 135 DEG C of polyol component.
3. the manufacturing process and methods of single track hanging wheel as described in claim 1, it is characterised in that: the base polyurethane prepolymer for use as choosing With NDI system polyurethane.
4. the manufacturing process and methods of single track hanging wheel as described in claim 1, it is characterised in that: the core wheel selects ZG270- 500 cast steels.
CN201811619371.2A 2018-12-28 2018-12-28 The manufacturing process and methods of single track hanging wheel Pending CN109483777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811619371.2A CN109483777A (en) 2018-12-28 2018-12-28 The manufacturing process and methods of single track hanging wheel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811619371.2A CN109483777A (en) 2018-12-28 2018-12-28 The manufacturing process and methods of single track hanging wheel

Publications (1)

Publication Number Publication Date
CN109483777A true CN109483777A (en) 2019-03-19

Family

ID=65712837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811619371.2A Pending CN109483777A (en) 2018-12-28 2018-12-28 The manufacturing process and methods of single track hanging wheel

Country Status (1)

Country Link
CN (1) CN109483777A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102278456A (en) * 2011-07-05 2011-12-14 江苏天奇物流系统工程股份有限公司 Transmission friction wheel and manufacture process thereof
CN102807665A (en) * 2012-08-27 2012-12-05 马鞍山市天鑫辊业有限责任公司 Low-hardness pouring polyurethane rubber roller and production method thereof
CN103786290A (en) * 2014-01-22 2014-05-14 杭州台创实业有限公司 Method for fabricating casting-type polyurethane elastomer tire
CN107325261A (en) * 2017-08-29 2017-11-07 杭州重力脚轮科技有限公司 A kind of 1,5 naphthalene diisocyanate type polyurethane elastomers and its preparation method and application
CN107337781A (en) * 2017-06-19 2017-11-10 杭州台创实业有限公司 A kind of polyurethane wheel production technology
CN108752909A (en) * 2018-06-13 2018-11-06 江苏唯源橡塑制品有限公司 A kind of composition of raw materials, raw material manufacture craft and its processing method of PU wheels

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102278456A (en) * 2011-07-05 2011-12-14 江苏天奇物流系统工程股份有限公司 Transmission friction wheel and manufacture process thereof
CN102807665A (en) * 2012-08-27 2012-12-05 马鞍山市天鑫辊业有限责任公司 Low-hardness pouring polyurethane rubber roller and production method thereof
CN103786290A (en) * 2014-01-22 2014-05-14 杭州台创实业有限公司 Method for fabricating casting-type polyurethane elastomer tire
CN107337781A (en) * 2017-06-19 2017-11-10 杭州台创实业有限公司 A kind of polyurethane wheel production technology
CN107325261A (en) * 2017-08-29 2017-11-07 杭州重力脚轮科技有限公司 A kind of 1,5 naphthalene diisocyanate type polyurethane elastomers and its preparation method and application
CN108752909A (en) * 2018-06-13 2018-11-06 江苏唯源橡塑制品有限公司 A kind of composition of raw materials, raw material manufacture craft and its processing method of PU wheels

Similar Documents

Publication Publication Date Title
UA92661C2 (en) composition for abrasive article, abrasive article and method of abrasive processing of billet
CN102501186A (en) Wear-resistant diamond polishing grinder and production method thereof
CN105860527A (en) Wear-resistant mechanical sealing ring compound rubber material and preparation technology thereof
CN101190586A (en) Wear-resistant lining plate and vulcanization preparation process thereof
CN109483777A (en) The manufacturing process and methods of single track hanging wheel
CN105837869A (en) High-performance mechanical seal ring composite material and preparation technology thereof
CN202147227U (en) Grinding wheel special for grinding soft metal
CN104194087A (en) Fraction lining for mine hoist and preparation method of fraction lining
CN101817941A (en) Composite material inlaying abrasion-resistant alloy in rubber and preparation method thereof
WO2017035917A1 (en) Aluminium oxide ceramic composite liner plate and preparation method therefor
CN209112928U (en) A kind of low-friction coefficient Scraper Conveyer Middle Trough wear-resistant middle plate
CN109049356B (en) High-wear-resistance concrete cutting rope saw and glue injection equipment and glue injection process thereof
CN102140188B (en) Frictional gasket for mine hoister and preparation method thereof
CN105858112A (en) Novel steel-ceramic composite supporting roller preparation method
CN110819864A (en) Metal bond diamond grinding wheel for grinding ferrous metal and preparation process
CN104859077B (en) A kind of wear resistant processing method of drums for magnetic separation machine, wear-resisting drums for magnetic separation machine
CN109250390A (en) A kind of low-friction coefficient Scraper Conveyer Middle Trough wear-resistant middle plate and its production method
CN204152880U (en) A kind of transmission oil cylinder
CN207326652U (en) A kind of tugboat and wheel belt surface remediation device
CN109759962A (en) A kind of heavy load resin wheel and its manufacturing method for steel billet grinding
CN205290587U (en) Wear -resisting ball surface transport all -in -one of polishing
CN108855432A (en) A kind of efficient grinding system of grinding machine
CN202155809U (en) Grinding wheel special for grinding of non-metal materials
CN208964978U (en) A kind of production antifriction alloy rod iron quenching conveying device
CN101250298A (en) Nano ceramic super high molecular weight polyethylene modified material as well as preparation method and use thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319