CN109482060A - Anti-clogging ash discharging system - Google Patents

Anti-clogging ash discharging system Download PDF

Info

Publication number
CN109482060A
CN109482060A CN201811301564.3A CN201811301564A CN109482060A CN 109482060 A CN109482060 A CN 109482060A CN 201811301564 A CN201811301564 A CN 201811301564A CN 109482060 A CN109482060 A CN 109482060A
Authority
CN
China
Prior art keywords
pipeline
blower
ash discharging
discharging system
clogging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811301564.3A
Other languages
Chinese (zh)
Inventor
尤金琰
顾泉荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Baohua Carbon Black Co Ltd
Original Assignee
Suzhou Baohua Carbon Black Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Baohua Carbon Black Co Ltd filed Critical Suzhou Baohua Carbon Black Co Ltd
Priority to CN201811301564.3A priority Critical patent/CN109482060A/en
Publication of CN109482060A publication Critical patent/CN109482060A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/80Semi-solid phase processes, i.e. by using slurries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/0283Flue gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a kind of anti-clogging ash discharging system, including powder cabin, it further includes blower which, which has cinder-discharging port, which is connected to by pipeline with cinder-discharging port;The anti-clogging ash discharging system further includes heater, and the heater is set on the pipeline between blower and cinder-discharging port.Unloading valve is provided at the powder cabin cinder-discharging port, the blower passes through pipeline connection at pipeline and unloading valve;It further include slurry tank, the slurry tank is set to powder cabin lower end.System solves the problem limestone powder bin bottom conduits to be easy to the problem of blocking, to ensure that the normal operation of desulfurization pulping system.

Description

Anti-clogging ash discharging system
Technical field
The present invention relates to a kind of anti-block systems, more particularly to a kind of anti-clogging ash discharging system of flue gas desulfurization agent.
Background technique
Wet desulfurization of flue gas by limestone-gypsum method technique often uses lime stone (main component is calcium carbonate) as absorption titanium dioxide The desulfurizing agent of sulphur, usually used agstone quality are as follows:
Partial size: 250 mesh, 0.067mm, 90% passes through;
CaCO3Content is greater than 90%;
MgCO3Content is less than 5%;
Limestone slurry liquid preparing system is by limestone powder bin, gate valve, frequency conversion batcher, belt of weighing conveyer, lime The composition such as stone slurry tank, jacking stirrer, lime stone slurry delivery pump.(90% passes through 250 to the finished product agstone of outsourcing Mesh), it is transported near limestone powder bin with Special seal tank car, closed tank truck carries air pump, is discharged into lime with pneumatic conveying mode Mountain flour storehouse, then given by frequency conversion batcher, belt of weighing conveyer to limestone slurry liquid case, the limestone slurry of 20% concentration is made Liquid, lime stone slurry are pumped to absorption tower by lime stone slurry conveying.
In actual use, the weighed belt conveyor of limestone powder bin enters the space length of limestone slurry liquid case It is close, it often will appear slurry tank and include pipeline, the valve altered on humid gas to limestone powder bin gate valve and frequency conversion batcher, Lead to agstone moisture absorption putty, influences system operation.
In view of this, it is necessary to provide a kind of anti-clogging ash discharging system, it can be using the blower of original configuration to above-mentioned easy It is blown in the pipeline of blocking, is allowed to keep drying, guarantee that whole system operates normally.
Summary of the invention
The purpose of the present invention is to provide a kind of anti-clogging ash discharging systems, easy to slurry tank to powder cabin cinder-discharging port by blower It is blown in the pipeline of blocking, to solve the problems, such as that powder cabin cinder-discharging port to slurry tank pipeline is easy to block, to guarantee The normal operation of desulfurization pulping system.
To achieve the above object, the invention provides the following technical scheme:
The embodiment of the present application discloses a kind of anti-clogging ash discharging system, including powder cabin, which has cinder-discharging port, further include Blower, the blower are connected to by pipeline with cinder-discharging port.
It preferably, further include heater in above-mentioned anti-clogging ash discharging system, the heater is set to blower and unloads ash On pipeline between mouthful.
Preferably, in above-mentioned anti-clogging ash discharging system, the blower number is 2, and 2 blowers are arranged side by side.
Preferably, in above-mentioned anti-clogging ash discharging system, unloading valve is provided at the powder cabin cinder-discharging port, the blower is logical Cross pipeline connection at pipeline and unloading valve.
Preferably, in above-mentioned anti-clogging ash discharging system, the blower is connected to powder cabin bulkhead simultaneously by pipeline, to powder Powder in storehouse is blown, and prevents powder from blocking cinder-discharging port.
It preferably, further include slurry tank in above-mentioned anti-clogging ash discharging system, the slurry tank is set to powder cabin lower end.
It preferably, further include belt weighing batcher in above-mentioned anti-clogging ash discharging system, the belt weighing batcher It is set between slurry tank and unloading valve, for controlling the weight of powder, realizes that powder, water proportion.
Wherein, belt weighing batcher could alternatively be flow controller, other effects identical as belt weighing batcher Component all within protection scope of the present invention.
It preferably, further include frequency conversion batcher in above-mentioned anti-clogging ash discharging system, the frequency conversion batcher, which is located at, unloads ash Between valve and belt weighing batcher, for controlling the blanking velocity and discharge quantity of powder.
Preferably, in above-mentioned anti-clogging ash discharging system, control is installed on the pipeline between the heater and blower Valve, for controlling blower to the dynamics for being easy to blocking pipeline and being blowed and sprayed.
Preferably, further include a thermometer in above-mentioned anti-clogging ash discharging system, the thermometer be set to heater with On pipeline between unloading valve, the thermometer is used to supervise the heating temperature in pipeline.
Preferably, in above-mentioned anti-clogging ash discharging system, control valve is installed between the thermometer and heater, uses Valve can be closed in the control blowing dynamics when blower works normally, while in remaining part damage, is replaced.
Compared with the prior art, the advantages of the present invention are as follows:
(1) blower can not be increased newly, only by optimizing former pipe-line system, for the most susceptible to plugging position of unloading valve regional area It sets, provides wind regime by former blower;
(2) former fluidized wind system only can ensure that powder cabin ash bucket position keeps powder mobility, and be unable to satisfy unloading valve office The mobility of portion region powder is especially directly contacted with powder after vapor is altered along ash-unloading tube road in slurry tank, thus Adherency blocking unloading valve regional area pipeline, leads to not normal blanking, influences pulping system normal operation.After blower individually Setting bypass line all the way, directly with most susceptible to plugging unloading valve position piping connection, when unloading ash every time, all the way by newly-increased this Valve is opened on bypass line, it is ensured that unloading valve position pipeline is unobstructed, so as to avoid lower grey putty.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The some embodiments recorded in application, for those of ordinary skill in the art, without creative efforts, It is also possible to obtain other drawings based on these drawings.
Fig. 1 show the structural schematic diagram of anti-clogging ash discharging system in a specific embodiment of the invention.
Detailed description of the invention: powder cabin -1, blower 2, heater early gate 31, heater 3, heater late gate 32, thermometer 4, Unloading valve 5;Frequency conversion batcher 6;Belt weighing batcher 7;Slurry tank 8.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, with reference to the accompanying drawing to specific reality of the invention The mode of applying is described in detail.The example of these preferred embodiments is illustrated in the accompanying drawings.Shown in attached drawing and according to The embodiments of the present invention of attached drawing description are only exemplary, and the present invention is not limited to these embodiments.
With reference to attached drawing 1, one of this specific embodiment anti-clogging ash discharging system, including powder cabin 1, which, which has, is unloaded Grey mouth is provided with unloading valve 5 at cinder-discharging port;Blower 2, the blower 2 are connected by the unloading valve 5 at pipeline and 1 cinder-discharging port of powder cabin It is logical;Heater 3, the heater 3 are provided with heating before the heater 3 on the pipeline between blower 1 and unloading valve 5 Having heaters late gate 32 is arranged after heater 3, blows and sprays for controlling blower 2 to blocking pipeline is easy to for device early gate 31; Thermometer 4, the thermometer 4 are placed on the pipeline between heater late gate 32 and unloading valve 5, for supervising adding in pipeline Hot temperature;Slurry tank 8, the slurry tank 8 are located at powder cabin lower end, the stirring for powder;Frequency conversion batcher 6, the frequency conversion are given Material machine 6 is installed between unloading valve 5 and slurry tank 8, for controlling the blanking velocity and discharge quantity of powder cabin powder;Belt weighing is given Material machine 7, the belt weighing batcher 7 is between frequency conversion batcher 6 and slurry tank 8, for weighing the weight of powder.
In one embodiment, powder cabin can be limestone powder bin, and pipeline is through blower 2, heater early gate 31, heating It is directly connect with 1 ash bucket bulkhead of powder cabin after device 3, heater late gate 32, thermometer 4, stream is dried to powder in powder cabin 1 Change, it is ensured that it can smoothly be flowed out through cinder-discharging port after conveying, meanwhile, it increases a bypass line after the heated device 3 of pipeline newly and is directly accessed The pipeline of 5 position of unloading valve, it is ensured that lower pipeline is dry on unloading valve 5 and the frequency conversion batcher 6 of lower section, and the moment that blower is opened can With while to be blown at powder cabin and unloading valve.
In the above-described embodiments, the quantity of blower 2 can be one, be also possible to multiple, if multiple, can be made with one With multiple spare, or ensure wind regime, open simultaneously multiple blowers.
In the above-described embodiments, the pipeline accessed at unloading valve can be the branch increased newly after the heated device of former pipeline Road pipeline is also possible to be connected to the pipeline of a blower again.
In another embodiment, the slurry tank in above system can be omitted, if the system is in relative humidity Environment in, lower pipeline can equally make moist because of moisture on unloading valve 5, cause powder to block, influence system operation, the application is same Suitable for the environment.
Specific working mode:
When unloading ash, the front and back valve 31,32 of heater 3 is opened, opens heater 3, blower 2 is then opened, opens simultaneously Unloading valve 5, blower blowing form the inside of powder cabin 1 and the flowing of about 5 circuit air of unloading valve, it is ensured that in powder cabin 1 with unloading valve 5 Limestone powder loose drying at upper lower pipeline, flows smoothly.
It should be noted that from from the newly-increased pipeline access unloading valve 5 of former pipeline of fans when pipeline, until unloading valve 5 The pipeline of position need to ensure with as far as 1 bulkhead ash bucket position of powder cabin pipeline on-way resistance and local resistance summation it is essentially identical, And parallel connection is kept, two branch drag losses are close, are conducive to pressure balance in this way, to can ensure that above-mentioned two position Fluid effect.
Here, it should also be noted that, in order to avoid having obscured the present invention because of unnecessary details, in the accompanying drawings only Show with closely related structure and/or processing step according to the solution of the present invention, and be omitted little with relationship of the present invention Other details.
The above is only the specific embodiment of the application, it is noted that for the ordinary skill people of the art For member, under the premise of not departing from the application principle, several improvements and modifications can also be made, these improvements and modifications are also answered It is considered as the protection scope of the application.

Claims (10)

1. a kind of anti-clogging ash discharging system, which is characterized in that
Including powder cabin, which has cinder-discharging port,
It further include blower, which is connected to by pipeline with cinder-discharging port.
2. a kind of anti-clogging ash discharging system according to claim 1, which is characterized in that it further include heater, the heating Device is set on the pipeline between blower and cinder-discharging port.
3. a kind of anti-clogging ash discharging system according to claim 1, which is characterized in that the blower number is 2,2 Blower is arranged side by side.
4. a kind of anti-clogging ash discharging system according to claim 1, which is characterized in that be provided at the powder cabin cinder-discharging port Unloading valve, the blower pass through pipeline connection at pipeline and unloading valve.
5. a kind of anti-clogging ash discharging system according to claim 4, which is characterized in that it further include slurry tank, the slurries Case is set to powder cabin lower end.
6. a kind of anti-clogging ash discharging system according to claim 5, which is characterized in that it further include belt weighing batcher, The belt weighing batcher is set between slurry tank and unloading valve.
7. a kind of anti-clogging ash discharging system according to claim 6, which is characterized in that it further include frequency conversion batcher, it is described Frequency conversion batcher is between unloading valve and belt weighing batcher.
8. a kind of anti-clogging ash discharging system according to claim 2, which is characterized in that between the heater and blower Control valve is installed on pipeline.
9. a kind of anti-clogging ash discharging system according to claim 4, which is characterized in that further include a thermometer, the temperature Degree meter is set on the pipeline between heater and unloading valve.
10. a kind of anti-clogging ash discharging system according to claim 9, which is characterized in that the thermometer and heater it Between control valve is installed.
CN201811301564.3A 2018-11-02 2018-11-02 Anti-clogging ash discharging system Pending CN109482060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811301564.3A CN109482060A (en) 2018-11-02 2018-11-02 Anti-clogging ash discharging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811301564.3A CN109482060A (en) 2018-11-02 2018-11-02 Anti-clogging ash discharging system

Publications (1)

Publication Number Publication Date
CN109482060A true CN109482060A (en) 2019-03-19

Family

ID=65692585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811301564.3A Pending CN109482060A (en) 2018-11-02 2018-11-02 Anti-clogging ash discharging system

Country Status (1)

Country Link
CN (1) CN109482060A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204642766U (en) * 2015-05-29 2015-09-16 上海天顺环保设备有限公司 A kind of agstone conveying blanking fluidization system
CN205073892U (en) * 2015-10-23 2016-03-09 山东电力工程咨询院有限公司 Stifled dust suppression device and limestone flour device of sizing mixing is prevented to limestone flour blanking

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204642766U (en) * 2015-05-29 2015-09-16 上海天顺环保设备有限公司 A kind of agstone conveying blanking fluidization system
CN205073892U (en) * 2015-10-23 2016-03-09 山东电力工程咨询院有限公司 Stifled dust suppression device and limestone flour device of sizing mixing is prevented to limestone flour blanking

Similar Documents

Publication Publication Date Title
US7343700B2 (en) Automatic control of the drying of particulate material
WO2017107836A1 (en) Hopper washing drying system
CN207209475U (en) Simple And Practical dry ash is removed stage makeup and costume system
CN206932941U (en) A kind of livestock-raising feeding reducing mechanism
CN108458577A (en) Feed for pet equipment natural gas direct combustion type subregion band drier
CN109482060A (en) Anti-clogging ash discharging system
CN106743668A (en) Powder conveying device
FI61467C (en) FOER TORKNING AV VAOTT KRUT UTNYTTJAT FOERFARANDE SAMT ANORDNING FOER GENOMFOERANDE AV FOERFARANDET
CN206881492U (en) A kind of lime stone slurry discharging discharger
US3070858A (en) Methods and apparatus for mixing foundry sand
JPH01181624A (en) Pneumatic transport method and device for resin material
CN204944133U (en) Large Efficient iron ore dehydration unit
JP4730666B2 (en) Method and apparatus for cleaning pneumatic transportation piping
CN107051594A (en) A kind of constant temperature humidity chamber of worm-gear driven wind circulation
CN204888664U (en) A a system of drying in air for food solid state fermentation
CN209411287U (en) Skid-mounted type raw materials of magnesium oxide conveying equipment in a kind of production of magnesite wallboard
CN208275302U (en) Water process lime slurry automatic preparation system
CN207395418U (en) A kind of separate type adjustable-speed circulatnig grain drier
CN206050698U (en) Prevent the combination type chute of materials from bonding
CN206152624U (en) Prevent stifled device suitable for wet flue gas desulfurization powder is carried
CN214825970U (en) Two-in-one cement silo side bulk device
CN206556395U (en) Rice drying machine
CN104444369B (en) A kind of converter dry method dust wet cooling tower cinder pneumatic conveying method under full working scope
CN220684069U (en) Take air heating device's easy damp powder material feeding system
CN104824814A (en) Automatic chemical liquor spraying system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319